01 Biomasa Elektronska Final

Download as pdf or txt
Download as pdf or txt
You are on page 1of 52

CONSTRUCTION OF PLANTS AND ELECTRICITY/HEAT GENERATION FROM BIOMASS IN THE REPUBLIC OF SERBIA GUIDE FOR INVESTORS

Branislava Lepoti Kovaevi, PhD Law Dragoslava Stojiljkovi, PhD Mech. Eng. Bojan Lazarevi, BSc El. Eng

IZGRADNJA POSTROJENJA I PROIZVODNJA ELEKTRINE/TOPLOTNE ENERGIJE IZ BIOMASE U REPUBLICI SRBIJI VODI ZA INVESTITORE
Dr Branislava Lepoti Kovaevi, dipl.prav. Dr Dragoslava Stojiljkovi, dipl.ma.in. Bojan Lazarevi, dipl.el.in.

ENGLISH

SERBIAN

CONSTRUCTION OF PLANTS AND ELECTRICITY/HEAT GENERATION FROM BIOMASS IN THE REPUBLIC OF SERBIA GUIDE FOR INVESTORS
2 4
4 4

Introduction Biomass/Biogas Power Plants


Biomass - Fuel for Electricity/Heat Generation Biogas - Fuel for Electricity/Heat Generation

4 5 5 5 6 6
6
7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 16

Investors Rights Relevant Legislation Competent Institutions From Idea to Power Plant Construction/Use Main Steps: From Idea to Plant Construction/Use Main Steps: From Idea to Power Plant Construction/Use (I)
I
I-1 I-2 I-2 I-3 I-3 I-3 I-3 I-3 I-4 I-4 I-4 I-4 I-4 I-4 I-4 I-5 I-5 I-5

Acquiring the Right to Construct and Constructing the Power Plant


Location Selection, Perusal of Valid Planning Documents and Information on Location Energy Permit Obtaining the Energy Permit Location Permit Requirements for Connection to the Electricity/DH Network Forming the Building Plot Water Requirements Obtaining the Location Permit Construction Permit Environmental Impact Assessment (1) Environmental Impact Assessment (2) Environmental Impact Assessment (3) Technical Documentation Water Approval and Technical Review of the Design Construction Permit, Attachments to the Request Obtaining the Construction Permit Operating Permit Construction of a Facility Technical Inspection and the Operating Permit

17
17
18 18 19 19 20 20 21 21 22 22 23 23 24 24

Main Steps: From Idea to Power Plant Construction/Use (II)


II Acquiring the Right to Undertake Electricity/Heat Generation
The Right to Electricity Generation - Acquisition Method II-1 Assigning the Engagement in an Activity of Public Interest II-1 Assignment Agreement - Requirements II-1 Assignment Agreement - Scope and Content II-1 Concession II-1 Concession - Contents of a Concession Agreement II-1 The Assignment Agreement vs. Concession - Main Differences II-2 License II-2 Obtaining the License II-3 Approval for Connection to the Electric Grid II-3 Approval for Connection to a Heat Distribution Network II-4 The Status of a Privileged Producer II-4 Acquiring the Status of a Privileged Producer II-5 Power Purchase Agreement 1

Renewable energy, such as biomass, wind, mini-hydro, and geothermal is receiving greater attention from governments, potential investors, and consumers worldwide. In 2007, the European Union (EU) set a combined member country target that 20% of overall energy consumption will come from renewable sources by 2020. Serbia has significant renewable energy resources to meet this emerging demand, and the Serbian Government has developed a strategy to leverage this opportunity. To support sector growth and investment, and to meet their commitment to the South East Europe Energy Community Treaty, the Serbian government adopted several regulations by decree in November 2009, including: Establishment of a Feed-in Tariff system whereby the Serbian government will subsidize the cost of renewable electricity; Defined the requirements of becoming a Privileged Electric Power Producer who uses renewable energy sources to generate electricity; With the Serbian governments adoption of feed-in tariffs and other key regulation, GTZ Project Strengthening of the Local Self-Government (GTZ SLS) has been working with government ministries and the USAID Competitiveness Project private sector investors to encourage investment in renewable energy projects.

BACK TO CONTENT

A key activity has been to create definitive guides to the renewable energy licensing process aimed at encouraging investors and other market actors to become active in the sector. Representatives of the Ministry of Mining and Energy, Ministry of Environment and Spatial Planning and Ministry of Agriculture, Forestry and Water Management together with the GTZ experts have created four such roadmaps, which explain the licensing process for developing projects in geothermal water, small hydro power, wind power and biomass subsectors. The USAID Competitiveness Project has supported GTZ SLS in the creation of investor roadmaps as part of its activities to encourage investment in the sector by providing technical assistance to prospective investors. Each roadmap is created as a detailed document, which describes administrative procedures and identifies relevant institutions and necessary planning and design documents needed for investors. The roadmaps navigate the legislative and regulatory framework and should be utilized as a baseline for further legislative and regulatory reform. GTZ SLS has also prepared short versions of roadmaps, which are executive summaries that investors can use for fact finding. We hope that this effort will be a vehicle to facilitate dialogue between the private sector and the Government to identify and address barriers to the growth and financial viability of the sector.

BACK TO CONTENT

Biomass/Biogas Power Plants

Power plants using biomass/biogas as primary fuel for electricity and/or heat generation
- Small power plants - up to 10MW - Big power plants - 10 MW and more

Biomass Fuel for Electricity/Heat Generation

Biomass, as fuel for electricity/heat generation is considered to be a renewable energy source; it is a biodegradable substance that originates from agriculture, forestry, supporting industries, and households. It includes:
- Plants and plant parts - Residues and byproducts of plants originating from agriculture (straw, maize stalks, branches, stones, shells/peels) - Residues of animal origin originating from agriculture (feces) - Plant residues from forestry (logging residues) - Biodegradable residues from food-processing and the timber and wood industry not containing hazardous substances

Biogas Fuel for Electricity/Heat Generation

Biogas is produced via an anaerobic process, from biomass, specifically from:


- Residues from agriculture (liquid manure, feces from cattle and poultry farms) - Residues of biomass from the primary processing of agricultural products (not containing hazardous substances)

Investor`s Rights

An investor must acquire the following rights:


- I The Right to Construct - II The Right to undertake electricity/heat production

BACK TO CONTENT

Relevant Legislation

- The Energy Law (Official Gazette of the RoS, No. 84/04) - The Law on Planning and Construction (Official Gazette of the RoS, Nos. 72/09 and 81/09) - Law on Environmental Protection (Official Gazette of the RoS, Nos. 135/04 and 36/09) - The Law on Waters (Official Gazette of the RoS, No. 30/10) - The Law on Concessions (Official Gazette of the RoS, No. 55/03) - The Law on Public Companies and Performing Activities of Public Interest (Official Gazette of the RoS, Nos. 25/00, 25/02, 107/05 and 108/05) - The Law on Public Utility Companies (Official Gazette of the RoS, Nos. 16/97 and 42/98) and other relevant laws and by-laws...

