Halong Shipyard Quality Standard Book 1
Halong Shipyard Quality Standard Book 1
Halong Shipyard Quality Standard Book 1
H¹ LONG 2006
-0-
preface
HALONG SHIP
BUILDING Co.
This HLSQS describes the quality standards and the inspection practice which are
applied during repair and building ship process in HA LONG SHIPBUILDING Co.
The contents of this documents are applied for all kinds of cargo ships, barges,
drilling rigs & special purpose etc. unless additional requirement are specified in the
contract specifications.
-1-
HALONG SHIP
* * contents * *
BUILDING Co.
* * contents * *
-2-
HALONG SHIP
BUILDING Co.
part I
quality standard
-3-
Halong shipbuilding co.
1.3 fabrication..................................................................................... 9
1.4 deformation................................................................................... 12
-4-
Hull * shipbuilding &
section I
HALONG SHIP construction repair
BUILDING Co.
1.1 Material
1.1.1 Surface flaw
1) Pit
Item Remarks
1. Grade A: Repair is unnecessary
2. Grade B:
1) Outer surface of shell plates. To be repaired by
grinding if necessary.
When painting with epoxy can not be done, grinding is
to be carried out.
2) Others: Repair unnecessary.
3. Grade C: To be repaired by grinding
4. Grade D: Repair method is to be determined after
discussion with owner and class.
* Recommended repair method: Grinding followed
by welding.
Area of pit
Area ratio (%) = x100
Total area of a plate
2) Flaking:
Item Remarks
1. Grade A: Repair is unnecessary
2. Grade B: Repair if necessary.
3. Grade C: Repair is necessary
* Repair method (d=depth of defects )
1) d 0.07t (max 3mm)- Grinding
2) 0.07t < d 0.2t: Welding and grinding ( The welded
area should be less than 2% of the total area of a plate ).
-5-
Hull * shipbuilding &
Section 1
HALONG SHIP construction repair
BUILDING Co.
3) Other defects
Item Remarks
1. Grade A: Repair is unnecessary.
2. Grade B: Repair is necessary.
* Repair method (d=depth of defects )
1) d 0.07t (max 3mm): Grinding.
2) 0.07t < d 0.2t: Welding and grinding. ( The welded
area should be less than 2% of the total area of a plate ).
1.1.2) Lamination
Item Remarks
Local In case where the range lamination is
lamination limited, it can be chipped out and built up
by welding as shown in ( a ).
In case where the range of lamination is
limited, also but is near the plate surface,
it is preferable to make the built up
welding as shown in ( b ).
-6-
Hull
Section 1 * shipbuilding
HALONG SHIP construction
BUILDING Co.
-7-
Hull
Section 1 * shipbuilding
HALONG SHIP construction
BUILDING Co.
1.2.2 Dimensions
Standard Tolerance
Item
range limits
L 3d
Length of taper
0.5d 1.0d
( L)
Depth of
1.5 2.0
grooves
-8-
Hull * shipbuilding &
Section 1
HALONG SHIP construction repair
BUILDING Co.
1.3 Fabrication.
1.3.1 Flange longitudinals Unit: mm
Standard Tolerance
Item
range limits
Breadth of webs
3.0 5.0
and flanges
Angle between
2.5 4.5
flange and webs
Compared with template per 100mm
in breadth of flanges
Curvature or
straightness in the 10 25
plane of flanges
Per 10m in length
Curvature of
straightness in the 10 25
plane of webs.
Per 10m in length
1.3.2 Flange brackets.
Standard Tolerance
Item
range limits
Breadth of
webs and 3.0 5.0
flanges
Angle between
flanges and 3.0 5.0
webs Compared with template per
100mm in breadth of flanges.
-9-
Hull
Section 1 * shipbuilding
HALONG SHIP construction
BUILDING Co.
Distortion of face b b
a 3 a 5
plates 100 100
Distortion of face b b
a 3 .5 a 6
plates 100 100
- 10 -
Hull * shipbuilding &
Section 1
HALONG SHIP construction repair
BUILDING Co.
1.3.4 Line heating method
Standard Tolerance
Item
range limits
Item Remark
TMCP Type 50HT
Within 3 cycles as far as practicable
(AH - DH)
TMCP Type 50HT
Within 2 cycles as far as practicable
(EH)
- 11 -
Hull
Section 1 * shipbuilding
HALONG SHIP construction
BUILDING Co.
1.4 Deformation
1.4.1.Unfairness Unit: mm
Standard Tolerance
Item Remarks
range limits
Parallel part ( side ) 4 6 Standard and/or
Shell plates Parallel part ( bottom ) 4 6 tolerance limits
Fore and aft part 5 7 are to be applied
Double bottom per each frame,
4 6
tank top plates longitudinal and
Longitudinal bulkheads, stiffener space
Bulkheads Transverse bulkheads, Swash 6 8 respectiveily.
bulkheads. Where above is
Parallel part within 0.6L 4 6 not applicable , it
Strength deck Fore and aft part 6 9 is to be applied
Covered part 7 9 per 1.8m in
Bare part 6 8 length.
Second deck
Covered part 7 9
Forecastle deck, Bare part 4 6
Poop deck. Covered part 7 9
Super structure Bare part 4 6
deck Covered part 7 9
(Where above
Lift-able 10 12
Car deck space is over
Fixed 6 8
1.8m paragraph
Intermediate deck 8 10
1.4.2 is to be
Outside walls 4 6
Deck house wall applied)
Inside walls 4 6
Covered part 7 9
Interior members
Webs of girders, transverses 5 7
- 12 -
Hull
Section 1 * ship repair
HALONG SHIP construction
BUILDING Co.
Standard Tolerance
Item Remarks
range limits
Shell plate Parallel part side 4 6 Standard and/or
Parallel part bottom 4 6 tolerance limits
Fore and aft part 5 7 are to be applied
Double bottom per each frame,
6 6
tank top plates longitudinal and
Bulkheads Longitudinal bulkheads stiffener space
transverse bulkheads, Swash 6 8 respectiveily.
bulkheads. Where above is
Strength deck Paralleled part with in 0.6L 4 6 not applicable , it
Fore and aft part 6 9 is to be applied
Covered part 7 9 per 1.8m in
Second deck Bare part 6 8 length.
