Determinar El Tipo de Losa

The document contains calculations for slabs and beams. For slabs, it determines type, predimensions thickness, analyzes loads, calculates stresses, and designs reinforcement. Beams are also predimensioned, loads analyzed, stresses calculated, and section designed for both bending and shear with reinforcement. Reinforcement amounts and locations are provided for various structural elements.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
88 views18 pages

Determinar El Tipo de Losa

The document contains calculations for slabs and beams. For slabs, it determines type, predimensions thickness, analyzes loads, calculates stresses, and designs reinforcement. Beams are also predimensioned, loads analyzed, stresses calculated, and section designed for both bending and shear with reinforcement. Reinforcement amounts and locations are provided for various structural elements.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 18

CALCULOS.

CALCULOS DE LOSAS
LOSA 1 = LOSA 4

Determinar el tipo de losa:

LM < 2 LM = 600 =1,8 < 2


Lm Lm = 335

Predimensionado:

Hp = c. LM + 1 =
Lm

Hp= 2,8 . 335 + 1 = 10cm.


100

Análisis de Carga

Pp=∂H x hp = 2,4tn/m³ x 0,15m = 0,36 tn/m²


Sc/Rev= = 0,30 tn/m²
0,66 tn/m²

Cálculo de Esfuerzos:
λ= a = 3,35 = 0,55
b 6,00

M= q x Lm² = 0,66 x 5² = 16,50 tn/m

Ma= Macp x M = 0,0619 x 16,50 tn/m = 1,02 tn/m


Mb= Mbcp x M = 0,0318 x 16,50 tn/m = 0,47tn/m
M0= M0 x M = 0,0579 x 16,50 tn/m = 0,66tn/m

Reacción de Losas s/ Vigas:

Ra= q x a² x Ra = 16,5 x 0,263 = 0,87tn


a 5
Rb= q x a² x Rb = 16,50 x 0,404 = 0,95tn
b 7

Dimensionamiento de la Sección del Hº

dmin= 1,77 Md =
b x fcd

dmin= 1,77 1,6x 1,02 x10 = 7,15


(100 x 100)
hm= dmin + r
hm= 7,15 + 1,5
hm= 8,65cm.

Dimensionamiento de la Sección del Acero

μ = Md = 1,6x10XM = 0,31M
bXd²xfcd 100x7,15²x100

As= bxdxfcd x ω = 100x7,15 x100 =19,60ω


Fyd 3652

M Valor Md ω As Distancia

Ma 1,02 0,316 0,4323 8,57 Ф 12 c/13cm.

Mb 0,52 0,161 0,1795 3,52 Ф 8 c/14cm

M0 0,95 0,2945 0,3937 7,72 Ф 12c/14cm.


LOSA 2 = LOSA 3

Determinar el tipo de losa:

LM < 2 LM = 335 =1,7 < 2


Lm Lm = 285

Predimensionado:

Hp = c. LM + 1 =
Lm

Hp= 2,8. 285 + 1 = 10 cm.


335

Análisis de Carga

Pp=∂H x hp = 2,4tn/m³ x 0,14m = 0,34 tn/m²


Sc/Rev= = 0,3 tn/m²
0,64 tn/m²

Cálculo de Esfuerzos:

λ= a = 2,8 = 0,9
b 3,3

M= q x Lm² = 0,64 x 4,5m² = 12,96 tn/m

Ma= Macp x M = 0,0156 x 12,96 tn/m = 0,20tn/m


Mb= Mbcp x M = 0,0359 x 12,96tn/m = 0,47tn/m
M0= M0 x M = 0,0512 x 12,96tn/m = 0,66tn/m

Reacción de Losas s/ Vigas:

Ra= q x a² x Ra = 12,96 x 0,256 = 0,74tn


a
Rb= q x a² x Rb = 12,96 x 0,300 = 0,78tn
b

Dimensionamiento de la Sección del Hº

dmin= 1,77 Md =
b x fcd

dmin= 1,77 1,6x0,66x10 = 5,75→6,5cm


100 x 100

hm= dmin + r
hm= 5,75 + 1,5
hm= 7,25cm. → 8cm.

Dimensionamiento de la Sección del Acero

μ = Md = 1,6x10Xm = 0,4M
bXd²xfcd 100x6,5²x100

As= bxdxfcd x ω = 100x 6,5 x100 =17,7 ω


Fyd 3652

M Valor Md ω As Distancia

Ma 0,20 0,080 0,0945 1,67 Ф 6 c/16cm.

Mb 0,47 0,188 0,2190 3,88 Ф 8 c/12cm

M0 0,66 0,2640 0,3232 5,72 Ф 10c/13cm.


