A Minor Project Report

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 36

A MINOR PROJECT REPORT ON

WATER TREATMENT PLANT

MADHAV INSTITUTE OF TECHNOLOGY AND SCIENCE GWALIOR


(An Autonomous Institute under RGPV, Bhopal)

Submitted By:

Nitin Singh Rajput (CE08029) Pranshu gupta (CE08032) Devanshu Agrawal (CE08017) Panjav Mahor (CE08030) Banwari Mahor (CE08014)

Candidates Declaration I hereby declare that the work presented in this project titled Water Treatment Plant submitted towards completion of minor-project in sixth Semester of B.E. (CIVIL) at Madhav Institute of Technology And Science Gwalior. It is an authentic record of my original work pursued under the guidance of Dr. Deepak Rastogi, Professor, MITS, Gwalior. I have not submitted the matter embodied in this project for the award of any other degree.
Nitin Singh Rajput (CE08029) Pranshu gupta (CE08032) Devanshu Agrawal (CE08017) Panjav Mahor (CE08030) Banwari Mahor (CE08014)
Date: 6-5-2011

------------------------------------------------------------------------------------------------------------

Certificate This is to certify that the above declaration made by the candidate is correct to the best of my knowledge and belief. Dr Deepak Rastogi Professor Place: MITS, Gwalior Date: May, 2011 Gwalior

ACKNOWLEDGEMENT
I have taken efforts in this project. However, it would not have been possible without the kind support and help of many individuals and organizations. I would like to extend my sincere thanks to all of them. I am highly indebted to Dr. Deepak Rastogi for their guidance and constant supervision as well as for providing necessary information regarding the project & also for their support in completing the project. I would like to express my gratitude towards my parents & member of MITS for their kind co-operation and encouragement which help me in completion of this project. I would like to express my special gratitude and thanks to industry persons for giving me such attention and time. My thanks and appreciations also go to my colleague in developing the project and people who have willingly helped me out with their abilities.

Nitin Singh Rajput (CE08029) Pranshu gupta (CE08032) Devanshu Agrawal (CE08017) Panjav Mahor (CE08030) Banwari Mahor (CE08014)

TABLE OF CONTENTS Object Chapter 1 Introduction Chapter 2 Literature Chapter 3 Case Study

CHAPTER 2 LITERATURE
SCREENING
Screens are fixed in the intake works or at the entrance of treatment plant so as to remove the floating matters as leaves, dead animals etc.

SEDIMENTATION
It is the process in which the suspended solids are made to settle by gravity under still water conditions is called plain sedimentation.

PLAIN SEDIMENTATION
By plain sedimentation the following are the advantages. 1. Plain sedimentation lightens the load on the subsequent process. 2. The operation of subsequent purification process can be controlled in better way. 3. The cost of cleaning the chemical coagulation basins is reduced. 4. No chemical is lost with sludge discharged from the plain settling basin. 5. Less quantity of chemicals are required in the subsequent treatment processes. The amount of matter removed by sedimentation tank depends upon the factors. 1. Velocity of flow 2. size and shape of particles 3. Viscosity of water The particles which do not change in size, shape or mass during settling are known as the discrete particles. The velocity of discrete particles with dia less than 0.1 mm is given by V = 418 (S - S1) d2 (3T + 70) ----------- ------------------100 Where V Velocity of settlement in mm/sec S Specific gravity of the particle S1 Specific gravity of water D dia of the particle in mm T Temperature in C

If the dia of the particle is greater than 0.1mm then the velocity is measured by V = 418 (S - S1) d (3T + 70) ----------- ---------------100 In practice settling of the particles governed by the resultant of horizontal velocity of water and the vertical downward velocity of the particle.

DESIGN ASPECTS OF SEDIMENTATION TANKS


The design aspects of sedimentary tanks are 1. Velocity of flow 2. Capacity of tank 3. Inlet and outlet arrangements 4. Shapes of tanks 5. Miscellaneous considerations. (1) Velocity of flow: The velocity of flow of water in sedimentation tanks should be sufficient enough to cause the hydraulic subsidence of suspended impurities. It should remain uniform throughout the tank and it is generally not allowed to exceed 150mm to 300mm per minute. (2) Capacity of tank: capacity of tank is calculated by i) detension period ii) Overflow rate (i) Detension period: The theoretical time taken by a particle of water to pass between entry and exit of a settling tank is known as the known as the detention period. The capacity of tank is calculated by C=QxT where C Capacity of tank Q Discharge or rate of flow T Detension period in hours The detention period depends on the quality of suspended impurities present in water. For plain sedimentation tanks, the detension period is found to vary from 4 to 8 hours. (ii) Overflow Rate: in this method it is assumed that the settlement of a particle at the bottom of the settlement of a particle at the bottom of the tank doesnt depend on the depth of tank and depends upon the surface area of the tank.

Distance of descend D Detension period, T = ------------------------ = ----- -------------(1) Velocity of descend V C But, T = ----------- ---------- (2) Q From (1) & (2) C D ------ = -----Q V D.Q D x Q Q Surface overflow rate, V = ------ = ----------- = --------C LxBxD LxB Where L Length of tank B Breadth of tank D Depth of tank = Side water depth = S.W.D C Capacity of tank T Detention period U Discharge or rate of flow V Velocity of descend of a particle to the bottom of tank = Surface overflow rate = S.O.R (3) INLET AND OUTLET ARRANGEMENTS The inlet is a device, which is provided to distribute the water inside a tank, and the outlet is a device, which is meant to collect outgoing water. These arrangements should be properly designed and located in a such a way that they do not form any obstruction or cause any disturbance to the flowing water. (4) SHAPES OF TANKS Following are the three shapes of settling tank. (i) Rectangular tanks with horizontal flow (ii) Circular tanks with radial or spiral flow (iii) Hopper bottom tanks with vertical flow The following are the parameters for satisfactory performance. 1. Detention period .. 3 to 4 hours for plain settling 2 to 21/2 hours for coagulant settling

