THE SIXTH INTERNATIONAL CONFERENCE ON PROBLEMS OF PILE FOUNDATIONS BUILDING, RUSSIA, SEPTEMBER 14-18, 1998

Problems of Pile Foundations Building


Damages to piles associated with excavation works in Bangkok soft clay
N. Thasnanipan, Maung A. W. and Tanseng P.
Seafco Company Limited Bangkok, Thailand

ISBN 5-88151-161-1

The 6th International Conference on Problems of Pile Foundations Building, Russia, September 14-18, 1998

DAMAGES TO PILES ASSOCIATED WITH EXCAVATION WORKS IN BANGKOK SOFT CLAY

Narong Thasnanipan SEAFCO Co., Ltd. Bangkok 10320 Thailand ABSTRACT

Aung Win Maung SEAFCO Co., Ltd. Bangkok 10320 Thailand

Pornpot Tanseng SEAFCO Co., Ltd. Bangkok 10320 Thailand

In Bangkok, Thailand, pile foundations are commonly used to support all type of structures. The excavation for construction of pile caps and mat foundations are carried out mostly in the soft clay layer. Sheet pile walls with temporary bracing systems are commonly used for excavation works (depth ranging form 4.0-11.3m) in the built-up areas of central and outskirts of Bangkok metropolis. Sometimes open cut excavation is adopted for shallow excavation (2.0-6.0m) in the areas where no buildings exist in the close vicinity of the site. Lateral movements of soils take place in such excavations causing pile deviation and cracks to the piles, especially located in the vicinity of boundary of excavation. Such defects have been found more frequently in smaller diameter piles than the larger diameter piles. These tension cracks in piles are commonly observed above the level of interface of soft and stiff clay layers where excavation induced bending moment in pile exceeds the piles cracking moment capacity. Sonic integrity testing is usually employed to test the piles integrity. High strain dynamic load test is sometimes employed to check the performance of piles with such defects. This paper presents four cases in which damages caused to piles by soil movement associated with excavation works. Pile damages, especially tension cracks indicated by integrity testing, analysis on stresses in pile due to the soil movements and behavior of retaining systems are also examined. Correlation between location of crack and bending moment in pile which exceeds the pile cracking moment capacity also made. KEYWORDS Pile deviation, Lateral movement, Sonic integrity test, Dynamic load test, Pile damage, Bending moment, Cracking moment

91

INTRODUCTION Almost every structure in Bangkok sits on pile foundations. Excavation works for preparing the pile cap, footing and/or mat are usually within the soft clay commonly found in Bangkok. However for structures requiring many basement levels and underground facilities, the excavation works are undertaken to below the soft clay more than 20m from the ground. Various soil retaining systems are adopted in such excavation works to suit the site and soil conditions and depth of excavation. Analysis and design for the retaining systems sometimes are overlooked by the practicing engineers for the possible movements, both vertical and lateral, of soil adjacent to the excavation boundaries. Moreover monitoring of soil movements, with exception of existing structure near by, is often ignored. Such ignorance leads to damage the piles already constructed or installed in soft soil stratum. As a result secondary defects found in the piles after completion of piling work, including pile top deviations far from allowable tolerance become an argument between the piling contractor, excavation subcontractor and the employer or supervising engineer. PILE FOUNDATIONS Both bored and driven piles are commonly used for foundations of structures in Bangkok subsoil. The subsoil generally consist of a 12-18m thick very soft clay layer overlying medium to stiff clay layer. A sand layer occurs at depth of 20m to 35m below the stiff clay layer. A second layer of dense sand is generally ound below 50m where the toe of deep bored piles are founded for high rise or heavy structures. Stiff to hard clay layers occurs intermittently between the sand layers. Large diameter bored piles having diameter of 800mm to 1500mm are extended down to 35m to 60m respectively being embedded in the sand layers. For low rise buildings driven or small diameter bored pile of 35mm to 600mm are commonly used with footing for pile groups or for individual piles. The length of pile is generally to 20 to 28m embedded in stiff clay or first sand layer. The working load capacity of bored piles is usually limited by the allowable stress of the concrete. Cutoff level of such piles generally varies from about 2.0m to 6.0m below ground surface. For the structures with deep basements, bored piles are trimmed down to 20.0m. Generally bored piles are constructed with reinforcement of 0.5-1.2% of sectional area of pile and concrete having cube strength of 30-32 MPa. Wet process, using bentonite slurry is normally employed for drilling in water-bearing sand layers and concrete pouring is done under the slurry. Dry process normally used for construction of small diameter bored piles with depth not greater than 26m.

