Project Introduction

This document provides details on the piling process for a construction project, including site layout, soil investigation, excavation methods, earth support systems, and dewatering if needed. It describes the piling procedures such as pile types, layout, construction sequence from installation to concreting and removal of casings. Testing methods like static, dynamic and integrity tests are mentioned to ensure pile load capacity. Equipment for drilling, hammering and concrete placement is listed. Project schedules and sequencing show preliminary site work before piling commences.

Uploaded by

kbkshanaka
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views2 pages

Project Introduction

This document provides details on the piling process for a construction project, including site layout, soil investigation, excavation methods, earth support systems, and dewatering if needed. It describes the piling procedures such as pile types, layout, construction sequence from installation to concreting and removal of casings. Testing methods like static, dynamic and integrity tests are mentioned to ensure pile load capacity. Equipment for drilling, hammering and concrete placement is listed. Project schedules and sequencing show preliminary site work before piling commences.

Uploaded by

kbkshanaka
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

 Project introduction

o Project Name
o Client, Consultant, Contractor
o Location
o Project Detail
 Type of Construction –e.g. Multi-storey office building etc.
 Date of commence and date of completion
 Auto cad or 3D max illustrations
 Current Construction photos
 Construction sequence including planning and management of site
o Brief introduction about project plan with schedule times and sequence of
construction with flow diagrams eg. Site investigation. Site clearance.
Preliminary excavation, Piling, Construction of Earth Retaining Structure,
Excavation for Basement Construction, Pile Cap Construction, Basement
Construction, Column, Lift Core and Floor Construction etc.
 Preliminary work including site layout, soil investigation report and
interpretation
o Include brief summary of soil investigation report including site condition
( type of soil/rock, depths, water table etc), site investigation methods and tests
had been carried out and the purpose of each test
o Include the site layout
 Location of site office
 Stores
 Vehicle mobilization
 Drilling Mud Plant
 Excavation, Compaction and Earth moving
o Purpose of excavation and stages of excavation process ( include sketches if
required)
o Machineries
o Removal of excavated materials
 Earth work support system and Dewatering method (if applicable)
o Type of earthwork system
o Purpose of earthwork system (Why is it required? )
o Sketches or photos of retaining system
o Dewatering process
 Pilling process
o Pile layout drawing
o Pile Drawing including pile cap
o Description about pile type (Rotary Drilled Pile, Driven Pile, Caisson etc), pile
size, number of piles and depth of pile. Mention the load resisting system
( Friction/End Bearing )
o Construction sequence of piling.
 Preliminary Site Preparation
 Setting out
 Installing Casing
 Drilling of Bore Hole ( Soil/ Rock)
 Circulation of Drilling Mud
 Reinforcement
 Concreting
 Removing Casing
o Machineries
 Drilling Equipments (Drilling Rig, Drilling Bit, Auger Drills etc.)
 Pile Hammers ( if applicable)
 Concrete Pump Cart
 Concrete Truck

 Pile testing mechanisms


o Purpose of Pile Testing
o Pile Tests
 Static Pile Testing
 Dynamic Pile Testing
 Pile Integrity Testing

 Cost proposal for piling work


o Find a BOQ of Pile Construction
 Special issues such as environmental concerns
o Find EIA Report of Pile Site