0% found this document useful (0 votes)
107 views5 pages

Piling Record Flour Mills Area

- This document is an inspection report from PT. Wilmar Nabati Indonesia detailing piling work conducted between December 29, 2011 and January 14, 2012. - Piling work involved driving 62 piles of varying diameters (400mm - 500mm) using a diesel hammer machine (DD-53). - For each pile, details such as date, location, penetration depth, number of hammer blows, and settlement are recorded.

Uploaded by

Dheed Ariyanto
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
107 views5 pages

Piling Record Flour Mills Area

- This document is an inspection report from PT. Wilmar Nabati Indonesia detailing piling work conducted between December 29, 2011 and January 14, 2012. - Piling work involved driving 62 piles of varying diameters (400mm - 500mm) using a diesel hammer machine (DD-53). - For each pile, details such as date, location, penetration depth, number of hammer blows, and settlement are recorded.

Uploaded by

Dheed Ariyanto
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

WILMAR GROUP

INSPECTION REPORT

PT. WILMAR NABATI INDONESIA


GRESIK

Flourmills Area

TENO INDONESIA

INSPECTION TYPE :

Subject

SUMMARY DAY OF PILE DRIVING RECORD

PILING WORK DAILY

Location
Date
COMMENT / NOTE

TYPE OF MACHINE DRIVING

JL. Darmo Sugondo Gresik


JL
29-Des-2011 s/d 10-Jan-2012
No. of Page

HAMMER DIESEL DD-53


PILE DATA
No.

Date

Axis

ID Pile

Pile Cap

No.

Type

Total

Section Pile

1.. Of 1..
Final

Length

Pene-

PILING CARASTERISTIC
Dolly /

tration of Ruyung

Joint

Potong

Stroke

Settle-

Amount

Weight

Total

Pile

of

ment of

of

of

Blow

Pile

29-Dec-12

Unit
Rig

REMARK

Qa

Hammer one drive Rebound Hammer


(nos)

Bearing
Cap*)

(mm)

(m) (m)

(m)

(m)

(cm)

(cm)

(cm)

(ton)

(blow)

(ton)

