0% found this document useful (0 votes)
22 views1 page

Proj Complete Work

The document outlines the sections for a proposed new system project, including an introduction, profile of the organization, description of the existing system and problems with it, needs and objectives for the new system, proposed system features such as inputs, outputs, assumptions, diagrams, code guidelines, and samples, operating environment, proposed enhancements, and conclusion. It provides details on the content and page limits for each of the 11 main sections.

Uploaded by

Vipul Langalia
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views1 page

Proj Complete Work

The document outlines the sections for a proposed new system project, including an introduction, profile of the organization, description of the existing system and problems with it, needs and objectives for the new system, proposed system features such as inputs, outputs, assumptions, diagrams, code guidelines, and samples, operating environment, proposed enhancements, and conclusion. It provides details on the content and page limits for each of the 11 main sections.

Uploaded by

Vipul Langalia
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

1. Acknowledgement.

(1 page)
2. Introduction. (1 page)
3. Organization Profile. (1 page)
4. Existing System. (Max. 2 pages)
5. Problem Areas (Max. 2 pages)
6. Need For The New System (Max. 2 pages)
7. Proposed System
7.1 Objectives To Be Fulfilled (1 page)
7.2 Business Process Description (Max. 2 pages)
7.3 System Features
7.3.1 Inputs (Actual)
7.3.2 Outputs (Actual)
7.3.3 Assumptions (1 page)
7.3.4 ERD / UML Diagrams (Actual)
7.3.5 DFD (Actual)
7.3.6 System Flow Chart (Actual)
7.3.7 Code guidelines (Actual)
7.3.8 Code Inventory
(List of Modules/ Reports)
(Actual)
7.3.8 Database Files/Data Dictionary (Actual)
7.3.9 Data Entry Screens (Samples) (Actual)
7.3.10 Reports (samples) (Actual)
7.3.11 User Manual / Guide (Max. 10 pages)
7.3.11 Test Plan & Test Cases (Max. 10 pages)
7.3.12 Project Schedule (Max. 2 Pages)
8. Operating Environment (1 page)
9. Proposed Enhancement (1 page)
10. Conclusion (1 page)
11. Bibliography (Actual)

You might also like