0% found this document useful (0 votes)
256 views1 page

Production Schedule

This production schedule outlines 3 scenes for the film "Mirrored Past" to be filmed on February 24th, February 25th, and March 2nd. Scene 1 takes place on a road and requires a dress. Scene 2 is set in a house bedroom and bathroom and may require pyjamas, bottles, and a mirror. Scene 3 is set in a school boardroom made to look like a museum, and will require newspaper articles, walking canes, and old hats. The final scene also takes place in a school bathroom and may require a lighter. Health and safety precautions are noted for each scene.

Uploaded by

goldeniz
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
256 views1 page

Production Schedule

This production schedule outlines 3 scenes for the film "Mirrored Past" to be filmed on February 24th, February 25th, and March 2nd. Scene 1 takes place on a road and requires a dress. Scene 2 is set in a house bedroom and bathroom and may require pyjamas, bottles, and a mirror. Scene 3 is set in a school boardroom made to look like a museum, and will require newspaper articles, walking canes, and old hats. The final scene also takes place in a school bathroom and may require a lighter. Health and safety precautions are noted for each scene.

Uploaded by

goldeniz
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

PRODUCTION SCHEDULE

PROJECT TITLE : Mirrored Past Scene Number 1 Date & Time Friday 24th February 2012 Director Deniz Arslan* Location Road, crossing the sreet Page 1 of 1

Crew Sofia Wikho Ng

Props/Costume req Dress

Health & Safety Avoid getting hit by a car as she will be on the road

Other

Scene Number 2

Crew

Date & Time Friday, 24th February 2012/ Saturday 25th February, 2012 Props/Costume req Mirror, bed, bottles. Pyjamas, casual outfits. Date & Time Friday 2nd March 2012

Director Deniz Arslan

Location House, bedroom & bathroom

Health & Safety Might slip in the bathroom

Other

Scene Number 2 Museum Boardroom Crew Jamie Mcdougall Kayleigh Quinn Louis Hyde Sofia Wikho NG Selasie Van-Lare Deniz Arslan

Director Deniz Arslan

Location School Board room as it looks like museum Other

Props/Costume req Newspaper article, Walking cane, Olden day hat. Different outfits

Health & Safety A lot to trip up on

Scene Number 3 Toilet scene Crew Deniz Arslan Sofia NG

Date & Time Friday 2nd March 2012/ Friday 9th March,2012 Props/Costume req Mirror Lighter

Director Deniz Arslan

Location School

Health & Safety Fire hazard

Other

You might also like