This document outlines a film shooting schedule that will take place from March 14-18, 2011. It details the date, duration, location, equipment, and description of scenes to be filmed each day. On Monday, a news reporter scene will be filmed at school. Tuesday will involve filming a stalker scene at a house. Wednesday will film a victim in the bathtub. Thursday is for checking equipment. Friday will film a victim in a bedroom.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
41 views1 page
Filming Sched.
This document outlines a film shooting schedule that will take place from March 14-18, 2011. It details the date, duration, location, equipment, and description of scenes to be filmed each day. On Monday, a news reporter scene will be filmed at school. Tuesday will involve filming a stalker scene at a house. Wednesday will film a victim in the bathtub. Thursday is for checking equipment. Friday will film a victim in a bedroom.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1
Filming Schedule.
Date of Duration Period Actors Location Equipment Description
Filming of (if in involved needed Filming school) Monday 14th 30 Period News In School; at Camera + We will be filming March ‘11 minutes 3 Reporter: desk in Tripod the News Glen Harries Reporter scene and taking a voiceover of the News Reporter’s speech. Tuesday 15th 2½ After- Stalker: Jess’s house; Camera + We will be filming March ‘11 hours school bedroom. Tripod the whole hours; sequence from at sun where the camera down; has been panned 5pm. from the television has to the wall. Wednesday 1 hour After- Victim in the Kat’s house; Camera + In this time we 16th March ‘11 preparati school bathtub. bathroom. Tripod will be taking on, 30 hours; photos of the minutes 4pm. victim that has camera just been ‘killed’ time. in the bathtub. Thursday 17th N/A N/A N/A N/A N/A In this day we will March ‘11 be checking everything over to see if any problems occur. This gives us an extra day if anything has to be re-shot. Friday 18th 1 hour After- Victim on the Jess’s house; Camera + We will be taking March ‘11 preparati school ground in bedroom. Tripod photos of the on, 30 hours; bedroom. second victim on minutes 4pm. the floor, to look camera as though she has time. just been ‘murdered’.
On Monday 14th March ’11 we will be putting the video
from the News Report onto a disc ready for Tuesday’s session after-school hours.