0% found this document useful (0 votes)
147 views2 pages

Plant Inspection Report Ver2

This inspection report summarizes the details of an outage at a power plant unit, including the date of inspection, plant owner information, unit capacity and staffing details. It documents whether NOx mitigation technologies are installed and the status of short and long term NOx measures. The type of outage is described along with the reason, start date and scheduled return date. It lists personnel interviewed, data reviewed during the inspection, and documents requested and received.

Uploaded by

makq
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
147 views2 pages

Plant Inspection Report Ver2

This inspection report summarizes the details of an outage at a power plant unit, including the date of inspection, plant owner information, unit capacity and staffing details. It documents whether NOx mitigation technologies are installed and the status of short and long term NOx measures. The type of outage is described along with the reason, start date and scheduled return date. It lists personnel interviewed, data reviewed during the inspection, and documents requested and received.

Uploaded by

makq
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

INSPECTION REPORT FOR DOWN

OR RESTRICTED UNIT

DATE OF INSPECTION: ______________


INSPECTION START TIME: ________________
INSPECTION END TIME: ___________________
NAME OF PLANT OWNER: ____________________________________________________
NAME OF PLANT: ____________________________________________________________________
UNIT NUMBER: ________________ UNIT CAPACITY (MW): __________________
PLANT OPERATIONS STAFFING PROVIDED BY: _______________
PLANT MAINTENANCE STAFFING PROVIDED BY: ______________
NOX MITIGATION:

SCR UNIT INSTALLED? YES ____ NO ____


IFGR UNIT INSTALLED? YES ____ NO ____
LOW NOX BURNERS INSTALLED? YES ____ NO ____

STATUS OF SHORT AND LONG TERM NOX MITIGATION MEASURES:


______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
TYPE OF OUTAGE AS DESCRIBED BY OWNERS REPRESENTATIVE:
SCHEDULED__________
FORCED______________
CURTAILED __________
MWs AVAILABLE ___________
SCHEDULED THEN FORCED _____________
FORCED THEN SCHEDULED _____________
REASON FOR OUTAGE:
BOILER ____________________________________________________________________________
BOILER FEEDWATER PUMP _________________________________________________________
BOILER TUBE LEAK _______________________________________________________________
BOILER WATER CHEMISTRY _________________________________________________________
CIRCULATING WATER PUMP ________________________________________________________
CONDENSATE PUMP ________________________________________________________________
CONDENSERS _______________________________________________________________________
ELECTRICAL SYSTEM _______________________________________________________________
EMISSION CONTROL EQUIPMENT (SCR, IFGR, low NOx burners, etc.) ______________________
EMISSION LIMITATION (non-equipment related such as AQMD limits, NOx credits, etc.) __________
FEEDWATER HEATER _______________________________________________________________
FORCED DRAFT FAN ________________________________________________________________
GAS TURBINE ______________________________________________________________________
GENERATOR _______________________________________________________________________
HRSG ______________________________________________________________________________
INDUCED DRAFT FAN _______________________________________________________________

Version 2

INSTRUMENTATION & CONTROL SYSTEM ________________________________________


MAIN PLANT COMPRESSOR _____________________________________________________
MAIN TRANSFORMER ___________________________________________________________
OPERATOR ERROR ______________________________________________________________
STARTUP SYSTEM ______________________________________________________________
STEAM TURBINE ________________________________________________________________
OTHER (explain) _________________________________________________________________
DATE AND TIME OUTAGE BEGAN: ____________________________
DATE OF SCHEDULED RETURN TO FULL OPERATION: ___________________________
HOW MANY HOURS/DAYS PER WEEK IS PLANT WORKING ON CORRECTING PROBLEM,
AND WHAT IS THE NUMBER OF PEOPLE COMMITTED TO THE EFFORT?
______________________________________________________________________________________
______________________________________________________________________________________
PERSONS INTERVIEWED:
Name
Employer
Title
Telephone Number
______________________________________________________________________________________
______________________________________________________________________________________
DATA REVIEWED (Include dates of reference):
LOG BOOKS __________________________________________________________________________
CHARTS ______________________________________________________________________________
RECORDERS __________________________________________________________________________
MAINTENANCE RECORDS _____________________________________________________________
ISO DATA_____________________________________________________________________________
OTHER _______________________________________________________________________________
LIST THE DOCUMENTS REQUESTED:
______________________________________________________________________________________
______________________________________________________________________________________
DID YOU RECEIVE ALL DOCUMENTS REQUESTED ON SITE? _________________________
IF NOT, WHAT DOCUMENTS DID YOU NOT RECEIVE? ________________________________
SUMMARY OF EVENTS AND OBSERVATIONS (No Conclusions)
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
______________________________________________________________________________________
PRINT YOUR NAME _____________________________________________
SIGNATURE ____________________________________DATE ___________

Version 2