0% found this document useful (0 votes)
36 views1 page

Progress 1

The document is a thesis progress report that includes the thesis group number and members, adviser, date and venue of a meeting. It summarizes that the group has decided to use OpenCV for computer vision, acquired a 30 fps webcam, installed necessary software like Visual Studio .NET 2003 and OpenCV SDK, and discussed PRO2 requirements and expectations with their adviser.

Uploaded by

api-3696675
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views1 page

Progress 1

The document is a thesis progress report that includes the thesis group number and members, adviser, date and venue of a meeting. It summarizes that the group has decided to use OpenCV for computer vision, acquired a 30 fps webcam, installed necessary software like Visual Studio .NET 2003 and OpenCV SDK, and discussed PRO2 requirements and expectations with their adviser.

Uploaded by

api-3696675
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Thesis Progress Report – Appendix A

Thesis Group No. : DSP


Thesis Course Status : ECEPRO2
Thesis Title : Inter-Active Projected Display

Thesis Group Members : Arcellana, Anthony


: Ching, Warren
: Guevara, Ram Christopher
: Santos, Marvin
: So, Jonathan

Thesis Adviser : Engr. Enrique Manzano


Date of Meeting : <Date>
Venue of Meeting : <Venue>

The proponents have decided to use Intel’s openCV to handle the vision system. We have
acquired a 30 fps webcam, Logitech creative IFX as the prototype’s camera. We have also
installed all the necessary software to develop the prototype’s program. These include Visual
Studio .net 2003, .net SDK, and openCV. In our first meeting with our adviser, we have
discussed the PRO2 requirements and his expectations for the group.

You might also like