0% found this document useful (0 votes)
861 views2 pages

Earned Value Management Gold Card

This document provides an overview of earned value management (EVM) concepts and terminology. It includes diagrams illustrating cost and schedule variances, formulas for calculating estimates at completion, and tables of common EVM acronyms and metrics. Government policies require EVM for large defense contracts to measure project performance and progress.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
861 views2 pages

Earned Value Management Gold Card

This document provides an overview of earned value management (EVM) concepts and terminology. It includes diagrams illustrating cost and schedule variances, formulas for calculating estimates at completion, and tables of common EVM acronyms and metrics. Government policies require EVM for large defense contracts to measure project performance and progress.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

EARNED VALUE MANAGEMENT

GOLD CARD
Management Reserve
PMB

EARNED VALUE MANAGEMENT


EAC TAB BAC

GOLD CARD
Management Reserve
PMB

EAC TAB BAC

$
BCWS

Schedule Variance ACWP

Cost Variance

$
BCWS

Schedule Variance ACWP

Cost Variance

BCWP

BCWP Time Now Completion Date

Time
Cost Variance CV Schedule Variance SV Variance at Completion VAC

Time
Cost Variance CV Schedule Variance SV Variance at Completion VAC

Time Now

Completion Date

VARIANCES Favorable is Positive, Unfavorable is Negative


= BCWP ACWP = BCWP BCWS = BAC EAC

CV % = (CV / BCWP) *100 SV % = (SV / BCWS) *100

VARIANCES Favorable is Positive, Unfavorable is Negative


= BCWP ACWP = BCWP BCWS = BAC EAC

CV % = (CV / BCWP) *100 SV % = (SV / BCWS) *100

OVERALL STATUS
% Schedule % Complete % Spent

DoD TRIPWIRE METRICS


TW TW TW

= (BCWSCUM / BAC) * 100 = (BCWPCUM / BAC) * 100 = (ACWPCUM / BAC) * 100 CPI = BCWP / ACWP SPI = BCWP / BCWS
Favorable is > 1.0, Unfavorable is < 1.0 Favorable is > 1.0, Unfavorable is < 1.0
TW TW TW

OVERALL STATUS
% Schedule % Complete % Spent

Cost Efficiency Schedule Efficiency

DoD TRIPWIRE METRICS


Cost Efficiency Schedule Efficiency

= (BCWSCUM / BAC) * 100 = (BCWPCUM / BAC) * 100 = (ACWPCUM / BAC) * 100 CPI = BCWP / ACWP SPI = BCWP / BCWS
Favorable is > 1.0, Unfavorable is < 1.0 Favorable is > 1.0, Unfavorable is < 1.0

BASELINE EXECUTION INDEX (BEI) = A Schedule Metric BEI = Tasks with Actual Finish Date / (# of Baseline Tasks Scheduled to Finish Prior to Status Date CRITICAL PATH LENGTH INDEX (CPLI) = A Schedule Metric CPLI = (CP Length (Time Now To Contract End)) + Total Float (To Contract End Baseline Finish)) / CP Length Hit / Miss = Months Tasks Completed ON or AHEAD / Months Tasks Scheduled to Complete

+ Tasks Missing Baseline Start or Finish Date)

BASELINE EXECUTION INDEX (BEI) = A Schedule Metric BEI = Tasks with Actual Finish Date / (# of Baseline Tasks Scheduled to Finish Prior to Status Date CRITICAL PATH LENGTH INDEX (CPLI) = A Schedule Metric CPLI = (CP Length (Time Now To Contract End)) + Total Float (To Contract End Baseline Finish)) / CP Length Hit / Miss = Months Tasks Completed ON or AHEAD / Months Tasks Scheduled to Complete

TW

+ Tasks Missing Baseline Start or Finish Date)

TW

# ESTIMATE AT COMPLETION (EAC) = Actuals to Date + [(Remaining Work)/(Performance Factor)]


EACCPI EACComposite = = = ACWPCUM + [(BAC BCWPCUM) / CPICUM ] BAC / CPICUM ACWPCUM + [(BAC BCWPCUM) / (CPICUM * SPICUM)]

