Revision 0 MNT-LST-004 15 Oct. 2010 Document No. Effective Date
Department :#
Date :IMPLEMENT
Facility Description
Asset # / Location
Work Description
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
Supervisor
ORGINATING DEPARTMENT Maintenance Department Engr. Sobhy Ahmed Originated by
DOWNTIME HOURS
PLAN
MEN
Title:
Page o1 of 01
Revision Document No. Effective 0 MNT-FMT-005 15 Oct. 2010
Date
2nd Week
IMPLEMENT DOWNTIME HOUR
3rd Week
IMPLEMENT DOWNTIME HOUR
4th Week
IMPLEMENT DOWNTIME HOUR
Total
IMPLEMENT DOWNTIME HOUR
PLAN
PLAN
PLAN
PLAN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Supervisor
Maintenance Department Engr, Sobhy Ahmed Originated by
ORGINATING DEPARTMENT
PLAN
MEN
MEN
MEN
MEN
MEN
Facility Description
Asset # / Location
Title:
Page o1 of 01
Revision 0 MNT-FMT-006 15 Oct. 2010 Document No. Effective Date
Level 3
Year :1 2 3 4 5 6 7 8 9 10 11 12
MEN
Total
IMPLEMENT DOWNTIME PLAN
Facility Description
Asset # / Location
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Supervisor
ORGINATING DEPARTMENT
Maintenance Department Engr, Sobhy Ahmed Originated by Engr, Wael Besar Checked by Engr, Hassan Khalil Aproved by
MEN PLAN IMPLEMENT DOWNTIME MEN PLAN IMPLEMENT DOWNTIME MEN PLAN IMPLEMENT DOWNTIME MEN PLAN IMPLEMENT DOWNTIME MEN PLAN IMPLEMENT DOWNTIME MEN PLAN IMPLEMENT DOWNTIME MEN PLAN IMPLEMENT DOWNTIME MEN PLAN IMPLEMENT DOWNTIME MEN PLAN IMPLEMENT DOWNTIME MEN PLAN IMPLEMENT DOWNTIME MEN PLAN IMPLEMENT DOWNTIME MEN PLAN IMPLEMENT DOWNTIME
Page o1 of 01
Document No. Effective Date
Level 3
GROUPS
( YEAR ) PER
ELECTRICAL EQUIPMENT
Sub Groups
MECHANICAL HANDLING
Sub Groups
AC & PANEL
CONNECTION
VEHICLE
Auto Control
PM
CM & NJ
Brekdown
Jan-10
5-Jan
Sep-10
Compressor # 6
Brekdown
29-Sep
Oct-10
Pending PM
26-Oct
Nov-10
Mobile Crane # 6
31-Dec 31-Dec 21-Dec 31-Dec 31-Dec 31-Dec 31-Dec 31-Dec 3-Jan 21-Dec
Dec-10
Vacuum Recovery
FOGGING MACHINE
Ship Lift Over Head Crane # 3 Hydraulic Press Cement Mixer ( 2 units ) Portable Air Compressor # 5
Adding Temperature Indicator to all Electrode Ovens
Pending PM Pending PM
21-Jan 21-Jan
Jan-11
CAR
DC
Status
MASON
MOTOR
ENGINE
FITTER
TOOLS
TOOLS
WORK
MACHINE
LIGHTING
Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM
28-Jan 28-Jan
Jan-11
