MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD
JANUARY 2009
(NWFP)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
FOREWARD
Following the increases in prices of materials and labour in the year 2008, the
revision / updation of CSR has been carried out. In the year 2008 we have seen the
prices of steel / diesel / bitumen go up considerably and towards the end of year
have come down. Analysts are still uncertain with the prices in the year 2009. For the
year 2009, we have carried out a general revision of all prices upto January 2009 in
consultation with leading manufacturer’s, supplier, and specialist contractors.
In the absence of standard fix formula the best engineering knowledge and rate
analysis practices are used to develop these rates. The variation in the proposed
rates is anticipated in certain cases, which may be due to varying degrees / levels of
productivity and price differences of various inputs at the regional level.
The rates, prices and outputs included in the resources and unit cost calculations,
including allowances for wastage, normal productivity and efficiency are based for
roadwork and bridge projects being carried out by NHA. The unit rates are average
unit rates for a particular district and not project specific. The market can change
very rapidly, which would obviously have an impact on the unit rates.
In the end, my appreciation to my team for all the possible technical and professional
efforts to produce Revised Composite Schedule of Rates 2009.
It is hoped that the CSR 2009, would serve as a Basic Engineer’s Estimate
Reference Document for National Highway Authority, various Government
Departments and the construction industry in general.
Whilst all efforts are made to ensure the accuracy of the data and information used
in updating the CSR , neither NHA or M/s Shabir Associates can in any way accept
liability for loss of any kind resulting from the use of CSR made by any person,
institution, company, department etc.
Muhammad Shabir
Q.S & Estimation Specialist
Shabir Associates
i
CONTENTS
1. General
2. Manpower List
3. Material List
4. Plants & Equipment Owning and Operating Cost
5. Quarry Sites
6. Conversion Factors & Technical Data
7. List of Districts
8. CSR January 2009 Item Rates
ii
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
1. General
For many years National Highway Authority has been compiling / updating the
Composite Schedule of Rates for use in the Civil Engineering Industry. The
Civil Engineering Industry uses this Schedule of Rates for pricing work by the
application of unit rates to the quantities measured from the designer’s
drawings. The main objective of the CSR is to provide a realistic reference
base for cost estimates. One has to understand no two projects are the same,
there are variables which effect the price of the project i.e., the volume of work
below ground, embankment height, cut & fill, increased exposure to weather,
and the tremendous variety of the projects, in terms of type, complexity and
scale makes the straight forward use of unit rates less reliable. This
uncertainty is compounded by the lower number of bill items generated in Civil
Engineering Projects as compared to Building Works so that the precise
nature of work is less apparent from bill descriptions and the statistical effect
of ‘swings and roundabout’ has less scope to average out extremes of pricing.
The CSR does embrace the great majority of work undertaken by NHA.
Although almost all projects will have individual features that require careful
attention in pricing, there will be some projects that are so specialist that they
will not confirm to standard pricing information at all. But for most projects,
within the range of work covered, this CSR should provide a firm foundation
for:
iii
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
Arbitration Matters
Updating the data inputs every year or from time to time, to revalidate the
item rates
2. GENERAL METHODOLOGY:
a. Composite Schedule of Rates was originally published in the year 1991 and
subsequent revisions were carried out in 1995, 2000, 2005, 2006 and 2008.
There are total of 91 Districts considered and are given numbers in
Alphabetical order and their Province wise breakdown as under:
Province No of Districts
Punjab 34
Sind 16
NWFP 21
Balochistan 20
b. These rates are based on the existing formulae and efficiency levels used in
the preparation of CSR 2005, 2006 and 2008 with some modifications.
c. The rates analysis of individual items of CSR 2009 consists of four basic
inputs, which have been assigned the same code numbers as in the previous
Composite Schedule of Rates.
iv
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
ii. NHA Composite Schedule of Rates 2005, 2006 & 2008 and its basic data
Code list of Manpower, Material and Equipment appear at the end of the
chapter for the convenience of the users.
2.1 MANPOWER:
b. Formulation of Rates:
Manpower basic rates collected from districts have been first scrutinized, to
eliminate irrational information and following overheads are applied to include
fringe benefits and other charges:
v. Bonus (Compulsory)
After including above overheads, manpower rates for each of the 91 district
have been calculated and separate records developed for use by the
Computer Program.
v
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
List of materials required for road construction has been first prepared from
the construction items appearing in the General Specifications of National
Highway Authority. After arranging the construction material list in order, code
numbers have been allocated.
b. Formulation of Rates:
c. Cost of Material
d. Cost of Transportation
The list of plant and equipment includes major equipment whereas small
equipment, tools and attachments are ignored, as these have been charged
under the item of overhead. After arranging the list in order, code numbers
have been allocated starting from 3001 (onwards).
vi
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
To arrive at the decision for choosing the right horse power, appropriate
performance level and reasonable maintenance charges, the
recommendation of well known suppliers have been considered. In order to
decide the price level of any equipment, average cost has been used, which
includes C&F price, plus duties and taxes etc.
The owning and operating costs are similar for all the districts, unlike
manpower and materials where rates may differ for each district.
The owning and operating costs are developed by using a standard format.
The duties and taxes have been calculated as per the latest Excise and Land
Customs Tariff for calculating total cost of equipment.
Fuel consumption, working efficiency and maintenance costs have been fixed
after consulting the recommendation of the manufacturers. Equipment
economical life and tire life have been fixed after consulting several
organizations using heavy and light equipment in the present indigenous
conditions.
The owning and operating costs for 80 types of equipment is provided at the
end of this chapter.
All the basic inputs have been updated in the individual rates analysis. These
formulae have been created by appropriate quantitative inputs of the following
items.
a. Profit
An addition to the estimate needs to be made to the net estimate to cover all
costs incurred in operating the central services provided by head office. Apart
vii
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
from general management and accountancy, this will normally include the
departments dealing with:
Tendering / Estimating
Planning & design
Wages and bonus
Finance Cost:- Some companies would include finance costs with head office
overheads, but this will vary from contractor to contractor.
The appropriate addition varies with the extent of services provided centrally
and company to company, rather than on site, and with size of organization.
c. Preliminaries
Generally contract document give detailed requirements for the facilities and
equipment to be provided for the employer and the Engineer’s Representative
given in the Bill of Quantities. Thus General Items given in the BOQ are
excluded from the check list of preliminaries.
Plant Maintenance
Vehicles / buses provided for use of staff and others including running
costs etc.
viii
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
d. Tax
In the CSR, 25% is added on the estimated unit cost of the items which
includes over heads, taxes, preliminaries and profit, however this will vary
from project to project and contractor to contractor.
Rate analysis in CSR have been prepared based on policy explained here
above. However, there are certain factors required to be considered while
deciding about more realistic rates in special situations.
ix
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
a. Price Escalation
b. Double Taxation
c. Service Roads
No provision has been made in this rate analysis for road diversion cost or
service road, which the contractor has to construct or maintain as a non-BOQ
item.
e. Other Factors
x
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
LIST OF MANPOWER
Man power Code Description
1001 SITE ENGINEER
1002 ASPHALT PLANT ENGINEER
1003 CONCRETE PLANT ENGINEER
1011 FOREMAN ASPHALT
1012 FOREMAN EARTHWORK
1013 FOREMAN CONCRETE
1014 GENERAL FOREMAN
1021 SUPERVISOR
1022 SURVEYOR
1023 ASSISTANT SURVEYOR
1031 MASON
1032 CARPENTER
1033 PAINTER
1034 STEEL BINDER/CUTTER
1040 HIGHLY SKILLED LABOUR
1041 HELPER
1042 WELDER
1051 LABOUR
Note:
3. All operators of Light and Heavy Duty Equipment and Plant Included in
the hourly rate of the equipment
xi
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
LIST OF MATERIAL
2001 ROCK CM
2002 SOIL CLASS-A1 CM
2004 SOIL CLASS-A2 CM
2008 SOIL CLASS-A3 CM
2009 SOIL CLASS-A4 CM
2010 SOIL CLASS-A5 CM
2014 CRUSHED AGGREGATE BASE A CM
2015 CRUSHED AGGREGATE BASE B CM
2016 CRUSHED AGGREGATE BASE B1 CM
2017 GRANULAR SUB-BASE A CM
2018 GRANULAR SUB-BASE B CM
2019 SAND CLASS C CM
2021 COARSE SAND CM
2022 FINE SAND CM
2023 AGGREGATE 2"-1.1/2" CM
2024 AGGREGATE 1.1/2"-3/4" CM
2025 AGGREGATE 3/4"-3/8" CM
2026 AGGREGATE 3/8"-EACH 4 CM
2027 AGGREGATE EACH4-EACH200 CM
2028 FILLER MATERIAL CM
2029 BRICK CLASS A EACH
2030 STONE RANDOM CLASS-A CM
2031 STONE RANDOM CLASS-B CM
2032 STONE RANDOM CLASS-C CM
2033 STONE RANDOM CLASS-D CM
2034 STONE DRESSED CM
2035 HAND BROKEN STONE 2.1/2"-1/2" CM
2041 ASPHALT GRADE 60/70 TON
2042 ASPHALT GRADE 80/100 TON
2043 ASPHALT M.C. 70 TON
2044 ASPHALT M.C. 250 TON
2045 ASPHALT M.C. 800 TON
2046 ASPHALT R.C. 70 TON
2047 ASPHALT R.C. 250 TON
2048 ASPHALT R.C. 800 TON
2049 ASPHALT S.S. 1 TON
2050 ASPHALT S.S. 1H TON
2051 ASPHALT R.S. 1 TON
2052 ASPHALT R.S. 2 TON
2053 CEMENT TYPE-I (OPC) BAG
2054 CEMENT TYPE-II (LOW S.R) BAG
2057 CEMENT TYPE-V (HIGH S.R) BAG
2058 ACCELERATOR LIT
2059 RETARDER LIT
2060 CURING COMPOUND LIT
2061 STEEL GRADE. 40 TON
2062 STEEL GRADE. 60 TON
xii
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
LIST OF MATERIAL
xiii
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
LIST OF MATERIAL
Material
Material Code Material Code
Code
2125 SHUTTERING (401) E LS
2126 SHUTTERING (401) F LS
2127 SHUTTERING (401) G LS
2128 SHUTTERING (401) H LS
2129 SHUTTERING (410) LS
2131 G.M.S BARBED WIRE KG
2133 ANGLE IRONS DIFFERENT SIZES KG
2134 STEEL CHANNELS KG
2135 SHEATHS (3/8", 1/2") M
2136 LIVE ANCHORAGES (3/8" - 1/2") EACH
2137 G.I. PIPE 3" DIA M
2140 G.M.S SCREW, NUTS, BOLTS AND WASHERS KG
2142 PLANTATION TREES EACH
2143 MOBILIZATION OF PILING EQUIPMENT LS
2144 RCC PIPE CLS-IV 310 MM (AASHTO M-170) M
2145 RCC PIPE CLS-IV 380 MM (AASHTO M-170) M
2146 RCC PIPE CLS-IV 460 MM (AASHTO M-170) M
2147 RCC PIPE CLS-IV 610 MM (AASHTO M-170) M
2148 RCC PIPE CLS-IV 760 MM (AASHTO M-170) M
2149 RCC PIPE CLS-IV 910 MM (AASHTO M-170) M
2150 RCC PIPE CLS-IV 1070 MM (AASHTO M-170) M
2151 RCC PIPE CLS-IV 1220 MM (AASHTO M-170) M
2152 RCC PIPE CLS-IV 1520 MM (AASHTO M-170) M
2153 PAVEMENT MARKING NON REFLECTING (TP) KG
2154 PAVEMENT MARKING REFLECTING (TP) KG
2155 GALVANIZED FLAT STEEL FASTENERS & WASHERS KG
2156 GALVANIZED U-BOLT CLAMP WITH 2 NUTS & TIE BOLTS KG
GALVANIZED SUPPORTING HOOKS CAST IN PRECAST
2157 EACH
POSTS
2158 GALVANIZED CHAIN LINK WIRE MESH FABRIC SM
2159 GALVANIZED WIRE 3.76MM Ø TENSION, 3MM Ø STIRRUP KG
2160 PRE-CAST CONCRETE TUFF KERB STONE(K-5) EACH
2161 LIFTING DEVICE ANCHORS EACH
2162 MS SHEET KG
2163 FABRICATION KG
2164 GALVANIZATION KG
xiv
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
xv
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
xvi
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