Covered part 7 9
Forecastle deck, Bare part 4 6
poop deck Covered part 7 9
Super structure Bare part 4 6
deck Covered part 7 9
(Where above
Car deck 10 12
space is over
Intermediate 8 10
1.8m paragraph
Deck house wall Outside walls 4 6
1.4.2 is to be
Inside walls 4 6
applied))
Covered part 7 9
Interior member Webs of girders, trans.
5 7
- 13 -
Hull * shipbuilding
section I
HALONG SHIP construction & repair
BUILDING Co.
1.4.2 Deformation per basic length Unit: mm
Standard Tolerance
Item Remarks
range limits
Shell plates Parallel part 2L/1.000 3L/1.000 Deformation per basic
length means the
Fore and aft part 3L/1.000 4L/1.000
deformation measured
Decks, Double between one transverse
3L/1.000 4L/1.000
bottom tank tops space.
Bulkheads 4L/1.000 5L/1.000 For cabin walls and
Cabin walls 2L/1.000 3L/1.000 curtain plates, the basic
length is about 5m.
Curtain plates 2L/1.000 3L/1.000
1.4.3 Distortion Unit: mm
Distortion of
girder and
transverses at the Per span 5 8
part of upper edge
and flange.
L 1000 5 8
Distortion of
2L 2L
longitudinals, 1000<L<3500 3 6
1000 1000
transverses,
frames, beams
L 3500 10 13
and stiffener at
the part of flange .
Distortion of H
type pillars
5 8
between decks
Distortion of
tripping brackets
Distortion at the
and small
part of free 1/2t t
stiffeners. ~
edges
- 14 -
Hull * shipbuilding
Section 1
HALONG SHIP construction & repair
BUILDING Co.
30 Not defined
Cocking-up
20 Not defined
1.5.3 Others
Unit: mm
Standard
Item Tolerance limits
range
Draft marks 1.0 2.0
- 15 -
Hull * shipbuilding
Section 1
HALONG SHIP construction & repair
BUILDING Co.
Twist of sub-assembly
5 10
(c)
- 16 -
Hull * shipbuilding &
Section 1
HALONG SHIP construction repair
BUILDING Co.
1.6 Welding
1.6.1 Shape of bead
Tolerance
Item Remarks
limits
Over-lap 1. 90 0 : Repair
is unnecessary
Butt 2. In case 90 0 ,
grinding or welding
90 0 in necessary to
make 90 0
Fillet
Fillet d 0.8
- 17 -
Hull * shipbuilding
Section 1
HALONG SHIP construction & Repair
BUILDING Co.
- 18 -
Hull * shipbuilding
Section 1
HALONG SHIP construction & repair
BUILDING Co.
Unacceptable L=min 0
2) Convex bead
Max 1.6
L 8
Max 3.0
8 L 25
Max 4.5
25 L
3) Division of position
Machine
Manual welding
welding
Vertical &
Plat Overhead
horizontal H 4mm
H 3.0mm H 4.0mm H 4.5mm
4) Bead repair
It the bead height is over the standard range which shows bad appearance, the bead will be
repaired by grinding.
- 19 -
Hull * shipbuilding
Section 1
HALONG SHIP construction & repair
BUILDING Co.
a 30
Butt
weld
to butt
weld
a 0
a 10
Butt
a 0
weld
to
filler
weld
Smaller distance can be
a 5 acceptable in special
cases.
- 20 -
Hull * shipbuilding
Section 1
HALONG SHIP construction & repair
BUILDING Co.
1.7.2 Minimum distance between holes and between hole and end of member.
Distance ( s)
Description Remarks
“A” Space “B” Space
1) Between holes
d1 d 2
d1+d2
2
d1 d 2
d+R
2
(min .50) (min. 50)
s 200 (ABS)
dB
d+B s 180 (LR)
2
s D (NK)
5) Between slots
s1 2B
s2 2d and
s2 2B
- 21 -
Hull * shipbuilding
Section 1
HALONG SHIP construction & repair
BUILDING Co.
- 22 -
Hull * shipbuilding
Section 1
HALONG SHIP construction & repair
BUILDING Co.
1.7.4 Gap of joints Unit: mm
Tolerance
Item Remarks
limits
1. Manual welding 1. 5<a 16
- 23 -
Hull * shipbuilding
Section 1
HALONG SHIP construction & repair
BUILDING Co.
a 8
Butt
1) Build-up on edges with backing
joints
strip of flat type ceramic backing
material to keep the gap within
12mm ( to make stringer beads.)
Build-up on the edges should not
a 12 exceed 1/2t1 . nor 12.5mm whichever
is smaller.
2) Welding.
2. a>25
- 24 -
Hull * shipbuilding
Section 1
HALONG SHIP construction & repair
BUILDING Co.
t1 t2
a 3
(1) To make bevel edge of web to 300~450
(2) To attach backing strip or ceramic
- 25 -
Hull * shipbuilding
Section 1
HALONG SHIP construction & repair
BUILDING Co.
- 26 -
Hull * shipbuilding
Section 1
HALONG SHIP construction & repair
BUILDING Co.
1.7.5 Alignment
Item Tolerance limits
Butt joints Strength a 0.15t1, a>0.15t1, or a>3
members (max.3) Refitting
- 27 -
Hull * shipbuilding
Section 1
HALONG SHIP construction & repair
BUILDING Co.
1.7.5 Alignment
Item Tolerance Remarks
Flange width
s 0.04b If s 0.08b
max. 8mm Grind corners to
smooth. Taper over
Alignment of butt distance min.
joints in stiffeners L=30s
If s>0.08b release and
adjust over distance
min.
L=50s
- 28 -
Hull * shipbuilding
Section 1
HALONG SHIP construction & repair
BUILDING Co.
1.7.5 Alignment
Item Tolerance Remarks
Openings for 1. Position of nearest scallop If d>75mm
stiffeners passing The nib between scallop
through girder webs and opening to be cut,
and lug to be welded to
plating, see figure
d 75mm
If 5<s 10mm.
s 3mm Chamfer and build up by
welding.
If s>10mm. Cut off nib
and fit lug of same height
as nib.
- 29 -
Hull * shipbuilding
Section 1
HALONG SHIP construction & repair
BUILDING Co.
- 30 -
Hull * shipbuilding
Section 1
HALONG SHIP construction & repair
BUILDING Co.