# ESTIMATE AT COMPLETION (EAC) = Actuals to Date + [(Remaining Work)/(Performance Factor)]


EACCPI EACComposite = = = ACWPCUM + [(BAC BCWPCUM) / CPICUM ] BAC / CPICUM ACWPCUM + [(BAC BCWPCUM) / (CPICUM * SPICUM)]

# TO COMPLETE PERFORMANCE INDEX (TCPI)

TCPIEAC = Work Remaining / Cost Remaining = (BAC BCWPCUM) / (EAC ACWPCUM) # To Determine a Contract Level TCPI or EAC; You May Replace BAC with TAB
To Determine the TCPI BAC or LRE Replace EAC with BAC or LRE

# TO COMPLETE PERFORMANCE INDEX (TCPI)

TCPIEAC = Work Remaining / Cost Remaining = (BAC BCWPCUM) / (EAC ACWPCUM) # To Determine a Contract Level TCPI or EAC; You May Replace BAC with TAB
To Determine the TCPI BAC or LRE Replace EAC with BAC or LRE

Contract Price
TAB
NCC
AUW OVERRUN

Contract Price
Profit / Fees
NCC

TAB
CBB OTB
OVERRUN AUW

Profit / Fees

CBB OTB

PMB Undistributed Budget Control Accounts

Management Reserve Summary Level Planning Packages Undistributed Budget

PMB Control Accounts

Management Reserve Summary Level Planning Packages

Work Packages

Planning Packages

Work Packages

Planning Packages

ACRONYMS

ACWP Actual Cost of Work Performed AUW Authorized Unpriced Work BAC Budget At Completion BCWP Budgeted Cost of Work Performed BCWS Budgeted Cost of Work Scheduled CA Control Account

Cost of work accomplished = ACTUAL COST Work contractually approved, but not yet negotiated / definitized Total budget for total contract thru any given level Value of work accomplished = EARNED VALUE Value of work planned to be accomplished = PLANNED VALUE Lowest CWBS element assigned to a single focal point to plan & control scope / schedule / budget CBB Contract Budget Base Sum of NCC & AUW EAC Estimate At Completion Estimate of total Cost for total contract thru any given level may be generated by Ktr, PMO, DCMA, etc. = EACKtr / PMO / DCMA LRE Latest Revised Estimate Ktrs EAC or EACKtr MR Management Reserve Budget withheld by Ktr PM for unknowns / risk management NCC Negotiated Contract Cost Contract Price Minus profit or fee(s) OTB Over Target Baseline Sum of CBB & recognized overrun PAC Price At Completion NCC Plus Profit or Fee(s) PMB Performance Measurement Baseline Contract time-phased budget plan PP Planning Package Far-term CA activities not yet defined into WPs SLPP Summary Level Planning Package Far-term activities not yet defined into CAs TAB Total Allocated Budget Sum of all budgets for work on contract = NCC, CBB, or OTB TCPI To Complete Performance Index Efficiency needed from time now to achieve a BAC, EAC, or LRE UB Undistributed Budget Broadly defined activities not yet distributed to CAs WP Work Package Near-term, detail-planned activities within a CA

ACRONYMS

ACWP Actual Cost of Work Performed AUW Authorized Unpriced Work BAC Budget At Completion BCWP Budgeted Cost of Work Performed BCWS Budgeted Cost of Work Scheduled CA Control Account