xvii
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
AGGREGATES
35 Kohistan dasu Buttgram/ Mansehra area
7-B Buttgram Buttgram/ Mansehra area
43 Mansehra Margalla, Hawalian
73 Muzafarabad Margalla, Hawalian
1 Abbottabad Margallah, Dur Nala
20-B Haripur Hazara Margallah, Dur Nala
10 Chitral Chitral Area, Swat Area
15 Dir Swat Area, Quarry Available no crusher
66 Swat Saidu Sharif Chakdara, Swat Area
66-B Kalam Chakdara, Swat Area
7-A Buneer Swat Area
42 Malakand chakdara, Swat area
10-A Charsaddah Charsad Area, Mardan, Dara Adam Khel
44 Mardan Katlung, Charsada
66-A Swabi Margallah, Katlung
49-C Nowshera Katlung (Nowshera), Margallah
52 Peshawar Charsada, charat, Khyber pass, Adam Khel
34 Kohat Kohat Area, Dara Adam Khel
27 Karak Kohat Area
6 Bannu Kohat, Eisa Khel
41-B Lucky Murwat Kohat, Eisa Khel
70-A Tank Daraban Crushers
12 Dera Ismail Khan Daraban Crushers, Chund quarry
CRUSHED AGGREGATE BASE
35 Kohistan dasu Chillas, Jalkot, Buttgram/ Mansehra area
7-B Buttgram Buttgram/ Mansehra area
43 Mansehra Margalla, Hawalian
73 Muzafarabad Margalla, Hawalian
1 Abbottabad Abbotabad Area, Dor Nala
20-B Haripur Hazara Margallah, Dur Nala
10 Chitral Shishi Bridge, Chitral Area
15 Dir Swat Area, Quarry Available no crusher
66 Swat Saidu Sharif Chakdara, Swat Area
66-B Kalam Chakdara, Swat Area
7-A Buneer Swat Area
xviii
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
xix
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
FILLER MATERIAL
35 Kohistan dasu Buttgram/ Mansehra area
7-B Buttgram Buttgram/ Mansehra area
43 Mansehra Margalla, Hawalian
73 Muzafarabad Margalla, Hawalian
1 Abbottabad Dur Nala
20-B Haripur Hazara Margallah, Dur Nala
10 Chitral Chitral Area, Swat Area
15 Dir Swat Area, Quarry Available no crusher
66 Swat Saidu Sharif Chakdara, Swat Area
66-B Kalam Chakdara, Swat Area
7-A Buneer Swat Area
42 Malakand chakdara, Swat area
10-A Charsaddah Charsad Area, Mardan, Dara Adam Khel
44 Mardan Katlung, Charsada
66-A Swabi Margallah, Katlung
49-C Nowshera Katlung (Nowshera), Margallah
52 Peshawar Charsada, charat, Khyber pass, Adam Khel
34 Kohat Kohat Area, Dara Adam Khel
27 Karak Kohat Area
6 Bannu Kohat, Eisa Khel
41-B Lucky Murwat Kohat, Eisa Khel
70-A Tank Daraban Crushers
12 Dera Ismail Khan Daraban Crushers, Chund quarry
xx
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
Note:
(i) Bituminous material types are (a) asphalt cement, (b) cut-back or
emulsified and (c) asphalt cement, cut-back and emulsified
xxi
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
Qty of Cement
Sr. No Description Unit in Bag of 50
Kg
xxii
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
CONVERSION FACTORS
To Convert Into Multiply By
Length
Inch Millimetre 25.4
Millimetre Inch 0.03937
Foot Metre 0.30480
Metre Foot 3.28084
Yard Metre 0.91440
Metre Yard 1.09361
Mile Kilometre 1.60934
Kilometre Mile 0.62137
Mass. Weight
Pound Kilogram 0.45359237
Kilogram Pound 2.20462
Ounce Gram 28.3495
Gram Ounce 0.03527
Quintal Kilogram 100
Grain Milligram 64.7989
Hundred Weight Kilogram 50.8023
Tonne Hundred Weight 19.6841
Tonne Kilogram 1000
Ton Kilogram 1016.0469
Ton Pound 2240
Ton Tonne 1.0160469
Tonne Ton 0.9842065
Seer Kilogram 0.9331
Maund Kilogram 37.324
Tola Gram 11.664
Capacity Volume
Pint (UK) Litre 0.568261
Gallon (Imperial) Litre 4.54609
Cubic foot Litre 28.3168
Cubic metre Litre 1000
Litre Cubic foot 0.0353147
Fluid ounce Millilitre 28.413
Litre Gallon (Imperial) 0.219969
Cubic inch Cubic millimetre 16387.1
Cubic foot Cubic metre 0.0283168
Cubic metre Cubic foot 35.3147
Cubic yard Cubic metre 0.764555
Cubic metre Cubic yard 1.30795
Acre foot Hectare metre 0.12334
Weights & Standard Sizes of Sheets
Birmingham Gauge Thickness in mm Kg Per Sqm
28 0.40 3.15
26 0.50 3.90
24 0.63 4.95
22 0.80 6.30
20 1.00 7.85
18 1.25 9.80
16 1.60 12.75
14 2.00 15.70
12 2.50 19.60
10 3.15 24.75
8 4.00 31.40
xxiii
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
Area
xxiv
NATIONAL HIGHWAY AUTHORITY
N.W.F.P.
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 1
.
Page 2
CSR - January 2009
National Highway Authority Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
Page 4
NATIONAL HIGHWAY AUTHORITY
ABBOTTABAD
(01)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 5
.
Page 6
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Abbottabad
Abbottabad District Code: 01
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 7.72 173.32 1.17 45.55 227.76
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 21.50 456.54 2.63 120.17 600.84
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 86.01 1,826.16 10.51 480.67 2,403.35
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 141.76 316.30 50.82 127.22 636.10
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 18.27 337.99 - 89.07 445.33
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 12.03 262.40 - 68.61 343.03
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 141.76 316.30 50.82 127.22 636.10
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 22.64 316.03 - 84.67 423.34
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 9.25 263.92 - 68.29 341.47
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 8.58 137.60 0.38 36.64 183.20
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 66.41 287.11 70.80 106.08 530.42
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 125.77 427.01 33.88 146.67 733.33
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 105.22 292.53 - 99.44 497.20
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 64.68 238.86 - 75.89 379.43
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 7.56 174.71 5.09 46.84 234.20
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 21.72 482.48 54.04 139.56 697.80
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 16.29 416.71 2.42 108.85 544.27
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 8.48 177.46 7.94 48.47 242.35
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 6.77 76.32 5.09 22.04 110.22
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 15.36 110.29 3.03 32.17 160.84
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.54 27.34 1.46 7.58 37.91
Page 7
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Abbottabad
Abbottabad District Code: 01
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.13 18.21 0.77 5.03 25.14
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.92 15.26 0.79 4.24 21.22
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.34 15.57 0.90 4.45 22.26
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 72.70 1,510.17 5,779.15 1,840.50 9,202.52
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 75.56 1,510.17 6,199.49 1,946.30 9,731.52
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 80.83 1,577.28 5,769.58 1,856.92 9,284.62
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 80.83 1,571.31 6,342.09 1,998.56 9,992.79
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 269.62 915.38 50,538.21 12,930.80 64,654.01
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 269.62 915.38 48,960.08 12,536.27 62,681.35
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 91.61 112.80 966.30 292.68 1,463.38
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 152.82 2,437.94 5,563.63 2,038.60 10,192.99
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 100.25 126.27 777.24 250.94 1,254.71
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 1.90 45.04 1.26 12.05 60.24
207b DEEP PATCHING (16-30 cm) SM 1.90 39.67 1.26 10.71 53.53
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.50 110.61 0.68 28.45 142.23
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.50 22.12 0.14 5.69 28.45
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.33 1.57 35.87 9.44 47.22
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.32 1.57 40.04 10.48 52.42
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.13 0.58 15.01 3.93 19.66
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.13 0.58 17.51 4.56 22.78
Page 8
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Abbottabad
Abbottabad District Code: 01
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 69.52 1,489.33 6,772.24 2,082.77 10,413.86
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 69.52 1,438.23 7,296.26 2,201.00 11,005.01
"B")
307a DENSE GRADED HOT BIT-MAC CM 167.81 379.77 5,555.86 1,525.86 7,629.31
307b OPEN GRADED HOT BIT-MAC CM 167.81 379.77 5,441.58 1,497.29 7,486.45
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 29.24 590.65 2,021.86 660.44 3,302.18
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 29.19 650.70 42,543.28 10,805.79 54,028.96
401a1i CONCRETE CLASS "A1" (Underground) CM 544.84 1,059.94 3,946.83 1,387.90 6,939.52
401a1ii CONCRETE CLASS "A1" (On ground) CM 544.84 1,059.94 4,224.31 1,457.27 7,286.36
401a1iii CONCRETE CLASS "A1" (Elevated) CM 544.84 1,059.94 4,779.25 1,596.01 7,980.04
401a2i CONCRETE CLASS "A2" (Underground) CM 544.84 1,059.94 4,324.83 1,482.40 7,412.02
401a2ii CONCRETE CLASS "A2" (On ground) CM 544.84 1,059.94 4,602.31 1,551.77 7,758.86
401a2iii CONCRETE CLASS "A2" (Elevated) CM 544.84 1,059.94 5,157.25 1,690.51 8,452.54
401a3i CONCRETE CLASS "A3" (Underground) CM 544.84 1,059.94 4,702.83 1,576.90 7,884.52
401a3ii CONCRETE CLASS "A3" (On ground) CM 544.84 1,059.94 4,980.31 1,646.27 8,231.36
401a3iii CONCRETE CLASS "A3" (Elevated) CM 544.84 1,059.94 5,535.25 1,785.01 8,925.04
401ci CONCRETE CLASS "C" (Underground) CM 531.99 500.55 3,544.96 1,144.37 5,721.87
401cii CONCRETE CLASS "C" (On ground) CM 531.99 500.55 3,663.30 1,173.96 5,869.80
401ciii CONCRETE CLASS "C" (Elevated) CM 531.99 500.55 3,899.98 1,233.13 6,165.66
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,788.08 947.15 4,942.49 1,919.43 9,597.14
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,788.08 947.15 5,698.49 2,108.43 10,542.14
401gii PRECAST CONCRETE CLASS "B" CM 1,788.08 947.15 4,778.84 1,878.52 9,392.59
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,788.08 947.15 6,076.49 2,202.93 11,014.64
Page 9
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Abbottabad
Abbottabad District Code: 01
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,788.08 947.15 6,454.49 2,297.43 11,487.14
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,788.08 947.15 6,832.49 2,391.93 11,959.64
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,649.89 781.47 59,888.00 15,579.84 77,899.20
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,649.89 781.47 67,238.00 17,417.34 87,086.70
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,311.27 5,393.81 56,007.02 15,678.02 78,390.12
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 2,816.57 15,659.05 133,860.36 38,083.99 190,419.97
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 115.67 - 301.01 104.17 520.85
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 115.67 - 307.07 105.68 528.42
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.53 2.67
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 20.82 69.68 117.77 52.07 260.34
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 355.84 1,654.04 899.75 727.41 3,637.04
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 533.76 2,481.06 1,349.62 1,091.11 5,455.56
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 533.76 2,481.06 997.52 1,003.09 5,015.44
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 889.61 4,135.11 1,174.50 1,549.80 7,749.02
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 762.52 4,884.94 1,354.70 1,750.54 8,752.70
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,334.41 6,909.78 1,487.23 2,432.86 12,164.28
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 22,545.15 45,769.30 100,542.38 42,214.21 211,071.05
407i PILE LOAD TEST UP TO 240 TON EACH 41,156.52 45,769.30 201,084.76 72,002.65 360,013.23
407j PILE LOAD TEST UP TO 360 TON EACH 59,767.89 50,188.38 301,627.14 102,895.85 514,479.27
407k CONFIRMATORY BORING (NX SIZE) M 194.25 1,582.02 6.37 445.66 2,228.30
411a STONE MASONRY RANDOM DRY CM 299.85 107.96 562.16 242.49 1,212.46
411b STONE MASONRY RANDOM WITH MORTAR CM 324.74 166.68 1,635.48 531.73 2,658.64
411c STONE MASONRY DRESSED UNCOURSED DRY CM 391.00 107.96 625.28 281.06 1,405.29
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 461.46 166.68 1,697.90 581.51 2,907.55
Page 10
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Abbottabad
Abbottabad District Code: 01
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 618.85 264.08 1,603.09 621.51 3,107.53
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 229.85 437.48 644.86 328.05 1,640.25
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 221.88 577.19 835.93 408.75 2,043.75