TYPES OF EXCAVATIONS Common type of excavation found in Bangkok subsoil are tabulated as below, Table 1. Common Types of Excavations in Bangkok Subsoil Type of Excavation Excavation Site below G.L. Conditions (m) Cut Slope 3.0-6.0 open area, no adjacent buildings Sheet Piles Wall 4.0 to 11.3 adequate site clearance Jet Grouted Wall 5.0 to 10.5 adequate site clearance Secant or 4.0 to 20.5m in built-up area Contiguous Pile Wall Diaphragm Wall 7.0 to 23.0m in built-up area First two types of excavations are found to induce higher lateral and vertical soil movements compared to the remaining types (Ref. 2) and sometimes cause a localize failure of the soil mass retained due to improper construction practice. In this paper pile damage associated with the first two types in four cases are studied and presented. INTEGRITY OF PILES Sonic integrity test is usually employed to test the integrity of piles after piles have been trimmed to the design cutoff level. Generally a minimum of 10% to a maximum of 100% of piles are tested. A sonic integrity tester with built-in computer having high quality signal acquisition system has been commonly used for pile integrity testing. However, severity of the defect/crack or any irregularity in piles is usually determined comparatively based on magnitude of reflection amplitude of individual piles from such a defect/crack or irregularity, with reference to the input pulse. Figure shows the sonic test records of a good pile and piles with crack in different severity from Cases IV. CASE I - CUT SLOPE (Bangna-Trad Highway KM. 26) Subsoil Condition - A 17m thick soft clay layer occurs with unconfined average shear strength (Su), ranging from 0.69 t/m2 at the top to 2.20 t/m2 at the bottom of the layer. The field vane shear test indicates in-situ shear strength of that layer is 1.40t/m2 to 3.80t/m2 with sensitivity of 2.7 to 3.7. The natural water content of soft clay layer exceeds 100%. Below the soft clay layer is medium clay layer with Su value of 4.0 t/m2 to 6.0t/m2. Then a stiff clay layer having Su value of 13.0t/m2 is found at the depth of 21m-22m overlying the first sand layer which extends to the depth of about 34m to 37m. The second sand layer occurs at the

92

depths of about 52.0m - 61.0m. Between sand layers a thick hard clay layer is present, but sporadically. Pile foundation - A total of 428 concrete bored piles of diameters 1.0m, 1.2m and 1.5m were installed with pile tip at 53m to 65m below the ground, being embedded in second dense sand layer to support a high rise structure. Cutoff level of piles ranges from 4.6m to 5.9m in depth. Entire length of piles were fully reinforced with steel reinforcement of 1% and 0.5% of pile sectional area in top 33m and lower section of pile shaft respectively. Soil Retaining System - Cut slope excavation with two levels of 1:3 slope and a berm was adopted to achieve the maximum excavation to -5.9m below the existing ground level as the site is a large open space being located outside built-up area. Slope stability analysis using effective stress soil parameters indicated that a safety factor of 1.2 for temporary condition can be achieved by driving 6m long I12 RC soldier piles at a spacing of 1.5m at the toe of the bottom slope. Moreover, the ground level around the perimeter of excavation was reduced down to 0.5m. Excavation was carried out on temporary working platforms supported by 24m long steel king posts (H300x300) driven into the ground. Pile Damages - All piles were tested with sonic integrity test. Test results are summarized in the Table below; Table 2. Summary of Pile Damage Detected by Sonic Integrity Test - Case I Pile No. of Piles with Defect Dia. Least Less Prominent Depth Prominent Prominent Crack below (m) crack Crack GL(m) 1.0 4 8 7 6.0-13.8 1.2 10 2 6.1-7.6 1.5 1 9.9

