0% found this document useful (0 votes)
16 views

Lua Eis Process Rev Tar

The document outlines the land use analysis and environmental impact statement process, which includes submitting an application, determining the level of environmental impact, selecting a contractor, issuing notices, conducting public scoping and reviews, drafting impact statements, analyzing alternatives and effects, assessing comments, and publishing a final decision.

Uploaded by

Mikhail Miguel
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views

Lua Eis Process Rev Tar

The document outlines the land use analysis and environmental impact statement process, which includes submitting an application, determining the level of environmental impact, selecting a contractor, issuing notices, conducting public scoping and reviews, drafting impact statements, analyzing alternatives and effects, assessing comments, and publishing a final decision.

Uploaded by

Mikhail Miguel
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

The Land Use Analysis/Environmental Impact Statement Process

Submit Application/ Proposal to Lead Agency

MOU Prepared

Preliminary Evaluation of Potential Impact

Significant Impact Will Occur EIS Preparation and Land Use Analysis Required

Impact is Uncertain EA Preparation Required

No Impact Will Occur Categorical Exclusion

Third-Party Contractor Selected

Notice of Intent (NOI)

FOSI Prepare EIS

FONSI No Further Study Required

Public Scoping

Preparation of Draft LUA/DEIS

Evaluation of Existing Baseline Data and Applicable NEPA Documents

90-Day Public Review of Draft EIS

Additional Baseline Data Gathered as Required

Preparation of Proposed LUA/Final EIS

Analysis of Management Situation (AMS) Application of Coal Suitability Criteria (43 CFR 3460)

Publish NOA 30-Day Public Protest Period 60-Day Governors Consistency Review

Formulate Alternatives Analyze Effects of Alternatives

Assessment of Public Comments

Preparation of Record of Decision (ROD) Select Preferred Alternative

You might also like