Brigada Eskwela Form 07
Brigada Eskwela Form 07
Brigada Eskwela Form 07
BE Form 07
DEPARMENT OF EDUCATION
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(to be accomplished by the School Head)
A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
Others (Brief
Repaired Repainted Replaced
Description)
1. Roofs
2. Ceilings
3. Walls
4. Windows and Door
5. Chairs/Desks, Tables, and Blackboards
6. Comfort Rooms
7. Leaking Pipes
8. School Grounds / Landscaping
9. School Signs
10. Others (specify)
BE Form 07
DEPARMENT OF EDUCATION
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(to be accomplished by the School Head)
A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
Others (Brief
Repaired Repainted Replaced
Description)
1. Roofs
2. Ceilings
3. Walls
4. Windows and Door
5. Chairs/Desks, Tables, and Blackboards
6. Comfort Rooms
7. Leaking Pipes
8. School Grounds / Landscaping
9. School Signs
10. Others (specify)
BE Form 07
DEPARMENT OF EDUCATION
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(to be accomplished by the School Head)
A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
Others (Brief
Repaired Repainted Replaced
Description)
1. Roofs
2. Ceilings
3. Walls
4. Windows and Door
5. Chairs/Desks, Tables, and Blackboards
6. Comfort Rooms
7. Leaking Pipes
8. School Grounds / Landscaping
9. School Signs
10. Others (specify)
BE Form 07
DEPARMENT OF EDUCATION
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(to be accomplished by the School Head)
A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
Others (Brief
Repaired Repainted Replaced
Description)
1. Roofs
2. Ceilings
3. Walls
4. Windows and Door
5. Chairs/Desks, Tables, and Blackboards
6. Comfort Rooms
7. Leaking Pipes
8. School Grounds / Landscaping
9. School Signs
10. Others (specify)
BE Form 07
DEPARMENT OF EDUCATION
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(to be accomplished by the School Head)
A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
Others (Brief
Repaired Repainted Replaced
Description)
1. Roofs
2. Ceilings
3. Walls
4. Windows and Door
5. Chairs/Desks, Tables, and Blackboards
6. Comfort Rooms
7. Leaking Pipes
8. School Grounds / Landscaping
9. School Signs
10. Others (specify)
BE Form 07
DEPARMENT OF EDUCATION
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(to be accomplished by the School Head)
A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
Others (Brief
Repaired Repainted Replaced
Description)
1. Roofs
2. Ceilings
3. Walls
4. Windows and Door
5. Chairs/Desks, Tables, and Blackboards
6. Comfort Rooms
7. Leaking Pipes
8. School Grounds / Landscaping
9. School Signs
10. Others (specify)
BE Form 07
DEPARMENT OF EDUCATION
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(to be accomplished by the School Head)
A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
Others (Brief
Repaired Repainted Replaced
Description)
1. Roofs
2. Ceilings
3. Walls
4. Windows and Door
5. Chairs/Desks, Tables, and Blackboards
6. Comfort Rooms
7. Leaking Pipes
8. School Grounds / Landscaping
9. School Signs
10. Others (specify)
BE Form 07
DEPARMENT OF EDUCATION
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(to be accomplished by the School Head)
A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
Others (Brief
Repaired Repainted Replaced
Description)
1. Roofs
2. Ceilings
3. Walls
4. Windows and Door
5. Chairs/Desks, Tables, and Blackboards
6. Comfort Rooms
7. Leaking Pipes
8. School Grounds / Landscaping
9. School Signs
10. Others (specify)
BE Form 07
DEPARMENT OF EDUCATION
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(to be accomplished by the School Head)
A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
Others (Brief
Repaired Repainted Replaced
Description)
1. Roofs
2. Ceilings
3. Walls
4. Windows and Door
5. Chairs/Desks, Tables, and Blackboards
6. Comfort Rooms
7. Leaking Pipes
8. School Grounds / Landscaping
9. School Signs
10. Others (specify)
BE Form 07
DEPARMENT OF EDUCATION
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(to be accomplished by the School Head)
A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
Others (Brief
Repaired Repainted Replaced
Description)
1. Roofs
2. Ceilings
3. Walls
4. Windows and Door
5. Chairs/Desks, Tables, and Blackboards
6. Comfort Rooms
7. Leaking Pipes
8. School Grounds / Landscaping
9. School Signs
10. Others (specify)
TOTAL P 3,126.00
Appendix II
BE Form 07
DEPARMENT OF EDUCATION
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(to be accomplished by the School Head)