Competent Institutions

The Ministry of Mining and Energy - MME A Local Self-government Unit - LSU The Energy Agency - EA The Republic Geodetic Authority - RGA The Ministry of Agriculture, Forestry and Water Management - MAFWM The Ministry of Environment and Spatial Planning - MESP The Republic Hydrometeorological Service - RHMS Electric Grid of Serbia - EMS Electric Power Industry of Serbia - EPS

and other competent institutions in each specific case

From Idea to Power Plant Construction/ Use

I Acquiring the Right to Construct and Constructing the Power Plant II Acquiring the right to generate electricity/heat

BACK TO CONTENT

Main Steps: From Idea to Power Plant Construction/Use (I)

Acquiring the Right to Construct and Constructing the Power Plant


I-1 The Information on Location I-2 Acquiring the Energy Permit I-3 Acquiring the Location Permit I-4 Acquiring the Construction Permit
Construction of the Power Plant

I-5 Acquiring the Operating Permit

BACK TO CONTENT

Main Steps: From Idea to Power Plant Construction/Use (I) Acquiring the Right to Construct and Constructing the Power Plant

Location selection

Perusal of the valid planning document (a local self-government unit)

The location planned for construction of an energy facility Yes

No

Obtaining the approval from the Ministry of Agriculture, Forestry and Water Management

A copy of the lot, the list of the lot owners (Real Estate Cadastral Service of a municipality)

Location Selection, Perusal of Valid Planning Documents, and Information on Location

I-1

Request for obtaining the information on the location Deadline: 8 days The Information on Location

The information on location

Feasibility Study for Construction

I-2

Energy Permit

ENERGY PERMIT

Opinion of the energy network operator on the possibilities for connection

Bank statement indicating bank readiness to support the investor with financing

BACK TO CONTENT

Main Steps: From Idea to Power Plant Construction/Use (I) Acquiring the Right to Construct and Constructing the Power Plant

I-2

Power plant power > 1 MW

No

Obtaining the Energy Permit

Pre-feasibility Study with the General Design

Yes

The Energy Permit is not required

Electricity generating power plant (Ministry of Mining and Energy) No Yes

CHP plant (Ministry of Mining and Energy + a local self-government unit)

Heat generating power plant (a local self-government unit)

> 10 MW

Request for the Energy Permit (Form O-1)

Request for the Energy Permit (Form O-2)

Request for the Energy Permit (Form O-10) The deadline for all the applications is 30 days (appealable within 7 days from receipt of the decision)

Energy Permit (valid for 2 years and may be extended at the request of the holder)

I-3

Location Permit

The location permit contains all the requirements and data needed for preparation of the technical documentation and the main design, in accordance with a valid planning document
Property rights issues resolved LOCATION PERMIT The construction plot formed (allotment/re-allotment) The technical documentation for a biomass/biogas power plant facility completed (data on the facility/the general design)

Requirements for designing collected

BACK TO CONTENT

Main Steps: From Idea to Power Plant Construction/Use (I) Acquiring the Right to Construct and Constructing the Power Plant

Request for the requirements for connecting the producer to the system (to the energy facility to whose system the power producer`s facility is to be connected)

Technical report - specifies whether power and technical conditions are in place for possible future connection of the facility according to the submitted application

Requirements for connection to the Electricity/ DH network

I-3

Issuing of the requirements for connection

Deadline: 30 days (maximum 60 days)

Preparation of the allotment/re-allotment plan (it must include the Design of Geodetic Survey Benchmarking)

Submitting the plan to the relevant authority in charge of town planning affairs at the local self-government unit No Notification is sent to party that submitted the plan Deadline: 3 days Notification is sent to party that submitted the plan Yes

The plan correlates with the valid planning document Deadline: 10 days

Forming the Building Plot

I-3

The competent authority verifies the plan

The decision on forming the cadastral lot(s)

Submitting the application to undertake allotment/ re=allotment the Republic Geodetic Authority) Deadline: 30 days (maximum 60 days), and appealable within 15 days from receipt of the decision

BACK TO CONTENT

Main Steps: From Idea to Power Plant Construction/Use (I) Acquiring the Right to Construct and Constructing the Power Plant

I-3

Water Requirements

The application for an opinion from the Republic organization in charge of hydro-meteorological affairs (RHMS) Deadline: 30 days (maximum 60)

Preliminary Feasibility Study, including the General Design

Application for the Water requirements (to the Ministry of Agriculture, Forestry and Water Management)

The opinion of the Republic organization in charge of hydro-meteorological affairs Yes The application for the opinion of a public Water enterprise (PMC Srbijavode/ PMC Vode Vojvodine) Deadline: 30 days (maximum 60)

A special opinion needs to be obtained No The facility is in the territory of a spa Yes No

Obtaining the opinion (the Ministry of Environment and Spatial Planning and/or a specialized scientific institution)

The opinion of the public water-management enterprise

Obtaining the opinion (the ministry in charge of tourism affairs)

The decision on issuing the Water requirements

Deadline: 30 days (maximum 60 days)

I-3

The application for the location permit (10 MW, to the Ministry of Environment and Spatial Planning or to the Autonomous Province, <10 MW, to the local self-government unit) No, within 8 days

Checking the submitted documentation

Notification to the applicant

Obtaining the Location Permit

Complete documentation Yes Checking the planning document (to make certain it contains all the requirements and data for preparation of the technical documentation)

The competent authority obtains the necessary data ex officio

The organization authorized to issue the requirements and data submits the required data to the competent authority Deadline: 30 days

Issuing of the Location Permit


BACK TO CONTENT 10

Main Steps: From Idea to Power Plant Construction/Use (I) Acquiring the Right to Construct and Constructing the Power Plant

After completing the technical supervision of the main design and the positive report on a completed technical supervision, the application must be submitted to the competent authority of the local self-government unit in order to obtain the Construction Permit
The design documentation (the preliminary design, the main design) The Environmental Impact Assessment Study Approvals of the Design Documentation and the Environmental Impact Assessment Study

Construction Permit

I-4

CONSTRUCTION PERMIT

Technical supervision of the design documentation

Power plant power > 1 MW Yes Power plant power > 50 MW Yes The Environmental Impact Assessment Study is mandatory Notification to the investor and to the public about the decision

No The Environmental Impact Assessment Study may be requested

No

The request for deciding on the need to assess the impact (10 MW, to the Ministry of Environment and Spatial Planning or to the autonomous Province, <10 MW, to the local self-government unit) Deadline: 10 days Notifications to interested authorities and to the public Deadline: 10 days Deadline: 3 days
Obtaining the opinions from interested authorities and public

Environmental Impact Assessment (1)

I-4

Deadline: 10 days The competent authority makes a decision on the request on the need for impact assessment The Environmental Impact Assessment Study is not required

The Environmental Impact Assessment Study is required

11

BACK TO CONTENT

Main Steps: From Idea to Power Plant Construction/Use (I) Acquiring the Right to Construct and Constructing the Power Plant

Environmental Impact Assessment (2)

I-4

The Environmental Impact Assessment Study is required No The decision defines the scope and contents of the Study Yes

The application for determining the scope and contentsof the impact assessment study (10 MW, to the Ministry of Environment and Spatial Planning or to the autonomous province, <10 MW, to the local self-government unit) Deadline: 10 days Notification to interested members of the public Deadline: 15 days The interested public submits the opinion Deadline: 10 days The competent authority makes the decision on the scope and contents of the impact assessment study

Making the Environmental Impact Assessment Study

Deadline: 3 days Notification on decision to the investor and to the public

I-4

Making the Environmental Impact Assessment Study Within 1 year from receipt of the final decision on the scope and contents of the Study Request for approval of the impact assessment study (10 MW, to the Ministry of Environment and Spatial Planning or to the Autonomous Province, <10 MW, to the local self-government unit) Deadline: 7 days Notification interested members of the public Deadline: 20 days Public insight, presentation, and debate on the study Deadline: 10 days Forming of the Technical Commission for evaluation of the Environmental Impact Assessment Study Deadline: 3 days The Study must be submitted to the Commission for evaluation Deadline: 30 days Report on evaluation of the Environmental Impact Assessment Study and a proposed decision Deadline: 10 days The decision whether to accept or reject the application for the consent on the Environmental Impact Assessment Study (valid for 2 years, time during which the project owner MUST begin construction)

Environmental Impact Assessment (3)

The report including proposed opinion of the interested public

BACK TO CONTENT

12

Main Steps: From Idea to Power Plant Construction/Use (I) Acquiring the Right to Construct and Constructing the Power Plant