Most piles with large crack detected were located in the outer row of foundation piles ( Fig. 1) and located under the traffic ramps of temporary working platform. It was found that the crack in these piles were caused by localized soil sliding which was occurred by the heavy traffic load. Pile deviations in order of 50cm to 100cm towards excavation were observed. An inspection after the soil sliding revealed that king posts were not installed to support parts of the ramps behind the slope on the ground. Apart from the traffic ramp area, a number of localized soil slidings up to 3m to 4m occurred in some areas. They are found to be caused by loose materials filled in bored hole above pile casting level during casting. Less Prominent crack detected in some piles, particularly within excavation zones are considered to be caused by improper pile trimming method. A backhoe was used to break off the over cast section by hitting the pile head after chipping of the concrete cover at the cutoff level around the pile shaft and separating the dowel bars form the overcast section. Soil around the suspected pile with prominent crack were excavated down to detected crack level. These piles were trimmed down to below the crack and re-constructed to the cut off level. Tie beams were provided for the piles with crack and horizontal deviation more than allowable tolerance. CASE II - SHEETPILE EXCAVATION SUPPORTED BY SOIL BERM (Huay Kwang Area) Subsoil Condition - A 12m thick soft clay layer occurs with unconfined average shear strength (Su), ranging from 1.0 t/m2 at the top to 2.50 t/m2 at the bottom of the layer. The natural water content of soft clay layer is about 60-80%. Below the soft clay layer is medium clay layer with Su value of 2.5 t/m2 to 3.5t/m2. Then a stiff clay layer with traces of fine sand having SPT N value of 15 to 37 is found at the depth of about 18m-overlying sand layers which occur below 27m in depth. Pile foundation - A total of 904 concrete bored piles of diameters 1.0m and 1.5m were installed with pile tip at about 59m below the ground, being embedded in dense sand layer to support a total of eight high rise buildings located at the particular size. Cutoff level of bored piles ranges from 5.1m to 8.1m in depth. Entire length of piles are fully reinforced with steel reinforcement of 0.72% of pile sectional area for the top and reduced gradually to 0.23% for bottom section of pile shaft. A total of 88 pre-cast concrete (I-30) piles with 21m in length was also driven to support the underground water tanks. The cutoff level of the precast piles was 3.1m below the ground level. Soil Retaining System - The foundation structure is about 10m to 20m away from the adjacent property boundaries. Initially excavation with cantilever sheet pile wall (FSP III

Figure 1. Excavation Plan and Location of Damaged Piles

93

with 14m in depth) supported by a soil berm or slope was adopted to achieve the maximum excavation to -8.10m below the existing ground level. However after excavation to some depths, due to sheet pile failure at some locations and excessive vertical and lateral soil movements, temporary raking struts were then immediately installed. Tension cracks wider than 300mm were observed on the ground about 4.0m away from the excavation zone. Minor damages also occurred to the adjacent properties due to soil movement. Pile Damages - More than 50 % of piles were tested with sonic integrity test. Table 3 Summary of Pile damage Detected Integrity Test - Case II. Pile No. of Piles with Dia. Least Less Prominent Prominent Prominent Crack (m) crack Crack I-30 49 14 1.0 1 23 4 1.5 1 1 by Sonic Defect Depth below GL (m) 6.2-8.0 13-16.6 15.6 Figure 2.1. A Typical Scene showing excavation works Case II CASE III SHEETPILE EXCAVATION WITH ONE LEVEL TEMPORARY SUPPORT (Yannawa) Subsoil Condition - In this project site, a 14-15m thick soft clay layer occurs with unconfined shear strength (Su) ranging from 1.0 t/m2 to 2.00 t/m2 at the top and bottom of the layer respectively. Below is stiff to very stiff clay layers extend down to about 42m in depth. The subsoil condition below 36m from the ground level is variable, having a 13m thick sand layer sporadically. A stiff to hard dark grey clay is found at the depth between 40m and 49m. Generally a thick dense sand layer occurs below 50m in depth. Pile foundation - A total of 402 concrete bored piles of diameters 1.0m and 1.5m were installed with pile tip at about 55m below the ground, being embedded in dense sand layer to support a building structure. Cutoff level of bored piles ranges from 0.75m to 7.80m in depth. Entire length of all piles are fully reinforced with steel reinforcement of 0.5% of pile sectional area. Soil Retaining System - Due to different cutoff levels of piles, sheet pile (14m) with one level of temporary bracing at about 1m below the ground level was used for each excavation zone. Figure 3 shows a portion of pile layout which includes an excavation zone with braced sheet pile wall. Prior to installation of temporary struts, excavation was carried out to about 2.5 to 3m in depth. The over excavation without support caused excessive movements of soil and sheet pile wall along grid line C10 (Fig.3). Deflected sheet piles were re-aligned and struts were installed immediately with pre-loading. Pile Damages - All piles were tested with sonic integrity test after pile were trimmed to the designed cutoff level. Piles with crack detected were mostly located in the vicinity of the excavation boundary (Fig. 3 and Ref. 6) . Moreover, lateral pile deviation in a range of 100-840mm towards excavation were also observed in those piles located in the vicinity of the sheet pile wall ( Fig. 3).