500

17

15

32

32,0

250

0,50

1,30

5,3

1144

142

(code)
TC-30

DD-53

29-Dec-12

500

17

15

32

32,0

250

0,70

1,10

5,3

1063

107

TC-30

DD-53

30-Dec-12

24

500

17

15

32

32,0

250

0,30

1,20

5,3

1310

214

TC-30

DD-53

30-Dec-12

25

500

17

15

32

32,0

250

0,30

1,40

5,3

1258

214

TC-30

DD-53

4-Jan-12

52

500

17

15

32

32,0

250

0,20

1,70

5,3

1243

285

TC-30

DD-53

4-Jan-12

53

500

17

15

32

32,0

250

0,40

1,40

5,3

1395

171

TC-30

DD-53

4-Jan-12

500

17

15

32

32,0

250

0,50

1,50

5,3

1357

142

TC-30

DD-53

4-Jan-12

500

17

15

32

32,0

250

0,40

1,50

5,3

958

171

TC-30

DD-53
DD-53

5-Jan-12

500

17

15

32

32,0

250

0,90

1,20

5,3

1236

85

TC-30

10

5-Jan-12

26

500

17

15

32

32,0

250

2,80

0,60

5,3

697

29

TC-30

DD-53

11

5-Jan-12

28

500

17

15

32

32,0

250

0,20

1,50

5,3

1248

285

TC-30

DD-53

12

5-Jan-12

27

500

17

15

32

32,0

250

0,30

1,40

5,3

1283

214

TC-30

DD-53

13

6-Jan-12

54

500

17

15

32

32,0

250

0,20

1,50

5,3

1183

285

TC-30

DD-53

14

6-Jan-12

55

500

17

15

32

32,0

250

0,20

1,30

5,3

1145

285

TC-30

DD-53

15

6-Jan-12

56

500

17

15

32

32,0

250

0,20

1,50

5,3

1230

285

TC-30

DD-53

16

6-Jan-12

58

500

17

15

32

32,0

250

0,90

1,30

5,3

930

85

TC-30

DD-53

17

9-Jan-12

51

500

17

15

32

32,0

250

0,30

1,40

5,3

1095

214

TC-30

DD-53

18

9-Jan-12

59

500

17

15

32

32,0

250

0,30

1,40

5,3

1486

214

TC-30

DD-53

19

9-Jan-12

30

500

17

15

32

32,0

250

0,30

1,40

5,3

1293

214

TC-30

DD-53

20

9-Jan-12

32

500

17

15

32

32,0

250

0,40

1,50

5,3

1198

171

TC-30

DD-53

21

9-Jan-12

29

500

17

15

32

32,0

250

0,20

1,30

5,3

1232

285

TC-30

DD-53

22

10-Jan-12

31

500

17

15

32

32,0

250

0,30

1,50

5,3

1167

214

TC-30

DD-53

23

10-Jan-12

500

17

15

32

32,0

250

0,50

1,60

5,3

1359

142

TC-30

DD-53

24

10-Jan-12

500

17

15

32

32,0

250

0,40

1,40

5,3

1163

171

TC-30

DD-53

25

10-Jan-12

500

17

15

32

32,0

250

0,60

1,40

5,3

1187

122

TC-30

DD-53

26

10-Jan-12

500

17

15

32

32,0

250

0,20

1,50

5,3

1193

285

TC-30

DD-53

27

11-Jan-12

11

500

17

15

32

32,0

250

0,20

1,60

5,3

1091

285

TC-30

DD-53

28

11-Jan-12

12

500

17

15

32

32,0

250

0,40

1,10

5,3

1145

171

TC-30

DD-53

29

11
Jan 12
11-Jan-12

10

500

17

15

32

32,0

250

0,30

1,40

5,3

1358

214

TC
30
TC-30

DD
53
DD-53

30

11-Jan-12

14

500

17

15

32

32,0

250

0,30

1,30

5,3

1084

214

TC-30

DD-53

31

11-Jan-12

13

500

17

15

32

32,0

250

0,30

1,30

5,3

1183

214

TC-30

DD-53

32

11-Jan-12

33

500

17

15

32

32,0

250

0,20

1,10

5,3

1096

285

TC-30

DD-53

33

12-Jan-12

40

500

17

15

32

32,0

250

0,70

1,10

5,3

1158

107

TC-30

DD-53

34

12-Jan-12

37

500

17

15

32

32,0

250

0,20

1,30

5,3

1138

285

TC-30

DD-53

35

12-Jan-12

39

500

17

15

32

32,0

250

0,40

1,30

5,3

1136

171

TC-30

DD-53

36

12-Jan-12

35

500

17

15

32

32 0
32,0

250

0 50
0,50

1 40
1,40

53
5,3

1145

142

TC-30

DD-53

37

12-Jan-12

34

500

17

15

32

32,0

250

0,50

1,50

5,3

1105

142

TC-30

DD-53

38

12-Jan-12

36

500

17

15

32

32,0

250

0,20

1,20

5,3

1113

285

TC-30

DD-53

39

12-Jan-12

19

500

17

15

32

32,0

250

0,24

1,90

5,3

1083

251

TC-42

DD-53

40

12-Jan-12

22

500

17

15

32

32,0

250

0,35

1,30

5,3

1226

190

TC-42

DD-53

41

12-Jan-12

23

500

17

15

32

32,0

250

0,90

1,00

5,3

1116

85

TC-42

DD-53

42

12-Jan-12

20

500

17

15

32

32,0

250

0,80

1,20

5,3

1093

95

TC-42

DD-53

43

12 Jan 12
12-Jan-12

18

500

17

15

32

32 0
32,0

250

0 90
0,90

1 60
1,60

53
5,3

1152

85

TC 42
TC-42

DD 53
DD-53

44

12-Jan-12

21

500

17

15

32

32,0

250

0,70

1,40

5,3

1254

107

TC-42

DD-53

45

13-Jan-12

15

500

17

15

32

32,0

250

0,50

1,60

5,3

1201

142

TC-42

DD-53

46

13-Jan-12

17

500

17

15

32

32,0

250

0,73

1,90

5,3

1320

103

TC-42

DD-53

WILMAR GROUP

INSPECTION REPORT

PT. WILMAR NABATI INDONESIA


GRESIK

Flourmills Area

TENO INDONESIA

INSPECTION TYPE :

Subject

SUMMARY DAY OF PILE DRIVING RECORD

PILING WORK DAILY

Location
Date
COMMENT / NOTE

TYPE OF MACHINE DRIVING

JL. Darmo Sugondo Gresik


JL
29-Des-2011 s/d 10-Jan-2012
No. of Page

HAMMER DIESEL DD-53


PILE DATA
No.

