GISRIP, BBCC
G-eneral Objectives I-deals S-uccess R-emuneration I-nterest of the Client P-rofessional Prerogative
1. E-conomic Feasibility Studies 2. P-roject Financing 3. A-rchitectural Programming 4. S-ite Selection and Analysis* 5. S-ite Utilization and Land-Use Studies* 6. S-pace/Management Studies 7. P-romotional Services
Methods of Compensation
E + MP + RE = Project Cost; where MP (Marginal Cost = 30%), RE (Reimbursable Expense) Project Cost + AE = Professional Fee: where AE = Architect & Engineer Fee N T R Mf Min. Fee = 2.0 2.5 as Multiplier
3. Lump Sum/ Fixed Fee 4. Per Diem Plus Reimbursable Expense 5. Combination 6. Professional Fee and Expenses 7. Turn Key
Reimbursable Expenses
Conditions:
1. Pertinent to the Project 2. Must occur within 100 K = radius 3. Mutual agreement
Schedule of Payments
CONTRACTOR
1. Downpayment - 20 50% of Project Cost 2. Progressive Billing base on percentage of completion (not more than 1 month) 3. Final Billing/Payment - 98% Complete 4. Guarantee Bond enforced for 1 year
ARCHITECT
1. Proposal Fee
5% 15%
1. Proposal Fee
5%
2. Prelim Drawings - 25% 3. Final Drawings 4. Retention - 50% - 20% = 3 months after the acceptance of the Architect
1. P-reliminary Design/S-chematic Design 2. W-orking Drawings/D-esign Devt Phase 3. S-pecifications and Other Contract Documents/C-ontract Documents* 4. P-art-Time Supervision/C-onstruction Phase*
*Under Contract Doc. Phase (Refer to UAP Doc 301 General Conditions of a Contract)
GASSD
1. G-eneral Conditions Execution, Intent satisfaction to finish the proj., Correlation 2. A-greement 3. S-pecifications 4. S-pecial Provisions 5. D-rawings
RERCF
1. R-eference Horizontal, Vertical 2. E-xcavation min. depth .60m until stable w/ signature of the Architect, must have a permit 3. R-ebars 4. C-oncreting 5. F-inishes Mock up (samples)
5 Ms of Construction
1. M-achines 2. M-oney 3. M-anpower 4. M-aterial 5. M-inutes
PROJECT CLASSIFICATION
UAP degree of difficulty/complexity of design FCP risk of occurrence of Fire NCP use and occupancy
SMERM RHEAC
DEFINITION MINIMUM BASIC FEE Without partitions P50M & less 6% With partitions P50M & less 7% Requires Consultants P50M & less 8% Single Detached or Duplex Requires Concepts 10% of Proj. Const. Cost 12% of Proj. Const. Cost 1st Structure MBF 2nd Structure 80% of BF 3rd Structure 60% of BF
M-onumental Buildings (Expositions, Mausoleums, Memorials) R-epetitive Buildings Construction of Similar Structures
H-ousing Projects
Succeeding 40% of BF 1st Unit = 10% MBF = A 2 to 10 Units = A + (60% of MBF x N) = B 11 and above = B + (30% of MBF x N) ; where N = no. of units 15% of Proj. Const. Cost
E-xtensive Detailing
Design of detailed Parts of appurtenances, special fittings, etc. Structures belonging MBF + 50% of MBF to Groups 1 to 5 Technical matters, P200, P500 service as an expert witness
PILAC
PARTICULARS PAYMENTS/SCHEDULE OF FEES Type I Site Devt Planning Must be an EnP 50 HAS P5000/HAS = A 50-100 A + P4500/HAS = B 100-200 B + P4000/HAS = C over 200 C + P3000
Type II Subdivision Planning (Urban) MM, Cities, Regional Centers, Provincial Capitals
2. Economic Planning 3. Socio-Cultural 4. Transport 5. Legal & Administrative Civil works (preparation of detailed engineering drawings and specifications, roads, drainage, sewerage, power and communication) 4% cost of the development
FC
1. F-ull Time Supervision Team or Individual, Quality Control, Evaluation, Records Basic Salary if Architect 1- 1.5% 2. C-onstruction Management CM - Team or Individual, Time and Cost Control, Coordination and Supervision 1.5 3% of Construction Cost
3*. P-roject Management PM 2 5% (Refer to UAP Doc 206 Comprehensive Architectural Services)
Before Construction
During Present
After
CM PM
Present
If the building is Safe and habitable will issue Certificate of Occupancy Good working condition and properly maintained
UAP 206 Comprehensive Architectural Services (Scope from UAP Doc 201 to 205)
The Project Manager PM 2 - 5% of Estimated Project Cost, Combination Methods if performs in regular Architectural Services for the same project will compensate separately.