Fork Lift # 10 Tower Lights Piping Threding # 2 Universal Milling Machine Lathe Machine # 1 Main Fire Pump Jocky Pump # 1 & 2 Overhead Crane # 1 Work Shop Compressr # 2 Band Saw Matel # 2 Big Drill # 2 Big Drill # 6 Fuel Pump Tower Lights Portable Compressor # 5 Fogging Machine Hack Saw Hydraulic Air Pump (Diaphragm Pump) Main Air Compressor # 3 Drayer # 3 Lath Machine # 2 & 3 Overhead Crane # 4 Hydraulic Press Lathe Machine # 1 Cutting CNC Machine - Fusion Power Socrce CNC - Fusion Air Compressor CNC - Fusion Vacuum Recovery High Pressure Pump Emergency Power Light # 2 Welding Generator # 2 Gas Cutting Torch Machine Fork Lift # 1 Gouging Machine - company grtd.service Crane # 9 - Boom Overhauling (Hydraulic hose) FIRE PUMP - Waiting for bearing
Portable Air Compressor # 2 W/F Injector Sleeve ** Water Blasting Pump - previously scraped ** Hydraulic Skimer # 3
4-Feb 4-Feb 4-Feb 4-Feb 4-Feb 4-Feb 4-Feb 11-Feb 11-Feb 11-Feb 11-Feb 11-Feb 11-Feb 11-Feb 25-Feb 25-Feb 25-Feb 25-Feb 25-Feb 25-Feb 25-Feb 25-Feb 25-Feb 4-Mar 4-Mar 11-Mar 11-Mar 11-Mar 11-Mar 11-Mar 11-Mar 11-Mar 11-Mar 11-Mar 17-Mar Crashed 17-Mar 2-Apr 2-Apr 4-Apr 4-Apr
Boom Overhauling (Waiting for Hydraulic hose)
Feb-11
DISPOSED
Brekdown
Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Overhauling
Mar-11
Brekdown Brekdown
Pending PM Pending PM Overhauling Pending PM Pending PM Pending PM Pending PM Pending PM
4-Apr 7-Apr 8-Apr 8-Apr 14-Apr Coupling Defects 8-Apr 8-Apr 8-Apr 8-Apr 15-Apr 15-Apr 30-Apr 30-Apr 7-May 7-May 13-May 20-May 20-May 20-May 20-May 20-May 20-May 20-May 20-May 20-May 20-May 20-May 20-May 20-May 31-May 17-Jun 17-Jun 17-Jun 17-Jun 19-Jun 20-Jun 21-Jun 21-Jun 21-Jun 21-Jun 24-Jun 21-Jun 20-May 20-May 20-May 20-May 20-May 7-May 13-May
Apr-11
Fuel Pump Jockey Pump # 1 & # 2 Emergency Tower Light # 1 Welding Generator # 1 Raboon Omega Crane # 105
Portable Air Compressor # 5
Brekdown
Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM
May-11
DRYER (CNC) - MESSER POWER SOURCE (CNC) - MESSER AIR COMPRESSOR (CNC) -MESSER WORKSHOP COMPRESSOR # 3 BAND SAW WOOD # 3 FARA PIPING THREADING # 1 PRESS BRAKE PLATE CUTTING LATHE # 3
Brekdown
Pending PM Pending PM
Brekdown Brekdown
Overhauling
Jun-11
Computer Repairing
3-Jul
11
8-Jul 8-Jul 8-Jul 22-Jul 22-Jul 22-Jul 22-Jul 22-Jul 22-Jul 31-Jul 19-Aug 19-Aug 19-Aug 19-Aug
Jul-11
CNC Messer Main Air Compressor # 1 Dryer # 1 Lathe Machine # 3 Hydraulic Power Pack # 1 Welding Generatoor # 2 CNC Messer Portable Air Compressor # 2 Overhead Crane # 3
Brekdown
Pending PM Pending PM Pending PM
Aug-11
Main Air Compressor # 3 Workshop Compressor # 1 Universal Milling Machine BAND SAW WOOD # 1 FLANGE FACING MACHINE DRAYER # 2 SHEET BENDING MACHINE CNC ROUTER CNC Fusion Fork Lift # 4 CNC Messer Welding Generator # 4
Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM Pending PM
2-Sep 2-Sep 2-Sep 2-Sep 2-Sep 2-Sep 2-Sep 2-Sep 2-Sep 2-Sep 2-Sep 9-Sep 9-Sep 9-Sep 16-Sep 16-Sep
Sep-11
Not completed
Completed
Disposal