LOSA VOLADIZO

Predimensionado:

Hp = c. 2Lv + 1 =
100

Hp= 2,8X 2X 150 + 1 = 9,40cm.


100

hp= 2 x Lm = 2 x 150 = 7,5cm.


40 40

Análisis de Carga

Pp=∂H x hp = 2,4tn/m³ x 0,09m = 0,23 tn/m²


Sc/Rev= = 0,30 tn/m²
0.53 tn/m²

Cálculo de Esfuerzos:

1m λ= a = 1,5 = 0,21
b 7

Pm= ∂m x em x hm x Lm = 1,4 x 0,15 x 1m x 1m = 0,21tn.m

Mov= q x Lm² + (Lm + v) x Lv x H x 1


2

Mov= 0,53 x 1,5² + (0,21 + 0,20) x 1,5 + (0,1x1)


2

Mov= 1,25tn/m

Rv= Rlv = q x L + Pm + v
V1

Rv= 0,53 x 1,5 + 0,21 + 0,20

Rv= 1,20tn

Dimensionamiento de la Sección del Hº

dmin= 1,77 Md =
b x fcd

dmin= 1,77 1,6x 1,25 x10 = 8,22


(100 x 100)
hm= dmin + r
hm= 7,9 + 1,5
hm= 9,4cm.

Dimensionamiento de la Sección del Acero

μ = Md = 1,6 x 10 X M = 0,32


bXd²xfcd 100x 7,9² x100

As= bxdxfcd x ω = 100 x 7,9 x100 x 0,4338 =9,4


Fyd 3652

M Valor Md ω As Distancia

Mv 1,25 0,32 0,4338 9,38 Ф 12 c/12cm.


CALCULOS DE VIGAS

VIGA 1 a (20 X …..) = VIGA 7 a (20 X …..)

Predimensionado

hp ≥ LM = 335 = 35
10 10

Análisis de Carga

Pp= ∂H x b x hp = 2,5tn/m³x0,20x0,35 = 0,27tn/m²


RL1/v1= = 0,87tn/m²
1,14 tn/m²

Cálculo de Esfuerzos

Mmáx= q x L² = 1,14x3,5² = 2,36tn.m


8 8

R= q x L = 1,14 x 3,5 = 3,19tn


2 2

Dimensionamiento de la Sección del Hº a la Flexión

dmin= 1,77 Md =
b x fcd

dmin= 1,77 1,6x 2,36 x10 = 25


(20 x 120)

dmin= 25 ≈ 30
hmin= dmin + r
hmin= 30 + 3
hmin=35cm

Dimensionamiento de la Sección de Hº al Corte

δwv ≥ δwd

δwv= 0,20xfcd = 0,20 x 120 = 24

δwd= Vd = 1,6 x 3,79 x 10³ = 8,35


bxd (20 x 37)
Dimensionamiento de la Sección del Acero a la Flexión → Arm. Princ.

Md = 1,6xMx10 = 1,6 x 2,36 x 10 = 0,31


bxd²xfcd 20x 37²x 120

As = ω x b x d x fcd = 0,4133 x 20 x 37 x120 = 10,04 Ф 5 c/16cm.


fyd 3652

Dimensionamieno de la Sección de Acero al Corte → Estribos.

Vd = Vcu + Vsu
Vcu = fvd x b x d = 0,5 120 x 20 x 37 = 4053
Vd = 1,6 x Vma 10³= 1,6 x 4,79 x 10³ = 7664

Vsu= Vd – Vcu = 7664 - 4053 = 3611

S= 0,9 x d x 2 x As x fyd
Vsu

S= 0,9 x 37 x 2 x 0,28 x 3652 = 18,85


3611
VIGA 1 b (20 X …..) = VIGA 5 a (20 X …..)

Predimensionado

hp ≥ LM = 335 = 35
10 10

Análisis de Carga

Pp= ∂H x b x hp = 2,5tn/m³x0,20x0,35 = 0,27tn/m²


RL1/v1= = 0,78tn/m²
Pm= ∂m x em x Lm = 1,6x0,15x2,8 = 0,67tn/m²
1,81 tn/m²

Cálculo de Esfuerzos

Mmáx= q x L² = 1,81x3,5² = 2,36tn.m


9 8

R= q x L = 1,81 x 3,5 = 3,19tn


3 2

Dimensionamiento de la Sección del Hº a la Flexión

dmin= 1,77 Md =
b x fcd

dmin= 1,77 1,6x 2,36 x10 = 25


(20 x 120)

dmin= 25 ≈ 30
hmin= dmin + r
hmin= 30 + 3
hmin=35cm

Dimensionamiento de la Sección de Hº al Corte

δwv ≥ δwd

δwv= 0,20xfcd = 0,20 x 120 = 24

δwd= Vd = 1,6 x 3,79 x 10³ = 8,35


bxd (20 x 37)

Dimensionamiento de la Sección del Acero a la Flexión → Arm. Princ.