Preliminary Feasibility Study, including the general design

Feasibility study with the preliminary design (containing the layout plan)

Technical Documentation

A facility referred to in Article 133, paragraph 2, points 5), 9) and 20) of the Law on Planning and Construction Yes Subject to review (expert supervision) by the committee (the review committee) Deadline: 30 days The review committee submits to the investor the report containing measures that must be applied when preparing the Main Design No

The Main Design

The Main Design

Obtaining the approval from the Ministry of Environment and Spatial Planning on the Main Design

Obtaining the approval from the Ministry of Health for the Main Design

Request for the Water Approval (to the Ministry of Agriculture, Forestry and Water Management/ to the competent authority of the AP of Vojvodina)

Obtaining the approval of the Main Design from authorities/organizations, when specified in the requirements contained in the Location Permit

Deadline: 30 days, maximum 60 days, appealable within 15 days from submitting the decision

Water Approval and Technical Review of the Design

I-4

The Water Approval of the Main Design (valid for 2 years from the date of receipt, time during which the request for the construction permit must be submitted) Technical review of the Design

13

BACK TO CONTENT

Main Steps: From Idea to Power Plant Construction/Use (I) Acquiring the Right to Construct and Constructing the Power Plant

I-4

Construction Permit* Attachments to the Request

- The Location Permit - Three copies of the Main Design, including the report on completed technical supervision and verification that it is correct - Evidence of ownership right,s or of the right to lease the construction land (submitted for the location permit as well) - Evidence of a formal relationship regarding payment of the fee for the construction land development - Evidence of payment of administrative fees and duties - Energy permit (if the power plant power exceeds 1 MW).
* For the facilities where the Construction Permit is issued by the Ministry, or by the autonomous province, the report of the review committee is also to be submitted with the request.

I-4

Technical supervision of the Main Design

Obtaining the Construction Permit

The report on the completed technical supervision of the main design

The application for the Construction Permit (10 MW, to the Ministry of Environment and Spatial Planning or to the autonomous province, <10 MW, to the local self-government unit) No, within 8 days

The design has been prepared according to the codes of construction contained in the location permit Yes, within 8 days

Notification to the investor to revise the design within 30 days

Yes, within 8 days

The design revised within 30 days No, within 8 days

The decision on the Construction Permit

The request for the Construction Permit is rejected

BACK TO CONTENT

14

Main Steps: From Idea to Power Plant Construction/Use (I) Acquiring the Right to Construct and Constructing the Power Plant

- The technical inspection determines the fitness of a facility for use - A facility may be used after the Operating Permit has been obtained - It is necessary to submit the As-built Design during the process of obtaining the Operating permit

Operating Permit

I-5

Construction of a facility OPERATING PERMIT Technical inspection of the constructed facility

As-built Design

Water Permit

The Main Design and the Decision on the Construction Permit No

The main design contains details needed for carrying out the works Yes

The Detailed Design

Construction of a Facility

I-5

Registration of the commencement of construction of the facility

Marking of the building plot, regulation, leveling, and building lines, marking of the construction site with an adequate panel

Construction of the facility

15

BACK TO CONTENT

Main Steps: From Idea to Power Plant Construction/Use (I) Acquiring the Right to Construct and Constructing the Power Plant

I-5

As-built design of the facility

Construction of the facility

Technical Inspection and the Operating Permit


The commission proposes to approve setting of the facility in test operation to the competent authority

The application for the technical inspection of the facility

Forming of the commission for technical inspection of the facility

Technical inspection

Yes

Fitness of the facility for use needs to be established No The application for the Water Permit

The decision on approval to set the facility into test operation

The commission verifies fulfillment of the requirements for issuing the Operating Permit The decision on issuing the Water Permit

The Report/Finding of the commission for technical inspection

Operating Permit

BACK TO CONTENT

16

Main Steps: From Idea to Power Plant Construction/Use (II)

Acquiring the Right to Undertake Electricity/Heat Generation

II

II-1 Acquiring the Right to Engage in an Activity of Public Interest II-2 License II-3 Approval for Connection II-4 Acquiring the Status of a Privileged Producer II-5 Engaging in Electricity/Heat Generation

17

BACK TO CONTENT

II

Main Steps: From Idea to Power Plant Construction/Use (II) Acquiring the right to undertake electricity/heat generation

The Right to Electricity Generation - Acquisition Method

1. Investment in the affiliated companies of a public company


- Involves clear and relatively short procedures - A potential problem - a parent public company is reluctant to allow a major share of the Investor - Risk - a high degree of discretionary power of the founder of the public company

or 2. Assigning the right to engage in an activity of public interest


- The investor acquires the right only after conclusion of the Assignment Agreement, and the Agreement is concluded only after the facility has been constructed - In practice, a simpler procedure compared to concessions - Most often applied in practice

or 3. Granting concessions
- The Investor acquires the right through a clearly defined procedure at the very start - The obligation to set up a new economic operator - The lengthiest procedure

II-1

Assigning the Engagement in an Activity of Public Interest

Electricity generation The Republic activity of public interest (competence: the Ministry of Mining and Energy)

Heat production A public utility service (competence: a local self-government unit)

Conclusion of the Assignment Agreement that assigns the activity of public interest: electricity generation

Conclusion of the Assignment Agreement that assigns the activity of public utility services (Heat production)

BACK TO CONTENT

18

Main Steps: From Idea to Power Plant Construction/Use (II) Acquiring the right to undertake electricity/heat generation

II

- Adequate technical prerequisites (the ownership right or the right to use the power plant, which has been constructed according to the law, technical and other regulations). - Staff capacity (that individuals working in the power plant have the necessary qualifications and other prescribed skills). - Implementation of the prescribed safety at work. - Implementation of the prescribed requirements and method of protection and the improvement of the environment.

Assignment Agreement Requirements

II-1

- Operation and business of the economic operator to whom this activity is assigned. - Obligations of the economic operator to provide the conditions necessary for continuous, proper, and quality needs of the users of products and services. - Mutual rights and obligations of the parties to the Agreement in cases where economic and other conditions for pursuing the activity of public interest are not provided. - Rights and obligations in case of a disruption in the economic operators business operations - Other rights, obligations and important issues to protect the public interest.

Assignment Agreement - Scope and Content

II-1

19

BACK TO CONTENT

II

Main Steps: From Idea to Power Plant Construction/Use (II) Acquiring the right to undertake electricity/heat generation

II-1

Proposal for granting a concession

Concession

Proposal for adoption of a concession deed

The concession deed

The decision designating the Concessionaire

Public invitation for tenders Concession Agreement The report of the Commission to undertake the public invitation for tenders

Setting of a Concessionary Enterprise

II-1

Concession - Contents of a Concession Agreement

- The parties to the Agreement, the subject matter of the concession, including the description of the facility, equipment, and plants. - Duration of the concession period and conditions under such terms may be extended for the duration of preparatory operations. - Manner of and deadlines for securing the funds for financing the concession business (the financial plan) and the time line for their employment, the amount and method of providing guarantees for fulfillment of concessionary obligation. - The requirements for conducting the concessionary business. - Standards of products and services, technology transfer. - Criteria for setting the end-user prices-tariff for products and services. - The concession fee (the amount, deadlines, conditions, and the method of payment) - Rights and obligations concerning the undertaking of measures to ensure general safety, protection of health and protection of the environment as well as liabilities for compensation of damage caused by jeopardizing general safety and protection of the environment. - The right to transfer the concession. - The time and method of handing over the immovables, the facility, equipment or plants and the condition in which they must be handed over. - Conditions for amendments or termination of the agreement and their consequences, changed circumstances and force majeure. - The method of settling disputes and enforcement of applicable law. - Other provisions mutually agreed upon between the parties to the agreement. The agreement also stipulates the method of exchanging notifications about the performance of the agreement, method of exercising control of the agreement performance, and exercising of the rights and obligations of the contracting parties.