Note that a release length of 100mm is provided in the horizontal seams at each corner of the insert
plate.
1. Weld framing to within 100mm of un-welded butts and seams.
2. Weld vertical butt complete
3. Weld vertical butt complete
4. Weld un-welded framing in way of vertical butts
5. Weld horizontal seam including release lengths
6. Weld horizontal seam including release lengths
7. Weld un-welded framing in way of horizontal seams
- 31 -
Hull * shipbuilding
Section 1
HALONG SHIP construction & repair
BUILDING Co.
3) Welding of insert
- 32 -
Hull * shipbuilding
Section 1
HALONG SHIP construction & repair
BUILDING Co.
4) Penetration parts
- 33 -
Hull * shipbuilding
Section 1
HALONG SHIP construction & repair
BUILDING Co.
w=t
t+8 2.25w
t<16.0 L<10.0w
p>2L
Details of weld joints
w t/2 vµ w 16
t+8 2.25w
t 16.0 L<10.0w
p>2L
00 All All
- 34 -
Hull * shipbuilding
Section 1
HALONG SHIP construction & repair
BUILDING Co.
- 35 -
Hull * shipbuilding
Section 1
HALONG SHIP construction & repair
BUILDING Co.
- 36 -
Hull * shipbuilding
Section 1
HALONG SHIP construction & repair
BUILDING Co.
Unit: mm
Item Tolerance limits Remarks
t 8 3–5
* Size of backing plates
8<t 20 5–8
- Normal: 6 - 10
t<20 8 – 10
- 37 -
Hull * shipbuilding
Section 1
HALONG SHIP construction & repair
BUILDING Co.
Control of heat
Item Which is heat temp’ Remarks
temp’
Mild steel -50C Min 160C
H.T steel 00 C Min 160C
Min 500C - Thicker plate
- Restaint structure
0
TMCP type -50C Min 20 C
(Ceq 0.36)
- 38 -
Hull
Section 1 * modification
HALONG SHIP construction
BUILDING Co.
* C=15 mm
L3 type
* C=15 mm
- 39 -
xcx
Hull
Section 1 * modification
HALONG SHIP construction
BUILDING Co.
- 40 -
Section 2 Hull outfitting
HALONG SHIP
BUILDING Co.
- 41 -
Section 2 Hull outfitting * h/c fabrication
HALONG SHIP
BUILDING Co.
4L
Length ( 1 hatch ) L 5 (3 )
10,000
Length ( 1 panel ) W 3 5
4L
Breadth B 3 (3 )
10,000
Height of hatch cover h 3 4
Diagonal difference ( hatch ) (L1-L2) 5 8
Diagonal difference (1 panel) (L3-L4) 4 6
Vertical deflection d1 3 4
Transverse deflection d2 3 4
Deformation of top plate d3 4 6
Height of packing gutter d4 1 2
Height of packing gutter d5 1 2
Breadth of packing gutter d6 1 2
- 42 -
Section 2 Hull outfitting * H/c fabrication
HALONG SHIP
BUILDING Co.
Standard Tolerance
Item
range limits
- 43 -
Section 2 Hull outfitting * H/c fabrication
HALONG SHIP
BUILDING Co.
Standard Tolerance
Item
range limits
2) Hatch cover ( side rolling type )
4L
Length ( 1 hatch ) L 5 (3 )
10,000
Length ( 1 panel ) W 4 5
4L
Breadth B 5 (3 )
10,000
Height of hatch cover h 3 4
Diagonal difference ( 1 hatch ) (L1-L2) 5 10
Diagonal difference ( 1 panel ) (L3-L4) 4 5
Vertical deflection d1 3 4
Transverse deflection d2 3 5
Deformation of top plate (d3) 3 4
Height of packing gutter D4 1 2
Height of packing gutter D5 1 2
Breadth of packing gutter D6 1 2
- 44 -
Section 2 Hull outfitting * H/c fabrication
HALONG SHIP
BUILDING Co.
Standard Tolerance
Item
range limits
- 45 -
Section 2 Hull outfitting * H/c fabrication
HALONG SHIP
BUILDING Co.
Standard Tolerance
Item
range limits
3) Hatch cover ( folding type )
4L
Length ( 1 hatch ) L 5 (3 )
10,000
Length ( 1 panel ) W 3 5
4L
Breadth B 3 (3 )
10,000
Height of hatch cover h 3 4
Diagonal difference ( 1 hatch ) (L1-L2) 5 10
Diagonal difference ( 1 panel ) (L3-L4) 4 5
Vertical deflection d1 3 4
Transverse deflection d2 3 5
Deformation of top plate d3 4 6
Height of packing gutter d4 1 2
Height of packing gutter d5 1 2
Breadth of packing gutter d6 1 2
- 46 -
Section 2 Hull outfitting * H/c fabrication
HALONG SHIP
BUILDING Co.
Standard Tolerance
Item
range limits
- 47 -
Section 2 Hull outfitting * H/c fabrication
HALONG SHIP
BUILDING Co.
Standard
Item Tolerance limits
range
4) Hatch cover ( pontoon type )
4L
Length ( 1 panel ) L 5 (3 )
10,000
4L
Breadth B 5 (3 )
10,000
Height of hatch cover h 3 4
Diagonal difference ( 1 hatch ) (L1-L2) 5 10
Vertical deflection d1 3 4
Diagonal difference d2 3 5
Deformation of top plate d3 4 6
Height of packing gutter d4 1 2
Height of packing gutter d5 1 2
Breadth of packing gutter d6 1 2
- 48 -
Section 2 Hull outfitting * H/c fabrication
HALONG SHIP
BUILDING Co.
Standard
Item Tolerance limits
range
4)
- 49 -
*h/coaming
Section 2 Hull outfitting
HALONG SHIP fabrication
BUILDING Co.
Length L 5 10
Breadth B 5 10
Diagonal (L1-L2) 10 15
Straightness of top plate ( side coaming ) d1 3 5
Straightness of top plate ( end coaming ) d2 4 5
Straightness of top plate ( partially/m ) d3 2 3
d4 3 Not
Straightness of hatch coaming ( partially/m)
defined
d5 4L ″
Straightness of hatch coaming ( all length ) (3 )
10,000
Alignment of wheel & guide rail d6 – Min.0
- 50 -
*h/coaming
Section 2 Hull outfitting
HALONG SHIP installation
BUILDING Co.
