TERMITE PROOFING TERMITE PROOFING (TRENCHES) HEPTACHLORE Lean Concrete (1:4:8) Ravi Sand & B.
Ballast Lean Concrete (1:4:8) Ravi Sand & B.Ballast
SFT LTS CFT BAGS CFT CFT CFT BAGS CFT CFT SFT BAGS CFT CFT KG LTRS
976.20 7.81 100.00 9.48 47.38 94.77 100.00 17.60 44.00 88.00 100.00 2.94 7.35 14.70 20.42 15.00 1.13 100.00 1.56 5.86 20.42 15.00 20.42
CEMENT OPC SAND RAVI
BRICK BALLAST Lean Concrete (1:2:4) Ravi Sand & B.Ballast
CEMENT OPC SAND RAVI
BRICK BALLAST Damp proof Course. 2" Horizontal D.P.C. (1:2:4)
CEMENT OPC SAND RAVI
AGGREGATE
BITUMEN
KEROSENE OIL Polythene Sheet VERTICAL D.P.C
CEMENT OPC SAND RAVI BITUMEN
KEROSENE OIL
WASTE WOOD
BRICK WORK IN SUB STRUCTURE ( G.Floor ) 13 1/2" thick (1:6)
SFT BAGS CFT KG LTRS Kgs
CEMENT OPC SAND RAVI BRICKS IST CLASS
R.C.C (1:2:4) using chenab sand crush. Footing
CFT BAGS CFT THOU
100.00 3.43 25.71 1.35
CEMENT OPC SAND CHENAB
AGGREGATE Steel
CFT BAGS CFT CFT Kg
100.00 17.60 44.00 88.00 272.23
Masonary up to slab level ( G.Floor ) BRICK WORK IN SUPER STRUCTURE 9" & 13 1/2" thick (1:6) (G.F)
15%
CFT 100.00
CEMENT OPC SAND RAVI BRICKS IST CLASS
BAGS CFT THOU
4.00 25.00 1.35