BACK TO CONTENT

20

Main Steps: From Idea to Power Plant Construction/Use (II) Acquiring the right to undertake electricity/heat generation

II

- The tendering procedure is not prescribed - The obligation to specify the place of engaging in the activity of electricity generation is not stipulated (if it is not tied to a concrete facility by the agreement) - The maximum time period for engaging in an activity of public interest is not specified (if it is not defined in the agreement) - The obligation to establish the scope of engaging in an activity is not prescribed - The obligation to pay a fee for engaging in an activity of public interest is not prescribed

The Assignment Agreement vs. Concession Main Differences

II-1

- The license is a permit to engage in an energy-related activity; it is issued by the Energy Agency of the Republic of Serbia - It is required only for power plants of one or more 1MW

II-2

License

21

BACK TO CONTENT

II

Main Steps: From Idea to Power Plant Construction/Use (II) Acquiring the right to undertake electricity/heat generation

II-2

Heat or electricity generation for own requirements or electricity generation in power plants of up to 1 MW Yes Acquiring the License is not required No Request for the License (to the Energy Agency) Deadline: 30 days The decision on the License (valid for 10 years)

Obtaining the License

II-3

Electricity generating power plant

CHP plant

Approval for Connection to the Electric Grid

Request for the approval to connect the facility to the electric power grid Deadline: 30 days The technical report for issuing the Decision on approval for connection to the electric power grid

The decision on approval of the connection (valid for 2 years, appealable within 15 days to the Energy Agency)

The Power Purchase Agreement

BACK TO CONTENT

22

Main Steps: From Idea to Power Plant Construction/Use (II) Acquiring the right to undertake electricity/heat generation

II

CHP plant

Heat Production Plant

Request for connection of the power plant to the heat distribution system Deadline: 30 days Verification of fulfillment of the requirements: whether the equipment and installations of the facility that are to be connected meet the requirements prescribed under the law, technical, and other regulations governing the conditions and method of exploitation of such facilities

Approval for Connection to a Heat Distribution Network

II-3

The decision on approval of the connection (appealable within 15 days from submitting the decision)

- The priority right in an organized market with respect to other producers offering electricity under equal terms and conditions - The right to subsidies (tax, customs, and other reliefs/facilities) - Incentives - Feed-in tariffs:
Power plant type

Installed power (MW)

Incentive - feed-in tariff (cEUR/1 kWh) 13,6 13,845 - 0,489*P 11,4 16,0 16,444-2,222*P 12,0 6,7

The Status of a Privileged Producer

II-4

Biomass power plants

Biogas power plants

Up to 0,5 MW from 0,5 MW to 5 MW from 5 MW to 10 MW Up to 0,2 MW from 0,2 MW to 2 MW over 2 MW

Landfill and sewage gas power plants

23

BACK TO CONTENT

II

Main Steps: From Idea to Power Plant Construction/Use (II) Acquiring the right to undertake electricity/heat generation

II-4

Heat Production Plant

Heat generating power plant

Acquiring the Status of a Privileged Producer

CHP plant

Application for the status of a privileged producer Deadline: 30 days The decision on acquiring the status of a privileged electricity producer (valid for 12 years)

It is possible to acquire the status of a privileged producer at the local selfgovernment level if it enacts relevant regulations

II-5

The application to sign the Power Purchase Agreement

Power Purchase Agreement

EPS

Power Purchase Agreement Term: 12 years

BACK TO CONTENT

24

IZGRADNJA POSTROJENJA I PROIZVODNJA ELEKTRINE/TOPLOTNE ENERGIJE IZ BIOMASE U REPUBLICI SRBIJI VODI ZA INVESTITORE
26 Uvodna re 28 Elektrane na biomasu/biogas
28 28 Biomasa - gorivo za proizvodnju energije Biogas - gorivo za proizvodnju energije

28 29 29 29
30
31 31 32 32 33 33 34 34 35 35 36 36 37 37 38 38 39 39 40

Prava Investitora Izvori prava Nadlene institucije Od ideje do korienja elektrane


I
I-1 I-2 I-2 I-3 I-3 I-3 I-3 I-3 I-4 I-4 I-4 I-4 I-4 I-4 I-4 I-5 I-5 I-5

30 Osnovni koraci od ideje do korienja elektrane (I)


Sticanje prava na izgradnju i izgradnja objekta elektrane
Izbor lokacije, uvid u vaee planske dokumente i informacija o lokaciji Energetska dozvola Pribavljanje energetske dozvole Lokacijska dozvola Uslovi za prikljuenje na elektroenergetsku i/ili mreu daljinskog gerjanja Formiranje graevinske parcele Vodni uslovi Dobijanje lokacijske dozvole Graevinska dozvola Procena uticaja na ivotnu sredinu (1) Procena uticaja na ivotnu sredinu (2) Procena uticaja na ivotnu sredinu (3) Tehnika dokumentacija Vodna saglasnost i tehnika kontrola projekta Graevinska dozvola, prilozi uz zahtev Dobijanje graevinske dozvole Upotrebna dozvola Izgradnja objekta Tehniki pregled i upotrebna dozvola

41 Osnovni koraci od ideje do korienja elektrane (II)


41
42 42 43 43 44 44 45 45 46 46 47 47 48 48

II Koraci za sticanje prava na obavljanje proizvodnje elektrine/toplotne energije


Pravo na obavljanje proizvodnje elektrine energije - nain sticanja II-1 Poveravanje obavljanja delatnosti od opteg interesa II-1 Ugovor o poveravanju - Uslovi II-1 Ugovor o poveravanju - Sadraj/Odredbe II-1 Koncesija II-1 Ugovor o poveravanju delatnosti - sadraj ugovora o koncesiji II-1 Ugovor o poveravanju u odnosu na.koncesiju - osnovne razlike II-2 Licenca II-2 Dobijanje licence II-3 Odobrenje za prikljuenje elektrane na elektroenergetsku mreu II-3 Odobrenje za prikljuenje elektrane na mreu za distribuciju toplotne energije II-4 Status povlaenog proizvoaa II-4 Sticanje statusa povlaenog proizvoaa II-5 Ugovor o otkupu elektrine energije

25

Obnovljiva energija iz biomase, vetra, malih hidroelektrana i geotermalnih izvora je u centru panje drava, potencijalnih investitora i potroaa u celom svetu. U 2007. godini, Evropska Unija (EU) postavila je cilj zemljama lanicama da, do 2020. godine, 20% energije u svakoj od zemalja treba da potekne iz obnovljivih izvora energije. Srbija ima znaajne izvore obnovljive energije kojima bi mogla da zadovolji novonastale zahteve. Vlada Srbije je razvila strategiju kako bi iskoristila ovu priliku. Da bi podstakla razvoj i investicije u ovaj sektor i ispunila obavezu po Ugovoru o energetskoj zajednici Jugoistone Evrope, Vlada Srbije je usvojila nekoliko propisa po direktivi od novembra 2009, ukljuujui: Uspostavljanje sistema podsticajnih tarifa u kom e Vlada Srbije subvencionisati troak obnovljive struje; Definisanje zahteva za sticanje statusa Povlaenog proizvoaa elektrine energije koji koristi obnovljive izvore energije za proizvodnju struje; Od usvajanja podsticajnih tarifa i ostalih kljunih propisa od strane Vlade Srbije, GTZ Projekat Jaanje lokalne samouprave (GTZ JLS) je saraivao sa relevantnim ministarstvima, USAID Projektom za razvoj konkurentnosti i investitorima u privatni sektor, kako bi podstakao investicije u obnovljive izvore energije.