Basic Functions
a. Operates as a member of Owner-Architect-Engineer-Contractor b. Contractor men and equipment, project delivery as per contract, Owner funds are available to complete project w/in budget estimates c. Plan, Program, Monitor activities, Adviser of material cost and Construction methods, Exercise Overall cost control.
Detailed Functions
a. Pre-Construction Phase b. Construction Phase
Proj. Const. Cost. in addition to Architects fee for Regular Design Services (UAP 202) 10% (if residential proj.) + 7% = 17%
a. Lump Sum b. If the cost is exceeded by not more than 10% it is divided = bet. Architect and Client. However if the excess is more than 10% the Architect pays for all extra cost of the 10%
3. Design Competition
Section 3 Equipment Materials Quality and Quantity Section 4 Premises Temporary Facilities
TEMPACIL* a. Office bedroom for Architect b. Quarters for staying workers c. Warehouse storage d. Accessway road ways, bridge, hoist (elevator)
*contractors expense
Section 5 Protection
a. Property (work area) b. Adjacent Property and Existing Utilities c. Life, work, and Property during emergencies
Work duration and deadlines; if delay P20,000 per day. Liquidated Damages = 0.01 of the Contract Sum by the government
Payments
Contractor
1. Progressive Billing partial % of Completion 2. Request for inspection
Architect will issue (if accept) a. Certificate of Acceptance < b. Certificate of Payment Owner for payment pay or not pay c. If 65% completion the contractor will issue of non-financial obligation (certificate)
5 copies of Drawings to: a. Contractor b. Owner c. Office of the Building Official (OBO) d. Fire Dept. e. Site
2. PD 1185 The Fire Code of the Philippines Enforced by PNP Gen. Hermohenes Ebdane 3. PD 957 The Condominium & Subdivision Buyers Protective Law 4. BP 220 Socialized Housing Law 5. BP 344 Law Enhancing the Mobility of the Disabled (Accessibility Law)
PD Presidential Decree BP Batas Pambansa EO - Executive Order LOI Letter of Instruction RA Republic Act
Additional Terms:
1. According to RA9266 all projects either big or small must have a contract. LAWYER NOTARY REGISTER OF CONTRACT 2. Contractor pays for the Building Permit (cannot be reimbursed, not included in Estimates) 3. Architect cannot be a Contractor at the same time. 4. Contractor is profit motivated; Builder is completion motivated; Contractor holds the money; Builder doesnt hold the money. 15 days can a contractor, atter giving due notice to the owner/architect suspend work or terminate a contract. Responsible for the payment of insurance for personal injury and to property; Responsible for the AsBuilt Plans of the Project 5. 2% per annum Interest (if money is not fully collected) 6. TOR Terms of Reference 7. Building Permit validity 120 days, valid 12 months if constructed has not commenced; exception government structure; excepted if P15,000 proj. cost 8. Notary to legalize document with series no., document no., etc. 9. Arbitration can file a case after 30 days 10. Specifications are printed documents stipulating the procedural aspects of the contract 11. Variance is the minimum possible deviation from standards which is permitted to make a highly beneficial housing project. 12. Project duration is computed immediately from the receipt date of the NTP 13. Design of any religious structures is assessed professional fees 14. Competitive bidding is mandatory for public work projects 15. 7 Days affectivity of a Construction contract from receipt of Notice of Final Payment
16. Civil Code liability of Architect for Regular Design of structures 15 years 17. PERT Prog. Evaluation Review Technique 18. CPM Critical Path Method