Date

Axis

ID Pile

Pile Cap

No.

Type

Total

Section Pile

1.. Of 1..
Final

Length

Pene-

PILING CARASTERISTIC
Dolly /

tration of Ruyung

Joint

Potong

Stroke

Settle-

Amount

Weight

Total

Pile

of

ment of

of

of

Blow

Pile

47

13-Jan-12

41

Unit
Rig

REMARK

Qa

Hammer one drive Rebound Hammer

(mm)

(m) (m)

(m)

(m)

(cm)

(cm)

(cm)

(ton)

(blow)

(ton)

500

17

32

32,0

250

0,50

1,70

5,3

1220

142

TC-42

DD-53
DD-53

15

(nos)

Bearing
Cap*)

(code)

48

13-Jan-12

42

500

17

15

32

32,0

250

0,40

1,20

5,3

1425

171

TC-42

49

13-Jan-12

16

500

17

15

32

32,0

250

0,80

1,20

5,3

1452

95

TC-42

DD-53

50

13-Jan-12

400

11

11

22

22,0

250

0,60

0,70

5,3

823

156

TC-41

DD-53

51

13-Jan-12

400

11

11

22

22,0

250

0,40

0,80

5,3

806

219

TC-41

DD-53

52

13-Jan-12

400

11

11

22

22,0

250

0,50

1,00

5,3

835

182

TC-41

DD-53

53

13-Jan-12

400

11

11

22

22,0

250

0,60

0,40

5,3

1010

156

TC-41

DD-53

54

13-Jan-12

400

11

11

22

22,0

250

0,80

0,90

5,3

859

122

TC-41

DD-53

55

13-Jan-12

400

11

11

22

22,0

250

0,70

1,10

5,3

866

137

TC-41

DD-53

56

13-Jan-12

400

11

11

22

22,0

250

0,80

1,30

5,3

855

122

TC-41

DD-53

57

13-Jan-12

400

11

11

22

22,0

250

1,00

1,10

5,3

851

99

TC-41

DD-53

58

13-Jan-12

400

11

11

22

22,0

250

0,80

0,50

5,3

890

122

TC-41

DD-53

59

14-Jan-12

45

500

17

15

32

32,0

250

0,32

1,90

5,3

1259

204

TC-42

DD-53

60

14-Jan-12

44

500

17

15

32

32,0

250

0,73

1,60

5,3

1189

103

TC-42

DD-53

61

14-Jan-12

43

500

17

15

32

32,0

250

0,49

1,80

5,3

1319

145

TC-42

DD-53

62

14-Jan-12

51

500

17

15

32

32,0

250

0,34

1,60

5,3

1230

194

TC-42

DD-53

63

14-Jan-12

49

500

17

15

32

32,0

250

0,54

1,70

5,3

1207

134

TC-42

DD-53

64

14-Jan-12

92

500

17

15

32

32,0

250

0,25

1,50

5,3

1163

244

TC-30

DD-53

65

14-Jan-12

62

500

17

15

32

32,0

250

0,35

1,50

5,3

1120

190

TC-30

DD-53

66

14-Jan-12

63

500

17

15

32

32,0

250

0,31

1,50

5,3

1047

209

TC-30

DD-53

67

14-Jan-12

61

500

17

15

32

32,0

250

0,27

1,10

5,3

1183

231

TC-30

DD-53

68

14-Jan-12

38

500

17

15

32

32,0

250

0,48

1,40

5,3

1100

147

TC-30

DD-53

69

14-Jan-12

64

500

17

15

32

32,0

250

0,20

1,30

5,3

1238

285

TC-30

DD-53

70

14-Jan-12

10

400

11

11

22

22,0

250

0,70