1 to 11/2 hours for up flow type 2. Overflow rate 30 40 m3/m2/day for horizontal flow 40-50m3/m2/day for up flow 3. Velocity of flow.. 0.5 to 1.0 cm/sec 4. Weir loading... 300m3/m/day 5. L:B .. 1:3 to 1:4 Breadth of tank.. (10 to 12m) to 30 to 50m 6. Depth of tank. 21/2 4m 7. Dia of circular tank. upto 60m 8. Solids removal efficiency.. 50% 9. Turbidity of water after sedimentation 15 to 20 N.T.U. 10. Inlet and Outlet zones. 0.75 to 1.0m 11. Free board 0.5m 12. Sludge Zone. 0.5m

SEDIMENTATION AIDED WITH COAGULATION


When water contains fine clay and colloidal impurities which are electrically charged are continually in motion and never settle down due to gravitational force. Certain chemicals are added to the water so as to remove such impurities which are not removed by plain sedimentation. The chemical form insoluble, gelatinous, flocculent precipitate absorbs and entangle very fine suspended matter and colloidal impurities during its formation and descent through water. These coagulants further have an advantage of removing colour, odour and taste from the water. Turbidity of water reduced upto 5-10 ppm and bacteria removes upto 65%. The following are the mostly used Coagulants with normal dose and PH values required for best floc formation as shown in Table 5.2. Sl.No. Coagulant PH Range Dosage mg/l 1. Aluminium sulphate Al2(SO4)3, 18 H2O 5.5 8.0 5 85 2. Sodium Aluminate, Na2Al2O4 5.5 8.0 3.4 34 3. Ferric Chloride (Fecl3) 5.5 11.0 8.5 51 4. Ferric Sulphate Fe2 (SO4)3 5.5 11.0 8.5 51

5.

Ferric Sulphate FeSO47H2O

5.5 11.0

8.5 51

Coagulants are chosen depending upon the PH of water. Alum or Aluminium sulphate is normally used in all treatment plants because of the low cost and ease of storage as solid crystals over long periods. The dosage of coagulants, which should be added to the water, depends upon kind of coagulant, turbidity of water, colour of water, PH of water, temperature of water and temperature of water and mixing & flocculation time. The optimum dose of coagulant required for a water treatment plant is determined by a Jar test.. For starting the experiment first of all the sample of water is taken in every jar and added the coagulant in a jar in varying amounts. The quantity of coagulant added in each jar is noted. Then with the help of electric motor all the paddles are rotated at a speed of 30-40 R.P.M. for about 10 minutes. After this the speed is reduced and paddles are rotated for about 20-30 minutes. The rotation of paddles is stopped and the floc formed in each Jar is noted and is allowed to settle. The dose of coagulant which gives the best floc is the optimum dose of coagulants. The coagulants may be fed or allowed to enter either in powder form called dry feeding or in solution form called wet feeding. The mixing of coagulant with the water to form the floc by the following methods. 1. Centrifugal pump 2. compressed air 3. hydraulic jump 4. mixing channel 5. mixing basins with buffle walls 6. Mixing basins with mechanical means Now a days some firms manufacture combined unit comprising of feeding, mixing, flocculator and clarifier device. Water enters in this tank through central inlet pipe placed inside the deflector box. The deflector box deflects the water downwards and then it goes out through the holes provided sides of the deflector box. The water flows radially from the deflector box towards the circumference of the tank, where outlet is provided on the full periphery as shown in the Fig. All the suspended particles along with floc settle down on the sloppy floor and clear water goes through outlet. The sludge is removed by scrapper which continuously moves around the floor with very small velocity. Disinfection and repainting is to be carried out once in a year before monsoon. Sludge pipes are to be flushed and kept clean. Bleaching powder may be used to control the growth of algae on the weirs. Scraper mechanism should be oiled and greased periodically.

FILTRATION
The process of passing the water through beds of sand or other granular materials is known as filtration. For removing bacteria, colour, taste, odours and producing clear and sparkling water, filters are used by sand filtration 95 to 98% suspended impurities are removed. THEORY OF FILTRATION The following are the mechanisms of filtration 1. Mechanical straining Mechanical straining of suspended particles in the sand pores. 2. Sedimentation Absorption of colloidal and dissolved inorganic matter in the surface of sand grains in a thin film 3. Electrolytic action The electrolytic charges on the surface of the sand particles, which opposite to that of charges of the impurities are responsible for binding them to sand particles. 4. Biological Action Biological action due to the development of a film of microorganisms layer on the top of filter media, which absorb organic impurities. Filtration is carries out in three types of filters 1. Slow sand filter 2. Rapid sand filter Gravity filters 3. Pressure filter SLOW SAND FILTER Slow sand filters are best suited for the filtration of water for small towns. The sand used for the filtration is specified by the effective size and uniformity coefficient. The effective size, D10, which is the sieve in millimeters that permits 10% sand by weight to pass. The uniformity coefficient is calculated by the ratio of D60 and D10. CONSTRUCTION Slow sand filter is made up of a top layer of fine sand of effective size 0.2. to 0.3mm and uniformity coefficient 2 to 3 . The thickness of the layer may be 75 to 90 cm. Below the fine sand layer, a layer of coarse sand of such size whose voids do not permit the fine sand to pass through it. The thickness of this layer may be 30cm. The lowermost layer is a graded gravel of size 2 to 45mm and thickness is about 20 to 30cm. The gravel is laid in layers such that the smallest sizes are at the top. The gravel layer is the retains for the coarse sand layer and is laid over the network of open jointed clay pipe or concrete pipes called under drainage. Water collected by the under drainage is passed into the out chamber OPERATION