Length d1
Breadth d2
Diagonal (L1-L2)
A. H.coaming wall d1 d2 L1-L2
1) Single pull type 10 10 15
2) Side rolling type 12 12 15
3) Pontoon type 12 12 15
4) Folding type 12 12 15
- 51 -
Section 2 Hull outfitting * small hatch
HALONG SHIP
BUILDING Co.
- 52 -
* Vent/ duct
Section 2 Hull outfitting
HALONG SHIP system
BUILDING Co.
- 53 -
Section 2 Hull outfitting * ladder & rail
HALONG SHIP
BUILDING Co.
Tolerance ±50 - -
- 54 -
Section 2 Hull outfitting * ladder & rail
HALONG SHIP
BUILDING Co.
DECK DECK
- 55 -
Section 2 Hull outfitting * anchor chain
HALONG SHIP
BUILDING Co.
- 56 -
* anchor chains
Section 2 Hull outfitting
HALONG SHIP marking
BUILDING Co.
- 57 -
Section 2 Hull outfitting * derrick boom
HALONG SHIP
BUILDING Co.
a. Length d1 7 10
b. Bending d2 5 10
c. Diameter d3 0 - 0.01d 0 + 0.01d
0
d. Roundness for piece fitting ( At boom seat ) DL- DS 1 20
*Boom & piece fitting d 10 20
- 58 -
Section 2 Hull outfitting * derrick boom
HALONG SHIP
BUILDING Co.
- 59 -
* in
Section 2 Hull outfitting
HALONG SHIP accommodation
BUILDING Co.
STEEL DECK
Vinyl sheet or
7 Finishing material
carpet
1mm or
6 Top coat Latex + powder
0.5mm
5 Middle coat Latex + powder 14mm
4 Base coat Latex + powder 3mm
3 Expanded metal SS41 (galv’d) 2.3t
2 Mineral wool 40t d=200kg/m3
1 Silica bond silica 2mm
No Description Material Size Q’ty Remarks
- 60 -
* in
Section 2 Hull outfitting
HALONG SHIP accommodation
BUILDING Co.
STEEL DECK
Vinyl sheet or
7 Finishing material
carper
6 Top coat Latex + powder
5 Middle coat Latex + powder 10mm
4 Metal lath SS41 (galv’d) #22
3 Base coat Latex + powder
2 Silicate board 25mm
1 Silica bond silica 2mm
No Description Material Size Q’ty Remarks
- 61 -
* in
Section 2 Hull outfitting
HALONG SHIP accommodation
BUILDING Co.
- 62 -
* in
Section 2 Hull outfitting
HALONG SHIP accommodation
BUILDING Co.
- 63 -
* in
Section 2 Hull outfitting
HALONG SHIP accommodation
BUILDING Co.
Not sweat
gutter way
area
Note: finishing material is glass cloth where not covered with lining
material
Sweat gutter
way area
- 64 -
* in
Section 2 Hull outfitting
HALONG SHIP accommodation
BUILDING Co.
Sketch
Application of insulation
Thickness of piping
Type of insulation
Piping insulation
Location Remark
system Thickness
Pipe Flange Nom. Dia.
of insul.
Refrigerant
(R-22)
Provision ref.
pipe All size 25mm
system
(return gas
pipe oily)
- 65 -
Section 3 Machinery & outfittings
HALONG SHIP
BUILDING Co.
- 66 -
Machinery * Main
Section 3
HALONG SHIP & outfittings machinery
BUILDING Co.
3) Installation
(1) Contact, ratio
- Main engine chock liner 70% 60%
- Bearing chock liner 60% 50%
(2) Clearance between liner and base 0.04 Not defined
(3) Chock fast orange
1. Thickness t 25-35 Min 12
2. Metal temperature 160C
3. Curing time 130C external heat
210C 12 hour
160C 24 hour
130C 48 hour
- 67 -
Machinery * Main
Section 3
HALONG SHIP & outfittings machinery
BUILDING Co.
Unit: mm
Item Standard range Tolerance limits
4) Centering ( New shipbuilding )
(1) Diameter of piano wire: d d=0.7 d=0.7 0.1
(2) Tension of piano wire : t t=50kg t=50 5kg
(3) Deviation between rudder center line and
shaft center line.
- Dead weight over 100.000 ton: t1 t1 5 t1 8
- Dead weight below 100.000 ton : t2 t2 4 t2 6
- 68 -
Machinery
Section 3 * rudder
HALONG SHIP & outfittings
BUILDING Co.
1) Installation
(1) Contact ratio 60% >50%
(2) Clearance between carrier and liner 0.04 <0.05
2) Centering
Deviation between center line of rudder carrier and d<0.3 d 0.5
pintle.
d<1.5
3) Centering of repair ship for checking only d<1.0
- 69 -
Machinery
Section 2 * Steering gear
HALONG SHIP & outfittings
BUILDING Co.
1) Installation
(1) Ram cylinder type
- Contact ratio
- Clearance between liner and base <0.06 Not defined
(2) Rotary vane type
- Contact ratio 60% Not defined
- Clearance between liner and base
2) Alignment
(d1) 1 (d1) 2
- 70 -
Machinery * Rudder
Section 2
HALONG SHIP & outfittings pintle/ bush
BUILDING Co.
- 71 -
Machinery * Rudder
Section 2
HALONG SHIP & outfittings pintle/ bush
BUILDING Co.
● L.R guidance
- Recommend: 4.0+0.002 pintle diameter
- Renewal: 5.0+0.02 pintle diameter
● K.R guidance
- 0.01 Dia’+4mm of pintle
- 0.01 Dia’+2mm of neck
- 72 -
Machinery * rudder
Section 3
HALONG SHIP & outfittings repair
BUILDING Co.
Slot welding
- 73 -
Machinery * rudder
Section 3
HALONG SHIP & outfittings repair
BUILDING Co.
1.50mm
- Carrier
- Upper
- Lower
- 74 -
Machinery * rudder
Section 3
HALONG SHIP & outfittings repair
BUILDING Co.
3.9.1 Adjustment
Min thickness
1) Machine-up the palm
0.03 x stock dia
0.04mm
2) Contact ratio (50%)
(70%)
3) Distance of bolt hole and flange edge DE: 0.75xF.T
- 75 -
Machinery
Section 3 * propeller
HALONG SHIP & outfittings
BUILDING Co.