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 221.73 935.96 1,071.91 557.40 2,787.00
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 229.77 1,146.39 1,600.63 744.20 3,720.99
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 264.84 1,078.41 2,300.27 910.88 4,554.41
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 330.10 1,331.30 3,618.01 1,319.85 6,599.26
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 427.18 1,481.41 4,683.95 1,648.14 8,240.68
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 500.94 1,798.85 5,968.88 2,067.17 10,335.84
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 596.65 2,098.66 9,218.85 2,978.54 14,892.70
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 229.85 507.33 725.04 365.56 1,827.78
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 221.88 577.19 854.75 413.46 2,067.28
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 216.61 935.96 1,046.49 549.77 2,748.83
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 229.77 1,146.39 1,745.56 780.43 3,902.15
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 264.84 1,078.41 3,318.70 1,165.49 5,827.45
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 330.10 1,331.30 4,875.32 1,634.18 8,170.90
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 427.18 1,481.41 6,812.38 2,180.24 10,901.22
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 500.94 1,798.85 9,239.15 2,884.74 14,423.68
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 596.65 2,098.66 12,997.71 3,923.26 19,616.28
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 93.70 118.93 428.06 160.17 800.85
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 800.63 612.95 3,599.38 1,253.24 6,266.20
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 5.67 - 109.50 28.79 143.96
508a BRICK PAVING (SINGLE COURSE) SM 115.45 32.70 246.96 98.78 493.88
508b BRICK PAVING (DOUBLE COURSE) SM 206.59 32.70 490.14 182.36 911.78
Page 11
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Abbottabad
Abbottabad District Code: 01
509d GROUTED RIP RAP CLASS "A" CM 616.99 102.14 1,889.70 652.21 3,261.04
509e GROUTED RIP RAP CLASS "B" CM 594.69 81.72 1,738.21 603.65 3,018.27
509f GROUTED RIP RAP CLASS "C" CM 586.72 68.10 1,784.62 609.86 3,049.29
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 816.75 353.02 4,161.87 1,332.91 6,664.55
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 47.66 191.97 415.94 163.90 819.48
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 159.31 67.48 75.94 75.68 378.41
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 203.92 86.37 97.21 96.87 484.37
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 260.29 180.32 374.87 203.87 1,019.34
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 325.36 225.40 468.58 254.84 1,274.18
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 288.84 572.25 2,210.98 768.02 3,840.08
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 982.88 670.54 4,055.33 1,427.18 7,135.92
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 143.14 90.27 430.28 165.92 829.61
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 25.20 - 1,197.58 305.69 1,528.47
604d STEEL POST OF METAL GUARD RAIL EACH 95.54 976.73 3,776.31 1,212.14 6,060.72
605a CONCRETE BEAM GUARD RAIL M 74.55 30.82 590.23 173.90 869.50
605c CONCRETE POST FOR GUARD RAIL M 91.53 27.36 590.14 177.26 886.29
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 240.49 255.15 6,856.68 1,838.08 9,190.40
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 70.70 382.72 9,258.32 2,427.94 12,139.68
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 240.49 541.89 11,887.89 3,167.57 15,837.83
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 754.41 598.64 20,957.75 5,577.70 27,888.50
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 150.88 119.73 9,209.53 2,370.04 11,850.18
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.83 5.86 16.16 6.21 31.07
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.94 4.03 39.66 11.16 55.79
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.83 5.86 21.57 7.56 37.82
LINES OF 20 cm WIDTH
Page 12
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Abbottabad
Abbottabad District Code: 01
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.94 4.03 52.89 14.47 72.33
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 76.53 5.22 156.16 59.48 297.39
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 76.53 9.98 499.74 146.56 732.82
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.54 8.59 22.48 8.65 43.26
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.54 9.63 67.50 20.17 100.85
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.54 6.95 29.97 10.12 50.58
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.54 9.63 90.01 25.79 128.97
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 76.53 3.73 217.02 74.32 371.60
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 76.53 7.90 851.20 233.91 1,169.53
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 63.89 3.73 104.11 42.93 214.66
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 63.89 7.90 333.67 101.36 506.82
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 63.89 3.73 144.68 53.07 265.37
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 63.89 7.90 568.32 160.03 800.14
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 9.41 81.62 193.86 71.22 356.11
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 9.41 81.62 233.86 81.22 406.10
DOUBLE)
610b RIGHT OF WAY MARKER EACH 102.51 121.33 299.32 130.79 653.95
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 640.99 976.31 2,009.70 906.75 4,533.75
610d TEN KILOMETRE POST EACH 1,224.53 1,952.61 4,414.31 1,897.86 9,489.32
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT M 135.53 91.00 952.71 294.81 1,474.05
WITH PRECAST PRESTRESSED R.C.C. POST
Page 13
.
Page 14
NATIONAL HIGHWAY AUTHORITY
BANNU
(06)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 15
.
Page 16
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Bannu
Bannu District Code: 06
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 6.47 173.32 1.17 45.24 226.20
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 17.93 456.54 2.63 119.27 596.37
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 71.71 1,826.16 10.51 477.10 2,385.48
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 119.86 316.30 50.82 121.74 608.72
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 15.88 337.99 - 88.47 442.34
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 10.44 262.40 - 68.21 341.05
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 119.86 316.30 50.82 121.74 608.72
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 19.06 316.03 - 83.77 418.86
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 8.10 263.92 - 68.01 340.03
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 7.50 137.60 0.38 36.37 181.85
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 56.09 287.11 70.80 103.50 517.52
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 105.87 427.01 33.88 141.69 708.46
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 88.71 292.53 - 95.31 476.56
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 54.45 238.86 - 73.33 366.64
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 6.60 174.71 5.09 46.60 233.01
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 18.71 482.48 54.04 138.81 694.04
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 14.03 416.71 2.42 108.29 541.45
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 7.35 177.46 7.94 48.19 240.94
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 5.95 76.32 5.09 21.84 109.20
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 13.31 110.29 3.03 31.66 158.28
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.32 27.34 1.46 7.53 37.65
Page 17
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Bannu
Bannu District Code: 06
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 0.99 18.21 0.77 4.99 24.96
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.81 15.26 0.79 4.21 21.07
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.20 15.57 0.90 4.42 22.08
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 60.93 1,510.17 6,175.96 1,936.76 9,683.82
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 63.29 1,510.17 6,637.76 2,052.80 10,264.01
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 67.89 1,577.28 6,165.88 1,952.76 9,763.81
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 67.89 1,571.31 6,787.17 2,106.59 10,532.96
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 225.34 915.38 54,580.23 13,930.24 69,651.19
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 225.34 915.38 53,002.10 13,535.71 67,678.53
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 76.02 112.80 1,020.83 302.41 1,512.06
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 130.07 2,437.94 5,897.02 2,116.26 10,581.30
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 82.54 126.27 819.51 257.08 1,285.41
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 1.68 45.04 1.26 11.99 59.96
207b DEEP PATCHING (16-30 cm) SM 1.68 39.67 1.26 10.65 53.26
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.20 110.61 0.68 28.37 141.87
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.44 22.12 0.14 5.67 28.37
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.28 1.57 38.74 10.15 50.74
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.27 1.57 43.24 11.27 56.36
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.11 0.58 16.21 4.23 21.13
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.11 0.58 18.91 4.90 24.51
Page 18
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Bannu
Bannu District Code: 06
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 58.58 1,489.33 7,271.71 2,204.91 11,024.53
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 58.58 1,438.23 7,847.43 2,336.06 11,680.30
"B")
307a DENSE GRADED HOT BIT-MAC CM 143.88 379.77 6,033.35 1,639.25 8,196.25
307b OPEN GRADED HOT BIT-MAC CM 143.88 379.77 5,901.23 1,606.22 8,031.11
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 26.26 590.65 2,127.90 686.20 3,431.01
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 23.97 650.70 46,705.36 11,845.01 59,225.03
401a1i CONCRETE CLASS "A1" (Underground) CM 478.21 1,059.94 4,023.06 1,390.30 6,951.52
401a1ii CONCRETE CLASS "A1" (On ground) CM 478.21 1,059.94 4,300.54 1,459.67 7,298.36
401a1iii CONCRETE CLASS "A1" (Elevated) CM 478.21 1,059.94 4,855.48 1,598.41 7,992.04
401a2i CONCRETE CLASS "A2" (Underground) CM 478.21 1,059.94 4,401.06 1,484.80 7,424.02
401a2ii CONCRETE CLASS "A2" (On ground) CM 478.21 1,059.94 4,678.54 1,554.17 7,770.86
401a2iii CONCRETE CLASS "A2" (Elevated) CM 478.21 1,059.94 5,233.48 1,692.91 8,464.54
401a3i CONCRETE CLASS "A3" (Underground) CM 478.21 1,059.94 4,779.06 1,579.30 7,896.52
401a3ii CONCRETE CLASS "A3" (On ground) CM 478.21 1,059.94 5,056.54 1,648.67 8,243.36
401a3iii CONCRETE CLASS "A3" (Elevated) CM 478.21 1,059.94 5,611.48 1,787.41 8,937.04
401ci CONCRETE CLASS "C" (Underground) CM 468.51 500.55 3,636.33 1,151.35 5,756.74
401cii CONCRETE CLASS "C" (On ground) CM 468.51 500.55 3,754.67 1,180.93 5,904.67
401ciii CONCRETE CLASS "C" (Elevated) CM 468.51 500.55 3,991.36 1,240.10 6,200.52
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,544.99 947.15 5,024.80 1,879.24 9,396.18
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,544.99 947.15 5,780.80 2,068.24 10,341.18
401gii PRECAST CONCRETE CLASS "B" CM 1,544.99 947.15 4,872.67 1,841.20 9,206.02
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,544.99 947.15 6,158.80 2,162.74 10,813.68
Page 19
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Bannu
Bannu District Code: 06
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,544.99 947.15 6,536.80 2,257.24 11,286.18
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,544.99 947.15 6,914.80 2,351.74 11,758.68
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,404.37 781.47 61,478.00 15,915.96 79,579.80
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,404.37 781.47 68,828.00 17,753.46 88,767.30
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,116.38 5,393.81 56,979.33 15,872.38 79,361.90
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 2,680.32 15,659.05 133,860.48 38,049.96 190,249.81
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 97.59 - 305.06 100.66 503.31
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 97.59 - 304.27 100.47 502.33
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.53 2.67
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 16.68 69.68 119.64 51.50 257.50