The water from sedimentation tanks enters the slow sand filter through a submersible inlet as shown in fig 5.3 This water is uniformly spread over a sand bed without causing any disturbances. The water passes through the filter media at an average rate of 2.4 to 3.6 m3/m2/day. This rate of filtration is continued until the difference between the water level on the filter and in the inlet chamber is slightly less than the depth of water above the sand. The difference of water above the sand bed and in the outlet chamber is called the loss of head. During filtration as the filter media gets clogged due to the impurities, which stay in the pores, the resistance to the passage of water and loss of head also increases. When the loss of head reaches 60cm, filtration is stopped and about 2 to 3 cms from the top of bed is scrapped and replaced with clean sand before putting back into service to the filter. The scrapped sand is washed with the water, dried and stored for return to the filter at the time of the next washing. The filter can run for 6 to 8 weeks before it becomes necessary to replace the sand layer. USES The slow sand filters are effective in removal of 98 to 99% of bacteria of raw water and completely all suspended impurities and turbidity is reduced to 1 N.T.U. Slow sand filters also removes odours, tastes and colours from the water but not pathogenic bacteria which requires disinfection to safeguard against water-borne diseases. The slow sand filters requires large area for their construction and high initial cost for establishment. The rate of filtration is also very slow. MAINTENANCE The algae growth on the overflow weir should be stopped. Rate of filtration should be maintained constant and free from fluctuation. Filter head indicator should be in good working condition. Trees around the plant should be controlled to avoid bird droppings on the filter bed, No coagulant should be used before slow sand filtration since the floc will clog the bed quickly. RAPID SAND FILTER Rapid sand filter are replacing the slow sand filters because of high rate of filtration ranging from 100 to 150m3/m2/day and small area of filter required. The main features of rapid sand filter are as follows. The main features of rapid sand filter are as follows Effective size of sand - 0.45 to 0.70mm Uniformity coefficient of sand - 1.3 to 1.7 Depth of sand - 60 to 75cm

Filter gravel - 2 to 50mm size (Increase size towards bottom) Depth of gravel - 45cm Depth of water over sand during filtration - 1 to 2m Overall depth of filter including 0.5m free board - 2.6m Area of single filter unit - 100m2 in two parts of each 50m2 Loss of head - Max 1.8 to 2.0m Turbidity of filtered water - 1 NTU OPERATION The water from coagulation sedimentation tank enters the filter unit through inlet pipe and uniformly distributed on the whole sand bed. Water after passing through the sand bed is collected through the under drainage system in the filtered water well. The outlet chamber in this filter is also equipped with filter rate controller. In the beginning the loss of head is very small. But as the bed gets clogged, the loss of head increases and the rate of filtration becomes very low. Therefore the filter bed requires its washing. WASHING OF FILTER Washing of filter done by the back flow of water through the sand bed First the value A is closed and the water is drained out from the filter leaving a few centimeter depth of water on the top of sand bed. Keeping all values closed the compressed air is passed through the separate pipe system for 2-3 minutes, which agitates the sand bed and stirrer it well causing the loosening of dirt, clay etc. inside the sand bed. Now value C and B are opened gradually, the wash water tank, rises through the laterals, the strainers gravel and sand bed. Due to back flow of water the sand expands and all the impurities are carried away with the wash water to the drains through the channels, which are kept for this purpose. CONSTRUCTION Rapid sand filter consists of the following five parts 1. Enclosure tank A water tight tank is constructed either masonry or concrete 2. Under drainage system may be perforated pipe system or pipe and stretcher system

3. Base material gravel should free from clay, dust, silt and vegetable matter. Should be durable, hard, round and strong and depth 40cm. 4. Filter media of sand The depth of sand 60 to 75cm 5. Appurtenances Air compressors useful for washing of filter and wash water troughs for collection of dirty water after washing of filter. Washing process is continued till the sand bed appears clearly. The easing of filter is done generally after 24 hours and it takes 10 minutes and during back washing the sand bed expands by about 50%. Rapid sand filter bring down the turbidity of water to 1 N.T.U. This filter needs constant and skilled supervision to maintain the filter gauge, expansion gauge and rate of flow controller and periodical backwash. PRESSURE FILTER Pressure filter is type of rapid sand filter in a closed water tight cylinder through which the water passes through the sand bed under pressure. All the operations of the filter is similar to rapid gravity filter, expect that the coagulated water is directly applied to the filter without mixing and flocculation. These filters are used for industrial plants but these are not economical on large scale. Pressure filters may be vertical pressure filter and horizontal pressure filter. The Fig shows vertical pressure filter. Backwash is carried by reversing the flow with values. The rate of flow is 120 to 300m3/m2/day. ADVANTAGES 1. It is a compact and automatic operation 2. These are ideal for small estates and small water works 3. These filters requires small area for installation 4. Small number of fittings are required in these filters 5. Filtered water comes out under pressure no further pumping is required. 6. No sedimentation and coagulant tanks are required with these units. DISADVATAGES 1. Due to heavy cost on treatment , they cannot be used for treatment large quantity of water at water works

2. Proper quality control and inspection is not possible because of closed tank 3. The efficiency of removal of bacteria & turbidity is poor. 4. Change of filter media, gravel and repair of drainage system is difficult.

DISINFECTION OF WATER
The process of killing the infective bacteria from the water and making it safe to the user is called disinfection. The water which comes out from the filter may contain some disease causing bacteria in addition to the useful bacteria. Before the water is supplied to the public it is utmost necessary to kill all the disease causing bacteria. The chemicals or substances which are used for killing the bacteria are known as disinfectants. REQUIREMENTS OF GOOD DISINFECTANTS 1. They should destroy all the harmful pathogens and make it safe for use,. 2. They should not take more time in killing bacteria 3. They should be economical and easily available 4. They should not require high skill for their application 5. After treatment the water should not become toxic and objectionable to the user. 6. The concentration should be determined by simply and quickly. METHODS OF DISINFECTION Disinfection of water by different physical and chemical methods I. PHYSICAL METHODS 1. BOILING: Boil the water for 15 to 20 minutes and kills the disease causing bacteria. This process is applicable for individual homes. 2. ULTRA-VIOLET RAYS: Water is allowed to pass about 10cm thickness by ultraviolet rays. This process is very costly and not used at water works. Suitable for institutions. 3. ULTRASONIC RAYS: Suitable for institutions.

II. CHEMICAL METHODS

1. CHLORINATION: Using chlorine gas or chlorine compounds. 2. BROMINE AND IODINE: It is expensive and leaves taste and odour. 3. POTASSIUM PERMANGANATE: This method is used for disinfection of dug well water, pond water or private source of water. 4. OZONE: Very expensive process leaves no taste, odour or residual. 5. EXCESS LIME TREATMENT: Needs long detension time for time interval and large lime sludges to be treated.