Large numbers of piles with crack detected were located in the periphery of the excavation zone (within the soil berm) .

Figure 2. Location of Damaged Piles (only a quarter of Project Site shown here) Case II Figure 2 shows a portion of the piling plan affected by soil movements. Pile deviations of up to 600mm, particularly in pile with prominent crack towards excavation were observed. Bored piles with crack were cored to the depth below the crack and grouted. High strain dynamic load test was carried out on two piles suspected with crack and large horizontal deviation after remedial work. The dynamic test results indicate that these piles could be capable of carrying the design load with factor of safety higher than 1.5.

94

Table 4. Summary of Pile damage Detected Integrity Test - Case III. Pile No. of Piles with Dia. Least Less Prominent Prominent Prominent (m) crack Crack Crack 1.0 5 1.5 14

by Sonic Defect Depth below GL (m) 7.5-9.4 8.4-21.0

Damaged piles were cored to the depth below the crack and grouted. Modification of reinforcement for the mat was done for defect piles with large horizontal deviation.

Figure 4. Plan of Excavation and Location of Damaged Piles (a Portion of Project Area) Case IV Pile Damages - All piles were tested with sonic integrity test. In this particular project, 84% of piles within the excavation zone were found to be cracked (Fig. 4 ). Table 5. Summary of Pile damage Detected by Sonic Integrity Test - Case IV. Pile No. of Piles with Defect Dia. Least Less Prominent Depth Prominent Prominent Crack below (m) Crack Crack GL (m) 0.6 38 33 6.5-13.8

Figure 3. Plan of Excavation and Location of Damaged Piles and Pile Movements (a Portion of Project Area) Case III CASE IV - SHEETPILE EXCAVATION WITH TWO LEVEL TEMPORARY SUPPORT (Sukhumvit Area) Subsoil Condition - A 14-15m thick soft clay layer occurs with unconfined shear strength (Su), ranging from 1.0 t/m2 at the top to 3.00 t/m2 at the bottom of the layer. The natural water content of soft clay layer is generally about 37 - 87%. Below is very thick stiff to very hard clay layers interbedding with a 3m thick medium clay layer at the depth of 19m. Pile foundation - A total of 143 concrete bored piles of 0.6m diameter were installed with pile tip at about 26m below the ground to support a residential apartment. Dry process was employed to construct the piles. Cutoff level of bored piles ranges from 0.85m to 5.95m in depth. Entire length of all piles are fully reinforced with steel reinforcement of 0.35% of pile sectional area. Soil Retaining System - Type FSP III sheet pile (14m) with two level of temporary bracing at about 1.0m and 3.5m below the ground level was used. Figure 4 shows a portion of pile layout which includes an excavation zone with braced sheet pile wall.

Figure 5. Sonic Integrity Test Records showing Good pile, Pile with less Prominent Crack and Prominent Crack respectively - Case IV. Five bored piles with crack suspected were cored to verify the crack and grouted later. High strain dynamic load test was also carried on a total of 25 piles in which 24 piles with crack and 1 pile without crack. Summary of dynamic load test results is presented in the Table 5. Table 6. Dynamic Load Test Results of Damaged Piles Case IV Mobilized Capacity/Design Ultimate No. of Capacity of 240 ton Pile less than 50% 1 less than 10% 2 More than 100% 22

95

From the results, only a few piles lead to low safety factor to carry the designed load and also connected by mat. Modification of reinforcement for the mat was done according to redistributed load. FINITE ELEMENT ANALYSIS WITH COMPUTER MODEL SIMULATION Two dimensional finite element computer modeling was carried out using PLAXIS computer program (ref. 7) for simulation of staged excavation process, pile/soil movements and to analyze the associated bending stress in the piles of the above projects. Stiffness of foundation piles per linear meter (E.I/pile spacing in row) was used as a parameter for plate elements, where E and I is Young Modulus and moment inertia of pile respectively. The soil between piles in a row is ignored. Mohr-Coulomb constitutive model is adopted with soil parameters derived from the soil borehole data at the site. A plane-strain analysis approach was adopted with undrained soil condition. Model profiles are presented in Figures 6 to 9. Figure no. 10 shows computed bending moments in pile and lateral deflection of pile in Case IV.

