1 Need of Pipelines

The document discusses the need for pipelines in soft drink manufacturing. Without pipelines, each bottle must be cleaned, dried, filled, and capped sequentially, taking 10 minutes total to complete the process on 4 bottles. With pipelines, the cleaning, drying, filling, and capping processes can be done simultaneously on different bottles, reducing the total time to complete 4 bottles from 40 minutes to 23 minutes. Pipelines allow resources to be shared across multiple tasks, reducing the overall time needed to complete multiple processes.

Uploaded by

gowsikh
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
91 views30 pages

1 Need of Pipelines

The document discusses the need for pipelines in soft drink manufacturing. Without pipelines, each bottle must be cleaned, dried, filled, and capped sequentially, taking 10 minutes total to complete the process on 4 bottles. With pipelines, the cleaning, drying, filling, and capping processes can be done simultaneously on different bottles, reducing the total time to complete 4 bottles from 40 minutes to 23 minutes. Pipelines allow resources to be shared across multiple tasks, reducing the overall time needed to complete multiple processes.

Uploaded by

gowsikh
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 30

Need of pipelines

-D.Gowsikhaa, M.Tech IT -Anna university, Chennai.

w/o pipelines -Soft drink manufacturing

Time taken to, clean 2 minutes dry 1 minute fill 4 minutes cap 3 minutes Total time taken to complete all the for stages, 10 minutes Sample scenario fill up and cap four bottles

Need of pipelines

Need of pipelines

CLEAN

Need of pipelines

DRY

Need of pipelines

FILL

Need of pipelines

Need of pipelines

CLEAN

Need of pipelines

DRY

Need of pipelines

FILL

Need of pipelines

Need of pipelines

CLEAN

Need of pipelines

DRY

Need of pipelines

FILL

Need of pipelines

Need of pipelines

CLEAN

Need of pipelines

DRY

Need of pipelines

FILL

Need of pipelines

Total time taken = 10 x number of bottles (4) = 40 minutes

with pipelines - Soft drink manufacturing

Need of pipelines

Need of pipelines

CLEAN

Need of pipelines

CLEAN

DRY

Need of pipelines

CLEAN

DRY

FILL

Need of pipelines

CLEAN

DRY

FILL

Need of pipelines

DRY

FILL

Need of pipelines

FILL

Need of pipelines

Total time taken = 23 minutes

Need of pipelines
Effectively uses processing units which are ideal.
Does not lessen the time to execute a single process Instead, shares the resources, such that time taken for completing multiple tasks get reduced.