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 347.81 1,654.04 900.65 725.62 3,628.12
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 521.71 2,481.06 1,350.97 1,088.44 5,442.19
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 521.71 2,481.06 999.02 1,000.45 5,002.25
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 869.52 4,135.11 1,177.00 1,545.41 7,727.04
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 745.31 4,884.94 1,357.91 1,747.04 8,735.20
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,304.29 6,909.78 1,490.98 2,426.26 12,131.31
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 18,410.39 45,769.30 92,271.26 39,112.74 195,563.69
407i PILE LOAD TEST UP TO 240 TON EACH 33,575.21 45,769.30 184,542.52 65,971.76 329,858.79
407j PILE LOAD TEST UP TO 360 TON EACH 48,740.03 50,188.38 276,813.78 93,935.55 469,677.74
407k CONFIRMATORY BORING (NX SIZE) M 179.28 1,582.02 6.37 441.92 2,209.59
411a STONE MASONRY RANDOM DRY CM 266.98 107.96 488.09 215.76 1,078.79
411b STONE MASONRY RANDOM WITH MORTAR CM 289.95 166.68 1,599.02 513.91 2,569.56
411c STONE MASONRY DRESSED UNCOURSED DRY CM 346.63 107.96 544.22 249.70 1,248.51
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 409.43 166.68 1,645.04 555.29 2,776.44
Page 20
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Bannu
Bannu District Code: 06
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 545.76 264.08 1,550.23 590.02 2,950.10
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 192.60 437.48 646.04 319.03 1,595.15
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 186.03 577.19 837.34 400.14 2,000.69
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 188.33 935.96 1,073.55 549.46 2,747.30
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 194.19 1,146.39 1,602.55 735.78 3,678.91
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 222.93 1,078.41 2,302.19 900.88 4,504.42
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 277.58 1,331.30 3,620.79 1,307.42 6,537.09
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 359.23 1,481.41 4,686.72 1,631.84 8,159.19
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 419.79 1,798.85 5,972.23 2,047.72 10,238.59
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 499.25 2,098.66 9,222.77 2,955.17 14,775.85
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 192.60 507.33 727.39 356.83 1,784.15
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 186.03 577.19 856.16 404.84 2,024.22
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 182.54 935.96 1,048.13 541.66 2,708.29
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 194.19 1,146.39 1,747.05 771.91 3,859.53
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 222.93 1,078.41 3,320.84 1,155.55 5,777.73
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 277.58 1,331.30 4,878.10 1,621.75 8,108.73
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 359.23 1,481.41 6,815.15 2,163.94 10,819.72
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 419.79 1,798.85 9,242.51 2,865.29 14,326.44
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 499.25 2,098.66 13,001.63 3,899.89 19,499.43
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 78.15 118.93 315.27 128.09 640.43
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 704.80 612.95 3,689.12 1,251.72 6,258.59
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 4.48 - 109.44 28.48 142.41
508a BRICK PAVING (SINGLE COURSE) SM 100.44 32.70 239.43 93.14 465.72
508b BRICK PAVING (DOUBLE COURSE) SM 180.10 32.70 476.03 172.21 861.03
Page 21
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Bannu
Bannu District Code: 06
509d GROUTED RIP RAP CLASS "A" CM 537.79 102.14 1,839.13 619.77 3,098.83
509e GROUTED RIP RAP CLASS "B" CM 519.08 81.72 1,685.80 571.65 2,858.23
509f GROUTED RIP RAP CLASS "C" CM 512.22 68.10 1,732.48 578.20 2,891.00
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 730.30 353.02 4,247.16 1,332.62 6,663.10
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 40.28 191.97 341.03 143.32 716.61
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 139.51 67.48 63.91 67.72 338.62
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 178.58 86.37 81.80 86.69 433.44
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 228.82 180.32 374.93 196.02 980.10
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 286.03 225.40 468.67 245.02 1,225.12
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 253.36 572.25 2,250.81 769.10 3,845.52
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 849.29 670.54 4,131.20 1,412.76 7,063.79
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 123.93 90.27 438.18 163.09 815.47
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 24.03 - 1,197.58 305.40 1,527.00
604d STEEL POST OF METAL GUARD RAIL EACH 85.29 976.73 3,776.31 1,209.58 6,047.91
605a CONCRETE BEAM GUARD RAIL M 62.31 30.82 600.21 173.33 866.67
605c CONCRETE POST FOR GUARD RAIL M 76.51 27.36 601.41 176.32 881.60
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 200.61 255.15 6,867.38 1,830.79 9,153.93
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 67.97 382.72 9,280.50 2,432.80 12,163.99
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 200.61 541.89 11,926.37 3,167.22 15,836.08
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 618.00 598.64 21,016.48 5,558.28 27,791.41
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 123.60 119.73 9,225.18 2,367.13 11,835.64
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.54 5.86 16.17 6.14 30.71
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.85 4.03 39.77 11.16 55.81
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.54 5.86 21.58 7.49 37.47
LINES OF 20 cm WIDTH
Page 22
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Bannu
Bannu District Code: 06
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.85 4.03 53.05 14.48 72.40
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 59.69 5.22 156.28 55.30 276.48
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 59.69 9.98 501.20 142.72 713.60
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.17 8.59 22.49 8.56 42.81
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.17 9.63 67.50 20.08 100.39
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.17 6.95 29.99 10.03 50.14
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.17 9.63 90.01 25.70 128.51
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 59.69 3.73 217.14 70.14 350.69
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 59.69 7.90 851.20 229.70 1,148.49
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 50.50 3.73 104.19 39.60 198.02
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 50.50 7.90 334.64 98.26 491.30
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 50.50 3.73 144.76 49.75 248.73
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 50.50 7.90 568.32 156.68 783.40
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 9.51 81.62 193.91 71.26 356.30
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 9.51 81.62 233.91 81.26 406.29
DOUBLE)
610b RIGHT OF WAY MARKER EACH 86.18 121.33 304.13 127.91 639.55
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 525.23 976.31 2,056.66 889.55 4,447.75
610d TEN KILOMETRE POST EACH 989.20 1,952.61 4,506.63 1,862.11 9,310.54
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT M 122.66 91.00 957.79 292.86 1,464.32
WITH PRECAST PRESTRESSED R.C.C. POST
Page 23
.
Page 24
NATIONAL HIGHWAY AUTHORITY
BUNEER
(07-A)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 25
.
Page 26
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Buneer
Buneer District Code: 7-A
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 6.87 190.65 1.28 49.70 248.50
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 18.92 502.19 2.89 131.00 655.00
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 75.67 2,008.78 11.56 524.00 2,620.01
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 129.72 347.93 55.90 133.39 666.94
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 17.06 371.79 - 97.21 486.07
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 11.25 288.63 - 74.97 374.86
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 129.72 347.93 55.90 133.39 666.94
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 20.64 347.63 - 92.07 460.34
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 8.71 290.32 - 74.76 373.78
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 8.16 151.36 0.42 39.99 199.93
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 63.16 315.83 77.89 114.22 571.09
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 114.67 469.72 37.27 155.41 777.06
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 95.97 321.79 - 104.44 522.20
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 58.97 262.75 - 80.43 402.15
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 7.14 192.18 5.60 51.23 256.15
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 20.09 530.73 59.45 152.57 762.83
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 15.07 458.38 2.66 119.03 595.14
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 7.91 195.20 8.73 52.96 264.81
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 6.42 83.95 5.60 23.99 119.96
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 14.25 121.32 3.33 34.72 173.62
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.43 30.07 1.60 8.27 41.37
Page 27
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Buneer
Buneer District Code: 7-A
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.06 20.03 0.85 5.49 27.43
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.86 16.79 0.87 4.63 23.15
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.29 17.13 0.99 4.85 24.25
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 62.56 1,615.88 6,223.24 1,975.42 9,877.10
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 65.08 1,615.88 6,685.49 2,091.61 10,458.07
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 69.89 1,687.69 6,212.77 1,992.59 9,962.95
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 69.89 1,681.30 6,840.53 2,147.93 10,739.65
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 237.22 979.45 55,307.88 14,131.14 70,655.69
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 237.22 979.45 53,619.29 13,708.99 68,544.95
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 77.06 120.69 963.10 290.21 1,451.06
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 134.71 2,608.60 5,956.16 2,174.87 10,874.33
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 83.51 135.11 788.03 251.66 1,258.31
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 1.76 48.19 1.34 12.82 64.11
207b DEEP PATCHING (16-30 cm) SM 1.76 42.45 1.34 11.39 56.94
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.33 118.35 0.73 30.35 151.77
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.47 23.67 0.15 6.07 30.35
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.29 1.68 39.25 10.31 51.54
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.28 1.68 43.82 11.45 57.23
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.12 0.62 16.43 4.29 21.46
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.12 0.62 19.17 4.98 24.88
Page 28
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Buneer
Buneer District Code: 7-A
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 60.48 1,593.58 7,318.59 2,243.16 11,215.81
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 60.48 1,538.91 7,892.89 2,373.07 11,865.34
"B")
307a DENSE GRADED HOT BIT-MAC CM 147.67 406.36 6,023.18 1,644.30 8,221.51
307b OPEN GRADED HOT BIT-MAC CM 147.67 406.36 5,886.71 1,610.18 8,050.92
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 27.01 631.99 2,179.20 709.55 3,547.75
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 24.99 696.25 46,789.90 11,877.79 59,388.93
401a1i CONCRETE CLASS "A1" (Underground) CM 519.72 1,112.93 4,079.84 1,428.12 7,140.61
401a1ii CONCRETE CLASS "A1" (On ground) CM 519.72 1,112.93 4,371.18 1,500.96 7,504.79
401a1iii CONCRETE CLASS "A1" (Elevated) CM 519.72 1,112.93 4,953.87 1,646.63 8,233.16
401a2i CONCRETE CLASS "A2" (Underground) CM 519.72 1,112.93 4,476.74 1,527.35 7,636.73
401a2ii CONCRETE CLASS "A2" (On ground) CM 519.72 1,112.93 4,768.08 1,600.18 8,000.92
401a2iii CONCRETE CLASS "A2" (Elevated) CM 519.72 1,112.93 5,350.77 1,745.86 8,729.28
401a3i CONCRETE CLASS "A3" (Underground) CM 519.72 1,112.93 4,873.64 1,626.57 8,132.86
401a3ii CONCRETE CLASS "A3" (On ground) CM 519.72 1,112.93 5,164.98 1,699.41 8,497.04
401a3iii CONCRETE CLASS "A3" (Elevated) CM 519.72 1,112.93 5,747.67 1,845.08 9,225.41