CHLORINATION
Chlorination is the addition of chlorine to kill the bacteria Chlorination is very widely adopted in all developing countries for treatment of water for public supply. Chlorine is available in gas, liquid or solid form (bleaching powder) ADVANTAGES OF CHLORINE 1. Chlorine is manufactured easily by electrolytes of common salts (NaCl) 2. It is powerful oxidant and can penetrate the cell wall of organism and its contents. 3. Dosage can be controlled precisely 4. Can be easily detected by simple orthotolidine test 5. Doesnt form harmful constituents on reaction with organics of inorganics in water 6. Leaves required residue in water to neutralize recontamination later. PRECAUTIONS IN USING CHLORINE 1. Chlorine gas or liquid is highly corrosive and Lethal to Inhale. Hence it is to be stored carefully in sealed container at a distance. 2. If the water contains phenolic compounds, there is a reaction with chlorine can result in cancer causing substances. RESIDUAL CHLORINE AND CHLORINE DEMAND When chlorine is applied in water some of it is consumed in killing the pathogens,some react organs & inorganic substances and the balance is detected as Residual Chlorine. The difference between the quantity applied per litre and the residual is called Chlorine

Demand. Polluted waters exert more chlorine demand. If water is pre-treated by sedimentation and aeration, chlorine demand may be reduced. Normally residual chlorine of 0.2 mg/litre is required. BEHAVIER OF CHLORINE IN WATER When chlorine is dissolved in water forms hypo chlorous acid and hydro chloric acid. Cl2 + H2O HOCl + HCl ---------- (1) After some time hydo chlorous acid further Ionizes as follows HOCl H+ + OCl - ------ (2) The two prevailing species (HOCl) and (OCl -) are called free available chlorine are responsible for the disinfection of water. Chlorine reacts with ammonia in water to form Monochloramine, (NH2Cl), dichloramine (NHCl2) and trichloramine , (NCl3) released and their distribution depends on the PH value of water. DOSAGE OF CHLORINE (A) PLAIN CHLORINATION Plain chlorination is the process of addition of chlorine only when the surface water with no other treatment is required. The water of lakes and springs is pure and can be used after plain chlorination. A rate of 0.8 mg/lit/hour at 15N/cm2 pressure is the normal dosage so as to maintain in resided chlorine of 0.2 mg/lit. (B) SUPER CHLORINATION Super chlorination is defined as administration of a dose considerably in excess of that necessary for the adequate bacterial purification of water. About 10 to 15 mg/lit is applied with a contact time of 10 to 30 minutes under the circumstances such as during epidemic breakout water is to be dechlorinated before supply to the distribution system. (C) BREAK POINT CHLORINATION When chlorine is applied to water containing organics, micro organisms and ammonia the residual chlorine levels fluctuate with increase in dosage Upto the point B it is obsorbed by reducing agents in water (like nitrates, Iron etc) further increases forms chloramines with ammonia in water. Chloramines are effective as CL and OCL formed. When the free chlorine content increases it reacts with the chloramines and reducing the available chlorine. At the point D all the chloramines are converted to effective N2, N2O and NCl3. Beyond point D free residual chlorine appear again. This point D is called break point

chlorination. Dosage beyond this point is the same as super chlorination. In super chlorination no such rational measurement is made and the dosage is taken at random. (D) DECHLORINATION Removal of excess chlorine resulting from super chlorination in part or completely is called Dechlorination. Excess chlorine in water gives pungent smell and corrode the pipe lines. Hence excess chlorine is to be removed before supply. Physical methods like aeration, heating and absorption on charcoal may be adopted. Chemical methods like sulphur dioxide (SO2) , Sodium Bi-sulphate (NaHSO3), Sodium Thiosulphate(Na2S2O8) are used. POINTS OF CHLORINATION Chlorine applied at various stages of treatment and distribution accordingly they are known as pre, post and Re-chlorination. a) PRE-CHLORINATION Chlorine applied prior to the sedimentation and filtration process is known as Prechlorination. This is practiced when the water is heavily polluted and to remove taste, odour, colour and growth of algae on treatment units. Pre-chlorination improves coagulation and post chlorination dosage may be reduced. b) POST CHLORINATION When the chlorine is added in the water after all the treatment is known as Postchlorination. c) RE-CHLORINATION In long distribution systems, chlorine residual may fall tendering the water unsafe. Application of excess chlorine to compensate for this may lead to unpleasant smell to consumers at the points nearer to treatment point in such cases chlorine is applied again that is rechlorinated at intermediate points generally at service reservoirs and booster pumping stations.

HARDNESS REMOVABLE
Generally a hardness of 100 to 150 mg/litre is desirable. Excess of hardness leads to the following effects. 1. Large soap consumption in washing and bathing 2. Fabrics when washed become rough and strained with precipitates.

3. Hard water is not fit for industrial use like textiles, paper making, dye and ice cream manufactures. 4. The precipitates clog the pores on the skin and makes the skin rough 5. Precipitates can choke pipe lines and values 6. It forms scales in the boilers tubes and reduces their efficiency and cause in erustations 7. Very hard water is not palatable When softening is practices when hardness exceed 300mg/lit. Water hardness more than 600 mg/lit have to rejected for drinking purpose. METHODS OF REMOVAL OF HARDNESS 1. Boiling 2. Freezing 3. Lime addition 4. Lime soda process 5. Excess Lime treatment 6. Caustic soda process 7. Zeolite process 8. Demineralization or exchange process. Methods 1,2 and 3 are suitable for removal of temporary hardness and 4 to 8 for both temporary and permanent hardness. The temporary hardness is removed as follows. Boiling heat Ca(HCO3)2 -----------> CaCO3 + CO2 +H2O heat Mg(HCO3)2 -----------> MgCO3 + CO2 +H2O Addition of lime Ca (HCO3)2 + Ca(OH)2 -----------> 2CaCO3 + 2H2O Mg(HCO3)2 + Ca(OH)2 -----------> CaCO3 + MgCO3 + 2H2O Removal of permanent Hardness: 1. Lime soda process: In this method, the lime and is sodium carbonate or soda as have used to remove permanent hardness from water. The chemical reactions involved in this process are as follows.