Note:
1. For screw propeller with constant as well as for screw propellers with variable pitch, the pitch of
screw propellers according to classes S. I and II should be measured at least on 5 radius ( e.g
0.3R; 0.5R; 0.8R; 0.95R and for class II on 3 radius ( e.g 0.5R; 0.7R; 0.9R ). As far as possible
the measurements should be taken on at least 3 point on each radius.
- 76 -
Machinery
Section 3 * propeller
HALONG SHIP & outfittings
BUILDING Co.
The smoothness of the surface of the propeller blades should be determined by the mean height.
Hm of the surface roughness of the blades at least for the radius of the screw propeller over
0.3R.
1
Hm ( H 1 H 2 ... Hn)
n
- 77 -
Machinery
Section 3 * propeller
HALONG SHIP & outfittings
BUILDING Co.
S I II III
C 15 25 40 75
K 0.0005 0.001 0.001 0.001
- 78 -
Machinery * propeller
Section 3
HALONG SHIP & outfittings repair
BUILDING Co.
R= propeller radius
C1= chord length at radius
A B C D boss
Kind of repair
Damage & cavitation part
x O O O -
build up welding
Partly renew x O O O -
Straightening O O O O -
Cold straightening x O O O -
Grind out x x x O -
- 79 -
Machinery * propeller
Section 3
HALONG SHIP & outfittings repair
BUILDING Co.
- 80 -
Machinery * propeller
Section 3
HALONG SHIP & outfittings repair
BUILDING Co.
Straightening
Material Preheat’ Temp 0C Stress relief Temp 0C
Temp. 0C
Mn-bronze 150-250 350-550 500-800
NiMn- bronze 150-250 350-550 500-800
NiAl-Bronze 50-150 Kh«ng 700-900
MnAl-bronze 100-250 450-600 700-850
- 81 -
Machinery * stern tube/
Section 3
HALONG SHIP & outfittings shaft
BUILDING Co.
1/4C(0.25C)
- 82 -
Machinery * shaft
Section 3
HALONG SHIP & outfittings alignment
BUILDING Co.
a. Gap = (g1-g2)
b. Sag = (s1-s2)
- 83 -
Machinery * Aux’
Section 3
HALONG SHIP & outfittings machinery
BUILDING Co.
- 84 -
Machinery * Aux’
Section 3
HALONG SHIP & outfittings machinery
BUILDING Co.
Standard Tolerance
Item
range limits
3) Alignment ( solid type ) Grade “B” only
- 85 -
Machinery
Section 3 * D/G engine
HALONG SHIP & outfittings
BUILDING Co.
Cold 2 x stroke
condition 10,000
- 86 -
Machinery
Section 3 * deck crane
HALONG SHIP & outfittings
BUILDING Co.
d1 5 Not defined
Not defined
d2 10
Not defined
d3 5
(per 10m)
Not defined
d4 8
To be measured
at each 5m
- 87 -
Machinery *boiler tube
Section 3
HALONG SHIP & outfittings damage
BUILDING Co.
* d = tube dia.
2. Smoke tube
* d = tube dia
- 88 -
Machinery * boiler tube
Section 3
HALONG SHIP & outfittings repair
BUILDING Co.
- 89 -
Machinery
Section 3 * boiler repair
HALONG SHIP & outfittings
BUILDING Co.
- 90 -
Machinery
Section 3 * boiler repair
HALONG SHIP & outfittings
BUILDING Co.
5. Welding
1) Welding is to be performed by approved welders.
2) Preheating : temp: 100-1500C
Method: Propane torch.
5-1) Electrodes
1) Manual: S7016-LF (produces by HWMCO )
LB-52 (produce by kobe steel )
2) TIG : TGS-50 (produce by kobe steel )
3) MIG: MGS-50 (produce by kobe steel)
- 91 -
Machinery
Section 3 * boiler repair
HALONG SHIP & outfittings
BUILDING Co.
- 92 -
Machinery
Section 3 * boiler repair
HALONG SHIP & outfittings
BUILDING Co.
6.Burner Plate
7. Flue Pipe
- 93 -
Machinery * boiler tube
Section 3
HALONG SHIP & outfittings joint
BUILDING Co.
3) Flange connection
- 94 -
section 4 piping system
HALONG SHIP
BUILDING Co.
- 95 -
section 4 piping system * piping grade
HALONG SHIP
BUILDING Co.
4.1 General
1. Grade of pipe
The grade specified by each classification society shall be divided as follows
(1) LR
Grade Class 1 Class 2 Class 3
Service Press. Temp. Press. Temp. Press. Temp.
Steam P>16.3 or T>300 7.1<P 16.3 or 170<T 300 P 7.1 T 170
Fuel oil P>16.3 or T>150 7.1<P 16.3 or 60<T 150 P 7.1 T 160
Other media P>40.8 or T>300 16.3<P 40.8 or 200<T 300 P 16.3 T 200
(2) ABS
Grade Class 1 Class 2
Service Press. Temp. Press. Temp.
Vapor and gas P<10.5 or >343 P 10.5 T 343
Water P<15.8 or T>177 P 15.8 T 177
Lubricating oil P<15.8 or T>204 P 15.8 T 204
Fuel oil P<10.5 or T>66 P 10.5 T 66
Hydraulic fluid P<15.8 or T>204 P 15.8 T 204
Lethal gas & liquids All - -
(3) KR & NK
Grade Class 1 Class 2 Class 3
Service Press. Temp. Press. Temp. Press. Temp.
Steam P>16 or T>300 7<P 16 170<T 300 P 7 T 170
Fuel oil P>16 or T>150 7<P 16 60<T 150 P 7 T 60
Water, lub. oil,
P>40 or T>300 200<T 300 T 200
comp. air, Hyd. 16<P 40 P 16
(Only KR) (Only KR) (Only KR)
oil
Primary
Refrigerant All All - - - -
( ammonia )
Primary
refrigerant - - - - All All
(R12,R22)
- 96 -
section 4 piping system * piping grade
HALONG SHIP
BUILDING Co.
(4) U.S.C.G.