0,90

5,3

850

137

TC-41

DD-53

71

14-Jan-12

11

400

11

11

22

22,0

250

0,70

0,80

5,3

810

137

TC-41

DD-53

72

14-Jan-12

12

400

11

11

22

22,0

250

0,60

0,30

5,3

825

156

TC-41

DD-53

73

14-Jan-12

13

400

11

11

22

22,0

250

0,70

0,90

5,3

863

137

TC-41

DD-53

74

14-Jan-12

14

400

11

11

22

22,0

250

0,80

0,40

5,3

845

122

TC-41

DD-53

75

14
Jan 12
14-Jan-12

15

400

11

11

22

22,0

250

1,20

0,90

5,3

852

84

TC
41
TC-41

DD
53
DD-53

0,80

0,60

5,3

836

122

TC-41

DD-53

5,3

835

1094

TC-41

DD-53

76

14-Jan-12

16

400

11

11

22

22,0

250

77

14-Jan-12

17

400

11

11

22

22,0

250

78

14-Jan-12

18

400

11

11

22

22,0

250

0,80

0,50

5,3

840

122

TC-41

DD-53

79

16-Jan-12

47

500

17

15

32

32,0

250

0,43

1,60

5,3

1139

161

TC-42

DD-53

80

16-Jan-12

46

500

17

15

32

32,0

250

0,35

1,60

5,3

1201

190

TC-42

DD-53

81

16-Jan-12

48

500

17

15

32

32,0

250

0,42

1,40

5,3

1219

164

TC-42

DD-53

82

16-Jan-12

50

500

17

15

32

32 0
32,0

250

0 53
0,53

1 70
1,70

53
5,3

1035

136

TC-42

DD-53

83

16-Jan-12

73

500

17

15

32

32,0

250

0,14

1,70

5,3

1387

356

TC-42

DD-53

84

16-Jan-12

78

500

17

15

32

32,0

250

0,40

1,50

5,3

1112

171

TC-42

DD-53

85

16-Jan-12

90

500

17

15

32

32,0

250

0,22

1,50

5,3

1121

267

TC-30

DD-53

86

16-Jan-12

91

500

17

15

32

32,0

250

0,39

1,40

5,3

1120

174

TC-30

DD-53

87

16-Jan-12

93

500

17

15

32

32,0

250

0,32

1,50

5,3

1093

204

TC-30

DD-53

88

16-Jan-12

67

500

17

15

32

32,0

250

0,29

1,20

5,3

1183

219

TC-30

DD-53

89

16 Jan 12
16-Jan-12

68

500

17

15

32

32 0
32,0

250

0 30
0,30

1 30
1,30

53
5,3

1048

214

TC 30
TC-30

DD 53
DD-53

90

17-Jan-12

97

500

17

15

32

32,0

250

0,20

1,40

5,3

1113

285

TC-30

DD-53

91

17-Jan-12

94

500

17

15

32

32,0

250

0,10

0,70

5,3

1163

427

TC-30

DD-53

92

17-Jan-12

96

500

17

15

32

32,0

250

0,10

0,90

5,3

1120

427

TC-30

DD-53

WILMAR GROUP

INSPECTION REPORT

PT. WILMAR NABATI INDONESIA


GRESIK

Flourmills Area

TENO INDONESIA

INSPECTION TYPE :

Subject

SUMMARY DAY OF PILE DRIVING RECORD

PILING WORK DAILY

Location
Date
COMMENT / NOTE

TYPE OF MACHINE DRIVING

JL. Darmo Sugondo Gresik


JL
29-Des-2011 s/d 10-Jan-2012
No. of Page

HAMMER DIESEL DD-53


PILE DATA
No.

Date

Axis

ID Pile

Pile Cap

No.