IDI NA SADRAJ

26

Kljuna aktivnost je bila kreiranje konanih vodia za proces izdavanja dozvola za obnovljive izvore sa ciljem podsticanja investitora i drugih trinih uesnika da postanu aktivni u ovom sektoru. Predstavnici Ministarstva rudarstva i energetike, Ministarstva zatite ivotne sredine i prostornog planiranja i Ministarstva poljoprivrede, umarstva i vodoprivrede zajedno sa strunjacima GTZ-a su kreirali etiri takva vodia, koji objanjavaju proces dobijanja dozvola za razvijanje projekata za podsektore geotermalne vode, malih hidroelektrana, energije vetra i biomase. USAID Projekat za razvoj konkurentnosti je podrao GTZ JLS u kreiranju vodia za investitore kao deo svojih aktivnosti vezanih za podsticanje investicija u sektor kroz pruanje tehnike pomoi perspektivnim investitorima. Svaki vodi je kreiran u vidu detaljnog dokumenta, koji opisuje administrativne procedure i identifikuje institucije od znaaja i dokumenta vezana za planiranje i izradu projekata koja su neophodna za investitore. Vodii obuhvataju i zakonski i regulatorni okvir i treba da se koriste kao osnova za dalje zakonske i regulatorne reforme. GTZ JLS je takoe pripremio krau verziju vodia, koji predstavljaju saetke vodia koje investitori mogu da koriste za nalaenje podataka. Nadamo se da e ovaj korak biti podstrek za dalji dijalog izmeu privatnog sektora i Vlade kako bi se identifikovale i uklonile prepreke razvoju i finansijskoj odrivosti sektora.

27

IDI NA SADRAJ

Elektrane na biomasu/biogas

Elektrane koje kao veinsko gorivo koriste biomasu/ biogas za obavljanje delatnosti proizvodnje elektrine i/ili toplotne energije
- Male elektrane - snage do 10MW - Velike elektrane - snage od 10 MW i vie

Biomasa gorivo za proizvodnju energije

Biomasa, u smislu goriva za proizvodnju energije (elektrine i toplotne) koje se smatra obnovljivim izvorom, jeste biorazgradljiva materija nastala u poljoprivredi, umarstvu i prateoj industriji i domainstvu i obuhvata:
- biljke i delove biljaka - ostatke i nusproizvode biljaka nastale u poljoprivredi (slama, kukuruzovina, granje, kotice, ljuske) - ostatke ivotinjskog porekla nastale u poljoprivredi (izmet) - ostatke biljaka u umarstvu (ostaci pri sei uma) - biorazgradljive ostatke u prehrambenoj i drvnoj industriji koji ne sadre opasne materije

Biogas - gorivo za proizvodnju energije

Biogas nastaje u anaerobnim postupcima od biomase i to:


- ostataka u poljoprivredi (teni stajnjak, izmet sa stoarskih i ivinarskih farmi) - ostataka biomase nastalih primarnom preradom poljoprivrednih proizvoda (koji ne sadre opasne materije)

Prava investitora

Investitor mora da stekne sledea prava:


- I Pravo na izgradnju - II Pravo na obavljanje proizvodnje elektrine/toplotne energije

IDI NA SADRAJ

28

Izvori prava

Zakon o energetici (Sl. Glasnik RS br. 84/04) Zakon o planiranju i izgradnji (Sl. glasnik RS br. 72/09 i 81/09) Zakon o zatiti ivotne sredine (Sl. glasnik RS br. 135/04 i 36/09) Zakon o vodama (Sl. glasnik RS br. 30/10) Zakon o koncesijama (Sl. glasnik RS br. 55/03) Zakon o javnim preduzeima i obavljanju delatnosti od opteg interesa (Sl. glasnik RS br. 25/00, 25/02, 107/05 i 108/05) - Zakon o komunalnim delatnostima (Sl. glasnik RS br. 16/97 i 42/98) i ostali pratei zakoni i podzakonska akta...

Nadlene institucije

Ministarstvo rudarstva i energetike - MRE Jedinica lokalne samouprave - JLS Agencija za energetiku - AE Republiki geodetski zavod - RGZ Ministarstvo poljoprivrede, umarstva i vodoprivrede - MPV Ministarstvo ivotne sredine i prostornog planiranja - MSPP Republiki hidrometeoroloki zavod - RHMZ Elektromrea Srbije - EMS Elektroprivreda Srbije - EPS

i ostale nadlene institucije u konkretnom sluaju

Od ideje do korienja elektrane

I Sticanje prava na izgradnju i izgradnja objekta elektrane II Sticanje prava na obavljanje proizvodnje elektrine/toplotne energije

29

IDI NA SADRAJ

Osnovni koraci od ideje do korienja elektrane (I)

Sticanje prava na izgradnju i izgradnja objekta elektrane


I-1 Informacija o lokaciji I-2 Pribavljanje energetske dozvole I-3 Pribavljanje lokacijske dozvole I-4 Pribavljanje graevinske dozvole
Graenje objekta

I-5 Pribavljanje upotrebne dozvole

IDI NA SADRAJ

30

Osnovni koraci od ideje do korienja elektrane (I) Sticanje prava na izgradnju i izgradnja objekta elektrane

Izbor lokacije

Uvid u vaei planski dokument (jedinica lokalne samouprave)

Lokacija predviena za izgradnju energetskog objekta Da

Ne

Pribavljanje saglasnosti Ministarstva poljoprivrede, umarstva i vodoprivrede

Kopija parcele, lista vlasnika parcele (Sluba za katastar nepokretnosti optine)

Izbor lokacije, uvid u vaee planske dokumente i informacija o lokaciji

I-1

Zahtev za dobijanje informacije o lokaciji rok 8 dana Informacija o lokaciji

Informacija o lokaciji

Elaborat o izgradnji

ENERGETSKA DOZVOLA

Energetska dozvola

I-2

Miljenje operatera mree o mogunostima prikljuenja

Izjava banke o spremnosti da prati investitora u finansiranju

31

IDI NA SADRAJ

Osnovni koraci od ideje do korienja elektrane (I) Sticanje prava na izgradnju i izgradnja objekta elektrane

I-2

Snaga elektrane > 1 MW

Ne

Pribavljanje energetske dozvole

Izrada prethodne studije opravdanosti sa generalnim projektom

Da

Nije potrebna energetska dozvola

Elektrana za proizvodnju elektrine energije (Ministarstvo energetike i rudarstva) Ne > 10 MW Da

Elektrana za kombinovanu proizvodnju elektrine i toplotne energije (Ministarstvo energetike i rudarstva + jedinica lokalne samouprave)

Elektrana za proizvodnju toplotne energije (jedinica lokalne samouprave)

Zahtev za izdavanje energetske dozvole (Obrazac O-1)

Zahtev za izdavanje energetske dozvole (Obrazac O-2)

Zahtev za izdavanje energetske dozvole (Obrazac O-10) Rok za sve zahteve je 30 dana (alba se podnosi u roku od 7 dana od prijema reenja)

Energetska dozvola (vai 2 godine i moe se produiti na zahtev imaoca)

I-3

Lokacijska dozvola

Lokacijska dozvola sadri sve uslove i podatke potrebne za izradu tehnike dokumentacije dokumentacije, glavnog projekta, a u skladu sa vaeim planskim dokumentom
Reeni imovinsko-pravni odnosi Prikupljeni uslovi za projektovanje LOKACIJSKA DOZVOLA Tehnika dokumentacija za objekat elektrane na biomasu/ biogas (podaci o objektu/ generalni projekat)

Izvreno formiranje graevinske parcele (parcelacija/ preparcelacija)

IDI NA SADRAJ

32

Osnovni koraci od ideje do korienja elektrane (I) Sticanje prava na izgradnju i izgradnja objekta elektrane