CO2 + Ca(OH)2 -----------> CaCO3 + H2O (removal of CO2) Ca(HCO3) + Ca(OH)2 -----------> 2CaCO3 + 2H3O (removal of temporary hardness) Mg(HCO3) + Ca(OH)2 -----------> CaCO3 + Mg(CO3) + 2H2O MgSO4 + Ca(OH)2 ----------> Mg(OH)2 + CaSO4 { conversion of MgSO4 to CaSO4} CaSO4 + Na2CO3 ----------> CaCO3 + Na2SO4 {removal of sulphates} CaCl2 + Ca(OH)2 --------------> Ca(OH)2 + CaCl2 MgCl2 + Ca(OH)2 --------------> Mg(OH)2 + CaCl2 { removal of chlorides} CaCl2 + Na2CO3 --------------> CaCO3 + 2NaCl MgCl2 + Na2CO3 --------------> Mg CO3 + 2NaCl {removal of chlorides} Advantages of lime soda process 1. The PH value of water treated by this process bring down to 9 and which results in decrease in corrosion of the distribution system. 2. Less quantity of coagulant will be required, if this process is adopted 3. Removal of iron and manganese to some extent 4. Reduction of total mineral content of water 5. Hardness of water is reduced to 40mg/lit (of CaCO3) and magnesium upto 10mg/lit 6. The process is economical 7. This process is most suitable for tubed and acidic waters where it will not possible to adopt zeolite process. Disadvantages 1. Large quantity of sludge formed during this process to be disposed off by some suitable Method 2. This process requires skilled supervision for its successful working 3. If recarbonation is omitted, a thick layer of calcium carbonate will be deposited in the filtering media, distribution pipes etc.

Zeolite process This is also known as the base-exchange or Ion exchange process. The hardness may be completely removed by this process. Principle Zeolites are compounds (silicates of aluminium and sodium) which replace sodium Ions with calcium and magnesium Ions when hardwater is passes through a bed of zeolites. The zeolite can be regenerated by passing a concentrated solution of sodium chloride through the bed. The chemical reactions involved are 2SiO2 Al2O3 Na2O + Ca(HCO3)2 ----------> 2SiO2 Al2O3 CaO + 2NaHCO3 (Zeolite) 2SiO2 Al2O3 Na2O + CaSO4 ----------> 2SiO2 Al2O3 CaO + Na2SO4 2SiO2 Al2O3 Na2O + CaC12 ----------> 2SiO2 Al2O3 CaO + 2NaCl Regeneration 2SiO2 Al2O3 Na2O + 2NaCl ----------> 2SiO2 Al2O3 Na2O + CaCl2 2SiO2 Al2O3 MgO + 2NaCl ----------> 2SiO2 Al2O3 Na2O + MgCl2 Advantages 1. In this process, the sludge is not formed hence problem of sludge disposal does not arise 2. It can be operated easily and no skilled supervision required 3. The hardness of water reduces to zero and hence used for boiler and textile industries 4. The process is economical where salt is cheaply available 5. The load on Zeolite can be reduced by combining it with lime or aeration process Disadvantages 1. The Zeolite process cannot be used for turbed or acidic water 2. The Zeolite process is unsuitable for water containing Iron and Manganese 3. The Zeolite should be operated carefully to avoid injury or damage to the equipment Demineralisation

Both cations and anions are removed by resins similar to zeolites in two columns by iron exchange method. Resins may be regenerated with sulpuric acid and sodium carbonate. This process is used in industries to get distilled water or quality water motion of water through the atmosphere, earth, plants, trees, rivers and oceans in a cyclic motion through liquid, solid and gaseous phases is called HYDROLOGICAL CYCLE.

DEFLUORIDATION BY NALGONDA TECHNIQUE


Defluoridation is process of removal of excess fluoride present in the water. The excess fluoride in the water causes dental abnormalities, hypertension, peptic ulcer, Skin infections, defective vision, coronary thrombosis etc. The permissible level of fluoride in the water is 1mg/litre.

METHODS OF REMOVAL 1. Activated carbons prepared from various materials can be used. 2. Lime soda process of water softening removes fluorides also along with magnesium 3. The materials like calcium phosphate, bone charcoal, synthetic tricalcium phosphate a may remove excess fluoride. 4. The water may be allowed to pass through filter beds containing floride retaining materials. In this technique, sodium aluminates or lime, bleaching powder and filter alum are added to fluoride water in sequence. The water is stored for ten minutes and settled for one hour and the water is then withdrawn without disturbing the sediments. The sodium aluminate or lime accelerates the settlement of precipitate and bleaching powder ensures disinfection. The alum dose required will depend upon the concentration of fluorides, alkanity and total dissolved solids in the raw water. It is found that this technique is simple in operation and economical. It can be used with advantage in villages either on an individual scale or on a mass scale.

Removal of ions and other dissolved substances


Ultrafiltration membranes use polymer membranes with chemically formed microscopic pores that can be used to filter out dissolved substances avoiding the use of coagulants. The type of membrane media determines how much pressure is needed to drive the water through and what sizes of micro-organisms can be filtered out.

Ion exchange: Ion exchange systems use ion exchange resin- or zeolite-packed columns to replace unwanted ions. The most common case is water softening consisting of removal of Ca2+ and Mg2+ions replacing them with benign (soap friendly) Na+ or K+ ions. Ion exchange resins are also used to remove toxic ions such as nitrate, nitrite, lead, mercury, arsenic and many others. Electrodeionization: Water is passed between a positive electrode and a negative electrode. Ion exchange membranes allow only positive ions to migrate from the treated water toward the negative electrode and only negative ions toward the positive electrode. High purity deionized water is produced with a little worse degree of purification in comparison with ion exchange treatment. Complete removal of ions from water is regarded as electro dialysis. The water is often pre-treated with a reverse osmosis unit to remove non-ionic organic contaminants.

(7) DESIGN OF CLEAR WATER RESERVOIR AT W.T.P.

