TREE TYPES
and
INSTALLATION METHODS
James Pappas Devon
Jamie Patrick-Maxwell FMC
Ray Guillory FMC
2
Deepwater Subsea Completion Systems
3
Contents
• Trends
• Technology
• Design Variables
• Subsea Configurations
• Drivers
• Tree Types
• Current & Future Technology
• Installation Methods
4
Subsea Equipment Trends
2000’s
1990’s 15,000 psi
20,000 psi
High Temperature
1960-
1990
10,000 psi
1,000 to 5,000 psi
5
Deepwater Installations Trends
1980
1980 1983
Bonito
Bonito Piraúna 1985
RJS-39 RJS-232
RJS-39 Marimbá
189m
189m 293m RJS-284 1988
FMC Kvaerner 383m Marimbá
RJS-376D 1988
619 ft 961 ft FMC 492m Placid
1,256 ft Green 1992
FMC Canyon 31 Marlim
1,613 ft 684m MRL-9 1994
781m Marlim
VG MRL-4 1997
2,244 ft FMC 1027m Marlim Sul
1997
2,561 ft MLS-3
FMC Shell Mensa
1709m
1618m
3,368 ft 1999
FMC Roncador
5,308 ft VG RJS-436 2000
1853m Petrobras
5,605 ft 2002
Roncador Marathon 2004
1877m Camden Shell
FMC Hills Coulomb
6,080 ft 2197m 2307m
VG
6,157 ft Cameron
7,209 ft FMC
7,570 ft
6
Installation Vessels
Semi- submersible
Drill Ship
Jack-up
Water Depth (Feet) Surface Vessel Type of Mooring
< 400 Jack-up Spud Can or Mudmat
400-4000 Semi-Submersible Mooring (Anchors)
Dynamically
> 4000 Semi-Submersible
Positioned (Thrusters)
Dynamically
> 2000 Drill Ship
Positioned (Thrusters)
7
Host Facilities Geographic Trends
Existing Popularity
Gulf of North West
Mexico Brazil Atlantic Africa
TLP/Spar High Med Med Med
Subsea to Platform High Low Med Low
Subsea to FPSO Med High High High
8
Subsea Tree & Control Module Trends
9
Early Trees …
Texaco Tartan Stacked Valve Tree
Shell Dry Chamber Tree
Archives from Various Operating Companies and Entities
10
My Career Early Trees …
Main Pass 261 #1 FMC CM-1 Mudline Tree
VK 739 #2 (Pecten) Dril-Quip Vertical Tree
GC 157 (Shell
Manatee) #1 Vertical
VK 739 #3 Kvaerner Side Valve Tree Tree
11
Deep Water Tree Technology
1992 1994 1996-1998 2000
12
Tree Interfaces that Govern Design
Well
– Tubing Size, Pressure,
Temperature, Material Class
The Well
• Controls
– Direct, Piloted, Electro/Hydraulic Controls
• Flowlines
– Pipeline Size, Pressure, Connection
Type Flowline
Connection Wellhead
• Wellhead
– Mudline, Clamp Hub, Mandrel,
Different Vendors
Optimum Subsea Tree Configuration Driven by Reservoir Requirements
Fundamental Subsea Configurations
13
VXT
(TH in Tubing Head)
• The type of
completion defines
where the tubing
VXT
hanger resides (TH in the wellhead) HXT and EHXT
• Anything above the
tubing hanger can
be removed
without disturbing
the well
Tubing
Tubing Head
Hanger Subsea
Wellhead
14
Typical Tree Decision Drivers
Horizontal Tree Vertical Tree
• Financial driver is “installed • Financial driver is “life-of-field
CAPEX” OPEX”
• Lower well count projects that • Large well count projects (or
cannot justify expense of open portfolios of projects) that can
water completion riser justify and benefit from
• High drive wells or multilaterals investment in open water
(have need for large bore ≥ 7”) completion riser system
• Complex reservoirs or frequent • Lower drive wells (smaller bore)