Zahtev za izdavanje uslova za prikljuenje korisnika na sistem (energetskom subjektu na iji sistem se prikljuuje objekat proizvoaa energije)

Tehniki izvetaj - utvruje da li postoje energetski i tehniki uslovi za eventualno budue prikljuenje objekta prema podnetom zahtevu

Izdavanje akta o uslovima prikljuenja

Rok je 30 dana (najkasnije 60 dana)

Uslovi za prikljuenje na elektroenergetsku i/ili mreu daljinskog grejanja

I-3

Izrada projekta parcelacije/ preparcelacije (obavezno sadri Projekat geodetskog obeleavanja)

Predaja projekta nadlenom organu za poslove urbanizma jedinice lokalne samouprave Ne Obavetava se podnosilac projekta Rok je 3 dana Prigovor gradskom optinskom veu Da

Projekat je u skladu sa vaeim planskim dokumentom Rok je 10 dana

Formiranje graevinske parcele

I-3

Nadleni organ potvruje projekat

Reenje o formiranju katastarske(ih) parcele(a)

Podnoenje zahteva za provoenje parcelacije/ preparcelacije (Republiki geodetski zavod) Rok je 30 dana (najkasnije 60 dana), a alba se podnosi u roku od 15 dana od prijema reenja

33

IDI NA SADRAJ

Osnovni koraci od ideje do korienja elektrane (I) Sticanje prava na izgradnju i izgradnja objekta elektrane

I-3

Vodni uslovi

Zahtev za dobijanje miljenja republike organizacije nadlene za hidrometeoroloke poslove (RHMZ) Rok je 30 dana (najkasnije 60)

Prethodna studija opravdanosti sa generalnim projektom

Zahtev za dobijanje vodnih uslova (Ministarstvu poljoprivrede, umarstva i vodoprivrede)

Miljenje republike organizacije nadlene za hidrometeoroloke poslove Da Zahtev za dobijanje miljenja javnog vodoprivrednog preduzea (JVP Srbija vode/JVP Vode Vojvodine) Rok je 30 dana (najkasnije 60)

Potrebno je pribavljanje posebnog miljenja Ne Objekat je na teritoriji banjskog mesta Da Ne

Pribavljanje miljenja (Ministarstvo ivotne sredine i prostornog planiranja i/ili specijalizovana nauna institucija)

Miljenje javnog vodoprivrednog preduzea

Pribavljanje miljenja (Ministarstvo nadleno za poslove turizma)

Reenje o izdavanju vodnih uslova

Rok je 30 dana (najkasnije 60)

I-3

Zahtev za dobijanje lokacijske dozvole (10 MW Ministarstvu ivotne sredine i prostornog planiranja ili autonomnoj pokrajini, <10 MW jedinici lokalne samouprave) ne, u roku Provera priloene dokumentacije od 8 dana

Dobijanje lokacijske dozvole

Obavetavanje podnosioca zahteva

Potpuna dokumentacija Da Provera planskog dokumenta (da li sadri sve uslove i podatke za izradu tehnike dokumentacije)

Nadleni organ pribavlja potrebne podatke po slubenoj dunosti

Ovlaena organizacija za izdavanje uslova i podataka dostavlja potrebne podatke nadlenom organu Rok 30 dana

Izdavanje lokacijske dozvole


IDI NA SADRAJ 34

Osnovni koraci od ideje do korienja elektrane (I) Sticanje prava na izgradnju i izgradnja objekta elektrane

Po izvrenoj tehnikoj kontroli glavnog projekta i pozitivnom izvetaju o izvrenoj tehnikoj kontroli, nadlenom organu jedinice lokalne samouprave podnosi se zahtev za izdavanje graevinske dozvole
Studija o proceni uticaja na ivotnu sredinu

Graevinska dozvola

I-4

Projektna dokumentacija (idejni projekat,glavni projekat)

GRAEVINSKA DOZVOLA

Tehnika kontrola projektne dokumentacije

Saglasnosti na projektnu dokumentaciju i studiju uticaja

Snaga elektrane > 1 MW Da Snaga elektrane > 50 MW Da Obavezna izrada studije uticaja na ivotnu sredinu

Ne Moe se zahtevati izrada studije uticaja na ivotnu sredinu

Ne

Zahtev za odluivanje o potrebi procene uticaja (10 MW Ministarstvu ivotne sredine i prostornog planiranja ili autonomnoj pokrajini, <10 MW jedinici lokalne samouprave) Rok 10 dana Obavetavanje zainteresovanih organa i javnosti Rok 10 dana Rok 3 dana Dobijanje miljenja zainteresovanih organa i javnosti Rok 10 dana Nadleni organ donosi odluku po zahtevu o potrebi procene uticaja Potrebna je izrada studije uticaja na ivotnu sredinu

Procena uticaja na ivotnu sredinu (1)

I-4

Obavetavanje investitora i javnosti o odluci

Potrebna je izrada studije uticaja na ivotnu sredinu

35

IDI NA SADRAJ

Osnovni koraci od ideje do korienja elektrane (I) Sticanje prava na izgradnju i izgradnja objekta elektrane

I-4

Potrebna je izrada studije uticaja na ivotnu sredinu Ne U odluci je definisan obim i sadraj studije

Procena uticaja na ivotnu sredinu (2)

Zahtev za odreivanje obima i sadraja studije o proceni uticaja (10 MW Ministarstvu ivotne sredine i prostornog planiranja ili autonomnoj pokrajini, <10 MW jedinici lokalne samouprave) Rok 10 dana Obavetavanje zainteresovane javnosti Rok 15 dana Zainteresovana javnost dostavlja miljenje

Da

Rok 10 dana Nadleni organ donosi odluku o obimu i sadraju studije o proceni uticaja

Izrada studije o proceni uticaja na ivotnu sredinu

Rok 3 dana Obavetavanje investitora i javnosti o odluci

I-4

Izrada studije o proceni uticaja na ivotnu sredinu 1 godina od prijema konane odluke o obimu i sadraju Studije Zahtev za davanje saglasnosti na studiju o proceni uticaja (10 MW Ministarstvu ivotne sredine i prostornog planiranja ili autonomnoj pokrajini, <10 MW jedinici lokalne samouprave) Rok 7 dana Obavetavanje zainteresovane javnosti Rok 20 dana Javni uvid, prezentacija i javna rasprava o studiji Rok 10 dana Obrazovanje Tehnike komisije za ocenu studije o proceni uticaja Rok 3 dana Komisiji se dostavlja studija na ocenu Rok 30 dana Izvetaj sa predlogom miljenja zainteresovane javnosti Izvetaj sa ocenom studije o proceni uticaja i predlog odluke Rok 10 dana Odluka o davanju saglasnosti ili odbijanju zahteva za davanje saglasnosti na studiju o proceni uticaja (rok vaenja je 2 godine za koje vreme nosilac projekta MORA da otpone izgradnju)

Procena uticaja na ivotnu sredinu (3)

IDI NA SADRAJ

36

Osnovni koraci od ideje do korienja elektrane (I) Sticanje prava na izgradnju i izgradnja objekta elektrane

Prethodna studija opravdanosti sa generalnim projektom

Tehnika dokumentacija

Studija opravdanosti sa idejnim projektom (sadri situaciono reenje)

Objekat iz lana 133. stav 2. taka 5), 9) i 20) Zakona o planiranju i izgradnji Da Podlee reviziji (strunoj kontroli) komisije (reviziona komisija) Rok 30 dana Reviziona komisija dostavlja investitoru izvetaj sa merama koje se obavezno primenjuju pri izradi glavnog projekta Ne

Glavni projekat

Glavni projekat

Pribavljanje saglasnosti Ministarstva zdravlja na glavni projekat

Pribavljanje saglasnosti Ministarstva ivotne sredine i prostornog planiranja na glavni projekat