Service Class Pressure ( psig ) Temp (0F)
I Any and 0 and above
Class B&C I-L Any and <0
poisons II (3) (3) (3)
II-L (3) (3) (3)
I >150 or > 650
Gases and I-L >150 and <0
vapors II 150 and 0 to 650
II-L 150 and <0
I >150 and 0
Liquefied
I-L >150 and <0
flammable
II 150 and 0
Gasses
II-L 150 and <0
I >225 or >330
Molten sulphur
II 225 and 330
I >225 or >150
Cargo liquids
I-L >225 and <0
Grades A
II 225 and 0 to 50
Through D
II-L 225 and <0
I >225 or >400
Cargo liquids I-L >225 and <0
Grade E II 225 and 0 to 400
II-L 225 and <0
I >225 or >350
Water
II 225 and 350
Fuel ( bunker I >150 or >150
diesel, gasoline,
II 150 and 150
etc...)
I >225 or >400
Lubricating oil
II 225 and 400
I >225 or >400
Asphalt
II 225 and 400
- 97 -
section 4 piping system * piping grade
HALONG SHIP
BUILDING Co.
- 98 -
section 4 piping system * Fabrication
HALONG SHIP
BUILDING Co.
d= 5
d 10
Not defined
(Three dimensional bending )
d= 4
d 10 Not defined
d= 4
d 10
Not defined
- 99 -
section 4 piping system * Fabrication
HALONG SHIP
BUILDING Co.
Unit: mm
Item Standard range Tolerance limits
2) Attachment of flange to pipe
(1) Angle of flange to pipe
a 2 Not defined
D>450
D: out dia. Of pipe a 1.5 <2.5
L 5 Not defined
- 100 -
section 4 piping system * Fabrication
HALONG SHIP
BUILDING Co.
Unit: mm
Standard Tolerance
Item
range limits
3) Pipe bending Bending Pipe Bending radius
Division
(1) Elliptically (E) method material 3D R 4D 4D R
E(%) ≤10 ≤10
Steek T(%) ≤20 ≤15
pipe 1
H H D
100
E(%) ≤10 ≤10
Cold or
Copper T(%) ≤25 ≤20
hot
pipe 1
bending H H D
Dl Ds 100
E x100%
D E(%) ≤10 ≤10
D: Out dia of pipe Al-Br &
T(%) ≤20 ≤15
R: Bending radius kunifer
1
(2) Thickness reduction ratio ( T) pipe H H D
100
t tr
T x100%
t
t: Original pipe thickness
tr: Thickness after bending
D: Out dia. of pipe
(3) Wrinkle & swelling
H: Height
D: Out of pipe
- 101 -
section 4 piping system * Fabrication
HALONG SHIP
BUILDING Co.
Unit: mm
Item Standard range Tolerance limits
4) Sleeve joint
(1) Steel
a: Min.1.5
l1: Not defined
Min.10(D≥65A) ″
Min.20(D≤80A) ″
(But max.1 only
for U.S.C.G)
5) Socket joint
a 1.0 a 1.5
b 0.2 b 0.8
- 102 -
section 4 piping system * Fabrication
HALONG SHIP
BUILDING Co.
Unit: mm
Item Standard range Tolerance limits
6) Welding of steel pipe
( 1 ) Edge Preparation d 1.6
a = 2.4 ± 0.8 Not defined
140
( 2 ) Back bead
0 d1 2 Not defined
d2 0.5
( 3 ) Under cut
d 0.3 d 0.8
- 103 -
section 4 piping system * Installation
HALONG SHIP
BUILDING Co.
l = 0.1D
But min.50 Not defined
( 2 ) Pipe penetration
A-Type T T1 Not defined
10 ~ 100A “
b = 30 ± 5 “
125 ~ 500A
b = 40 ± 5
“
D- type 550 ~ 700A
b = 50 ± 5
“
D1 = D + Max.15
“
65A & below
L = 100
Not defined
- 104 -
section 4 piping system * Installation
HALONG SHIP
BUILDING Co.
Unit: mm
Item Standard range Tolerance limits
2) Alignment a 2 Not defined
c–b 2
- 105 -
section 4 piping system * Installation
HALONG SHIP
BUILDING Co.
- 106 -
section 4 piping system * Installation
HALONG SHIP
BUILDING Co.
For boiler
C 3
Blow down
L 15
Distance
D 500 ± 10
Piece
C 3
For ship side
L 15
Distance piece
D 500 ± 10
L1 15
For pad flange
L2 15
C 3
For Echo
D 450 ± 5
sound, Pad
flange
- 107 -
* Installation
50 Standard
down or 10K
general 65 7.5 >SCH’80 component material
adapting STPG38
80 7.6 pipe
STPT38
- 108 -
100 8.6 flange
SM41, SF45
125 9.0 or S20C
Sea chest on pad
the sea side 150 11.0
200 12.7 Note :
section 4
class
surveyor
owner )
Section 4 piping system * Scupper piping
HALONG SHIP
BUILDING Co.
1) Deck penetration
- 109 -
Section 4 piping system * hull piping
HALONG SHIP
BUILDING Co.
1 Pipe to pipe
1 20 0 S=2 1
2 20 0 B=1.6 0.8
t >3.2
50
1 30 0 00
t=t1
S=2 1
t >3.2
Pipe to fitting ( Elbow,
2
reducer, tee )
1 10 0 S=2 1
50
2 30 0 00 B=1.6 0.8
t = t1
t >3.2
t < t1 S = 2 1
a 1.6 B =1.6 0.8
: Refer to 1 or 2
Specified above.
t >3.2 Pipe to pipe or
3
a>1.6 Pipe to fitting
: Refer to 1 or 2
Specified above
t >3.2
- 110 -
Section 4 piping system * hull piping
HALONG SHIP
BUILDING Co.
Dimension L 5mm
- 111 -
Section 4 piping system * hull piping
HALONG SHIP
BUILDING Co.
( 2 ) Pipe to sleeve
W : Refer to page 52/86.
C : See “ C “ value of pipe to flange weld.
* Mark part to be at least 9.5mm
- 112 -
Section 4 piping system * hull piping
HALONG SHIP
BUILDING Co.
Note : 1) “ PANDA-90” fire sleeve transit device for the penetration of A or B class division for
PVC pipe.
2) Noncombustible material certificate of PANDA -90 fire sleeve.