workovers requiring tubing • Simple reservoirs or low
retrieval frequency of tubing retrieval
• ESP technology workovers
• Batch drilling/completion and/or • High pressure - difficult well
requirement for drill thru control issues
systems
15
Subsea Trees by Water Depth
Mudline Tree
Diverless Tree
Guidelineless (GLL)
(Guideposts/Guidelines)
Tree (Funnels)
Water Depth (Feet) Surface Vessel Type of Tree
< 400 Jack-up Mudline – Diver Assist
200-800 Floating Vessel Diver Assist
Diver Assist Tree
800-2500 Floating Vessel Diverless
¾2500 Floating Vessel Guidelineless
16
Tree
Configurations
10K Vertical Deep Water Standard
10K Vertical Shallow Water Tree
15K Enhanced Vertical Tree 15K Standard EHXT 10K Standard EHXT
Comparison of Traditional and
17
Enhanced Vertical Trees
ROV Tree Cap
Flowline
U-Loop
Tubing Hanger Tubing Head
With Annulus Slim OD
Installed in
Isolation Valve Tubing Hanger
Wellhead
Traditional VXT Enhanced VXT
Traditional Vertical Tree with Tubing
18
Hanger Completion in Wellhead
• Eliminates Need for Tubing
Head
• 18-3/4” Dual Bore Tubing
Hanger Features Integral
Annulus Valve
• 14-1/2” TH and Adapter
Sleeve used on Competitor
Wellheads
• Trip Saving ROV Tree Cap
• Guideline or Guidelineless
Configurations
• BOP Setup Required for TH
Orientation
19
4” x 2” 5K Dual Bore GL Tree
”
EG MAGY “C
20
EVXTTM-SB EVXTTM-DB
Total Girassol
”
Shell Std
Enhanced Slim Bore Enhanced Dual Bore
Vertical Tree Vertical Tree
4” x 2” 10,000 psi 5” x 2” 5,000 psi
5” x 2” 15,000 psi 5” x 2” 10,000 psi
GLL 10K Enhanced Vertical Tree
21
and Tubing Head Stack Section View
Tree Valves
22
GLL 10K Enhanced Vertical Tree System
ROV Tree Cap
Tree Assembly Subsea Control Module
Tubing Hanger
Tubing Head
Assembly
Vertical Hub
for Well Jumper
23
GLL 10K Enhanced Vertical Tree
ROV Tree Cap
Tree Cap Parking
Slot
Subsea Control
Module
Flowline Hydraulic Flying
Connector Lead Receptacles
Tree Connector
24
10K EVXT Tubing Head
Hub for Tree
Flowline Connector
Vertical Hub for
Well Jumper
Flowline Hub
Latch/Release
Annulus Access
Valve
10K Concentric Slimbore
25
Tubing Hanger
Running Tool Latch Profile
Locking Mandrel
Lock Ring
Dual Elastomer
Secondary Seals
Alignment Key
Tubing Suspension
Threads (4” to 5 1/2”)
National Hydraulic
Couplings
Tronic Wet-Mate
Electrical Connectors Plug Profile
Split Protective Sleeve
For Couplings
26
10K ROV Tree Cap
• Run subsea with tree
• Weighs less than 100 lbs
in water
27
10K Enhanced Vertical Tree
Stack Views
28
15K Enhanced Vertical Tree System
SCM
Choke
Tree Assembly
Tubing Hanger
Tubing Head
Vertical Hub Assembly
for Well Jumper
Capable of handling BOP’s directly
15K Enhanced
29
Vertical Tree
PRODUCTION WING VALVE
18 ¾ - H4
PRODUCTION RE-ENTRY
MASTER VALVE HUB
TREE CHEMICAL
INJECTION VALVE
TREE
CHEMICAL
PRODUCTION
INJECTION
SHUT IN VALVE
VALVE
TREE
CONNECTOR
PROD. MQC
PLATE
DOWNHOLE
FUNCTIONS
CHOKE
ROV PANEL
MANF / SLED
MQC PLATE EROSION DETECTOR BLOCK
15K Enhanced
30
Vertical Tree
SUBSEA CONTROL
TREE CAP PARKING MODULE
RECEPTACLE
ANNULUS
CROSSOVER
VALVE
ANNULUS
WING VALVE
ANNULUS