Md = 1,6xMx10 = 1,6 x 2,36 x 10 = 0,31
bxd²xfcd 20x 37²x 120

As = ω x b x d x fcd = 0,4133 x 20 x 37 x120 = 10,04 Ф 5 c/16cm.


fyd 3652

Dimensionamieno de la Sección de Acero al Corte → Estribos.

Vd = Vcu + Vsu
Vcu = fvd x b x d = 0,5 120 x 20 x 37 = 4053
Vd = 1,6 x Vma 10³= 1,6 x 4,79 x 10³ = 7664

Vsu= Vd – Vcu = 7664 - 4053 = 3611

S= 0,9 x d x 2 x As x fyd
Vsu

S= 0,9 x 37 x 2 x 0,28 x 3652 = 18,85


3611
VIGA 2 (20 X …..) = VIGA 3 (20 X …..) = VIGA 6 c (20 X …..)

Predimensionado

hp ≥ LM = 335 = 35
10 10

Análisis de Carga

Pp= ∂H x b x hp = 2,5tn/m³x0,20x0,35 = 0,37tn/m²


RL2/v2= = 0,78tn/m²
Pm= ∂m x em x Lm = 1,6x0,15x2,8 = 0,67tn/m²
1,81 tn/m²
Cálculo de Esfuerzos

Mmáx= q x L² = 1,81x3,5² = 2,36tn.m


10 8

R= q x L = 1,81 x 3,5 = 3,19tn


4 2

Dimensionamiento de la Sección del Hº a la Flexión

dmin= 1,77 Md =
b x fcd

dmin= 1,77 1,6x 2,36 x10 = 25


(20 x 120)

dmin= 25 ≈ 30
hmin= dmin + r
hmin= 30 + 3
hmin=35cm

Dimensionamiento de la Sección de Hº al Corte

δwv ≥ δwd

δwv= 0,20xfcd = 0,20 x 120 = 24

δwd= Vd = 1,6 x 3,79 x 10³ = 8,35


bxd (20 x 37)

Dimensionamiento de la Sección del Acero a la Flexión → Arm. Princ.

Md = 1,6xMx10 = 1,6 x 2,36 x 10 = 0,31


bxd²xfcd 20x 37²x 120

As = ω x b x d x fcd = 0,4133 x 20 x 37 x120 = 10,04 Ф 5 c/16cm.


fyd 3652

Dimensionamieno de la Sección de Acero al Corte → Estribos.

Vd = Vcu + Vsu
Vcu = fvd x b x d = 0,5 120 x 20 x 37 = 4053
Vd = 1,6 x Vma 10³= 1,6 x 4,79 x 10³ = 7664

Vsu= Vd – Vcu = 7664 - 4053 = 3611

S= 0,9 x d x 2 x As x fyd
Vsu

S= 0,9 x 37 x 2 x 0,28 x 3652 = 18,85


3611
VIGA 5 b (20 X …..)

Predimensionado

hp ≥ LM = 600 = 60
10 10

Análisis de Carga

Pp= ∂H x b x hp = 2,5tn/m³x0,20x0,60 = 0,30tn/m²


RL1= = 0,78tn/m²
Pm= ∂m x em x Lm = 1,6x0,15x2,8 = 0,67tn/m²
1,7tn/m²

Cálculo de Esfuerzos

Mmáx= q x L² = 1,7x6² = 7,30tn.m


8 8

R= q x L = 1,7 x 6 = 5,15tn
5 2

Dimensionamiento de la Sección del Hº a la Flexión

dmin= 1,77 Md =
b x fcd

dmin= 1,77 1,6x 6 x10 = 33,27


(20 x 120)

dmin= 33,27 ≈ 34
hmin= dmin + r
hmin= 34 + 3
hmin=37cm

Dimensionamiento de la Sección de Hº al Corte

δwv ≥ δwd

δwv= 0,20xfcd = 0,20 x 120 = 24

δwd= Vd = 1,6 x 5,3 x 10³ = 12,47


bxd (20 x 34)

Dimensionamiento de la Sección del Acero a la Flexión → Arm. Princ.


Md = 1,6xMx10 = 1,6x5,3x10 = 0,31
bxd²xfcd 20x 34²x 120

As = ω x b x d x fcd = 0,4133 x 20 x 34 x120 = 9,23 Ф 3 c/20cm.


fyd 3652

Dimensionamieno de la Sección de Acero al Corte → Estribos.