A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
Others (Brief
Repaired Repainted Replaced
Description)
1. Roofs
2. Ceilings
3. Walls
4. Windows and Door
5. Chairs/Desks, Tables, and Blackboards
6. Comfort Rooms
7. Leaking Pipes
8. School Grounds / Landscaping
9. School Signs
10. Others (specify)
B. DONATIONS/ MATERIAL RESOURCES GENERATED (Use separate sheets, if needed)
Type of Donations Source Estimated Cost
Painting materials & snacks PTCA P 1,750.00
TOTAL P 1,750.00
Appendix II
BE Form 07
DEPARMENT OF EDUCATION
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(to be accomplished by the School Head)
A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
Others (Brief
Repaired Repainted Replaced
Description)
1. Roofs
2. Ceilings
3. Walls
4. Windows and Door
5. Chairs/Desks, Tables, and Blackboards
6. Comfort Rooms
7. Leaking Pipes
8. School Grounds / Landscaping
9. School Signs
10. Others (specify)
B. DONATIONS/ MATERIAL RESOURCES GENERATED (Use separate sheets, if needed)
Type of Donations Source Estimated Cost
TOTAL
Appendix II
BE Form 07
DEPARMENT OF EDUCATION
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(to be accomplished by the School Head)
A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
Others (Brief
Repaired Repainted Replaced
Description)
1. Roofs
2. Ceilings
3. Walls
4. Windows and Door
5. Chairs/Desks, Tables, and Blackboards
6. Comfort Rooms
7. Leaking Pipes
8. School Grounds / Landscaping
9. School Signs
10. Others (specify)
B. DONATIONS/ MATERIAL RESOURCES GENERATED (Use separate sheets, if needed)
Type of Donations Source Estimated Cost
Gasoline, Faucet & foods for snacks Cash / PTCA P 2,185.00
TOTAL P 2,185.00
Appendix II
BE Form 07
DEPARMENT OF EDUCATION
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(to be accomplished by the School Head)
A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
Others (Brief
Repaired Repainted Replaced
Description)
1. Roofs
2. Ceilings
3. Walls
4. Windows and Door
5. Chairs/Desks, Tables, and Blackboards
6. Comfort Rooms
7. Leaking Pipes
8. School Grounds / Landscaping
9. School Signs
10. Others (specify)
B. DONATIONS/ MATERIAL RESOURCES GENERATED (Use separate sheets, if needed)
Type of Donations Source Estimated Cost
Construction materials PTCA / LGU P 4,180.00
TOTAL P 4,180.00
Appendix II
BE Form 07
DEPARMENT OF EDUCATION
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(to be accomplished by the School Head)
A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
Others (Brief
Repaired Repainted Replaced
Description)
1. Roofs
2. Ceilings
3. Walls
4. Windows and Door
5. Chairs/Desks, Tables, and Blackboards
6. Comfort Rooms
7. Leaking Pipes
8. School Grounds / Landscaping
9. School Signs
10. Others (specify)
TOTAL P 40,204.00
Appendix II
BE Form 07
DEPARMENT OF EDUCATION
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(to be accomplished by the School Head)
A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
Others (Brief
Repaired Repainted Replaced
Description)
1. Roofs
2. Ceilings
3. Walls
4. Windows and Door
5. Chairs/Desks, Tables, and Blackboards
6. Comfort Rooms
7. Leaking Pipes
8. School Grounds / Landscaping
9. School Signs
10. Others (specify)
TOTAL P 1,500.00
Appendix II
BE Form 07
DEPARMENT OF EDUCATION
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(to be accomplished by the School Head)
A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
Others (Brief
Repaired Repainted Replaced
Description)
1. Roofs
2. Ceilings
3. Walls
4. Windows and Door
5. Chairs/Desks, Tables, and Blackboards
6. Comfort Rooms
7. Leaking Pipes
8. School Grounds / Landscaping
9. School Signs
10. Others (specify)
TOTAL P 3,761.00
Appendix II
BE Form 07
DEPARMENT OF EDUCATION
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(to be accomplished by the School Head)
A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
Others (Brief
Repaired Repainted Replaced
Description)
1. Roofs
2. Ceilings
3. Walls
4. Windows and Door
5. Chairs/Desks, Tables, and Blackboards
6. Comfort Rooms
7. Leaking Pipes
8. School Grounds / Landscaping
9. School Signs
10. Others (specify)
TOTAL P 522.00
Appendix II
BE Form 07
DEPARMENT OF EDUCATION
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(to be accomplished by the School Head)
A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
Others (Brief
Repaired Repainted Replaced
Description)
1. Roofs
2. Ceilings
3. Walls
4. Windows and Door
5. Chairs/Desks, Tables, and Blackboards