17.00
0 1.5 2.5 5

Su (t/m 2)
0.0 1.0 2.0 3.0 4.0 0

SPT (blows/ft)
20 40 60

0.0

Crust

5.0

Sheet pile
Soft CLAY

10.0

Medium CLAY 15.0 Very Stiff CLAY

20.0 Medium CLAY

25.0 Hard CLAY

30.0

Figure 8. Model Profile of Case III


40.50
0 3 5 1 0

9.50

0. 0

CL
Crust

Su (t/m 2)
0. 0 2. 0 4. 0 6. 0

SPT (Blows/ft)
0 2 0 4 0

5. 0

Sheet pile
Soft to Vsoft CLAY

10. 0

15. 0

Medium CLAY

20. 0

Stiff to Vstiff CLAY

25. 0

Figure 9. Model Profile of Case IV DISCUSSION The modeling results indicate that bending moments in piles induced by excavation are higher than the cracking moment capacity of the piles in all cases. Summary of analysis is presented in the Table below; Table 6. Moment Capacity of Piles and Excavation Induced Moments in the Piles Closer to Excavation Boundary. Ultimate Moment Case Pile Rebar Cracking Moment by FEM Size Moment (Whitney) Model (m) (%) (t.m) (t.m) (t.m) I 1.0 1.0 30 100 86.4 109.5* II 1.0 0.75 30 79 149.7 III 1.5 0.5 102 188 117.2 255.7* IV 0.6 0.35 6.5 9.2 13.3 Note: 1. (*) moment in pile located in active side of soil mass either outside of sheet pile wall or cut slope. In Cases I and III, piles located in the active side of soil mass are found to be under the bending stress about 10% and 36% higher than the ultimate bending capacity of piles respectively. In Case II, the computed bending moments in the pile closest to the sheet pile wall and piles in second row is 89% and 27% respectively higher than the ultimate bending

6.00 0 3 5 10

32.00

9.00

18.00

Center Line

Su (t/m2)
0 4.0 8.0

SPT (Blows/ft)
0 50 100

0.0 5.0 10.0 15.0

Slope 1:3

Slope 1:3

Crust
Mat Zone

Soft CLAY

Medium CLAY 20.0 25.0 30.0 35.0 Dense to Very Dense SAND Stiff to Very Stiff CLAY

Figure 6. Model Profile of Case I


0.0 0.0
0 3 5 10

Su (t/m2) SPT (Blows/ft) 2.5 5.0 0 20 40 60

Weathered CLAY

5.0

MAT FOOTING

Sheet pile
10.0

Soft to Very Soft CLAY

14.0
15.0

Medium CLAY

20.0

Stiff to Hard CLAY

25.0

Figure 7. Model Profile of Case II

96

capacity of piles. The sonic integrity test also detected presence of crack in 35% of the piles which are located in first two outer rows (see Fig. 2). In Case IV, the modeling results show that excavation induced bending moments in pile exceed the ultimate moment capacity of piles. This is confirmed by the observed pile damages (see Fig. 5). Moreover the model results suggest that these piles are subject to some degrees of basal heave due to flexibility of and soil condition at embedment of sheet pile wall. Sonic integrity test results shows presence of more than one crack in some piles at depths, suggesting piles would have experienced combined stresses. Comparison between Case III and Case IV illustrates that cracks are found more frequently in small piles than large piles in a case of soil movements due to excavation. The crack location in piles indicated by sonic integrity test generally is found to be consistent with the location of computed bending moment which exceeds the cracking moment capacity of piles for all cases. Table 7. Locations of Crack and Computed Bending Moments in Piles in the Vicinity of Excavation Boundary Integrity Test Depth of B.M Depth of Crack Depth of by FEM Case in Piles Max. B.M exceeding near Excavation by FEM Piles Cracking Boundary Moment (m) (m) (m) I 6.0 & 13.8 19.5 13.5 II 12.7 & 13.7 18.0 11.0 & 13.0 III 12.4 &19.0 15.0 12.8 & 14.5 IV 11.5 & 12.0 15.5 13.0 &14.0 FEM analysis indicates the maximum bending moment in piles occurs at the level close to the interface between soft clay and stiff clay layers. For lateral movements of piles and soil, a direct comparison can not be made between model and observed data as the accurate field monitoring data are not available. Performance of soil retaining systems by model analysis are summarized in the Table below; Table 8. System Case I II III IV Summary of Type of Retaining (m) Cut Slope Sheet Pile Sheet Pile Sheet Pile Lateral Movements of Retaining Level of Strut 1 1 2 Excav. Depth (m) 5.4 5.7 8.0 6.0 Max. Lateral Movement (mm) 117 175 56 52