Zahtev za dobijanje vodne saglasnosti (Ministarstvu poljoprivrede, umarstva i vodoprivrede / nadlenom organu AP Vojvodine)

Pribavljanje saglasnosti na glavni projekat od organa/ organizacija, kada je to predvieno uslovima sadanim u lokacijskoj dozvoli

rok 30 dana, najkasnije 60 dana, alba u roku od 15 dana od dostavljanja reenja

Vodna saglasnost i tehnika kontrola projekta

I-4

Vodna saglasnost na glavni projekat (vai 2 godine od dana dobijanja, u toku kojih mora da se podnese zahtev za izdavanje graevinske dozvole) Tehnika kontrola projekta

37

IDI NA SADRAJ

Osnovni koraci od ideje do korienja elektrane (I) Sticanje prava na izgradnju i izgradnja objekta elektrane

I-4

Graevinska dozvola* prilozi uz zahtev

- Lokacijska dozvola - Glavni projekat u tri primerka sa izvetajem o izvrenoj tehnikoj kontroli i potvrdom o ispravnosti - Dokaz o pravu svojine, odnosno pravu zakupa na graevinskom zemljitu (priloeno i za lokacijsku dozvolu) - Dokaz o ureivanju odnosa u pogledu plaanja naknade za ureivanje graevinskog zemljita - Dokaz o uplati administrativne takse - Energetska dozvola (ako je snaga elektrane vea od 1 MW).
* Za objekte za koje graevinsku dozvolu izdaje Ministarstvo, odnosno autonomna pokrajina, uz zahtev se podnosi i izvetaj revizione komisije.

I-4

Tehnika kontrola glavnog projekta

Dobijanje graevinske dozvole

Izvetaj o izvrenoj tehnikoj kontroli glavnog projekta

Zahtev za izdavanje graevinske dozvole (10 MW Ministarstvu ivotne sredine i prostornog planiranja ili autonomnoj pokrajini, <10 MW jedinici lokalne samouprave) ne, u roku od 8 dana

Projekat je uraen u skladu sa pravilima graenja sadranim u lokacijskoj dozvoli da, u roku od 8 dana

Obavetavanje investitora da u roku od 30 dana uskladi projekat

da, u roku od 8 dana

Projekat je usklaen u roku od 30 dana ne, u roku od 8 dana

Reenje o graevinskoj dozvoli

Zahtev za izdavanje graevinske dozvole se odbija

IDI NA SADRAJ

38

Osnovni koraci od ideje do korienja elektrane (I) Sticanje prava na izgradnju i izgradnja objekta elektrane

- Podobnost objekta za upotrebu utvruje se tehnikim pregledom - Objekat se moe koristiti po prethodno pribavljenoj upotrebnoj dozvoli - U procesu dobijanja upotrebne dozvole potrebno je priloiti projekat izvedenog stanja

Upotrebna dozvola

I-5

Izgradnja objekta UPOTREBNA DOZVOLA Tehniki pregled izgraenog objekta

Projekat izvedenog stanja

Vodna dozvola

Glavni projekat i Reenje o graevinskoj dozvoli Ne Izvoaki projekat

Glavni projekat sadri razradu detalja potrebnih za izvoenje radova Da Prijava poetka graenja objekta

Izgradnja objekta

I-5

Obeleavanje graevinske parcele, regulacionih, nivelacionih i graevinskih linija, obeleavanje gradilita odgovarajuom tablom

Izgradnja objekta

39

IDI NA SADRAJ

Osnovni koraci od ideje do korienja elektrane (I) Sticanje prava na izgradnju i izgradnja objekta elektrane

I-5

Projekat izvedenog objekta

Izgradnja objekta

Tehniki pregled i upotrebna dozvola

Zahtev za izvrenje tehnikog pregleda objekta

Obrazovanje komisije za tehniki pregled objekta

Tehniki pregled

Komisija predlae nadlenom organu da odobri putanje objekta u probni rad

Da

Potrebno utvrivanje podobnosti objekta za upotrebu Ne Zahtev za dobijanje vodne dozvole

Reenje o odobravanju putanja objekta u probni rad

Komisija proverava ispunjenost uslova za izdavanje upotrebne dozvole Reenje o izdavanju vodne dozvole

Izvetaj/Nalaz komisije za tehniki pregled

Upotrebna dozvola

IDI NA SADRAJ

40

Osnovni koraci od ideje do korienja elektrane (II)

Koraci za sticanje prava na obavljanje proizvodnje elektrine/toplotne energije

II

II-1 Sticanje prava na obavljanje delatnosti od opteg interesa II-2 Licenca II-3 Odobrenje za prikljuenje II-4 Sticanje statusa povlaenog proizvoaa Graenje objekta II-5 Obavljanje delatnosti proizvodnje elektrine/toplotne energije

41

IDI NA SADRAJ

II

Osnovni koraci od ideje do korienja elektrane (II) Koraci za sticanje prava na obavljanje proizvodnje elektrine/toplotne energije

Pravo na obavljanje proizvodnje elektrine energije nain sticanja

1. Ulaganje u zavisna drutva javnog preduzea


- Ima jasne i relativno kratke procedure - Potencijalni problem - matino javno preduzee teko dozvoljava veinski udeo Investitora - Rizik - velik stepen diskrecione vlasti osnivaa javnog preduzea

ILI 2. Poveravanje prava obavljanja delatnosti od opteg interesa


- Investitor stie pravo tek po zakljuivanju ugovora o poveravanju, a ugovor se zakljuuje tek posle izgradnje objekta - Jednostavnija procedura u praksi u odnosu na koncesije - Najee primenjivano u praksi

ILI 3. Dodeljivanje koncesija


- Investitor stie pravo kroz jasno definisanu proceduru na samom poetku - Obaveza osnivanja novog privrednog subjekta - Najdugotrajniji postupak

II-1

Poveravanje obavljanja delatnosti od opteg interesa

Proizvodnja elektrine energije republika delatnost od opteg interesa (nadlenost: Ministarstvo rudarstva i energetike)

Proizvodnja toplotne energije komunalna delatnost (nadlenost: jedinica lokalne samouprave)

Zakljuenje ugovora o poveravanju delatnosti od opteg interesa proizvodnje elektrine energije

Zakljuenje ugovora o poveravanju obavljanja komunalnih delatnosti (proizvodnja toplotne energije)

IDI NA SADRAJ

42

Osnovni koraci od ideje do korienja elektrane (II) Koraci za sticanje prava na obavljanje proizvodnje elektrine/toplotne energije

II

- Adekvatna tehnika opremljenost (pravo vlasnitva ili pravo korienja elektrane, koja je izgraena u skladu sa zakonom, tehnikim i drugim propisima). - Kadrovska osposobljenost (da lica koja rade u elektrani imaju neophodnu strunu spremu i druga propisana znanja). - Sprovoenje propisane zatite na radu. - Ostvarivanje propisanih uslova i naina zatite i unapreenja ivotne sredine.

Ugovor o poveravanju Uslovi

II-1

- Rad i poslovanje privrednog subjekta kome se poverava ova delatnost. - Obaveze privrednog subjekta u pogledu obezbeivanja uslova za kontinuirano, uredno i kvalitetno zadovoljavanje potreba korisnika proizvoda i usluga. - Meusobna prava i obaveze ugovornih strana u sluaju kada nisu obezbeeni ekonomski i drugi uslovi za obavljanje delatnosti od opteg interesa. - Prava i obaveze u sluaju poremeaja u poslovanju privrednog subjekta. - Druga prava i obaveze i pitanja koja su od znaaja za ostvarivanje i zatitu opteg interesa.