6. Comfort Rooms
7. Leaking Pipes
8. School Grounds / Landscaping
9. School Signs
10. Others (specify)
TOTAL
Appendix II
BE Form 07
DEPARMENT OF EDUCATION
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(to be accomplished by the School Head)
A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
Others (Brief
Repaired Repainted Replaced
Description)
1. Roofs
2. Ceilings
3. Walls
4. Windows and Door
5. Chairs/Desks, Tables, and Blackboards
6. Comfort Rooms
7. Leaking Pipes
8. School Grounds / Landscaping
9. School Signs
10. Others (specify)
TOTAL P 10,877.00
Appendix II
BE Form 07
DEPARMENT OF EDUCATION
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(to be accomplished by the School Head)
A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
Others (Brief
Repaired Repainted Replaced
Description)
1. Roofs
2. Ceilings
3. Walls
4. Windows and Door
5. Chairs/Desks, Tables, and Blackboards
6. Comfort Rooms
7. Leaking Pipes
8. School Grounds / Landscaping
9. School Signs
10. Others (specify)
TOTAL P 1,100.00
Appendix II
BE Form 07
DEPARMENT OF EDUCATION
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(to be accomplished by the School Head)
A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
Others (Brief
Repaired Repainted Replaced
Description)
1. Roofs
2. Ceilings
3. Walls
4. Windows and Door
5. Chairs/Desks, Tables, and Blackboards
6. Comfort Rooms
7. Leaking Pipes
8. School Grounds / Landscaping
9. School Signs
10. Others (specify)
TOTAL P 450.00
Appendix II
BE Form 07
DEPARMENT OF EDUCATION
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(to be accomplished by the School Head)
A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
Others (Brief
Repaired Repainted Replaced
Description)
1. Roofs
2. Ceilings
3. Walls
4. Windows and Door
5. Chairs/Desks, Tables, and Blackboards
6. Comfort Rooms
7. Leaking Pipes
8. School Grounds / Landscaping
9. School Signs
10. Others (specify)
TOTAL
Appendix II
BE Form 07
DEPARMENT OF EDUCATION
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(to be accomplished by the School Head)
A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
Others (Brief
Repaired Repainted Replaced
Description)
1. Roofs
2. Ceilings
3. Walls
4. Windows and Door
5. Chairs/Desks, Tables, and Blackboards
6. Comfort Rooms
7. Leaking Pipes
8. School Grounds / Landscaping
9. School Signs
10. Others (specify)
TOTAL P 200.00
Appendix II
BE Form 07
DEPARMENT OF EDUCATION
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(to be accomplished by the School Head)
A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED (Please check appropriate column)
Others (Brief
Repaired Repainted Replaced
Description)
1. Roofs
2. Ceilings
3. Walls
4. Windows and Door
5. Chairs/Desks, Tables, and Blackboards
6. Comfort Rooms
7. Leaking Pipes
8. School Grounds / Landscaping
9. School Signs
10. Others (specify)
TOTAL
Appendix II
BE Form 07
DEPARMENT OF EDUCATION
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(to be accomplished by the School Head)
TOTAL
Appendix II
BE Form 07
DEPARMENT OF EDUCATION
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT
(to be accomplished by the School Head)
TOTAL
BE Form 07
DEPARMENT OF EDUCATION
6 Private Citizens 1 3 3 0 0 0 7
7 Prival Companies/Corp 0 0 0 0 0 0 0
12 Others: (specify) 3 6 4 3 1 10 27
13 Prominent Volunteers 0 2 0 0 0 0 2
D. ESTIMATED COST OF VOLUNTEER SERVICES RENDERED: Refer to Guide for Computing Labor Cost.
(Use separate sheets, if needed)
Total Number of Total Number of
Type of Service Total Estimated Costs
Volunteers Hours Rendered
Masonry 29 119 5,455.00
Carpentry 71 236 14,231.00
Plumbing 1 8 250.00
Electrical/Electronic 6 40 1,350.00
Landscaping/Gardening 299 909 29,957.50
Painting 47 231 2,332.00
Ordinary Labor 185 291 18,400.44
Others 144 453 11,725.00
E. ISSUES AND CONCERNS (Describe briefly problems encountered and how resolved)
- the teaching staff and the SH voluntarily offered financial assistance and tapped also choose persons
Getting in touch with the stakeholders is one of the best way to remedy some problems in school which
2 Release funds for every school to be use for repair and maintenance of school buildings and
materials.
G. EVIDENCES / ATTACHMENTS
a. Photos (before, during and after)
b. Photocopy of all completed BE Forms (checked if attached)
Form 01 Form 05
Form 02 Form 06
Form 03
Form 04
Date:
Prepared by:
ROMULO O. MANOOS
Name and Designation BRIGADA ESKWELA/ADOPT-A-SCHOOL PROGRAM
DISTRICT COORDINATOR