0% found this document useful (0 votes)
55 views1 page

PM Assignment

This document outlines the topics to be covered in a project management course at L D College of Engineering in Ahmedabad, India from January 12th to December 26th, 2011. The topics include explaining the characteristics and criteria for using project management, system concepts and principles, modularization and iterative analysis, project feasibility, requests for proposals and project proposals, requirements analysis, work breakdown structures, network diagrams, dummy activities, and slack times for project planning.

Uploaded by

Amit Rathod
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views1 page

PM Assignment

This document outlines the topics to be covered in a project management course at L D College of Engineering in Ahmedabad, India from January 12th to December 26th, 2011. The topics include explaining the characteristics and criteria for using project management, system concepts and principles, modularization and iterative analysis, project feasibility, requests for proposals and project proposals, requirements analysis, work breakdown structures, network diagrams, dummy activities, and slack times for project planning.

Uploaded by

Amit Rathod
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

L D College of Engineering, Ahmedabad Assignment

Subject name: Project Management Start time: 1/12/2011 End time: 26/12/2011

1. Explain characteristics of project management. 2. Explain about criteria for using project management 3. Write a short note on system concepts and principles. 4. What is system approach? Explain in detail. 5. Explain modularisation with iterative analysis-synthesis-evaluation cycle. 6. Discuss about project feasibility. 7. Explain RFP and project proposal. Discuss content of both. 8. Consider a practical scenario and write contents of RFP and project proposal for the same. (Everybody should write a different scenario/example). 9. Discuss functional and non-functional requirements. 10. Compare user-requirement and system requirement with examples. 11. Explain Work breakdown structure in detail. 12. Draw and explain AON, AOA network diagrams. 13. Explain dummy activities. 14. Discuss late start time, late finish time, total slack and free slack in regard to project time planning.

You might also like