Type

Total

Section Pile

1.. Of 1..
Final

Length

Pene-

PILING CARASTERISTIC
Dolly /

tration of Ruyung

Joint

Potong

Stroke

Settle-

Amount

Weight

Total

Pile

of

ment of

of

of

Blow

Pile

93

17-Jan-12

65

Unit
Rig

REMARK

Qa

Hammer one drive Rebound Hammer

(mm)

(m) (m)

(m)

(m)

(cm)

(cm)

(cm)

(ton)

(blow)

(ton)

500

17

32

32,0

250

0,60

1,30

5,3

1096

122

TC-30

DD-53

15

(nos)

Bearing
Cap*)

(code)

94

17-Jan-12

66

500

17

15

32

32,0

250

0,20

1,20

5,3

1183

285

TC-30

DD-53

95

17-Jan-12

69

500

17

15

32

32,0

250

0,44

1,30

5,3

1391

158

TC-42

DD-53

96

17-Jan-12

74

500

17

15

32

32,0

250

0,28

1,90

5,3

1351

225

TC-42

DD-53

97

17-Jan-12

75

500

17

15

32

32,0

250

0,37

1,50

5,3

1202

182

TC-42

DD-53

98

17-Jan-12

76

500

17

15

32

32,0

250

0,22

1,40

5,3

1490

267

TC-42

DD-53

99

17-Jan-12

79

500

17

15

32

32,0

250

0,20

1,60

5,3

1440

285

TC-42

DD-53

100

17-Jan-12

80

500

17

15

32

32,0

250

0,30

1,70

5,3

1154

214

TC-42

DD-53

101

18-Jan-12

95

500

17

15

32

32,0

250

0,60

1,40

5,3

1323

122

TC-30

DD-53

102

18-Jan-12

60

500

17

15

32

32,0

250

0,60

1,80

5,3

1179

122

TC-30

DD-53

103

18-Jan-12

88

500

17

15

32

32,0

250

0,50

1,40

5,3

1125

142

TC-30

DD-53

104

18-Jan-12

86

500

17

15

32

32,0

250

0,40

1,30

5,3

1146

171

TC-30

DD-53

105

18-Jan-12

89

500

17

15

32

32,0

250

0,40

1,30

5,3

1086

171

TC-30

DD-53

106

18-Jan-12

99

500

17

15

32

32,0

250

0,20

1,60

5,3

1376

285

TC-42

DD-53

107

18-Jan-12

70

500

17

15

32

32,0

250

0,10

1,60

5,3

1358

427

TC-42

DD-53

108

18-Jan-12

72

500

17

15

32

32,0

250

0,20

1,80

5,3

1256

285

TC-42

DD-53

109

18-Jan-12

71

500

17

15

32

32,0

250

0,20

1,80

5,3

1313

285

TC-42

DD-53

110

18-Jan-12

98

500

17

15

32

32,0

250

0,10

1,70

5,3

1414

427

TC-42

DD-53

111

18-Jan-12

100

500

17

15

32

32,0

250

0,30

1,70

5,3

1292

214

TC-42

DD-53

112

19-Jan-12

85

500

17

15

32

32,0

250

0,30

1,50

5,3

1157

214

TC-30

DD-53

113

19-Jan-12

83

500

17

15

32

32,0

250

0,30

1,40

5,3

1083

214

TC-30

DD-53

114

19-Jan-12

87

500

17

15

32

32,0

250

0,60

1,50

5,3

1380

122

TC-30

DD-53

115

19-Jan-12

84

500

17

15

32

32,0

250

0,50

1,90

5,3

1157

142

TC-30

DD-53

116

19-Jan-12

81

500

17

15

32

32,0

250

0,60

1,30

5,3

1236

122

TC-30

DD-53

117

19-Jan-12

101

500

17

15

32

32,0

250

0,40

1,50

5,3

1214

171

TC-42

DD-53

118

19-Jan-12

102

500

17

15

32

32,0

250

0,30

1,80