Bending Moment (T-m) -20 0.00 -10 0 10 20

Displacement (mm) 40 20 0

5.00

10.00 Depth (m)

Cracking Moment of Pile

15.00
Interface between Soft and Stiff Clay

20.00

25.00

Figure 10. Computed Bending Moment in Pile and Piles Deflection Closest to Sheet Pile Wall - Case IV

Figure 11. Section Showing Displacements of Soil - Case IV Instrumentation such as installation of inclinometer and strain gauges in piles and active side of soil mass is suggested for the future projects to analyze behaviour and performance of piles subject to lateral loads induced by excavation. CONCLUSION This paper presents four case studies on bored piles damaged by excavation induced lateral soil movements in Bangkok soft clay layer. Performance and response of pile are studied by FEM modeling and confirmed with pile integrity test results. Causes of pile damages found are also discussed. In addition to FEM analysis, the followings were found from the actual site construction activities, 1. Over excavation prior to installation of support 2. Inadequate retaining system which can effectively control soil movement. 3. Inadequate support for construction traffic load (Ref. 4) 4. Improper pile trimming method (Ref. 4) 5. Inadequate pile design for lateral load during construction 6. Inadequate reinforcement in piles to resist soil heave

For Case III, model analysis also confirmed that without temporary bracing, sheet pile would fail when soil berm is removed for trimming pile adjacent to the wall.

97

In designing of bored piles, the above mentioned causes, including deviation of piles due to excavation induced soil movement are to be taken into account. ACKNOWLEDGEMENT The authors express their appreciation to the colleagues, especially to Mr. Ganeshan Baskaran, Mr. Muhammad Ashfaq Anwar, Mr. Tossaporn Sree-iam and Mr. Chetsadar Plongkrathok for their assistance in the preparation of this paper. REFERENCES 1. Phienwej N., Balasubramaniam A.S., and Sutabutr T. [1996]. Performance of Retaining Structures for Deep Excavation in Bangkok Soft Clay Short Course on Deformation of Soils & Rocks and Displacement of Structures, Ground Movment in Deep Excavation - Case Histories in Bangkok Subsoil, Bangkok, Thailand. pp.14-20. 2. Phienwej N., Akewantop, K. and Balasubramaniam A.S., [1996]. Comparative Evaluation of Ground Movements Associated with Braced Excavation in Bangkok Soft Soil Short Course on Deformation of Soils & Rocks and Displacement of Structures, Ground Movement in Deep Excavation - Case Histories in Bangkok Subsoil, Bangkok, Thailand. pp.21-35. 3. Teparaksa W. [1994]. Prediction of Movement and Behavior of Sheet Pile Wall for Deep Braced Cut Excavation in Soft Bangkok Clay. Symposium on Developments in Geotechnical Engineering (From Havard

to New Delhi 1936-1994), Bangkok, Thailand, pp 5.31 5.42 4. Sliwinski Z. J. and Fleming G.K. [1983]. The Integrity and Performance of Bored Piles Advances in Piling and Ground Treatment for Foundations, London, UK, pp 153165. 5. Phienwej N and Kanok-nukulchai W. [1989]. Excavation Induced Pile Movement and Damage - A Case History in Bangkok, Piletalk - International 1989, Kuala Lumpur, Malaysia. pp 234-244. 6. Chiruppapa P. [1995]. A Case Study of Pile Failure Created by Excessive Lateral Deflection of Braced Sheet Pile Wall During Basement Excavation. Annual Technical Conference 1995, Engineering Institute of Thailand. pp CE81 - CE94. 7. PLAXIS Manual [1995]. PLAXIS - Finite Element Code for Soil and Roack Analyses Version 6, Edited by Vermeer P.A. and Brinkgreve R.B.J. 8. Poulos H.G. and Chen L.T. [1997]. Pile Response due to Excavation - Induced Lateral Soil Movement, Deep Foundations, Excavations, Ground Improvements & Tunneling, 30th Year Anniversary Symposium of The Southeast Asian Geotechnical Society, Bangkok, Thailand. pp 5.24-5.47. 9. Nilson, A.H. and Winter G. [1991]. Design of Concrete Structures, eleventh edition, McGraw -Hill, Inc.

98