0% found this document useful (0 votes)
299 views

Adding A User Requirement in CA7

The document provides instructions on how to add a user requirement to a job in CA-7 for a specific date. It describes navigating to the DB Maintenance option in CA-7, selecting the job and system, and then choosing the User Requirements option to add a new requirement. The user is prompted to fill out fields including the job name, apply date, SE name, SE phone, and requirement text, and then hits enter to add the new user requirement to the database.

Uploaded by

pathak2277
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
299 views

Adding A User Requirement in CA7

The document provides instructions on how to add a user requirement to a job in CA-7 for a specific date. It describes navigating to the DB Maintenance option in CA-7, selecting the job and system, and then choosing the User Requirements option to add a new requirement. The user is prompted to fill out fields including the job name, apply date, SE name, SE phone, and requirement text, and then hits enter to add the new user requirement to the database.

Uploaded by

pathak2277
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

How to add a User Requirement to a Job in CA-7 for a specific date

From ISPF main menu, go to E.7;P Choose Option 5 for DB MAINTENANCE. Note: We will be using GMBRARGM and the date of 08/01/1998 for our example. Put in GMBRARGM for Job Name , and GMBRRCM for System Name. Hit Enter. ------------------------PRODUCTION SCHEDULING INTERFACE---------------------------OPTION ===> 5 Job Name ===> GMBRARGM System Name ===> GMBRRCM 1 QUEUES 2 ABENDS 3 PRIOR RUN Queue Activity - Request, Ready, and Active queue information - Production abends, fails, errors, and requeues - Prior Run queue information 05/22/1998 - 14:07 Julian Date: 1998.142

Data Base Activity 4 RESOLVE - SPARM/ZPARM/Override JCL Resolution 5 DB MAINTENANCE - ZPARMs, overrides, resdates, job requests, user rqmts L S T X Special Activity LOG DISPLAY - Browse CA7 on-line log SYSTEM AUTHORITY - Add, delete, and list system ID authority TUTORIAL - Display information about PSI V4.1 EXIT - Terminate this session

Enter 1 for USER RQMTS. Hit Enter. ------------------------ PSI CA-7 Data Base Maintenance -----------------OPTION ===> 1 Job Name ===> GMBRARGM 1 2 3 4 5 6 USER RQMTS JOB SCHEDULING ZPARM/OVERRIDE ZPARM VALUE RESOLUTION DATE OVERRIDE EDIT System Name ===> GMBRRCM

- Add, delete, and list user requirements. - Add, delete, update, and list job requests. - Update and list ZPARM and override flags. - Add, delete, update, and list ZPARMs. - Add, delete, update and list resolution dates. - Edit or browse override and reset override flag.

If there are no user requirements for this specific job, then the message NO RECORDS SELECTED will be in the upper right hand corner. To pull up a list of jobs, you can use part of the job name followed by an * (ex: GMBRAR* ). To add a job, type A at the command and Hit Enter. ----------------------- List Data Base User Requirement NO RECORDS SELECTED COMMAND ===> A SCROLL ===> PAGE Job Name ===> GMBRARGM System Name ===> GMBRRCM Apply Date ===> 08/01/1998 (MM/DD/YYYY) Line Commands: D Delete requirement Primary Commands: S Display requirement A Add requirement By

System Apply A Requirement Added Job Name Name Date P User Requirement... On At ---------------------------------------------------------------------------

Fill in the following fields, if they are not there automatically. Make sure the date format is MM/DD/YYYY. When you have filled out all of the fields, then hit Enter. The job now has a User Requirement for 08/01/1998 and will not run until the SE removes the extra requirement which happens to be a Hold. Once the requirement date has expired, it is up to the SE to delete the user requirement. ------------------------- ADD User Requirement -COMMAND ===> System Name ===> GMBRRCM Job Name Apply Date SE Name SE Phone ===> GMBRARGM ===> 08/01/1998 (MM/DD/YYYY) ===> MICHELE AGNETTI ===> 8-365-1072

Requirement ===> Hold the job for production.

You might also like