5,3

1266

214

TC-42

DD-53

119

19-Jan-12

104

500

17

15

32

32,0

250

0,50

1,60

5,3

1238

142

TC-42

DD-53

120

19-Jan-12

106

500

17

15

32

32,0

250

0,30

1,40

5,3

1442

214

TC-42

DD-53

121

19
Jan 12
19-Jan-12

103

500

17

15

32

32,0

250

0,20

1,30

5,3

1405

285

TC
42
TC-42

DD
53
DD-53

122

19-Jan-12

108

500

17

15

32

32,0

250

0,30

1,50

5,3

1303

214

TC-42

DD-53

123

20-Jan-12

110

500

17

15

32

32,0

250

0,30

1,60

5,3

1173

214

TC-30

DD-53

124

20-Jan-12

82

500

17

15

32

32,0

250

0,80

1,40

5,3

1183

95

TC-30

DD-53

125

20-Jan-12

132

500

17

15

32

32,0

250

0,60

1,50

5,3

1073

122

TC-30

DD-53

126

20-Jan-12

107

500

17

15

32

32,0

250

0,60

1,20

5,3

1098

122

TC-30

DD-53

127

20-Jan-12

166

500

17

15

32

32,0

250

0,50

1,40

5,3

1097

142

TC-30

DD-53

128

20-Jan-12

107

500

17

15

32

32 0
32,0

250

0 20
0,20

1 60
1,60

53
5,3

1407

285

TC-42

DD-53

129

20-Jan-12

105

500

17

15

32

32,0

250

0,30

1,50

5,3

1386

214

TC-42

DD-53

130

20-Jan-12

123

500

17

15

32

32,0

250

0,30

1,70

5,3

1333

214

TC-42

DD-53

131

20-Jan-12

122

500

17

15

32

32,0

250

0,50

1,60

5,3

1286

142

TC-42

DD-53

132

20-Jan-12

125

500

17

15

32

32,0

250

0,30

1,80

5,3

1352

214

TC-42

DD-53

133

21-Jan-12

109

500

17

15

32

32,0

250

0,20

1,50

5,3

1152

285

TC-30

DD-53

134

21-Jan-12

131

500

17

15

32

32,0

250

0,40

1,60

5,3

1146

171

TC-30

DD-53

135

21 Jan 12
21-Jan-12

111

500

17

15

32

32 0
32,0

250

0 40
0,40

1 90
1,90

53
5,3

1148

171

TC 30
TC-30

DD 53
DD-53

136

21-Jan-12

112

500

17

15

32

32,0

250

0,30

0,40

5,3

1149

214

TC-30

DD-53

137

21-Jan-12

134

500

17

15

32

32,0

250

0,40

1,40

5,3

1079

171

TC-30

DD-53

138

21-Jan-12

133

500

17

15

32

32,0

250

0,20

1,40

5,3

1096

285

TC-30

DD-53

WILMAR GROUP

INSPECTION REPORT

PT. WILMAR NABATI INDONESIA


GRESIK

Flourmills Area

TENO INDONESIA

INSPECTION TYPE :

Subject

SUMMARY DAY OF PILE DRIVING RECORD

PILING WORK DAILY

Location
Date
COMMENT / NOTE

TYPE OF MACHINE DRIVING

JL. Darmo Sugondo Gresik


JL
29-Des-2011 s/d 10-Jan-2012
No. of Page

HAMMER DIESEL DD-53


PILE DATA
No.

Date

Axis

ID Pile

Pile Cap

No.

Type

Total

Section Pile

1.. Of 1..
Final

Length

Pene-

PILING CARASTERISTIC
Dolly /

tration of Ruyung

Joint

Potong

Stroke

Settle-

Amount

Weight

Total

Pile

of

ment of

of

of

Blow

Pile

Unit
Rig

REMARK

Qa

Hammer one drive Rebound Hammer


(nos)

Bearing
Cap*)

(mm)

(m) (m)

(m)

(m)

(cm)

(cm)

(cm)

(ton)

(blow)

(ton)

