Website Development

The document outlines the steps for a website development project including initiation and planning, analysis, design, construction, testing, and deployment. It details activities at each stage such as gathering requirements, developing site designs, constructing pages and databases, integration and user testing, and final deployment and project closure. The project follows an iterative process with sign-offs required at key stages.

Uploaded by

Divya Suhag
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views5 pages

Website Development

The document outlines the steps for a website development project including initiation and planning, analysis, design, construction, testing, and deployment. It details activities at each stage such as gathering requirements, developing site designs, constructing pages and databases, integration and user testing, and final deployment and project closure. The project follows an iterative process with sign-offs required at key stages.

Uploaded by

Divya Suhag
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

0

Website Development

Initiation and planning

1.1 1.2

Business justification Scope statement

1.3

Create project charter

1.4

Funding commitment (100%)

1.5 1.6

Sign project charter Reserve resources

2 3

Project management activities Analysis

3.1

Gather requirements

3.2

Identify data sources

3.3

Sign off on requirements

3.4

Create project plan

3.5 3.6 4 4.1

Statement of work (60%) SOW signoff Design Develop test plans

4.2 4.3 4.4

Develop site hierarchy Reports

4.5

Technical design

4.5.1

Develop technology guidelines

4.5.2 4.5.3 4.5.4 4.5.5 4.5.6 4.6

Design database schema

Administration tool

Sign off on design

4.7

Update project plan

4.8 4.9 5 5.1 5.2 5.3

Statement of work (30%) SOW signoff Construction Install software Construct database

5.4 5.4.1 5.4.2 5.4.3 5.4.4 5.5 5.5.1 5.5.2 5.5.3 5.5.4 5.6 Construct pages

5.6.1

Content Templates

5.6.2

Cascading style sheets

5.6.3 5.7 5.7.1 5.7.2 5.7.3 5.7.4 5.7.5 5.7.6

Tie database to pages Reports Framework Usage report Site change report Error report

5.8

Administration tool

5.8.1 5.8.2 5.8.2.1

Framework and interface Screens Content input

5.8.2.2 5.8.2.3 5.8.2.4 5.8.3 5.8.3.1 5.8.3.2 5.9 6 6.1 6.2

Data source management User access Report

Testing System test Rework

6.3 6.4 6.5 7 7.1 7.2 7.3

User acceptance testing Rework Testing signoff Deployment Automated deploy Test Rework

7.4 7.5 8

User acceptance test Testing signoff Closure

8.1 8.2

Documentation for support Archive code

8.3

Archive documents

8.4 8.5 8.6

Turnover to support Release resources Project signoff