LR: SVG/F91/355
DNV: F-11314
ABS: 91-BK-27245-X
KR: BU-02901/03
BV: 5031/5042/A1/0
GL: 67951 HH
3 ) *** Mark : PANDA-90 length 180mm, steel sleeve 200mm.
- 113 -
Section 4 piping system * hull piping
HALONG SHIP
BUILDING Co.
Note: Theoretical criteria is guided by a limitation of about 3mm deflection with piping filled
fully between pipe supports one another.
( 2 ) Stays for pipe supports to be fitted on or close to stiffening beam as far as possible.
( 3 ) Stays for pipe supports to be sniffed to avoid sharp ends and to be paint finished.
- 114 -
Section 4 piping system * Hyd-line design
HALONG SHIP
BUILDING Co.
CORROSION
SUS ( stainless ) SPECIAL REQUEST
JIS G 3459 RESISTANCE
(304, 306 TP) ONLY BY OWNER
HIGH TEMPERATURE
SERVICE SYSTEM
- 115 -
Section 4 piping system * Hyd-line design
HALONG SHIP
BUILDING Co.
- 116 -
SECTION 5 PAINTING PART
HALONG SHIP
BUILDING Co.
- 117 -
section 5 painting part * steel surface
HALONG SHIP
BUILDING Co.
Sa2 1
2
Sa2 1
Sand blasting or
Pipe Sa2 1
or St2-St3
hand/ power tooling 2
250 d
pickling
Hand/ power tooling
Outfitting, pickling St2-St3 or Sa2 1
250>d 2
( Blasting at yard’s 2
mach. Etc.
convenience )
- 118 -
section 5 painting part * steel surface
HALONG SHIP
BUILDING Co.
- 119 -
section 5 painting part * D. F. t Control
HALONG SHIP
BUILDING Co.
Item Standard
Tanks One point/ five square meters
Measuring
Outside
points One point/ ten square meters
shell
1. Average dry film thickness of the paint to be attained
as the specification.
2. At least 85% of the measuring points to meet the
specified film thickness.
3. Min. 85% of the specified film thickness to be
attained on remaining 15% measuring points.
Item Standard
Tanks One point/ Ten square meters
Measuring
Our side
points One point / 50 square meters
shell
1. Average dry film thickness of paint to be attained as
the specification.
2. At least 80% of the measuring points to be met the
D. F. T Control
specified film thickness.
3. Min 80% of the specified film thickness to be
attained on remaining 20% measuring points.
- 120 -
section 5 painting part * Pre- treatment
HALONG SHIP
BUILDING Co.
Kind of paint
Epoxy resin conventional
Item Inorganic zinc
MOISTURE Not to be visible to the naked eye
Salt “”
Oil/ grease Not to be visible. Trace of thinner wiping is permitted
Fat “”
Soap solution White deposits are not to be visible
To remove white deposits, but the remaining trace may be visible
Zinc salt
after sweep-blasting or power tooling
Fume by welding or
Not to be remained.
cutting
Chalk/ slate pencil
To be wiped with rags or brush. The trace be visible
mark
- 121 -
section 5 painting part * Pre- treatment
HALONG SHIP
BUILDING Co.
Stable spatter ( O )
Removable or unstable spatters to be removed
with grinder, disc-sander or chipping hammer.
Unstable spatters
Unstable spatter ( x )
For non-exposed Remain welding beads
areas. ( Cargo hold
spaces, C. O. tanks,
W. B tanks, void
spaces, covered parts
of superstructures,
2) Repair welding
etc... )
bead of notches
Welding and grind flush
For exposed areas.
( Exposed deck,
outside shells, engine
room passageways
etc... )
- 122 -
section 5 painting part * Pre- treatment
HALONG SHIP
BUILDING Co.
Item Remarks
Slag to be removed with grinder or disc-sander up to the
standard. But if not completely removes, trace or stain may be
left.
3) Slag
- 123 -
section 5 painting part * Pre- treatment
HALONG SHIP
BUILDING Co.
Item Remarks
Weld-fume
5) Weld fume
Repair
Grade Area Defects
Method
Butt & Seam lines
of side shell Blow hole Welding and
1
Air, Water tight pin hole Grinding
boundaries
- 124 -
section 5 painting part * damage part
HALONG SHIP
BUILDING Co.
Preparation
and
Feathering
Touch-up
Roughness
- 125 -
section 5 painting part * damage part
HALONG SHIP
BUILDING Co.
Item Remarks
( 1 ) In case damage reaches to bare steel:
- 126 -
section 5 painting part * damage part
HALONG SHIP
BUILDING Co.
Item Remarks
- Squeezes
- Compression
Spot-rusted part
4) Spot rusted area
- 127 -
section 5 painting part * damage part
HALONG SHIP
BUILDING Co.
Item Remarks
5) Burnt part
- 128 -
section 5 painting part * environmental
HALONG SHIP
BUILDING Co.
1) pre-coating
( Stripe coat )
- 129 -
section 5 painting part * final condition
HALONG SHIP
BUILDING Co.
- 130 -
Section 6 Electrical part
HALONG SHIP
BUILDING Co.
- 131 -
* CABLE
SECTION 6 ELECTRICAL PART
HALONG SHIP INSTALLATION
BUILDING Co.
Item
6.1. Electric cable installation
1.1 Turning method of main cable ways
1.1.1 In case of same height.
- 132 -
* CABLE
SECTION 6 ELECTRICAL PART
HALONG SHIP INSTALLATION
BUILDING Co.
Item
1.1.3. In case of curved way
* The cable shall be installed on adequate supporter as shown on following
figure.
- 133 -
* CABLE
SECTION 6 ELECTRICAL PART
HALONG SHIP INSTALLATION
BUILDING Co.
Item
1.3. Vertical main cable ways
- 134 -
* CABLE
SECTION 6 ELECTRICAL PART
HALONG SHIP INSTALLATION
BUILDING Co.
Item
1.4. Under floor method
- 135 -
SECTION 6 ELECTRICAL PART * CABLE Band
HALONG SHIP
BUILDING Co.
Item
1.5. Cable tie and binding tape
1.5.1. Cable tie
* The cable tie to be applied inside of switch board, control console, etc cable
fastening.
Symbol L Remark
CT- 100 100 MIL – S – 23190 D MS 3367 – 4
Ct – 175 175 MIL – S – 23190 MS 3367 - 1
- 136 -
SECTION 6 ELECTRICAL PART * CABLE Band
HALONG SHIP
BUILDING Co.
