How much do you think the cost of building this small building? Take a guess or make an estimate
Before we estimate or calculate the cost of this small building, let us quickly see how it is build. The next few slides will show you the process of building this building
HARDCORE
What you will see are the main works only. The more detail works are taught in your Construction Technology subject
HARDCORE
It is hope that these slides will give you some idea of how a small building is build (if (if you have not already know or understand), understand), so that you may have some idea of how to measure and quantify the works. Please watch these slides carefully and take note of the PROCESS OF BUILDING this building from start to finish.
1. FOR A START, YOU HAVE TO REMOVE THE TREES AND THE HEDGE THAT ARE FOUND WITHIN THE BOUNDARY OF THE SITE.
2. THEN WE HAVE TO EXCAVATE ABOUT 150MM DEEP TO REMOVE THE TOP VEGETABLE SOIL
3. THEN FOLLOWED BY THE EXCAVATION FOR THE COLUMN BASES 4. THEN EXCAVATE FOR THE GROUND BEAMS
5. THEN BUILD THE CONCRETE COLUMN BASES (Kemudian bina asas konkrit) 6. FOLLOWED BY BUILDING THE COLUMN STUMPS (Diikuti oleh pembinaan tunggul tiang)
REINFORCEMENT TO COLUMN
The next few slides will show you how the foundation is constructed in detail. Slaid seterusnya menunjukkan bagaimana asas dibina bermula dari pengorekan
Formwork to column
k. After completion of the construction, fill up the pit with excavated earth
GROUND BEAM
8. AFTER CONSTRUCTING THE FOUNDATION, COLUMN STUMPS AND THE GROUND BEAM FILL UP THE EXCAVATED AREA WITH EARTH
9. AND THEN FILL-UP FLOOR AREA WITH HARDCORE 10. AND THEN POUR CONCRETE TO FORM SLAB
cOPY
11. AND THEN CONSTRUCT THE FRAMES i.e. THE COLUMNS 12. AND THE ROOF BEAMS
RC ROOF BEAM
RC COLUMN
The next few slides will show you how the suspended reinforced concrete beam is constructed
Steel Reinforcement
Struts
Concrete Filling
HARDCORE
BRICK WALL
WALL PLATE
HARDCORE
15. AFTER FINISHING THE ROOF STRUCTURE, LAY THE ROOFING TILES ON THE BATTENS
ROOF TILES
HARDCORE
16. AFTER LAYING THE ROOF TILES, FIX THE DOOR AND FRAMES 17. AFTER THAT, FIX THE WINDOWS AND FRAMES
HARDCORE
a. BUILD THE BRICK WALLS b. FIX THE LINTOL c. FIX DOOR FRAME
Lintol
Door Frame
Clay bricks
Timber Ground
Clay bricks
A PLASTERED AND PAINTED BRICK WALL. The wall is made of common clay bricks laid in cement and sand mortar in stretcher bond
18. BUILD THE APRON AROUND THE BUILDING - FILL-UP WITH HARDCORE - LAY CONCRETE BED
HARDCORE
Concrete Bed
Hardcore
19. INSTALL WATER SUPPLY PIPES TO ROOF SPACE 20. INSTALL ELECTRICITY SUPPLY 21. PLASTERING AND PAINTING TO WALLS 22. LAYING THE FLOOR FINISH