Ugovor o poveravanju - Sadraj/ Odredbe

II-1

43

IDI NA SADRAJ

II

Osnovni koraci od ideje do korienja elektrane (II) Koraci za sticanje prava na obavljanje proizvodnje elektrine/toplotne energije

II-1
Koncesija

Predlog za davanje koncesije

Predlog za donoenje koncesionog akta

Koncesioni akt Odluka o odreivanju koncesionara Javni tender Ugovor o koncesiji Izvetaj Komisije o sprovoenju javnog tendera

Osnivanje koncesionog preduzea

II-1

Koncesija sadraj ugovora o koncesiji

- Ugovorne strane, predmet koncesije, ukljuujui opis objekata, ureaja, postrojenja. - Rok trajanja koncesije i uslovima pod kojim se taj rok moe produiti, duini trajanja pripremnih radnji. - Nain i rokovi obezbeivanja sredstava za finansiranje koncesione delatnosti (finansijski plan) i dinamika njihovog ulaganja, visini i nainu obezbeenja garancija za izvravanje koncesione obaveze. - Uslovi obavljanja koncesione delatnosti. - Standardi proizvoda i usluga, transferu\ tehnologije. - Kriterijumi za odreivanje cena-tarifa proizvoda i usluga za krajnje korisnike. - Koncesiona naknada (visina, rokovi, uslovi i nain plaanja) - Prava i obaveze u pogledu preduzimanja mera obezbeivanja opte sigurnosti, zatite zdravlja i zatite ivotne sredine kao i odgovornosti za naknadu tete prouzrokovane ugroavanjem opte sigurnosti i zatite ivotne sredine. - Prava na prenos koncesije. - Vreme i nain predaje nepokretnosti, objekta, ureaja ili postrojenja i stanje u kome se oni moraju predat. - Uslovi izmena ili raskida ugovora i njihovim posledicama, promenjenim okolnostima i vioj sili. - Nain reavanja sporova i primena merodavnog prava. - Druge odredbe o kojima se sporazumno dogovore ugovorne strane. Ugovorom se odreuje i nain meusobnog obavetavanja o izvrenju ugovora, nainu vrenja kontrole izvrenja ugovora i ostvarivanja prava i obaveza ugovornih strana.
44

IDI NA SADRAJ

Osnovni koraci od ideje do korienja elektrane (II) Koraci za sticanje prava na obavljanje proizvodnje elektrine/toplotne energije

II

- Nije propisana tenderska procedura - nije utvrena obaveza utvrivanja mesta obavljanja delatnosti proizvodnje elektrine energije (ukoliko se ugovorom ne vee za konkretan objekat - nije utvren maksimalan rok obavljanja delatnosti od opteg interesa (ukoliko se ugovorom ne definie) - nije propisana obaveza utvrivanja obima obavljanja delatnosti - nije propisana obaveza plaanja bilo kakve naknade za obavljanje delatnonsti od opteg interesa

Ugovor o poveravanju u odnosu na koncesiju osnovne razlike

II-1

- Licenca je dozvola za obavljanje energetske delatnosti koju izdaje Agencija za energetiku Republike Srbije - Potrebna samo za elektrane snage od 1MW i vee

II-1

Licenca

45

IDI NA SADRAJ

II

Osnovni koraci od ideje do korienja elektrane (II) Koraci za sticanje prava na obavljanje proizvodnje elektrine/toplotne energije

II-2
Dobijanje licence

Obavljanje proizvodnje toplotne ili elektrine energije za sopstvene potrebe ili za proizvodnju elektrine energije u elektranama do 1 MW Da Nije potrebno pribavljanje licence Ne Zahtev za dobijanje licence (Agenciji za energetiku) rok 30 dana Reenje o licenci (vai 10 godina)

II-3

Elektrana za proizvodnju elektrine energije

Elektrana za kombinovanu proizvodnju elektrine i toplotne energije

Odobrenje za prikljuenje elektrane na elektroenergetsku mreu

Zahtev za izdavanje odobrenja za prikljuenje objekta na elektroenergetsku mreu rok 30 dana Tehniki izvetaj za izdavanje Reenja o odobrenju za prikljuenje na elektroenergetsku mreu

Reenje o odobrenju prikljuenja (vai 2 godine, alba u roku od 15 dana Agenciji za energetiku)

Ugovor o otkupu

IDI NA SADRAJ

46

Osnovni koraci od ideje do korienja elektrane (II) Koraci za sticanje prava na obavljanje proizvodnje elektrine/toplotne energije

II

Elektrana za kombinovanu proizvodnju elektrine i toplotne energije

Elektrana za proizvodnju toplotne energije

Zahtev za odobrenje za prikljuenje elektrane na distributivni sistem za toplotnu energiju rok 30 dana Provera ispunjenosti uslova da ureaji i instalacije objekta koji se prikljuuje ispunjavaju uslove propisane zakonom, tehnikim i drugim propisima kojima se ureuju uslovi i nain eksploatacije tih objekata

Reenje o odobrenju prikljuenja (alba u roku od 15 dana od dostavljanja reenja)

Odobrenje za prikljuenje elektrane na mreu za distribuciju toplotne energije

II-3

- Pravo prioriteta na organizovanom tritu u odnosu na druge proizvoae koji nude energiju pod jednakim uslovima - Pravo na subvencije (poreske, carinske i druge olakice) - Mere podsticaja - Feed-in tarife:
Vrsta elektrane

Elektrane na biomasu

Elektrane na biogas

Elektrane na deponijski gas i gas iz postrojenja za tretman komunalnih otpadnih voda

Instalisana snaga (MW) Mera podsticaja otkupna cena (cEUR/1 kWh) 13,6 do 0,5 MW od 0,5 MW do 5 MW 13,845 - 0,489*P od 5 MW do 10 MW 11,4 do 0,2 MW 16,0 od 0,2 MW do 2 MW 16,444-2,222*P preko 2 MW 12,0 6,7

Status povlaenog proizvoaa

II-4

47

IDI NA SADRAJ

II

Osnovni koraci od ideje do korienja elektrane (II) Koraci za sticanje prava na obavljanje proizvodnje elektrine/toplotne energije

II-4

Elektrana za proizvodnju elektrine energije

Elektrana za proizvodnju toplotne energije

Sticanje statusa povlaenog proizvoaa

Elektrana za kombinovanu proizvodnju elektrine i toplotne energije

Zahtev za sticanje statusa povlaenog proizvoaa rok 30 dana Reenje o sticanju statusa povlaenog proizvoaa elektrine energije (vai 12 godina)

Status povlaenog proizvoaa mogue je ostvariti na nivou jedinice lokalne samouprave ukoliko donesu propise

II-5
Ugovor o otkupu elektrine energije

Zahtev za potpisivanje Ugovora o otkupu elektrine energije

EPS

Ugovor o otkupu elektrine energije Rok vaenja 12 godina

IDI NA SADRAJ

48

See the detailed text of the Guide for Investors at the web site of the Ministry of Mining and Energy Detaljno uputstvo za investitore moete pronai na web sajtu Ministarstva rudarstva i energetike

www.mre.gov.rs

This publication is made possible by the support of the American people through the United States Agency for International Development (USAID) in cooperation with the German Development Agency (GTZ), supported by the Ministry of Mining and Energy and the Ministry of Environment and Spatial Planning, and does not necessarily reflect the views of USAID or the United States Government nor the views of GTZ or the Government of Federal Republic of Germany

Izrada ove publikacija omoguena je podrkom amerikog naroda kroz Ameriku agenciju za meunarodni razvoj (USAID) u saradnji sa Nemakom organizacijom za tehniku saradnju (GTZ), a podrali su je Ministarstvo rudarstva i energetike i Ministarstvo ivotne sredine i prostornog planiranja, i ona ne mora nuno da odraava stavove USAID ili Vlade Sjedinjenih amerikih drava, niti GTZ ili Vlade Savezne Republike Nemake

You might also like