401ci CONCRETE CLASS "C" (Underground) CM 498.50 525.57 3,638.41 1,165.62 5,828.11
401cii CONCRETE CLASS "C" (On ground) CM 498.50 525.57 3,762.67 1,196.69 5,983.43
401ciii CONCRETE CLASS "C" (Elevated) CM 498.50 525.57 4,011.19 1,258.82 6,294.08
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,626.16 994.51 5,120.44 1,935.28 9,676.38
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,626.16 994.51 5,914.24 2,133.73 10,668.63
401gii PRECAST CONCRETE CLASS "B" CM 1,626.16 994.51 4,933.12 1,888.45 9,442.24
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,626.16 994.51 6,311.14 2,232.95 11,164.75
Page 29
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Buneer
Buneer District Code: 7-A
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,626.16 994.51 6,708.04 2,332.18 11,660.88
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,626.16 994.51 7,104.94 2,431.40 12,157.00
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,603.90 820.55 63,772.80 16,549.31 82,746.56
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,603.90 820.55 71,490.30 18,478.69 92,393.44
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,275.65 5,663.50 59,328.57 16,566.93 82,834.66
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 2,724.95 16,442.00 140,581.54 39,937.12 199,685.61
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 108.38 - 319.92 107.08 535.38
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 108.38 - 318.85 106.81 534.04
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.23 0.56 2.80
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 17.86 73.17 124.08 53.78 268.88
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 352.77 1,736.74 945.27 758.70 3,793.48
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 529.16 2,605.12 1,417.90 1,138.05 5,690.23
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 529.16 2,605.12 1,048.29 1,045.64 5,228.21
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 881.93 4,341.86 1,234.71 1,614.63 8,073.13
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 755.94 5,129.19 1,424.35 1,827.37 9,136.85
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,322.90 7,255.27 1,563.82 2,535.50 12,677.49
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 18,298.32 48,057.77 96,884.82 40,810.23 204,051.14
407i PILE LOAD TEST UP TO 240 TON EACH 33,188.79 48,057.77 193,769.65 68,754.05 343,770.26
407j PILE LOAD TEST UP TO 360 TON EACH 48,079.27 52,697.80 290,654.47 97,857.89 489,289.43
407k CONFIRMATORY BORING (NX SIZE) M 178.98 1,661.12 6.68 461.70 2,308.48
411a STONE MASONRY RANDOM DRY CM 262.96 113.36 437.90 203.55 1,017.77
411b STONE MASONRY RANDOM WITH MORTAR CM 285.07 175.02 1,545.15 501.31 2,506.55
411c STONE MASONRY DRESSED UNCOURSED DRY CM 340.28 113.36 497.04 237.67 1,188.35
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 401.06 175.02 1,608.49 546.14 2,730.70
Page 30
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Buneer
Buneer District Code: 7-A
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 533.58 277.29 1,508.95 579.95 2,899.77
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 196.68 472.48 695.82 341.25 1,706.23
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 189.59 623.36 902.05 428.75 2,143.74
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 193.44 1,010.84 1,156.77 590.26 2,951.30
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 199.06 1,238.10 1,727.64 791.20 3,956.00
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 229.02 1,164.69 2,483.25 969.24 4,846.21
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 285.50 1,437.80 3,905.96 1,407.32 7,036.58
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 369.48 1,599.92 5,057.17 1,756.64 8,783.22
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 432.40 1,942.76 6,444.57 2,204.93 11,024.67
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 513.68 2,266.55 9,954.24 3,183.62 15,918.09
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 196.68 547.92 781.77 381.59 1,907.97
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 189.59 623.36 922.37 433.83 2,169.15
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 187.59 1,010.84 1,129.32 581.94 2,909.68
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 199.06 1,238.10 1,884.39 830.39 4,151.94
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 229.02 1,164.69 3,583.05 1,244.19 6,220.95
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 285.50 1,437.80 5,263.85 1,746.79 8,733.95
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 369.48 1,599.92 7,355.88 2,331.32 11,656.60
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 432.40 1,942.76 9,976.47 3,087.91 15,439.54
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 513.68 2,266.55 14,035.41 4,203.91 21,019.56
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 80.98 128.44 340.49 137.48 687.39
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 773.04 661.98 3,804.83 1,309.96 6,549.82
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 5.10 - 120.81 31.48 157.38
508a BRICK PAVING (SINGLE COURSE) SM 101.23 35.32 298.25 108.70 543.50
508b BRICK PAVING (DOUBLE COURSE) SM 180.76 35.32 593.44 202.38 1,011.89
Page 31
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Buneer
Buneer District Code: 7-A
509d GROUTED RIP RAP CLASS "A" CM 540.84 110.32 1,871.46 630.65 3,153.27
509e GROUTED RIP RAP CLASS "B" CM 521.30 88.25 1,710.43 580.00 2,899.99
509f GROUTED RIP RAP CLASS "C" CM 513.95 73.54 1,758.82 586.58 2,932.89
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 750.93 381.27 4,416.66 1,387.21 6,936.07
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 41.47 207.33 368.32 154.28 771.40
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 141.31 72.87 56.55 67.68 338.42
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 180.88 93.28 72.39 86.64 433.18
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 230.89 194.75 377.32 200.74 1,003.70
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 288.61 243.44 471.66 250.93 1,254.63
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 280.93 613.92 2,333.98 807.21 4,036.03
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 912.38 711.97 4,321.15 1,486.37 7,431.87
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 132.05 97.09 452.55 170.42 852.11
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 23.35 - 1,221.53 311.22 1,556.10
604d STEEL POST OF METAL GUARD RAIL EACH 84.69 996.27 3,851.83 1,233.20 6,165.99
605a CONCRETE BEAM GUARD RAIL M 62.15 31.44 603.55 174.29 871.43
605c CONCRETE POST FOR GUARD RAIL M 76.31 27.91 603.31 176.88 884.41
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 200.77 260.25 6,990.19 1,862.80 9,314.02
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 65.01 390.38 9,432.97 2,472.09 12,360.45
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 200.77 552.72 12,108.52 3,215.50 16,077.52
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 613.45 610.62 21,352.47 5,644.13 28,220.67
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 122.69 122.12 9,391.72 2,409.13 12,045.67
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.50 5.98 16.49 6.24 31.20
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.83 4.11 40.51 11.36 56.81
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.50 5.98 22.00 7.62 38.10
LINES OF 20 cm WIDTH
Page 32
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Buneer
Buneer District Code: 7-A
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.83 4.11 54.03 14.74 73.71
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 70.14 5.32 159.35 58.70 293.50
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 70.14 10.18 510.48 147.70 738.50
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.12 8.76 22.93 8.70 43.52
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.12 9.82 68.85 20.45 102.25
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.12 7.09 30.58 10.20 50.98
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.12 9.82 91.81 26.19 130.94
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 70.14 3.80 221.42 73.84 369.20
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 70.14 8.06 868.22 236.60 1,183.02
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 58.42 3.80 106.23 42.11 210.56
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 58.42 8.06 340.84 101.83 509.14
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 58.42 3.80 147.61 52.46 262.29
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 58.42 8.06 579.69 161.54 807.71
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 9.17 83.25 197.71 72.53 362.66
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 9.17 83.25 238.51 82.73 413.67
DOUBLE)
610b RIGHT OF WAY MARKER EACH 84.33 123.75 303.75 127.96 639.79
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 537.79 995.83 2,040.17 893.45 4,467.24
610d TEN KILOMETRE POST EACH 1,028.70 1,991.66 4,484.05 1,876.10 9,380.52
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT M 123.92 95.67 983.15 300.68 1,503.42
WITH PRECAST PRESTRESSED R.C.C. POST
Page 33
.
Page 34
NATIONAL HIGHWAY AUTHORITY
BUTTGRAM
(07-B)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 35
.
Page 36
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Buttgram
Buttgram District Code: 7-B
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 8.32 190.65 1.28 50.06 250.32
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 23.27 502.19 2.89 132.09 660.44
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 93.09 2,008.78 11.56 528.36 2,641.78
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 161.10 347.93 55.90 141.23 706.16
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 21.39 371.79 - 98.30 491.48
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 14.09 288.63 - 75.68 378.40
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 161.10 347.93 55.90 141.23 706.16
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 25.82 347.63 - 93.36 466.82
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 10.82 290.32 - 75.28 376.42
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 9.12 151.36 0.42 40.23 201.13
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 71.46 315.83 77.89 116.29 581.46
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 143.47 469.72 37.27 162.61 813.07
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 121.06 321.79 - 110.71 553.56
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 73.78 262.75 - 84.13 420.67
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 8.59 192.18 5.60 51.59 257.97
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 24.45 530.73 59.45 153.66 768.28
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 18.34 458.38 2.66 119.85 599.23
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 9.61 195.20 8.73 53.39 266.93
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 7.59 83.95 5.60 24.28 121.42
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 16.98 121.32 3.33 35.41 177.03
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.71 30.07 1.60 8.35 41.73
Page 37
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Buttgram
Buttgram District Code: 7-B
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.22 20.03 0.85 5.52 27.62
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.98 16.79 0.87 4.66 23.30
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.46 17.13 0.99 4.89 24.46
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 80.37 1,615.88 6,459.09 2,038.83 10,194.17
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 83.88 1,615.88 6,897.41 2,149.29 10,746.46
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 89.49 1,687.69 6,448.52 2,056.43 10,282.13
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 89.49 1,681.30 7,053.73 2,206.13 11,030.65
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 286.50 979.45 56,312.93 14,394.72 71,973.60
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 286.50 979.45 54,624.34 13,972.57 69,862.86
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 97.62 120.69 1,004.34 305.66 1,528.32
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 169.85 2,608.60 6,106.46 2,221.23 11,106.14
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 108.02 135.11 834.88 269.50 1,347.52
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 2.03 48.19 1.34 12.89 64.45
207b DEEP PATCHING (16-30 cm) SM 2.03 42.45 1.34 11.46 57.28
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.45 118.35 0.73 30.38 151.92
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.49 23.67 0.15 6.08 30.38
