0% found this document useful (0 votes)
65 views3 pages

Statement of Requirement

This document outlines the requirements for a project titled "Title of the project". It lists the group members and supervisor. It details sections on introduction, technical requirements, miscellaneous items, hazards/safety, and costs. The introduction includes the project scope, related documents, symbols, and deliverables. The technical requirements and design considerations sections provide additional details. It estimates the total project cost and notes the cost is subject to material, assembly, and testing costs. The project advisor signs off on the requirements document.

Uploaded by

aliskhh
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
65 views3 pages

Statement of Requirement

This document outlines the requirements for a project titled "Title of the project". It lists the group members and supervisor. It details sections on introduction, technical requirements, miscellaneous items, hazards/safety, and costs. The introduction includes the project scope, related documents, symbols, and deliverables. The technical requirements and design considerations sections provide additional details. It estimates the total project cost and notes the cost is subject to material, assembly, and testing costs. The project advisor signs off on the requirements document.

Uploaded by

aliskhh
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Title of the project {Arial, 16, bold, centre aligned, no full

stop} Title of the project {Arial, 16, bold, centre aligned, no


full stop} Title of the project {Arial, 16, bold, centre aligned,
no full stop}

Statement of Requirement {Arial, 14, bold}


(SOR) {Arial, 16, bold}

Group members Supervisor

Mr Ali Mr Ali
Mr Khan
Ms … Advisors

Mr Khan
Mr Nasir

Pakistan Navy Engineering College


National University of Sciences and Technology
Title Design and fabrication (everything Issue: 01 Date: 15-03-2011
in this table is Arial, 10)

CHANGES D/W REF REQUIREMENTS

    1 Introduction

    1.1 Preamble

      (everything in this table is Arial, 10)

      If required you can use second paragraph here


(everything in this table is Arial, 10)

    1.2 Scope

    1.2.1 (everything in this table is Arial, 10)

    1.3 Related Documents

    1.3.1 Books

(everything in this table is Arial, 10)

(everything in this table is Arial, 10)

(everything in this table is Arial, 10)

(everything in this table is Arial, 10)

    1.3.2 Software

      (everything in this table is Arial, 10)

1.4 Symbols

From the D/W column of this table

D Demand A mandatory requirement

W(H) Wish high A highly desirable attribute

W(L) Wish low A low desirable attribute

1.5 Deliverables

W(H) (everything in this table is Arial, 10)

W(L) (everything in this table is Arial, 10)

  W(H)   (everything in this table is Arial, 10)

  D   Final project report


2 Technical Requirements

2.1 (everything in this table is Arial, 10)

2.2 Design Considerations

(everything in this table is Arial

(everything in this table is Arial

(everything in this table is Arial

(everything in this table is Arial

    3 Miscellaneous

    3.1 (everything in this table is Arial, 10)

    3.2 (everything in this table is Arial, 10)

4 Hazards/Safety

(everything in this table is Arial, 10)

    5 Costs

    5.1 The estimated cost of the Project is Rs. xx,000.

5.2 The above mentioned cost is subjected to material


cost, assembly requirements, and testing.

    5.3 Source of above funding and budged allocation


(optional)

Project Advisor's

Signature

You might also like