SWAB
VALVE
PRODUCTION
ANNULUS SHUT DOWN
MASTER VALVE
VALVE CONNECTOR / FLOWLINE
SCSSV ROV PANEL CONNECTOR
31
15K Tubing Hanger Assembly
32
15K ROV Tree Cap
33
Enhanced Horizontal Tree System
5” x 2” 10,000 psi
5” x 2” 15,000 psi
Comparison of Traditional and
34
Enhanced Horizontal Trees
Tubing Hanger Internal Tree Cap
Both Crown Plugs
Installed in
Extended
Tubing Hanger
Traditional HXT Enhanced HXT
Enhanced Horizontal 35
Tree EHXT®
85,000 lbs
14.5’ x 14.5’
footprint x
12.5’ tall
36
10K & 15K ROV Tree Cap
37
EHXT Tubing Hanger Features
Crown
Plug
Tubing Hanger
38
10K & 15K EHXT EH-5 Radial Penetrator
• Enables 9 downhole control lines
through 2 EH-5 Penetrators
– Hydraulic, chemical, electrical
Tree EH-5
Tubing
Spool Penetrator
Hanger
Body
Welded Tubing
Connections on Female Male
Ends of Radial Coupler Coupler
Penetrator Stems
39
15K EHXT
Length
166”
(4.22m)
153”
(3.88m)
134”
(3.40m)
40
5K HXT WireLineLess w/ ESP
Petrobras
41
5K HXT with ESP Features
Tubing
Hanger
With
Dual Ball Valve
ROV
Tree
Cap
42
5K EHXT with Retrievable Choke Module
Choke
Module
TREE
43
5K EHXT Retrievable Choke Module
•MEG Flow Meter
•Wet Gas Meter
•Water Cut Meter
•Choke
•Tree Connector
•Manifold Connector
•Two Sand Detectors
•Suite of Dual PT/TT Sensors
44
Electric Tree with Redundant Battery
System
Standard
Electric
Connectors
Battery
Pack
45
Electric Choke Control Retrofit
• Reported production
gain of 1900 bbl/d
• Fully open to fully
closed 45 seconds.
Electric Flow
46
Control Valves
• Electric Actuators position
control and fast operation
• Electric Actuators for subsea
processing systems
47
Boosting and Processing
Tordis Subsea Separation System
48
Installation Methods
and
Systems
49
Vertical Tree on Drill Pipe
50
Horizontal Tree On Drill Pipe
5” x 2” 5K GLL Dual Bore Tree,
51
LMRP, EDP & Completion Riser
Heave Compensated Landing System (HCLS)
52
Tree overboarding
Tree being moved off Laney deck
Tree lowering into water
HCLS buoy deployment
53
HCLS Tree Installation Boat to Crane
Buoys
Tree
54
HCLS Tree Installation Crane to Overboard
55
HCLS Tree Installation Crane to Boat
56
HCLS Tree Installation Buoys Overboard
HCLS Tree Installation Sling
57
58
HCLS Tree Installation Landout
59
Rig Winch Tree Installation Boat Offload
60
Rig Winch Tree Installation Rig Deployment
61
Rig Winch Tree Installation
62
Rig Winch Tubing Head Spool Deployment
63
Subsea Tree Installation
• Run on monobore riser
• Controlled by SCM
during installation
64
Monobore Completion Riser Systems
• 5” 10K & 15K
monobore riser
systems
• Riser systems
can be used for
light well
intervention on
both vertical and
horizontal trees
15K
65
Monobore EDP
Riser
LRP
Tree
Tubing
Head
66
5” 15K Completion Riser System
Tapered
Stress
Lubricator Valve Joint
HPU
Surface
Tree
Riser
Control
Station
Lubricator
Valve Reel Unit
Tension To EDP
Joint / LRP
Intermediate Joints
Umbilical
Reel
67
THANKS! Tree
QUESTIONS?
Me
One of my Earliest Trees – Happy Holidays, Y’all!
TREE TYPES
and
INSTALLATION METHODS
James Pappas Devon
Jamie Patrick-Maxwell FMC
Ray Guillory FMC