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.36 1.68 39.97 10.50 52.52
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.35 1.68 44.61 11.66 58.31
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.15 0.62 16.73 4.37 21.87
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.15 0.62 19.51 5.07 25.35
Page 38
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Buttgram
Buttgram District Code: 7-B
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 77.57 1,593.58 7,567.55 2,309.68 11,548.38
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 77.57 1,538.91 8,169.44 2,446.48 12,232.39
"B")
307a DENSE GRADED HOT BIT-MAC CM 187.95 406.36 6,283.20 1,719.38 8,596.88
307b OPEN GRADED HOT BIT-MAC CM 187.95 406.36 6,094.61 1,672.23 8,361.15
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 32.28 631.99 2,210.92 718.80 3,593.99
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 29.72 696.25 47,824.81 12,137.69 60,688.47
401a1i CONCRETE CLASS "A1" (Underground) CM 555.90 1,112.93 4,287.33 1,489.04 7,445.20
401a1ii CONCRETE CLASS "A1" (On ground) CM 555.90 1,112.93 4,578.67 1,561.88 7,809.38
401a1iii CONCRETE CLASS "A1" (Elevated) CM 555.90 1,112.93 5,161.36 1,707.55 8,537.74
401a2i CONCRETE CLASS "A2" (Underground) CM 555.90 1,112.93 4,684.23 1,588.26 7,941.32
401a2ii CONCRETE CLASS "A2" (On ground) CM 555.90 1,112.93 4,975.57 1,661.10 8,305.50
401a2iii CONCRETE CLASS "A2" (Elevated) CM 555.90 1,112.93 5,558.26 1,806.77 9,033.87
401a3i CONCRETE CLASS "A3" (Underground) CM 555.90 1,112.93 5,081.13 1,687.49 8,437.45
401a3ii CONCRETE CLASS "A3" (On ground) CM 555.90 1,112.93 5,372.47 1,760.33 8,801.63
401a3iii CONCRETE CLASS "A3" (Elevated) CM 555.90 1,112.93 5,955.16 1,906.00 9,529.99
401ci CONCRETE CLASS "C" (Underground) CM 534.61 525.57 3,815.35 1,218.89 6,094.43
401cii CONCRETE CLASS "C" (On ground) CM 534.61 525.57 3,939.61 1,249.95 6,249.75
401ciii CONCRETE CLASS "C" (Elevated) CM 534.61 525.57 4,188.13 1,312.08 6,560.40
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,798.96 994.51 5,354.15 2,036.90 10,184.52
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,798.96 994.51 6,147.95 2,235.35 11,176.77
401gii PRECAST CONCRETE CLASS "B" CM 1,798.96 994.51 5,067.11 1,965.14 9,825.72
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,798.96 994.51 6,544.85 2,334.58 11,672.89
Page 39
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Buttgram
Buttgram District Code: 7-B
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,798.96 994.51 6,941.75 2,433.80 12,169.02
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,798.96 994.51 7,338.65 2,533.03 12,665.14
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,629.09 820.55 64,412.78 16,715.60 83,578.01
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,629.09 820.55 72,130.28 18,644.98 93,224.89
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,342.11 5,663.50 59,879.17 16,721.20 83,605.98
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 3,217.96 16,442.00 140,626.65 40,071.65 200,358.27
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 119.30 - 321.05 110.09 550.44
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 119.30 - 319.98 109.82 549.10
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.23 0.56 2.81
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 22.84 73.17 124.01 55.00 275.02
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 386.35 1,736.74 1,042.27 791.34 3,956.71
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 579.53 2,605.12 1,563.40 1,187.01 5,935.06
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 579.53 2,605.12 1,145.90 1,082.64 5,413.18
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 965.88 4,341.86 1,333.34 1,660.27 8,301.34
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 827.90 5,129.19 1,523.70 1,870.19 9,350.97
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,448.82 7,255.27 1,675.73 2,594.95 12,974.76
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 23,946.10 48,057.77 108,824.75 45,207.15 226,035.77
407i PILE LOAD TEST UP TO 240 TON EACH 43,488.04 48,057.77 217,649.50 77,298.83 386,494.13
407j PILE LOAD TEST UP TO 360 TON EACH 63,029.97 52,697.80 326,474.25 110,550.51 552,752.54
407k CONFIRMATORY BORING (NX SIZE) M 212.17 1,661.12 6.68 470.00 2,349.98
411a STONE MASONRY RANDOM DRY CM 296.27 113.36 612.69 255.58 1,277.91
411b STONE MASONRY RANDOM WITH MORTAR CM 319.95 175.02 1,798.90 573.47 2,867.33
411c STONE MASONRY DRESSED UNCOURSED DRY CM 387.05 113.36 679.66 295.02 1,475.08
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 456.11 175.02 1,850.32 620.36 3,101.81
Page 40
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Buttgram
Buttgram District Code: 7-B
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 613.99 277.29 1,750.77 660.51 3,302.57
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 241.34 472.48 698.36 353.05 1,765.23
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 233.43 623.36 905.09 440.47 2,202.35
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 235.72 1,010.84 1,160.32 601.72 3,008.59
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 244.74 1,238.10 1,731.79 803.66 4,018.30
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 285.25 1,164.69 2,487.41 984.34 4,921.68
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 358.75 1,437.80 3,911.95 1,427.13 7,135.63
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 464.26 1,599.92 5,063.15 1,781.83 8,909.16
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 546.35 1,942.76 6,451.82 2,235.23 11,176.17
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 649.33 2,266.55 9,962.70 3,219.65 16,098.23
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 241.34 547.92 786.84 394.03 1,970.14
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 233.43 623.36 925.42 445.55 2,227.76
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 230.69 1,010.84 1,132.87 593.60 2,967.99
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 244.74 1,238.10 1,887.62 842.62 4,213.08
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 285.25 1,164.69 3,587.66 1,259.40 6,297.00
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 358.75 1,437.80 5,269.85 1,766.60 8,833.00
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 464.26 1,599.92 7,361.85 2,356.51 11,782.54
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 546.35 1,942.76 9,983.72 3,118.21 15,591.04
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 649.33 2,266.55 14,043.87 4,239.94 21,199.69
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 97.83 128.44 473.70 174.99 874.96
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 838.70 661.98 3,939.75 1,360.11 6,800.55
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 5.99 - 118.20 31.05 155.23
508a BRICK PAVING (SINGLE COURSE) SM 119.28 35.32 247.26 100.46 502.32
508b BRICK PAVING (DOUBLE COURSE) SM 212.65 35.32 490.06 184.51 922.53
Page 41
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Buttgram
Buttgram District Code: 7-B
509d GROUTED RIP RAP CLASS "A" CM 635.20 110.32 2,102.01 711.88 3,559.40
509e GROUTED RIP RAP CLASS "B" CM 611.27 88.25 1,934.26 658.45 3,292.23
509f GROUTED RIP RAP CLASS "C" CM 602.76 73.54 1,985.98 665.57 3,327.86
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 846.94 381.27 4,544.21 1,443.10 7,215.52
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 51.38 207.33 489.54 187.06 935.32
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 162.85 72.87 85.77 80.37 401.87
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 208.45 93.28 109.78 102.88 514.39
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 265.28 194.75 424.50 221.13 1,105.67
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 331.60 243.44 530.63 276.42 1,382.08
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 300.75 613.92 2,444.21 839.72 4,198.59
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 1,006.80 711.97 4,458.68 1,544.36 7,721.82
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 146.78 97.09 473.13 179.25 896.25
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 25.05 - 1,221.53 311.64 1,558.22
604d STEEL POST OF METAL GUARD RAIL EACH 97.45 996.27 3,851.83 1,236.39 6,181.93
605a CONCRETE BEAM GUARD RAIL M 73.31 31.44 614.71 179.86 899.32
605c CONCRETE POST FOR GUARD RAIL M 90.01 27.91 616.63 183.64 918.18
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 247.33 260.25 7,005.46 1,878.26 9,391.30
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 67.04 390.38 9,470.67 2,482.02 12,410.10
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 247.33 552.72 12,172.27 3,243.08 16,215.41
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 769.36 610.62 21,458.42 5,709.60 28,548.00
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 153.87 122.12 9,426.66 2,425.67 12,128.33
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.74 5.98 16.51 6.31 31.53
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.91 4.11 40.65 11.42 57.10
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.74 5.98 22.02 7.68 38.42
LINES OF 20 cm WIDTH
Page 42
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Buttgram
Buttgram District Code: 7-B
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.91 4.11 54.22 14.81 74.06
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 72.75 5.32 159.49 59.39 296.95
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 72.75 10.18 512.30 148.81 744.05
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.42 8.76 22.95 8.78 43.91
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.42 9.82 68.85 20.53 102.63
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.42 7.09 30.60 10.28 51.39
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.42 9.82 91.81 26.26 131.32
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 72.75 3.80 221.56 74.53 372.64
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 72.75 8.06 868.22 237.26 1,186.29
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 60.82 3.80 106.32 42.74 213.68
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 60.82 8.06 342.05 102.73 513.66
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 60.82 3.80 147.71 53.08 265.41
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 60.82 8.06 579.69 162.14 810.70
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 8.74 83.25 197.81 72.45 362.25
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 8.74 83.25 238.61 82.65 413.25
DOUBLE)
610b RIGHT OF WAY MARKER EACH 101.67 123.75 313.42 134.71 673.55
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 626.15 995.83 2,123.30 936.32 4,681.60
610d TEN KILOMETRE POST EACH 1,200.07 1,991.66 4,647.61 1,959.84 9,799.18
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT M 135.90 95.67 992.09 305.92 1,529.59
WITH PRECAST PRESTRESSED R.C.C. POST
Page 43
.
Page 44
NATIONAL HIGHWAY AUTHORITY
CHITRAL
(10)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 45
.
Page 46
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Chitral
Chitral District Code: 10
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 7.36 194.12 1.31 50.70 253.49
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 20.54 511.33 2.94 133.70 668.51
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 82.16 2,045.30 11.77 534.81 2,674.04
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 142.37 354.26 56.92 138.39 691.93
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 19.30 378.55 - 99.46 497.32
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 12.83 293.88 - 76.68 383.38
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 142.37 354.26 56.92 138.39 691.93
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 22.68 353.95 - 94.16 470.79
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 9.84 295.59 - 76.36 381.79
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 8.55 154.11 0.43 40.77 203.86
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 68.93 321.57 79.30 117.45 587.25
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 126.00 478.26 37.95 160.55 802.75
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 106.22 327.64 - 108.46 542.32
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 64.80 267.53 - 83.08 415.41
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 7.87 195.67 5.70 52.31 261.56
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 22.18 540.38 60.53 155.77 778.85
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 16.63 466.72 2.71 121.51 607.57
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 8.75 198.75 8.89 54.10 270.49
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 7.04 85.47 5.70 24.55 122.77
