Case Studies 7
Case Studies 7
2. What are the 7 tools of Statistical Process Control and mention their use. (15)
CSQA R-II Subjective Questions-7 Duration: 1 Hour
5. As Manager QA of an ISO 9001 company you have planned for a global quality award as the
next milestone. How would you impress your management the plans and gain approval of
your plan? (10)
6. What are the various stages of testing and important objectives of each of them? (10)
CSQA R-II Subjective Questions-7 Duration: 1 Hour
7. The following list contains the problems in the month of Jan’04. Identify the major cause of
the problem.
• Data referenced out-of-bounds,
• Data initialization
• Incomplete or missing output
• Incorrect/inaccurate equation
• Missing logic or condition test
• Variable used as flag or index not set properly
• Data not properly defined/dimensioned
• Subscripting error
• Data written to different location
• Incorrect operand in logical expression
• Logic out of sequence
• Wrong variable being checked
• Incorrect format
• Input read from incorrect location
• End-of-file missing or encountered prematurely
• Output garbled or misleading
• Incorrect format
• Incorrect operand in equation
• Incorrect use of parentheses
• Rounding or truncation error
• Data file not available
• Loop iterated incorrect number of times (25)