Treated water stored in clean water reservoir = 120 MLD Since pumping is for 16 hrs and D.P. is 8 hrs then Capacity of clean water reservoir = 3*120/24 =40ml =40000m3 Assume water depth =3m Plan area required =40000/3 =13333.33m2 Assume L: B =2.5:1 13333.33 =2.5 B2 B=73m nearly 75m L =182.5m nearly 185m Hence, provide a tank of size 185*75*3 m

(9) DESIGN OF MAIN DISTRIBUTION TANK


Water required =120 MLD Since water will come in the tank in 16 hr pumping from clean water reservoir & it will go to service reservoirs in 18 hr ,a storage of 2 hr in required on the tank. A provision of 3 hr storage has however been made Capacity of tank required = 120*3*103 =15000 m3 Provide a depth of water =3m Plan area = 15000/3 =5000m2 Assume L: B = 2.5:1 2.5 B2 = 5000 B =44.72 m nearly 45 m L =111.8 m nearly 112 m Provide a tank of size 112 m * 45 m * 3 m

(9) DESIGN OF 1ST STAGE RISING MAIN & ITS PUMP HOUSE :The 1st stage rising main is to be operated between Pre-sedimentation tank/sump and raw water storage tank. The static lift between these two places. The design discharge shall be taken as 120 MLD to be pumped in 16 hrs. Q = 120 *24 /16 = 180 MLD = 180*106/24*3600*1000 m3/sec = 2.08 m3/sec Let us use 350 mm dia MS.ERW pipe for rising main. The head loss in the pipe is calculated by using Modified Hezen Williams formula as :HL= L.(Q/CR)1.81/994.62 d4.81 =10950*(2.08)1.81/994.62*(0.35)4.81 HL =48.3 m Assume other losses in fittings @ 10% = 4.83 m Total frictional losses = 48.3*4.83 = 53.13 m Static lift =500m (assume) Total head required for pumping =500+53.13 =553.13 m Power required =YwQH/ =9.81*2.08*553.13/0.6 =18810 KW 1HP =735 watt =0.735 KW HP of pump required =25593 nearly 25600 HP Hence provide 5 pumps of 5000 HP. With one additional pump of equal capacity as stand by for repairs etc.

(10) DESIGN OF 2ND STAGE RISING MAIN AND ITS PUMP HOUSE :The 2nd stage rising main is to be operated between WTP and Main distribution reservoir for a static lift of 450 m. Let us use 400 mm dia M.S.ERW pipes, being the most economical dia . The head loss is HL =L.(Q/CR)1.81/994.62 d 4.81 = 6150(2.08)1.81/994.62(0.4)4.81 = 14.26 m Other losses @ 10% =1.426 m Total frictional losses =15.686 m Static lift =450 m Total head against which pumping is to be done =450+15.686 =465.686 m Power required = YW QH/ =9.81*2.08*465.686/0.6 =15837 KW HP of pump used =21547 nearly 22000 H.P. Provide 6 pumps of 3500 H.P.

Reynolds no. ,

R = Vs d/v = 8.90 * 10-3 * 0.1* 10-3/1.01*10-6 = 0.88 < 1

Hence, the flow is laminar and stokes law is applicable.

(iii) SETTLEMENT VELOCITY (VS) BY THE METHOD OF DISCHARGE ENTERING THE TANK AND TANK DIMENSIONS
1. 2. 3. 4. Discharge entering the basin (Q) =7653 m3/hr =2.125 m3/sec. Depth of water in tank H =3.0 m Width of basin B = 35.7m length of tank L =107.2 m

Horizontal flow velocity is given as V=Q/BH =2.125/35.7*3 = 0.0198 m /sec = 1.19 m /min Settling velocity VS =V*H/L =1.19*3/107.2 =0.033m/min = 5.55*10-4 m/sec Thus, particles having settling velocity greater than or equal to 5.5 * 10-4 m/sec shall settle in the tank of dimensions assumed above.

(iv) TIME PERIOD REQUIRED FOR PARTICLES TO SETTLE IN THE TANK


As given in above, a particle of size 0.1 mm shall settle in the tank if its settling velocity is greater than equal to 8.9 * 10-3 m/sec. Since we have required the water depth = 3.0m Time required to settle down this depth = t1 =3.0/8.9 * 10-3 secs =337.078 sec =0.0936 hrs Since the horizontal velocity of flow is 0.0198 m/s and the length of the tank is 107.2 m. the time taken by water to reach the outlet t2 is given as:

t2 = 107.2/0.0198 = 5414.14 sec =1.5 hrs Thus, the time required by the water to flow from the inlet to the outlet is more than the time required by the particles size 0.1mm to settle down. Hence all the particles of size 0.1mm having a settling velocity greater than or equal to 8.9*10-3 m/sec shall be retained in the sedimentation tank Actual detension time in the sedimentation tank = 107.2*35.7*3/7653 = 1.5 hrs

(v)

CHECK AGAINST PARTICLES

SCOUR

OF

DEPOSITED

Scour velocity (Vd) =[ 8g (Ss-1)d/f]1/2 Where =0.04 (for unigranular particles) f=0.03 (darcy friction factor) Vd =0.13 m/sec To avoid scour, the flow velocity should not exceed Vd. here the horizontal flow velocity (V) is 0.0198 m/sec which is less than the scour velocity (Vd). hence design is O.K.

(2.) DESIGN OF RAW WATER TANK


A raw water storage tank of 8.0 hrs detension period is proposed to be provided so that the water coming from the rising main at the rate of 1.5* avg. discharge due to 16 hrs pumping can be stored in it for 8 hrs. the outflow from the tank will be at the rate of avg. discharge and the water stored in the tank shall maintain the continuous flow in the filtration plant for 24 hrs. Water requirement = 120 MLD Taking 8 hrs detension period, capacity of tank = 8*120/24 =40 ML=40000 m3 Provide water depth = 3.0 Plan area of tank required = 40000/3 = 13333.3 m2 Assume L:B = 2.5:1 2.5B*B=13333.33 B=73m L=183m Provide a tank of size 183m*73m*3m (water depth) Provide a free board =0.5 m

Hence, provide a tank of size 183m*73m*3m.

(3) DESIGN OF CASCADE AERATOR


Water requirement = 120 MLD Avg. water requirement Q=120*106/24*3600*1000 Q=1.39 m3/s Width of the weir proposed = 4.0m For broad crested weir, Q=1.65 BH3/2 H=(Q/1.65B)2/3 H=0.353 m say 35 cm Alum dose Alum required @ 20mg/l = 20/1000 * 120*106 *1/1000 = 2400 kg/day Only 20% of 2400 kg shall be used in normal conditions. Thus, for most of the year, the alum to be used will be 480 kg/day.