139

21-Jan-12

124

500

17

15

32

32,0

250

0,30

1,20

5,3

1368

214

(code)
TC-42

DD-53

140

21-Jan-12

126

500

17

15

32

32,0

250

0,30

1,10

5,3

1394

214

TC-42

DD-53

141

21-Jan-12

127

500

17

15

32

32,0

250

0,20

1,20

5,3

1370

285

TC-42

DD-53

142

21-Jan-12

128

500

17

15

32

32,0

250

0,20

1,00

5,3

1331

285

TC-42

DD-53

143

21-Jan-12

129

500

17

15

32

32,0

250

0,30

1,60

5,3

1301

214

TC-42

DD-53

144

21-Jan-12

130

500

17

15

32

32,0

250

0,20

1,50

5,3

1386

285

TC-42

DD-53

145

21-Jan-12

142

500

17

15

32

32,0

250

0,20

1,50

5,3

1483

285

TC-42

DD-53

146

23-Jan-12

136

500

17

15

32

32,0

250

0,20

1,50

5,3

1501

285

TC-42

DD-53

147

23-Jan-12

120

500

17

15

32

32,0

250

0,20

1,30

5,3

1378

285

TC-42

DD-53

148

23-Jan-12

119

500

17

15

32

32,0

250

0,20

1,50

5,3

1216

285

TC-42

DD-53

149

23-Jan-12

141

500

17

15

32

32,0

250

0,40

1,90

5,3

1421

171

TC-42

DD-53

150

23-Jan-12

143

500

17

15

32

32,0

250

0,40

1,60

5,3

1319

171

TC-42

DD-53

151

23-Jan-12

135

500

17

15

32

32,0

250

0,50

0,10

5,3

1043

142

TC-30

DD-53

152

23-Jan-12

114

500

17

15

32

32,0

250

0,40

1,30

5,3

1197

171

TC-30

DD-53

153

23-Jan-12

113

500

17

15

32

32,0

250

0,80

0,90

5,3

1199

95

TC-30

DD-53

154

23-Jan-12

115

500

17

15

32

32,0

250

0,60

1,20

5,3

1192

122

TC-30

DD-53

155

23-Jan-12

116

500

17

15

32

32,0

250

0,50

1,20

5,3

1138

142

TC-30

DD-53

156

23-Jan-12

1160

600

11

10

11

32

32,0

300

0,60

1,30

5,3

1575

132

TC-32

DD-53

157

23-Jan-12

590

600

11

10

11

32

32,0

300

0,14

1,30

5,3

1342

386

TC-32

DD-53

158

23-Jan-12

1161

600

11

11

10

32

32,0

300

0,50

1,30

5,3

1554

155

TC-32

DD-53

159

23-Jan-12

1162

600

11

11

10

32

32,0

300

0,17

1,10

5,3

1528

343

TC-32

DD-53

160

24-Jan-12

117

500

17

15

32

32,0

250

0,60

1,50

5,3

1196

122

TC-30

DD-53

161

24-Jan-12

118

500

17

15

32

32,0

250

0,70

1,30

5,3

1088

107

TC-30

DD-53

162

24-Jan-12

198

500

17

15

32

32,0

250

0,70

1,20

5,3

1229

107

TC-30

DD-53

163

24-Jan-12

196

500

17

15

32

32,0

250

0,50

1,00

5,3

1273

142

TC-30

DD-53

164

24-Jan-12

195

500

17

15

32

32,0

250

0,70

1,40

5,3

1277

107

TC-30

DD-53

165

24-Jan-12

197

500

17

15

32

32,0

250

0,50

1,20

5,3

1142

142

TC-30

DD-53

166

24-Jan-12

138

500

17

15

32

32,0

250

0,20

1,70

5,3

1398

285

TC-42

DD-53

167

24
Jan 12
24-Jan-12

121

500

17

15

32

32,0

250

0,20

1,40

5,3

1304

285

TC
42
TC-42

DD
53
DD-53

168

24-Jan-12

137

500

17

15

32

32,0

250

0,20

1,30

5,3

1364

285

TC-42

DD-53

169

24-Jan-12

202

500

17

15

32

32,0

250

0,30

1,40

5,3

1193

214

TC-42

DD-53

170

24-Jan-12

200

500

17

15

32

32,0

250

0,20

1,80

5,3

1235

285

TC-42

DD-53

171

24-Jan-12

199

500

17

15

32

32,0

250

0,30

1,80

5,3

1358

214

TC-42

DD-53

172

24-Jan-12

