0% found this document useful (0 votes)
49 views

Manual Test Process

The document outlines the manual testing process which consists of test planning, development, execution, result analysis, defect tracking, and summarization. Key steps include preparing test cases, scripts, data, and procedures; executing tests; analyzing results; tracking defects; and generating reports.

Uploaded by

Damodar Reddy
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views

Manual Test Process

The document outlines the manual testing process which consists of test planning, development, execution, result analysis, defect tracking, and summarization. Key steps include preparing test cases, scripts, data, and procedures; executing tests; analyzing results; tracking defects; and generating reports.

Uploaded by

Damodar Reddy
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
You are on page 1/ 1

Manual Testing Process :

Process is a roadmap to develop the project is consists a number of sequential steps.

Software Testing Life Cycle:


• Test Plan
• Test Development
• Test Execution
• Analyse Results
• Defect Tracking
• Summarise Report

Test Plan :

It is a document which describes the testing environment, purpose, scope, objectives, test
strategy, schedules, mile stones, testing tool, roles and responsibilities, risks, training, staffing
and who is going to test the application, what type of tests should be performed and how it will
track the defects.

Test Development :

• Preparing test cases


• Preparing test data
• Preparing test procedure
• Preparing test scenario
• Writing test script

Test Execution :

In this phase we execute the documents those are prepared in test development phase.

Analyse result :

Once executed documents will get results either pass or fail. we need to analyse the results
during this phase.

Defect Tracking :

When ever we get defect on the application we need to prepare the bug report file and forwards
to Test Team Lead and Dev Team. The Dev Team will fix the bug. Again we have to test the
application. This cycle repeats till we get the software with our defects.

Summarise Reports :

• Test Reports
• Bug Reports
• Test Documentation

You might also like