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 15.62 123.52 3.39 35.63 178.17
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.56 30.62 1.63 8.45 42.26
Page 47
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Chitral
Chitral District Code: 10
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.14 20.39 0.87 5.60 28.00
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.92 17.09 0.89 4.73 23.63
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.40 17.44 1.00 4.96 24.80
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 70.53 1,646.08 6,879.12 2,148.93 10,744.66
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 73.44 1,646.08 7,369.31 2,272.21 11,361.03
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 79.10 1,719.24 6,867.81 2,166.54 10,832.68
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 79.10 1,712.72 7,534.06 2,331.47 11,657.36
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 261.51 997.76 60,681.42 15,485.17 77,425.87
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 261.51 997.76 58,961.26 15,055.13 75,275.67
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 86.75 122.95 1,075.60 321.32 1,606.62
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 150.85 2,657.36 6,494.39 2,325.65 11,628.25
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 94.85 137.64 834.25 266.69 1,333.43
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 1.90 49.09 1.37 13.09 65.45
207b DEEP PATCHING (16-30 cm) SM 1.90 43.25 1.37 11.63 58.15
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.43 120.57 0.74 30.94 154.68
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.49 24.11 0.15 6.19 30.94
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.32 1.72 43.07 11.28 56.38
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.31 1.72 48.07 12.53 62.63
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.13 0.63 18.02 4.70 23.48
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.13 0.63 21.03 5.45 27.24
Page 48
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Chitral
Chitral District Code: 10
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 68.06 1,623.37 8,092.64 2,446.02 12,230.08
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 68.06 1,567.67 8,743.32 2,594.76 12,973.81
"B")
307a DENSE GRADED HOT BIT-MAC CM 164.59 413.95 6,758.19 1,834.18 9,170.91
307b OPEN GRADED HOT BIT-MAC CM 164.59 413.95 6,568.69 1,786.81 8,934.03
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 29.03 643.80 2,341.02 753.46 3,767.31
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 26.27 709.26 52,133.13 13,217.16 66,085.82
401a1i CONCRETE CLASS "A1" (Underground) CM 569.68 1,165.93 4,423.58 1,539.80 7,698.99
401a1ii CONCRETE CLASS "A1" (On ground) CM 569.68 1,165.93 4,728.80 1,616.10 8,080.51
401a1iii CONCRETE CLASS "A1" (Elevated) CM 569.68 1,165.93 5,339.24 1,768.71 8,843.56
401a2i CONCRETE CLASS "A2" (Underground) CM 569.68 1,165.93 4,839.38 1,643.75 8,218.74
401a2ii CONCRETE CLASS "A2" (On ground) CM 569.68 1,165.93 5,144.60 1,720.05 8,600.26
401a2iii CONCRETE CLASS "A2" (Elevated) CM 569.68 1,165.93 5,755.04 1,872.66 9,363.31
401a3i CONCRETE CLASS "A3" (Underground) CM 569.68 1,165.93 5,255.18 1,747.70 8,738.49
401a3ii CONCRETE CLASS "A3" (On ground) CM 569.68 1,165.93 5,560.40 1,824.00 9,120.01
401a3iii CONCRETE CLASS "A3" (Elevated) CM 569.68 1,165.93 6,170.84 1,976.61 9,883.06
401ci CONCRETE CLASS "C" (Underground) CM 546.01 550.60 3,954.63 1,262.81 6,314.05
401cii CONCRETE CLASS "C" (On ground) CM 546.01 550.60 4,084.80 1,295.35 6,476.77
401ciii CONCRETE CLASS "C" (Elevated) CM 546.01 550.60 4,345.16 1,360.44 6,802.21
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,801.80 1,041.87 5,531.38 2,093.76 10,468.81
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,801.80 1,041.87 6,362.98 2,301.66 11,508.31
401gii PRECAST CONCRETE CLASS "B" CM 1,801.80 1,041.87 5,275.03 2,029.67 10,148.37
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,801.80 1,041.87 6,778.78 2,405.61 12,028.06
Page 49
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Chitral
Chitral District Code: 10
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,801.80 1,041.87 7,194.58 2,509.56 12,547.81
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,801.80 1,041.87 7,610.38 2,613.51 13,067.56
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,716.12 859.62 67,625.80 17,550.39 87,751.93
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,716.12 859.62 75,710.80 19,571.64 97,858.18
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,393.08 5,933.20 62,696.24 17,505.63 87,528.14
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 2,891.00 17,224.95 147,314.08 41,857.51 209,287.54
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 120.09 - 337.83 114.48 572.39
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 120.09 - 336.90 114.25 571.23
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.33 0.59 2.94
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 20.92 76.65 129.94 56.88 284.39
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 358.17 1,819.45 1,192.20 842.45 4,212.27
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 537.25 2,729.17 1,788.30 1,263.68 6,318.40
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 537.25 2,729.17 1,300.52 1,141.74 5,708.68
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 895.42 4,548.62 1,496.48 1,735.13 8,675.64
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 767.50 5,373.43 1,695.62 1,959.14 9,795.69
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,343.13 7,600.76 1,867.25 2,702.78 13,513.92
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 21,389.84 50,346.23 103,772.22 43,877.07 219,385.36
407i PILE LOAD TEST UP TO 240 TON EACH 38,940.59 50,346.23 207,544.44 74,207.81 371,039.07
407j PILE LOAD TEST UP TO 360 TON EACH 56,491.34 55,207.22 311,316.65 105,753.80 528,769.02
407k CONFIRMATORY BORING (NX SIZE) M 192.86 1,740.22 7.00 485.02 2,425.11
411a STONE MASONRY RANDOM DRY CM 297.37 118.76 473.31 222.36 1,111.80
411b STONE MASONRY RANDOM WITH MORTAR CM 322.39 183.35 1,653.97 539.93 2,699.64
411c STONE MASONRY DRESSED UNCOURSED DRY CM 386.42 118.76 529.98 258.79 1,293.94
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 455.96 183.35 1,709.86 587.29 2,936.47
Page 50
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Chitral
Chitral District Code: 10
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 609.03 290.49 1,605.57 626.27 3,131.37
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 218.18 481.23 709.35 352.19 1,760.95
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 211.13 634.90 919.53 441.39 2,206.95
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 214.93 1,029.55 1,179.10 605.89 3,029.47
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 221.98 1,261.03 1,760.69 810.93 4,054.63
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 256.43 1,186.26 2,530.30 993.25 4,966.23
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 320.85 1,464.43 3,979.82 1,441.27 7,206.37
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 415.22 1,629.55 5,152.35 1,799.28 8,996.39
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 486.32 1,978.74 6,565.76 2,257.71 11,288.53
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 579.20 2,308.53 10,140.73 3,257.12 16,285.58
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 218.18 558.07 797.54 393.45 1,967.23
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 211.13 634.90 940.23 446.56 2,232.82
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 209.51 1,029.55 1,151.14 597.55 2,987.75
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 221.98 1,261.03 1,920.11 850.78 4,253.90
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 256.43 1,186.26 3,650.57 1,273.31 6,366.57
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 320.85 1,464.43 5,362.86 1,787.03 8,935.17
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 415.22 1,629.55 7,493.62 2,384.60 11,922.99
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 486.32 1,978.74 10,163.07 3,157.03 15,785.16
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 579.20 2,308.53 14,297.48 4,296.30 21,481.51
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 87.97 130.82 377.80 149.15 745.74
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 818.35 674.24 3,976.86 1,367.36 6,836.81
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 5.58 - 119.56 31.28 156.42
508a BRICK PAVING (SINGLE COURSE) SM 112.77 35.97 364.11 128.21 641.06
508b BRICK PAVING (DOUBLE COURSE) SM 201.82 35.97 724.84 240.66 1,203.28
Page 51
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Chitral
Chitral District Code: 10
509d GROUTED RIP RAP CLASS "A" CM 602.27 112.36 1,933.60 662.06 3,310.29
509e GROUTED RIP RAP CLASS "B" CM 580.87 89.89 1,768.13 609.72 3,048.61
509f GROUTED RIP RAP CLASS "C" CM 573.10 74.91 1,818.02 616.51 3,082.53
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 813.36 388.33 4,594.72 1,449.10 7,245.50
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 46.45 211.17 408.19 166.45 832.26
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 155.67 74.22 59.97 72.47 362.33
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 199.26 95.01 76.76 92.76 463.78
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 254.90 198.35 401.16 213.60 1,068.01
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 318.62 247.94 501.45 267.00 1,335.02
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 310.99 648.78 2,549.31 877.27 4,386.35
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 1,019.28 745.57 4,674.05 1,609.73 8,048.63
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 147.67 102.44 492.96 185.77 928.83
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 22.64 - 1,233.50 314.04 1,570.18
604d STEEL POST OF METAL GUARD RAIL EACH 85.54 1,006.03 3,889.60 1,245.29 6,226.46
605a CONCRETE BEAM GUARD RAIL M 67.92 31.75 618.76 179.61 898.03
605c CONCRETE POST FOR GUARD RAIL M 83.40 28.18 620.14 182.93 914.65
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 225.02 262.80 7,073.94 1,890.44 9,452.21
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 69.06 394.21 9,551.21 2,503.62 12,518.10
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 225.02 558.14 12,270.23 3,263.35 16,316.74
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 690.55 616.60 21,630.70 5,734.46 28,672.31
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 138.11 123.32 9,504.22 2,441.41 12,207.06
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.66 6.03 16.66 6.34 31.70
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.89 4.15 41.00 11.51 57.55
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.66 6.03 22.23 7.73 38.66
LINES OF 20 cm WIDTH
Page 52
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Chitral
Chitral District Code: 10
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.89 4.15 54.69 14.93 74.66
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 75.22 5.37 161.01 60.40 301.99
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 75.22 10.28 516.71 150.55 752.77
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.33 8.85 23.17 8.84 44.18
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.33 9.92 69.53 20.69 103.47
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.33 7.16 30.89 10.34 51.72
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.33 9.92 92.71 26.49 132.44
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 75.22 3.84 223.69 75.69 378.43
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 75.22 8.13 876.74 240.02 1,200.11
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 62.44 3.84 107.34 43.40 217.02
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 62.44 8.13 345.00 103.89 519.46
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 62.44 3.84 149.13 53.85 269.25
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 62.44 8.13 585.37 163.99 819.93
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 9.64 84.07 199.68 73.35 366.73
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 9.64 84.06 240.87 83.65 418.23
DOUBLE)
610b RIGHT OF WAY MARKER EACH 92.32 124.97 313.83 132.78 663.89
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 591.34 1,005.59 2,121.89 929.71 4,648.53
610d TEN KILOMETRE POST EACH 1,131.56 2,011.19 4,651.41 1,948.54 9,742.70
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT M 132.91 99.10 1,014.27 311.57 1,557.85
WITH PRECAST PRESTRESSED R.C.C. POST
Page 53
.
Page 54
NATIONAL HIGHWAY AUTHORITY
CHARSADDAH
(10-A)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 55
.
