This inspection report summarizes the details of an outage at a power plant unit, including the date of inspection, plant owner information, unit capacity and staffing details. It documents whether NOx mitigation technologies are installed and the status of short and long term NOx measures. The type of outage is described along with the reason, start date and scheduled return date. It lists personnel interviewed, data reviewed during the inspection, and documents requested and received.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
147 views2 pages
Plant Inspection Report Ver2
This inspection report summarizes the details of an outage at a power plant unit, including the date of inspection, plant owner information, unit capacity and staffing details. It documents whether NOx mitigation technologies are installed and the status of short and long term NOx measures. The type of outage is described along with the reason, start date and scheduled return date. It lists personnel interviewed, data reviewed during the inspection, and documents requested and received.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2
INSPECTION REPORT FOR DOWN
OR RESTRICTED UNIT
DATE OF INSPECTION: ______________
INSPECTION START TIME: ________________ INSPECTION END TIME: ___________________ NAME OF PLANT OWNER: ____________________________________________________ NAME OF PLANT: ____________________________________________________________________ UNIT NUMBER: ________________ UNIT CAPACITY (MW): __________________ PLANT OPERATIONS STAFFING PROVIDED BY: _______________ PLANT MAINTENANCE STAFFING PROVIDED BY: ______________ NOX MITIGATION:
SCR UNIT INSTALLED? YES ____ NO ____
IFGR UNIT INSTALLED? YES ____ NO ____ LOW NOX BURNERS INSTALLED? YES ____ NO ____
STATUS OF SHORT AND LONG TERM NOX MITIGATION MEASURES:
______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ TYPE OF OUTAGE AS DESCRIBED BY OWNERS REPRESENTATIVE: SCHEDULED__________ FORCED______________ CURTAILED __________ MWs AVAILABLE ___________ SCHEDULED THEN FORCED _____________ FORCED THEN SCHEDULED _____________ REASON FOR OUTAGE: BOILER ____________________________________________________________________________ BOILER FEEDWATER PUMP _________________________________________________________ BOILER TUBE LEAK _______________________________________________________________ BOILER WATER CHEMISTRY _________________________________________________________ CIRCULATING WATER PUMP ________________________________________________________ CONDENSATE PUMP ________________________________________________________________ CONDENSERS _______________________________________________________________________ ELECTRICAL SYSTEM _______________________________________________________________ EMISSION CONTROL EQUIPMENT (SCR, IFGR, low NOx burners, etc.) ______________________ EMISSION LIMITATION (non-equipment related such as AQMD limits, NOx credits, etc.) __________ FEEDWATER HEATER _______________________________________________________________ FORCED DRAFT FAN ________________________________________________________________ GAS TURBINE ______________________________________________________________________ GENERATOR _______________________________________________________________________ HRSG ______________________________________________________________________________ INDUCED DRAFT FAN _______________________________________________________________
Version 2
INSTRUMENTATION & CONTROL SYSTEM ________________________________________
MAIN PLANT COMPRESSOR _____________________________________________________ MAIN TRANSFORMER ___________________________________________________________ OPERATOR ERROR ______________________________________________________________ STARTUP SYSTEM ______________________________________________________________ STEAM TURBINE ________________________________________________________________ OTHER (explain) _________________________________________________________________ DATE AND TIME OUTAGE BEGAN: ____________________________ DATE OF SCHEDULED RETURN TO FULL OPERATION: ___________________________ HOW MANY HOURS/DAYS PER WEEK IS PLANT WORKING ON CORRECTING PROBLEM, AND WHAT IS THE NUMBER OF PEOPLE COMMITTED TO THE EFFORT? ______________________________________________________________________________________ ______________________________________________________________________________________ PERSONS INTERVIEWED: Name Employer Title Telephone Number ______________________________________________________________________________________ ______________________________________________________________________________________ DATA REVIEWED (Include dates of reference): LOG BOOKS __________________________________________________________________________ CHARTS ______________________________________________________________________________ RECORDERS __________________________________________________________________________ MAINTENANCE RECORDS _____________________________________________________________ ISO DATA_____________________________________________________________________________ OTHER _______________________________________________________________________________ LIST THE DOCUMENTS REQUESTED: ______________________________________________________________________________________ ______________________________________________________________________________________ DID YOU RECEIVE ALL DOCUMENTS REQUESTED ON SITE? _________________________ IF NOT, WHAT DOCUMENTS DID YOU NOT RECEIVE? ________________________________ SUMMARY OF EVENTS AND OBSERVATIONS (No Conclusions) ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ ______________________________________________________________________________________ PRINT YOUR NAME _____________________________________________ SIGNATURE ____________________________________DATE ___________