Project Status Report

The project is on time and within budget according to the status report. The first draft of the functional specification was signed off and the team started producing detailed design documents. There is a risk that resources from another team will not be available until March, which could delay the project by 4 weeks if additional staff are not allocated. The top priorities for the coming week are to complete two deliverables and assign an individual to be responsible for each.

Uploaded by

Chelsea Tan
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
197 views

Project Status Report

The project is on time and within budget according to the status report. The first draft of the functional specification was signed off and the team started producing detailed design documents. There is a risk that resources from another team will not be available until March, which could delay the project by 4 weeks if additional staff are not allocated. The top priorities for the coming week are to complete two deliverables and assign an individual to be responsible for each.

Uploaded by

Chelsea Tan
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Project Status Report for Week Ending:

Project Name: Project Manager:


Weekly Project Summary:
Enter a very brief summary of the project status, noting any key issues for the week. Comment on major deliverables completed; milestones reached and percent complete. Is project on time and within budget? Example: First draft of functional specification signed off by R. Atkinson. Team started producing detailed design documents. Resources from the XYZ team will not be available till March. This could delay the project by 4 weeks if additional staff are not allocated by month end.

Program Name: Prepared By:

Project Performance Rating (Red/Yellow/Green) Also known as Project Health


Schedule Quality Scope Budget

Key Milestones: Should refer to major deliverables from WBS and Milestone Chart.
ID 1 2 Description Description Title Original planned completion date (this date should not change) dd-mmm-yy dd-mmm-yy Current forecast completion date dd-mmm-yy dd-mmm-yy Actual completion date dd-mmm-yy dd-mmm-yy

Key Accomplishments:
Provide a brief list of key accomplishments for the past week. This could be in the form of a bulleted list.

Top Priorities for the coming week (2-5 items):


Priority # Description Individual responsible

Top 5 Risks for this Period


List the current high-risk issues, and identify them as type: Quality, Schedule, or Cost. Risk ID Risk Type Description Probability (L/M/H) Impact (L/M/H)

Change Request History: List current change requests to date and their resulting consensus and status
CR ID# Title or Description Schedule change (if any) Status (in review, agreed, withdrawn) Comments

Miscellaneous:
Briefly document other issues that require action or attention (request for additional resources, logistical information, special comments, use of contingency funding, etc.)

Note: Attach or make reference to a high level Gantt Chart. A hyperlink is often effective.