Challenges in Cryogenic Development Present & The Future: Twentieth National Conference New Delhi April 10-11, 2006
Challenges in Cryogenic Development Present & The Future: Twentieth National Conference New Delhi April 10-11, 2006
SATELLITE C25
L110 (ES)
S200(2 Nos)
Expander Cycle
GG Cycle
Fig 1. ENGINE / SUBSYSTEMS GAS GENERATOR LOX TURBOPUMP LH2 TURBOPUMP INTEGRATED TURBOPUMP THRUST CHAMBER FLUID COMPONENTS INTEGRATED ENGINE (SL)
3 3 4
GAS GENERATOR
EBW
2
EBW
3
110
4
17
Electric igniter
Pyrogen igniter
Tf =To + 50 s
OPEN Tf+0.2
OPEN Tf+2.5
CLOSE Tf+10
CLOSE To-3
OPEN Tf+1.5
LH2 INJECTION VALVE(HIV2) IGNITER LOX INJECTION VALVE(OIV1) LOX INJECTION VALVE(OIV2)
ON To+0.2 OPEN To+0.3 CLOSE To-10 OPEN To+ 2.7
CLOSE Tf + 1
3 7 .8 +
30
s)
LH2 TURBINE
LOX TURBINE
External layer
Internal layer
Composition Cu-10%Sn Cu-10%Sn-5%BN Porosity(%) 30 Max. 20-35 Hardness(BHN) 50 Min. 35 Max Bending strength 250 min(MPa) 100 min (MPa) UTS 150 min. (MPa) 50 min (MPa)
Bronze Sealring(YMB-22)
Proto LH2 pump at test bed for testing with water & driven by electric motor
LH2 TURBINE COLD FLOW TEST LH2 Turbine tested with GN2 at design pressure ratio and low power level. Cd & efficiency as expected. Speed= 8300 rpm
Pi = 8.1 bar, Pout =1 bar, Ti = 284K, Flow =1.1 kg/s PR = 8.1 , U/Co = 0.15 Power= 80 KW Cd value = 0.91-0.93 Efficiency= 47% at U/Co=0.15
12000
10000
LH2 TANK
ENGINE
Fig 10