Vd = Vcu + Vsu
Vcu = fvd x b x d = 0,5 120 x 20 x 34 = 3724
Vd = 1,6 x Vma 10³= 1,6 x 4,25 x 10³ = 6800

Vsu= Vd – Vcu = 6800 – 3724 = 3076

S= 0,9 x d x 2 x As x fyd
Vsu

S= 0,9 x 34 x 2 x 0,28 x 3652 = 20,34


3076
VIGA 6 b (30 X …..)

Predimensionado

hp ≥ LM = 435 = 45
10 10

Análisis de Carga

Pp= ∂H x b x hp = 2,5tn/m³x0,20x0,53 = 0,27tn/m²


RL1/v6= = 0,78tn/m²
RL3/V6= =0,77tn/m²
Pm= ∂m x em x Lm = 1,6x0,15x2,8 = 0,67tn/m²
2,49 tn/m²

Cálculo de Esfuerzos

Mmáx= q x L² = 2,49 x 5,3² = 8,74tn.m


9 8

R= q x L = 2,49 x 5,3 = 6,6tn.


6 2

Dimensionamiento de la Sección del Hº a la Flexión

dmin= 1,77 Md =
b x fcd

dmin= 1,77 1,6x 8,74 x10 = 40,7


(20 x 120)

dmin= 40,7 ≈ 43
hmin= dmin + r
hmin= 43 + 3
hmin=46cm

Dimensionamiento de la Sección de Hº al Corte

δwv ≥ δwd

δwv= 0,20xfcd = 0,20 x 120 = 24

δwd= Vd = 1,6 x 6,6 x 10³ = 12,27


bxd (20 x 43)
Dimensionamiento de la Sección del Acero a la Flexión → Arm. Princ.

Md = 1,6xMx10 = 1,6 x 8,74 x 10 = 0,32


bxd²xfcd 20x 43²x 120

As = ω x b x d x fcd = 0,4323 x 20 x 43 x120 = 12,22 Ф 4 c/16cm.


fyd 3652 Ф 4 c/16cm.

Dimensionamieno de la Sección de Acero al Corte → Estribos.

Vd = Vcu + Vsu
Vcu = fvd x b x d = 0,5 120 x 20 x 43 = 4710
Vd = 1,6 x Vma 10³= 1,6 x 6,6 x 10³ = 10560

Vsu= Vd – Vcu = 10560 - 4710 = 5850

S= 0,9 x d x 2 x As x fyd
Vsu

S= 0,9 x 43 x 2 x 0,28 x 3652 = 13,53


5850
VIGA 7 b (30 X …..)
5,35 6,18 12,96
Predimensionado 2,88

hp ≥ LM = 600 = 60 2,14
10 10 2,5 4,5

Análisis de Carga

Pp= ∂H x b x hp = 2,5tn/m³x0,30x0,60 = 0,52tn/m²


RL1/V7= = 0,74tn/m²
RL2/V7= = 0,95tn/m²
Pm= ∂m x em x Lm = 1,6x0,15x2,8 = 0,67tn/m²
2,88 tn/m²

Cálculo de Esfuerzos

Mmáx= q x L² = 2,88 x 6² = 17,64tn.m


8 8
R1 + R2 = 5,35 + 6,18 + 12,96 = 24,49

12,96x4,75 + 6,18x2,5 + 5,35x1,25 = R2x7

R2 = 11,95tn R1= 12,53tn

Dimensionamiento de la Sección del Hº a la Flexión

dmin= 1,77 Md =
b x fcd

dmin= 1,77 1,6x 17,64 x10 = 49,59


(30 x 120)

dmin= 50cm
hmin= dmin + r
hmin= 50 + 3
hmin=53cm

Dimensionamiento de la Sección de Hº al Corte

δwv ≥ δwd

δwv= 0,20xfcd = 0,20 x 120 = 24

δwd= Vd = 1,6 x 12,53 x 10³ = 13,36


bxd (30 x 50)

Dimensionamiento de la Sección del Acero a la Flexión → Arm. Princ.


Md = 1,6xMx10 = 1,6 x 17,64 x 10 = 0,32
bxd²xfcd 30x 50²x 120

As = ω x b x d x fcd = 0,4338 x 30 x 50 x120 = 21,38 Ф 4 c/20cm.


fyd 3652 Ф 4 c/20cm.

Dimensionamieno de la Sección de Acero al Corte → Estribos.

Vd = Vcu + Vsu
Vcu = fvd x b x d = 0,5 120 x 30 x 50 = 8215
Vd = 1,6 x Vma 10³= 1,6 x 12,53 x 10³ = 20048

Vsu= Vd – Vcu = 20048 - 8215 = 11833

S= 0,9 x d x 2 x As x fyd
Vsu

S= 0,9 x 50 x 2 x 0,28 x 3652 = 7,77


11833