The document appears to be a bill of quantities for construction materials for a building project. It lists various construction materials including cement, sand, bricks, aggregates, and their quantities in bags, cubic feet and other units of measure. The materials listed are for tasks like termite proofing, damp proof coursing, brick work in sub and super structures, RCC footing, masonry work up to slab level and in super structure.

Uploaded by

backstreetboy17
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
344 views2 pages

Building Material Calculation

The document appears to be a bill of quantities for construction materials for a building project. It lists various construction materials including cement, sand, bricks, aggregates, and their quantities in bags, cubic feet and other units of measure. The materials listed are for tasks like termite proofing, damp proof coursing, brick work in sub and super structures, RCC footing, masonry work up to slab level and in super structure.

Uploaded by

backstreetboy17
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

TERMITE PROOFING TERMITE PROOFING (TRENCHES) HEPTACHLORE Lean Concrete (1:4:8) Ravi Sand & B.

Ballast Lean Concrete (1:4:8) Ravi Sand & B.Ballast

SFT LTS CFT BAGS CFT CFT CFT BAGS CFT CFT SFT BAGS CFT CFT KG LTRS

976.20 7.81 100.00 9.48 47.38 94.77 100.00 17.60 44.00 88.00 100.00 2.94 7.35 14.70 20.42 15.00 1.13 100.00 1.56 5.86 20.42 15.00 20.42

CEMENT OPC SAND RAVI


BRICK BALLAST Lean Concrete (1:2:4) Ravi Sand & B.Ballast

CEMENT OPC SAND RAVI


BRICK BALLAST Damp proof Course. 2" Horizontal D.P.C. (1:2:4)

CEMENT OPC SAND RAVI


AGGREGATE

BITUMEN
KEROSENE OIL Polythene Sheet VERTICAL D.P.C

CEMENT OPC SAND RAVI BITUMEN


KEROSENE OIL

WASTE WOOD
BRICK WORK IN SUB STRUCTURE ( G.Floor ) 13 1/2" thick (1:6)

SFT BAGS CFT KG LTRS Kgs

CEMENT OPC SAND RAVI BRICKS IST CLASS


R.C.C (1:2:4) using chenab sand crush. Footing

CFT BAGS CFT THOU

100.00 3.43 25.71 1.35

CEMENT OPC SAND CHENAB


AGGREGATE Steel

CFT BAGS CFT CFT Kg

100.00 17.60 44.00 88.00 272.23

Masonary up to slab level ( G.Floor ) BRICK WORK IN SUPER STRUCTURE 9" & 13 1/2" thick (1:6) (G.F)

15%
CFT 100.00

CEMENT OPC SAND RAVI BRICKS IST CLASS

BAGS CFT THOU

4.00 25.00 1.35