Cost of work accomplished = ACTUAL COST Work contractually approved, but not yet negotiated / definitized Total budget for total contract thru any given level Value of work accomplished = EARNED VALUE Value of work planned to be accomplished = PLANNED VALUE Lowest CWBS element assigned to a single focal point to plan & control scope / schedule / budget CBB Contract Budget Base Sum of NCC & AUW EAC Estimate At Completion Estimate of total Cost for total contract thru any given level may be generated by Ktr, PMO, DCMA, etc. = EACKtr / PMO / DCMA LRE Latest Revised Estimate Ktrs EAC or EACKtr MR Management Reserve Budget withheld by Ktr PM for unknowns / risk management NCC Negotiated Contract Cost Contract Price Minus profit or fee(s) OTB Over Target Baseline Sum of CBB & recognized overrun PAC Price At Completion NCC Plus Profit or Fee(s) PMB Performance Measurement Baseline Contract time-phased budget plan PP Planning Package Far-term CA activities not yet defined into WPs SLPP Summary Level Planning Package Far-term activities not yet defined into CAs TAB Total Allocated Budget Sum of all budgets for work on contract = NCC, CBB, or OTB TCPI To Complete Performance Index Efficiency needed from time now to achieve a BAC, EAC, or LRE UB Undistributed Budget Broadly defined activities not yet distributed to CAs WP Work Package Near-term, detail-planned activities within a CA

EVM POLICY: DoDI 5000.02, Encl 4. Table 5. EVMS in accordance with ANSI/EIA-748 is required for cost or

incentive contracts, subcontracts, intra-government work agreements, & other agreements valued > $20M (Then-Yr $). EVMS contracts > $50M (TY $) require that the EVM system be formally validated by the cognizant contracting officer. Additional Guidance in Defense Acquisition Guidebook & Earned Value Management Implementation Guide (EVMIG). EVMS is discouraged on Firm-Fixed Price & Time & Material Contracts; & LOE activities regardless of cost.

EVM POLICY: DoDI 5000.02, Encl 4. Table 5. EVMS in accordance with ANSI/EIA-748 is required for cost or

incentive contracts, subcontracts, intra-government work agreements, & other agreements valued > $20M (Then-Yr $). EVMS contracts > $50M (TY $) require that the EVM system be formally validated by the cognizant contracting officer. Additional Guidance in Defense Acquisition Guidebook & Earned Value Management Implementation Guide (EVMIG). EVMS is discouraged on Firm-Fixed Price & Time & Material Contracts; & LOE activities regardless of cost.

EVM CONTRACTING REQUIREMENTS:


FAR EVM Clauses NOT FOR DOD

52.234-2 for Solicitation = Pre-Award IBR or 52.234-3 = Post Award IBR 52.234-4 for Solicitation & Contract FOR DOD $20M DFARS CLAUSES 252.234-7001 NOTICE OF EVMS FOR SOLICITATIONS 252.234-7002 EVMS FOR SOLICITATIONS & CONTRACTS CONTRACT PERFORMANCE REPORT DI-MGMT-81466A* 5 FORMATS = WBS, ORGANIZATION, BASELINE, STAFFING, EXPLANATION INTEGRATED MASTER SCHEDULE DI-MGMT-81650* MANDATORY FOR DOD EVMS CONTRACTS INTEGRATED BASELINE REVIEW MANDATORY FOR ALL EVMS CONTRACTS * See the EVMIG for CPR & IMS tailoring guidance EVM Home Page = https://acc.dau.mil/evm eMail Address: [email protected] Revised September 2010

EVM CONTRACTING REQUIREMENTS:


FAR EVM Clauses NOT FOR DOD

52.234-2 for Solicitation = Pre-Award IBR or 52.234-3 = Post Award IBR 52.234-4 for Solicitation & Contract FOR DOD $20M DFARS CLAUSES 252.234-7001 NOTICE OF EVMS FOR SOLICITATIONS 252.234-7002 EVMS FOR SOLICITATIONS & CONTRACTS CONTRACT PERFORMANCE REPORT DI-MGMT-81466A* 5 FORMATS = WBS, ORGANIZATION, BASELINE, STAFFING, EXPLANATION INTEGRATED MASTER SCHEDULE DI-MGMT-81650* MANDATORY FOR DOD EVMS CONTRACTS INTEGRATED BASELINE REVIEW MANDATORY FOR ALL EVMS CONTRACTS * See the EVMIG for CPR & IMS tailoring guidance EVM Home Page = https://acc.dau.mil/evm eMail Address: [email protected] Revised September 2010

You might also like