WorkSheet : REINFORCED CONCRETE DESIGN CALCULATION By: IDZ
Projek: PROPOSED CONSTRUCTION AND COMMISIONNING Check: CCY
OF THE 1.0 MILLION GALLONS CIRCULAR REINFORCED
CONCRETE RESERVOIR ANF ANCILLARY WORKS AT BUKIT NASAH
DAERAH HULU PERAK, PERAK DARUL RIDZUAN
File No: PMK/0779/07/RC
FLOOR SLAB CALCULATION
Provide movement joint spacing 7.5m for partial construction joint or 15m for complete construction
joint. Fall in temperature T2 is not considered.
Table A.1 Minimum steel required is ρ = 0 @ 0.35%
Base Thickness d = 300 mm
b = 1000 mm
As = 0.0035 x 500 x 1000/2
= 525 mm2/m
Cl 3.22 (a) Direct tension in immature concrete
App.A Provide Reinforcement T = 12 @ 125
Section Area A = 653 mm2/m
Cracking Checking
Steel ratio ρ = As/bd
= 0
fct/fb = 0.67
Thermal Coef. α = 1.2 x 10-5
Bar size φ = 12 mm
Fall in temp T1 = 25 0C
T2 = 0 0C
Crack width w = Smax α (T1 + T2)/2
= [ (fct/fb)(φ /2ρ)] [ α (T1+T2)/2]
= [(0.67 x 12)/(2 x 0.0037)] (1.2 x 10-5)(25)/2
= 0.16 < 0.2mm
Provide complete constraction joint at the centre of the pool
WorkSheet : REINFORCED CONCRETE DESIGN CALCULATION By: IDZ
Projek: PROPOSED CONSTRUCTION AND COMMISIONNING Check: CCY
OF THE 1.0 MILLION GALLONS CIRCULAR REINFORCED
CONCRETE RESERVOIR ANF ANCILLARY WORKS AT BUKIT NASAH
DAERAH HULU PERAK, PERAK DARUL RIDZUAN
File No: PMK/0779/07/RC
D = 31.06 m
RING BEAM CALCULATION A = (75/1000)2
= 0.006
Tension T0 (1.4
= LL + 1.2 DL) x 0.01
= 0.024 kN
x = 0.024 cos 200
= 0.02 kN
T = xD/2
= 0.35 kN
As = T/fy
= 0.35 /410
= 852.91 mm2/m
Provide Reinforcement Y = 12 @ 250
Section Area As = 854 mm2/m
Cracking Checking
Steel ratio ρ = As/bd
= 0.002
fct/fb = 0.67
Thermal Coef. α = 1.2 x 10-5
Bar size φ = 12 mm
Fall in temp T1 = 25 0C
T2 = 0 0C
Crack width w = Smax α (T1 + T2)/2
= [ (fct/fb)(φ /2ρ)] [ α (T1+T2)/2]
= [(0.67 x 12)/(2 x 0.0037)] (1.2 x 10-5)(25)/2
= 0.16 < 0.2mm
Provide complete constraction joint at the centre of the pool