(4) DESIGN OF SEDIMENTATION TANK General Provisions


Overflow rate = 15 to 30 m3/d/m2 Min. side water depth = 2.5m Detension period for coagulated water= 2 to 4 hrs Weir Loading = 300 m3/d/m2 Side slopes for non mechanical cleaning =10% from sides towards the longitudinal central line Longitudinal slope = 1% in case of rectangular table Ratio of length and width = 3:1 to 5:1 Settling velocity = to ensure removal of minimum of particles of 0.02mm Detension time to flocculation chamber =10 to 30minutes Skimming weir= to check the froth on the surface outlet to reduce load on the filter Horizontal flow velocity=0.15 to 0.9 m/min

HYDRAULIC DESIGN OF PROPOSED SEDIMENTATION CUM FLOCCULATION TANK


(i) DIMENSIONS OF THE TANK

WATER REQD. =120 MLD = 5000 m3/hr Water lost in desludging = 2% Design avg. flow = 5000*100/(100-2) = 5102 m3/hr Assume a total detension period of 2.6 hrs Effective storage of sedimentation tank = 5102*2.6 = 13265.2 m3 Assume effective depth H = 3.0 m Area of tank reqd. = 13265.2/3 =4421.73 m2 Assume L/B =3:1 3B *B = 4421.73 B=38.4 m L=115.2m Provide a tank of 115.2*38.4*3.0 (water depth) Provide a free board of 0.5m Loading on the tank/overflow rate =Q/A =27.68 m3 /m 2/day Which is within the prescribed range of 15-30 m3 /m 2/day. Hence ok. Hence, use of tank of size 115.2*38.4*3.5 Provide extra depth for sludge. Provide longitudinal slope of 1 in 50. Also provide side slope of 1 in 30 towards the longitudinal central line. (ii)

SETTLEMENT VELOCITY (VS) BY STOKES LAW

Following parameters:Size of particles (d) = 0.02 mm Specific gravity of particles (Ss)=2.65 v=1.01*10-6 m2/s Vs=g(Ss-1)d2/18v Vs=3.56 * 10-4 m/s

Reynolds no. ,

R = Vs d/v

= 7.04 * 10-2 <1 Hence, flow is laminar and stokes law is applicable.

(iii) SETTLEMENT VELOCITY (VS) BY THE METHOD OF DISCHARGE ENTERING THE TANK AND TANK DIMENSIONS
5. 6. 7. 8. Discharge entering the basin (Q) =5102 m3/hr =1.417 m3/sec. Depth of water in tank H =3.0 m Width of basin B = 38.4m length of tank L =115.2 m

Horizontal flow velocity is given as V=Q/BH =1.417/38.4*3 = 0.012 m /sec Settling velocity VS =V*H/L =0.012*3/115.2 =0.033m/min = 3.2*10-4 m/sec Thus, particles having settling velocity greater than or equal to 3.2 * 10-4 m/sec shall settle in the tank of dimensions assumed above.

(iv) TIME PERIOD REQUIRED FOR PARTICLES TO SETTLE IN THE TANK


Time required to settle down this depth = t1 =3.0/3.56 * 10-4 secs =8426.965 sec =2.34 hrs Since the horizontal velocity of flow is 0.012 m/s and the length of the tank is 115.2 m. the time taken by water to reach the outlet t2 is given as: t2 = 107.2/0.012 = 9600 sec =2.67 hrs > t1 Actual detension time in the sedimentation tank Tank size = 115.2*38.4*3 =13271.04 m3 Discharge = 1.417 m3/sec

Detension time = 13271.04/1.417*3600 =2.6 hrs > 2.5 hrs

(v) CHECK PARTICLES

AGAINST

SCOUR

OF

DEPOSITED

Scour velocity (Vd) =[ 8g (Ss-1)d/f]1/2 Where =0.04 (for unigranular particles)

f=0.03 (darcy friction factor)


Vd =0.058 m/sec To avoid scour, the flow velocity should not exceed Vd. here the horizontal flow velocity (V) is 0.019 m/sec which is less than the scour velocity (Vd). Hence design is O.K.

(vi) DESIGN OF FLOC CHAMBER


In addition to 115.2m length of settling tank, the floc chamber at the entry has to be provided. Assume the depth of the floc chamber as half the depth of the floc chamber as half the depth of the sedimentation tank i.e. 3.5/2=1.75 m Say 1.8m Detension period =20min. Capacity of the chamber = flow reqd. in 20 min =1.417*20*60=1700.4 m3 Width of chamber =38.4 m Length of chamber =1700/38.4*1.8=24.6m Thus, floc chamber has of 24.6m*38.4m*1.8m.

CHAPTER 1 INTRODUCTION

Water purification is the process of removing undesirable chemicals, materials, and biological contaminants from contaminated water. The goal is to produce water fit for a specific purpose. Most water is purified for human consumption (drinking water) but water purification may also be designed for a variety of other purposes, including meeting the requirements of medical, pharmacology, chemical and industrial applications. In general the methods used include physical processes such as filtration and sedimentation, biological processes such as slow sand filters or activated sludge, chemical processes such as flocculation and chlorination and the use of electromagnetic radiation such as ultraviolet light. The purification process of water may reduce the concentration of particulate matter including suspended particles, parasites, bacteria, algae, viruses, fungi; and a range of dissolved and particulate material derived from the surfaces that water may have made contact with after falling as rain. The standards for drinking water quality are typically set by governments or by international standards. These standards will typically set minimum and maximum concentrations of contaminants for the use that is to be made of the water. It is not possible to tell whether water is of an appropriate quality by visual examination. Simple procedures such as boiling or the use of a household activated carbon filter are not sufficient for treating all the possible contaminants that may be present in water from an unknown source. Even natural spring water considered safe for all practical purposes in the 19th century must now be tested before determining what kind of treatment, if any, is needed. Chemical analysis, while expensive, is the only way to obtain the information necessary for deciding on the appropriate method of purification. According to a 2007 World Health Organization report, 1.1 billion people lack access to an improved drinking water supply, 88% of the 4 billion annual cases of diarrhea disease are attributed to unsafe water and inadequate sanitation and hygiene, and 1.8 million people die from diarrhea diseases each year. The WHO estimates that 94% of these diarrhea cases are preventable through modifications to the environment, including access to safe water. Simple techniques for treating water at home, such as chlorination, filters, and solar disinfection, and storing it in safe containers could save a huge number of lives each year. Reducing deaths from waterborne diseases is a major public health goal in developing countries.