Item
1.5.2 Cable binding tape
* These binding tapes shall be used for cable securing and selected in accordance
with cable kind and / or their location. P. V. C coated BTN – 3, 4 type shall be used for
non-metallic sheath or non-armoured cable others ( BTM-1, 2 ) shall be used for metallic
sheath or armoured cable. For cable which are exposed to weather or installed in
refrigerated rooms, laundry, etc.. stainless steel tape shall be applied.
Symbol w t remark
BTN-1 15 0.5 elec.’ glav. ‘ steel
BTN-2 - “ stainless
BTN-3 “ “ elec. ‘ glav. ‘ steel ( PVC coating )
BTN-4 “ “ Stainless ( P. V. C coating )
- 137 -
SECTION 6 ELECTRICAL PART * cable stair
HALONG SHIP
BUILDING Co.
Item
1.6 Cable stair
1.6.1 Single stair combined method
W
Type Hanger Runner bar L
H < 300 H > 300
LA – 2 L- 2 25x 6 F. B 200 224 292
LA – 3 L–3 “ 300 324 392
LA – 4 L–4 38 x 6 F.B 400 424 492
LA – 5 L–5 “ 500 524 592
LA – 6 L–6 “ 600 624 692
LA - 7 L–7 “ 700 724 792
LA – 8 L–8 “ 800 824 892
LA – 9 L–9 “ 900 924 992
LA – 1m L – 1m “ 1000 1024 1092
- 138 -
SECTION 6 ELECTRICAL PART * cable stair
HALONG SHIP
BUILDING Co.
- 139 -
SECTION 6 ELECTRICAL PART * cable stair
HALONG SHIP
BUILDING Co.
- 140 -
SECTION 6 ELECTRICAL PART * penetration
HALONG SHIP
BUILDING Co.
Item
1.7 Deck and wall penetration
1.7.1 Collar and coaming
Coaming dimension.
COAMTING COAMTING
NO n TYPE NO n TYPE
A B A B
1 100 60 30 1 23 350 200 50 2
2 ″ 80 40 1 24 400 60 30 1
3 150 60 30 1 25 ″ 80 40 1
4 ″ 80 40 1 26 ″ 100 50 1
5 ″ 100 50 1 27 ″ 160 ″ 2
6 200 60 30 1 28 ″ 200 ″ 2
7 ″ 80 40 1 29 450 80 40 1
8 ″ 100 50 1 30 ″ 100 50 1
9 ″ 160 50 2 31 ″ 160 ″ 2
10 250 60 30 1 32 ″ 200 ″ 2
11 ″ 80 40 1 33 500 80 40 1
12 ″ 100 50 1 34 ″ 100 50 1
13 ″ 160 50 2 35 ″ 160 ″ 2
14 300 60 30 1 36 ″ 200 ″ 2
15 ″ 80 40 1 37 600 80 40 1
16 ″ 100 50 1 38 ″ 100 50 1
17 ″ 160 50 2 39 ″ 160 ″ 2
18 ″ 200 50 2 40 ″ 200 ″ 2
19 350 60 30 1 41 700 80 40 1
20 ″ 80 40 1 42 ″ 100 50 1
21 ″ 100 50 1 43 ″ 160 ″ 2
22 ″ 160 50 2 44 ″ 200 ″ 2
- 141 -
SECTION 6 ELECTRICAL PART * penetration
HALONG SHIP
BUILDING Co.
Item
- 142 -
SECTION 6 ELECTRICAL PART * penetration
HALONG SHIP
BUILDING Co.
Item
b. Substantial for watertight penetration
i ) In case of fitting of one by one gland
- 143 -
* method of
SECTION 6 ELECTRICAL PART
HALONG SHIP entering cable
BUILDING Co.
Item
b. For coaming
- 144 -
SECTION 6 ELECTRICAL PART *wall collar
HALONG SHIP
BUILDING Co.
Item
Cable
- 145 -
SECTION 6 ELECTRICAL PART * coamings
HALONG SHIP
BUILDING Co.
Item
b. A class deck
i ) Rectangular coaming type
- 146 -
SECTION 6 ELECTRICAL PART * M. c. t
HALONG SHIP
BUILDING Co.
Item
- 147 -
* fittings
SECTION 6 ELECTRICAL PART
HALONG SHIP installation
BUILDING Co.
2.3 Cable pipe thickness range for on deck and W.T or F.O tank penetration parts.
- 148 -
* fittings
SECTION 6 ELECTRICAL PART
HALONG SHIP installation
BUILDING Co.
- 149 -
* cable
SECTION 6 ELECTRICAL PART
HALONG SHIP expansion
BUILDING Co.
- 150 -
* HULL OPENING
SECTION 6 ELECTRICAL PART
HALONG SHIP METHOD
BUILDING Co.
* NOTE:
GENERALLY IN “ C” SPACE, OPENING SHOULD NOT BE CUT, IF
UNAVOIDABLE FOR PIPING, ETC.. OPENING COMPENSATION SHOULD BE DESIGNED
AFTER CONSIDERING TYPE OF STRUCTUAL MEMBER AND ITS SIZE OF LOAD, ETC.
IF TO BE FITTED DOUBLING PLATE COAMING ( RING )
S1 = ( S – 1/2h ).
- 151 -
* hull opening
section 6 electrical part
HALONG SHIP method
BUILDING Co.
5.2 MIN. DISTANCE BETWEEN HOLE & HOLE, HOLE & END OF STRUCTURE MEMBER
d1 d 2
S S=d1+d2
2
1
S d S=d
2
S=d S=2+d
(Min.75mm) (Min.75mm)
d r
S S=d+R
2
(Min.50mm)
(Min.50mm)
* NOTE:
GENERALLY WHEN DOUBLING PLATE OR F.B COAMING HAD SAME AS
HULL THICKNESS TO BE DESIGENED, “S” MAY BE REDUCED BY HALF OF DOUBLING
PLATE OR F.B COATING.
HOWEVER “ S” IS NOT TO BE LESS HALF OF STANDARD.
- 152 -
* hull
section 6 electric part
HALONG SHIP reinforcement
BUILDING Co.
a b/2
t1 t
a b/2
t1 t
d Min. 25
a 1.5h
b L
h 3d-H
- 153 -