201

500

17

15

32

32,0

250

0,30

1,40

5,3

1331

214

TC-42

DD-53

173

24-Jan-12

1163

600

11

11

10

32

32,0

300

0,17

1,60

5,3

1557

343

TC-32

DD-53

174

24-Jan-12

591

600

11

11

10

32

32 0
32,0

300

0 14
0,14

1 40
1,40

53
5,3

1568

386

TC-32

DD-53

175

24-Jan-12

592

600

11

10

11

32

32,0

300

0,11

1,20

5,3

1547

442

TC-32

DD-53

176

24-Jan-12

1164

600

11

10

11

32

32,0

300

0,15

1,90

5,3

1581

371

TC-32

DD-53

177

25-Jan-12

179

500

17

15

32

32,0

250

0,10

1,40

5,3

1235

427

TC-30

DD-53

178

25-Jan-12

194

500

17

15

32

32,0

250

0,50

0,80

5,3

1098

142

TC-30

DD-53

179

25-Jan-12

181

500

17

15

32

32,0

250

0,60

1,10

5,3

1064

122

TC-30

DD-53

WILMAR GROUP

INSPECTION REPORT

PT. WILMAR NABATI INDONESIA


GRESIK

Flourmills Area

TENO INDONESIA

INSPECTION TYPE :

Subject

SUMMARY DAY OF PILE DRIVING RECORD

PILING WORK DAILY

Location
Date
COMMENT / NOTE

TYPE OF MACHINE DRIVING

JL. Darmo Sugondo Gresik


JL
29-Des-2011 s/d 10-Jan-2012
No. of Page

HAMMER DIESEL DD-53


PILE DATA
No.

Date

Axis

ID Pile

Pile Cap

No.

Type

Total

Section Pile

1.. Of 1..
Final

Length

Pene-

PILING CARASTERISTIC
Dolly /

tration of Ruyung

Joint

Potong

Stroke

Settle-

Amount

Weight

Total

Pile

of

ment of

of

of

Blow

Pile

Unit
Rig

REMARK

Qa

Hammer one drive Rebound Hammer

(mm)

(m) (m)

(m)

(m)

(cm)

(cm)

(cm)

(ton)

(blow)

(ton)

180

25-Jan-12

182

500

17

15

32

32,0

250

0,70

1,30

5,3

1241

107

TC-30

DD-53

181

25-Jan-12

183

500

17

15

32

32,0

250

0,60

1,30

5,3

1230

122

TC-30

DD-53

182

25-Jan-12

180

500

17

15

32

32,0

250

0,60

1,20

5,3

1246

122

TC-30

DD-53

183

25-Jan-12

169

500

17

15

32

32,0

250

0,20

1,60

5,3

1476

285

TC-42

DD-53

184

25-Jan-12

171

500

17

15

32

32,0

250

0,20

1,30

5,3

1400

285

TC-42

DD-53

185

25-Jan-12

172

500

17

15

32

32,0

250

0,30

1,70

5,3

1417

214

TC-42

DD-53

186

25-Jan-12

170

500

17

15

32

32,0

250

0,40

1,50

5,3

1371

171

TC-42

DD-53

187

25-Jan-12

187

500

17

15

32

32,0

250

0,20

1,30

5,3

1351

285

TC-42

DD-53

188

25-Jan-12

185

500

17

15

32

32,0

250

0,20

1,40

5,3

1496

285

TC-42

DD-53

189

26-Jan-12

186

500

17

15

32

32,0

250

0,20

1,40

5,3

1596

285

TC-42

DD-53

190

26-Jan-12

184

500

17

15

32

32,0

250

0,30

1,20

5,3

1509

214

TC-42

DD-53

191

26-Jan-12

156

500

17

15

32

32,0

250

0,20

1,30

5,3

1483

285

TC-42

DD-53

192

26-Jan-12

157

500

17

15

32

32,0

250

0,18

1,80

5,3

1505

305

TC-42

DD-53

193

26-Jan-12

155

500

17

15

32

32,0

250

0,18

1,30

5,3

1541

305

TC-42

DD-53

194

26-Jan-12

154

500

17

15

32

32,0

250

0,12

1,10

5,3

1624

389

TC-42

DD-53

6028

6028

202

TOTAL PEKERJAAN

Reviewed/Witnessed by :
PT.WILMAR NABATI INDONESIA

( ________________________ )

(nos)

Bearing
Cap*)

(code)

Prepared by :
PT. TERAPAN NILAIOSILASI INDONESIA

( Dwi Dedy Ariyanto )

You might also like