The following points should be kept in mind while giving layout of any treatment plant. 1. The W.T.P. should be located as near to the town so as to avoid the contamination. 2. All the units of plant should be located in order of sequence and flow from one unit to other by gravity. 3. All the units are arranged in such a way that minimum area is required so as to reduce the cost of construction. 4. Sufficient area should be reserved for the future expansion 5. Staff quarters and office should be provided near the treatment plants so that the operators can watch the plants easily. 6. The site of treatment plant should be very neat and give very good asthetic appearance.

Drinking water standards


S.No. CHARACTERICTICS NORMALLY ACCEPTABLE VALUE 10C 15C 2.5 5.0 Unobjectionable 7.0-8.5 500 200 200 200 45 1.0 75 6.5-9.2 1500 600 1000 400 45 1.5 200 MAX. PERMISIBLE LIMIT 10 25

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12.

Temperature Turbidity (N.T.U) Colour (platinum cobalt scale) Taste and odour PH Total dissolved solids(mg/litre) Total hardness mg/l (as caco3) Chlorides (as Cl) mg/l Sulphates (as So4) mg/l Nitrates ( as No3) mg/l Fluorides (as F) mg/l Calcium (as Ca) mg/l

Magnesium (as mg) mg/l 13. 14. 15. 16. 17. 18. 19. 20. Iron (as Fe) mg/l Manganese (As Mn) mg/l Phenolic compounds (as phenol) mg/l Arsenic (as mg) mg/l Chromium (as cr+6) mg/l Cynamides (as CN) mg/l Coliform count per 100ml of water sample 30-120 0.1 0.05 0.001 0.05 0.05 0.05 Zero 150 1.0 0.5 0.002 0.05 0.05 0.05 -

METHODS OF PURIFICATION OF WATER The processes below are the ones commonly used in water purification plants. Some or most may not be used depending on the scale of the plant and quality of the water. Pre-treatment 1. Pumping and containment The majority of water must be pumped from its source or directed into pipes or holding tanks. To avoid adding contaminants to the water, this physical infrastructure must be made from appropriate materials and constructed so that accidental contamination does not occur. 2. Screening The first step in purifying surface water is to remove large debris such as sticks, leaves, trash and other large particles which may interfere with subsequent purification steps. Most deep groundwater does not need screening before other purification steps. 3. Storage Water from rivers may also be stored in bank side reservoirs for periods between a few days and many months to allow natural biological purification to take place. This is especially important if treatment is by slow sand filters. Storage reservoirs also provide a buffer against short periods of drought or to allow water supply to be maintained during transitory pollution incidents in the source river.

4. Pre-conditioning Water rich in hardness salts is treated with soda-ash (sodiuM carbonate) to precipitate calcium carbonate out utilising the common-ion effect. 5. Pre-chlorination In many plants the incoming water was chlorinated to minimise the growth of fouling organisms on the pipe-work and tanks. Because of the potential adverse quality effects (see chlorine below), this has largely been discontinued. Widely varied techniques are available to remove the fine solids, micro-organisms and some dissolved inorganic and organic materials. The choice of method will depend on the quality of the water being treated, the cost of the treatment process and the quality standards expected of the processed water. SEDIMENTATION It is the process in which the suspended solids are made to settle by gravity under still water conditions is called plain sedimentation. SEDIMENTATION AIDED WITH COAGULATION When water contains fine clay and colloidal impurities which are electrically charged are continually in motion and never settle down due to gravitational force. Certain chemicals are added to the water so as to remove such impurities which are not removed by plain sedimentation. The chemical form insoluble, gelatinous, flocculent precipitate absorbs and entagle very fine suspended matter and colloidal impurities during its formation and descent through water. These coagulants further have an advantage of removing colour, odour and taste from the water. Turbidity of water reduced upto 5-10 ppm and bacteria removes upto 65%. FILTRATION The process of passing the water through beds of sand or other granular materials is known as filtration. For removing bacteria, colour, taste, odours and producing clear and sparkling water, filters are used by sand filtration 95 to 98% suspended impurities are removed. DISINFECTION OF WATER The process of killing the infective bacteria from the water and making it safe to the user is called disinfection. The water which comes out from the filter may contain some disease causing bacteria in addition to the useful bacteria. Before the water is supplied to the public it is utmost necessary to kill all the disease causing bacteria. The chemicals or substances which are used for killing the bacteria are known as disinfectants. CHLORINATION

Chlorination is the addition of chlorine to kill the bacteria Chlorination is very widely adopted in all developing countries for treatment of water for public supply. Chlorine is available in gas, liquid or solid form (bleaching powder) Additional treatment options 1. Water fluoridation: in many areas fluoride is added to water with the goal of preventing tooth decay. Fluoride is usually added after the disinfection process. In the U.S., fluoridation is usually accomplished by the addition of hexafluorosilicic acid, which decomposes in water, yielding fluoride ions. 2. Water conditioning: This is a method of reducing the effects of hard water. Hardness salts are deposited in water systems subject to heating because the decomposition of bicarbonate ions creates carbonate ions that crystallise out of the saturated solution of calcium or magnesium carbonate. Water with high concentrations of hardness salts can be treated with soda ash (sodium carbonate) which precipitates out the excess salts, through the common-ion effect, producing calcium carbonate of very high purity. The precipitated calcium carbonate is traditionally sold to the manufacturers of toothpaste. Several other methods of industrial and residential water treatment are claimed (without general scientific acceptance) to include the use of magnetic or/and electrical fields reducing the effects of hard water. 3. Plumbosolvency reduction: In areas with naturally acidic waters of low conductivity (i.e. surface rainfall in upland mountains of igneous rocks), the water may be capable of dissolving lead from any lead pipes that it is carried in. The addition of small quantities of phosphate ion and increasing the pH slightly both assist in greatly reducing plumbo-solvency by creating insoluble lead salts on the inner surfaces of the pipes. 4. Radium Removal: Some groundwater sources contain radium, a radioactive chemical element. Typical sources include many groundwater sources north of the Illinois River in Illinois. Radium can be removed by ion exchange, or by water conditioning. The back flush or sludge that is produced is, however, a low-level radioactive waste. 5. Fluoride Removal: Although fluoride is added to water in many areas, some areas of the world have excessive levels of natural fluoride in the source water. Excessive levels can be toxic or cause undesirable cosmetic effects such as staining of teeth. Methods of reducing fluoride levels is through treatment with activated alumina and bone char filter media.

You might also like