Page 56
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Charsaddah
Charsaddah District Code: 10-A
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 5.84 173.32 1.17 45.08 225.41
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 16.35 456.54 2.63 118.88 594.39
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 65.38 1,826.16 10.51 475.51 2,377.57
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 106.99 316.30 50.82 118.53 592.64
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 14.34 337.99 - 88.08 440.42
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 9.41 262.40 - 67.95 339.76
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 106.99 316.30 50.82 118.53 592.64
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 17.03 316.03 - 83.27 416.33
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 7.29 263.92 - 67.80 339.02
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 6.46 137.60 0.42 36.12 180.60
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 53.51 287.11 70.80 102.86 514.29
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 94.63 427.01 33.88 138.88 694.40
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 79.59 292.53 - 93.03 465.16
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 48.67 238.86 - 71.88 359.41
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 5.86 174.71 5.59 46.54 232.70
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 16.75 482.48 54.36 138.40 691.99
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 12.56 416.71 2.66 107.98 539.91
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 6.57 177.46 8.44 48.12 240.59
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 5.26 76.32 5.59 21.79 108.97
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 11.89 110.29 3.32 31.38 156.88
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.17 27.34 1.60 7.53 37.64
Page 57
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Charsaddah
Charsaddah District Code: 10-A
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 0.86 18.21 0.85 4.98 24.90
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.71 15.26 0.87 4.21 21.05
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.06 15.57 0.97 4.40 22.00
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 56.28 1,510.17 5,991.72 1,889.54 9,447.70
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 58.42 1,510.17 6,404.20 1,993.20 9,965.99
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 62.55 1,577.28 5,981.81 1,905.41 9,527.06
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 62.55 1,571.31 6,550.19 2,046.01 10,230.06
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 200.32 915.38 52,507.71 13,405.85 67,029.26
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 200.32 915.38 50,929.58 13,011.32 65,056.59
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 70.86 112.80 916.96 275.15 1,375.76
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 118.58 2,437.94 5,669.56 2,056.52 10,282.60
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 77.49 126.27 816.11 254.97 1,274.84
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 1.47 45.04 1.38 11.97 59.86
207b DEEP PATCHING (16-30 cm) SM 1.47 39.67 1.38 10.63 53.16
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.87 110.61 0.75 28.31 141.54
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.37 22.12 0.15 5.66 28.31
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.25 1.57 37.27 9.77 48.86
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.24 1.57 41.60 10.85 54.27
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.10 0.58 15.60 4.07 20.35
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.10 0.58 18.20 4.72 23.59
Page 58
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Charsaddah
Charsaddah District Code: 10-A
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 53.81 1,489.33 7,025.82 2,142.24 10,711.19
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 53.81 1,438.23 7,584.47 2,269.13 11,345.64
"B")
307a DENSE GRADED HOT BIT-MAC CM 132.34 379.77 5,826.50 1,584.65 7,923.26
307b OPEN GRADED HOT BIT-MAC CM 132.34 379.77 5,655.06 1,541.79 7,708.96
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 23.64 590.65 2,059.20 668.37 3,341.86
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 21.30 650.70 44,571.28 11,310.82 56,554.10
401a1i CONCRETE CLASS "A1" (Underground) CM 468.85 1,059.94 4,014.71 1,385.87 6,929.37
401a1ii CONCRETE CLASS "A1" (On ground) CM 468.85 1,059.94 4,292.18 1,455.24 7,276.21
401a1iii CONCRETE CLASS "A1" (Elevated) CM 468.85 1,059.94 4,847.13 1,593.98 7,969.89
401a2i CONCRETE CLASS "A2" (Underground) CM 468.85 1,059.94 4,392.71 1,480.37 7,401.87
401a2ii CONCRETE CLASS "A2" (On ground) CM 468.85 1,059.94 4,670.18 1,549.74 7,748.71
401a2iii CONCRETE CLASS "A2" (Elevated) CM 468.85 1,059.94 5,225.13 1,688.48 8,442.39
401a3i CONCRETE CLASS "A3" (Underground) CM 468.85 1,059.94 4,770.71 1,574.87 7,874.37
401a3ii CONCRETE CLASS "A3" (On ground) CM 468.85 1,059.94 5,048.18 1,644.24 8,221.21
401a3iii CONCRETE CLASS "A3" (Elevated) CM 468.85 1,059.94 5,603.13 1,782.98 8,914.89
401ci CONCRETE CLASS "C" (Underground) CM 454.48 500.55 3,547.05 1,125.52 5,627.60
401cii CONCRETE CLASS "C" (On ground) CM 454.48 500.55 3,665.40 1,155.11 5,775.53
401ciii CONCRETE CLASS "C" (Elevated) CM 454.48 500.55 3,902.08 1,214.28 6,071.38
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,506.02 947.15 5,016.28 1,867.36 9,336.81
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,506.02 947.15 5,772.28 2,056.36 10,281.81
401gii PRECAST CONCRETE CLASS "B" CM 1,506.02 947.15 4,751.22 1,801.10 9,005.49
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,506.02 947.15 6,150.28 2,150.86 10,754.31
Page 59
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Charsaddah
Charsaddah District Code: 10-A
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,506.02 947.15 6,528.28 2,245.36 11,226.81
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,506.02 947.15 6,906.28 2,339.86 11,699.31
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,445.71 781.47 60,206.00 15,608.29 78,041.47
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,445.71 781.47 67,556.00 17,445.79 87,228.97
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,160.29 5,393.81 56,000.99 15,638.77 78,193.86
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 2,470.45 15,659.05 133,860.62 37,997.53 189,987.65
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 99.62 - 302.98 100.65 503.25
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 99.62 - 302.17 100.45 502.24
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.01 - 2.12 0.53 2.67
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 16.50 69.68 117.83 51.00 255.01
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 319.83 1,654.04 719.98 673.46 3,367.32
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 479.75 2,481.06 1,079.97 1,010.20 5,050.98
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 479.75 2,481.06 819.36 945.04 4,725.21
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 799.58 4,135.11 999.57 1,483.56 7,417.82
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 685.35 4,884.94 1,182.08 1,688.09 8,440.47
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,199.37 6,909.78 1,293.47 2,350.65 11,753.27
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 17,317.36 45,769.30 99,000.62 40,521.82 202,609.10
407i PILE LOAD TEST UP TO 240 TON EACH 31,756.11 45,769.30 198,001.24 68,881.66 344,408.31
407j PILE LOAD TEST UP TO 360 TON EACH 46,194.85 50,188.38 297,001.86 98,346.27 491,731.37
407k CONFIRMATORY BORING (NX SIZE) M 167.58 1,582.02 6.99 439.15 2,195.74
411a STONE MASONRY RANDOM DRY CM 243.26 107.96 573.28 231.13 1,155.63
411b STONE MASONRY RANDOM WITH MORTAR CM 264.33 166.68 1,641.05 518.01 2,590.07
411c STONE MASONRY DRESSED UNCOURSED DRY CM 317.48 107.96 639.90 266.33 1,331.66
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 375.64 166.68 1,709.41 562.93 2,814.67
Page 60
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Charsaddah
Charsaddah District Code: 10-A
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 503.00 264.08 1,614.60 595.42 2,977.11
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 178.12 437.48 645.37 315.24 1,576.22
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 172.55 577.19 836.46 396.55 1,982.75
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 172.97 935.96 1,072.53 545.36 2,726.82
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 179.12 1,146.39 1,601.53 731.76 3,658.79
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 205.91 1,078.41 2,301.17 896.37 4,481.86
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 256.66 1,331.30 3,619.29 1,301.81 6,509.06
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 332.15 1,481.41 4,685.73 1,624.82 8,124.11
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 388.28 1,798.85 5,971.03 2,039.54 10,197.71
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 462.34 2,098.66 9,221.37 2,945.59 14,727.96
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 178.12 507.33 725.36 352.70 1,763.52
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 172.55 577.19 855.28 401.25 2,006.27
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 168.04 935.96 1,047.11 537.78 2,688.89
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 179.12 1,146.39 1,746.12 767.91 3,839.54
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 205.91 1,078.41 3,319.79 1,151.03 5,755.14
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 256.66 1,331.30 4,876.60 1,616.14 8,080.70
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 332.15 1,481.41 6,814.16 2,156.93 10,784.65
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 388.28 1,798.85 9,241.31 2,857.11 14,285.56
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 462.34 2,098.66 13,000.23 3,890.31 19,451.54
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 70.99 118.93 407.53 149.36 746.81
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 672.70 612.95 3,562.17 1,211.95 6,059.77
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 4.52 - 109.50 28.50 142.52
508a BRICK PAVING (SINGLE COURSE) SM 92.92 32.70 237.66 90.82 454.10
508b BRICK PAVING (DOUBLE COURSE) SM 167.13 32.70 471.68 167.88 839.39
Page 61
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Charsaddah
Charsaddah District Code: 10-A
509d GROUTED RIP RAP CLASS "A" CM 497.87 102.14 1,897.44 624.36 3,121.82
509e GROUTED RIP RAP CLASS "B" CM 480.93 81.72 1,746.29 577.24 2,886.18
509f GROUTED RIP RAP CLASS "C" CM 474.99 68.10 1,792.68 583.94 2,919.71
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 676.71 353.02 4,126.08 1,288.95 6,444.77
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 37.12 191.97 382.69 152.95 764.74
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 127.80 67.48 77.75 68.26 341.29
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 163.59 86.37 99.52 87.37 436.85
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 210.12 180.32 379.74 192.55 962.73
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 262.65 225.40 474.67 240.68 1,203.41
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 248.44 572.25 2,246.49 766.80 3,833.98
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 828.62 670.54 4,100.42 1,399.89 6,999.46
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 119.93 90.27 433.90 161.02 805.12
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 21.98 - 1,197.58 304.89 1,524.45
604d STEEL POST OF METAL GUARD RAIL EACH 76.62 976.73 3,776.31 1,207.42 6,037.08
605a CONCRETE BEAM GUARD RAIL M 60.29 30.82 594.68 171.45 857.25
605c CONCRETE POST FOR GUARD RAIL M 74.03 27.36 595.43 174.21 871.03
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 192.65 255.15 6,846.80 1,823.65 9,118.26
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 60.66 382.72 9,242.62 2,421.50 12,107.51
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 192.65 541.89 11,862.24 3,149.19 15,745.97
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 600.00 598.64 20,913.67 5,528.08 27,640.39
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 120.00 119.73 9,193.99 2,358.43 11,792.15
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.25 5.86 16.16 6.07 30.33
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.75 4.03 39.61 11.10 55.48
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.25 5.86 21.56 7.42 37.08
LINES OF 20 cm WIDTH
Page 62
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Charsaddah
Charsaddah District Code: 10-A
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.75 4.03 52.83 14.40 72.01
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 67.36 5.22 156.12 57.17 285.87
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 67.36 9.98 499.15 144.12 720.61
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 2.81 8.59 22.47 8.47 42.34
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 2.81 9.63 67.50 19.99 99.93
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 2.81 6.95 29.96 9.93 49.65
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 2.81 9.63 90.01 25.61 128.06
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 67.36 3.73 216.98 72.02 360.08
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 67.36 7.90 851.20 231.61 1,158.07
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 55.87 3.73 104.08 40.92 204.59
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 55.87 7.90 333.27 99.26 496.29
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 55.87 3.73 144.65 51.06 255.31
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 55.87 7.90 568.32 158.02 790.11
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 8.29 81.62 193.85 70.94 354.70
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 8.29 81.62 233.85 80.94 404.70
DOUBLE)
610b RIGHT OF WAY MARKER EACH 81.54 121.33 302.80 126.42 632.08
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 521.25 976.31 2,036.05 883.40 4,417.02
610d TEN KILOMETRE POST EACH 996.55 1,952.61 4,467.86 1,854.26 9,271.28
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT M 113.81 91.00 953.30 289.53 1,447.65
WITH PRECAST PRESTRESSED R.C.C. POST
Page 63
.
Page 64
NATIONAL HIGHWAY AUTHORITY
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 65
.
Page 66
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Dera
Dera Ismail
Ismail Khan
Khan District Code: 12
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 6.89 173.32 1.17 45.34 226.72
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 19.32 456.54 2.63 119.62 598.11
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 77.29 1,826.16 10.51 478.49 2,392.46
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 121.49 316.30 50.82 122.15 610.77
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 16.01 337.99 - 88.50 442.50
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 10.41 262.40 - 68.20 341.01
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 121.49 316.30 50.82 122.15 610.77
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 19.35 316.03 - 83.85 419.23
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 8.11 263.92 - 68.01 340.04
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 7.33 137.60 0.38 36.33 181.64
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 60.23 287.11 70.80 104.54 522.69
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 107.51 427.01 33.88 142.10 710.51
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 90.19 292.53 - 95.68 478.40
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 55.29 238.86 - 73.54 367.69
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 6.56 174.71 5.09 46.59 232.95
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 18.99 482.48 54.04 138.88 694.39
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 14.24 416.71 2.42 108.34 541.71
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 7.41 177.46 7.94 48.20 241.01
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 5.90 76.32 5.09 21.83 109.14
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 13.54 110.29 3.03 31.71 158.57
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.33 27.34 1.46 7.53 37.66
Page 67
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Dera
Dera Ismail
Ismail Khan
Khan District Code: 12
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 0.98 18.21 0.77 4.99 24.95
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.81 15.26 0.79 4.22 21.08
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.19 15.57 0.90 4.41 22.07
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 65.24 1,510.17 6,104.67 1,920.02 9,600.10
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 67.59 1,510.17 6,580.96 2,039.68 10,198.40
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 72.03 1,577.28 6,093.84 1,935.79 9,678.94
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 72.03 1,571.31 6,733.42 2,094.19 10,470.95
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 226.93 915.38 56,046.75 14,297.26 71,486.32
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 226.93 915.38 54,468.62 13,902.73 69,513.66
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 83.54 112.80 817.47 253.45 1,267.25
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 135.72 2,437.94 5,767.82 2,085.37 10,426.85
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 91.47 126.27 761.36 244.77 1,223.87
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 1.66 45.04 1.26 11.99 59.94
207b DEEP PATCHING (16-30 cm) SM 1.66 39.67 1.26 10.65 53.24
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.11 110.61 0.68 28.35 141.75
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.42 22.12 0.14 5.67 28.35
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.29 1.57 39.78 10.41 52.05
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.28 1.57 44.40 11.56 57.81
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.11 0.58 16.65 4.34 21.68
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.11 0.58 19.42 5.03 25.15
Page 68
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Dera
Dera Ismail
Ismail Khan
Khan District Code: 12
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 61.94 1,489.33 7,232.51 2,195.94 10,979.72
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 61.94 1,438.23 7,819.16 2,329.83 11,649.15
"B")
307a DENSE GRADED HOT BIT-MAC CM 153.42 379.77 6,016.53 1,637.43 8,187.15
307b OPEN GRADED HOT BIT-MAC CM 153.42 379.77 5,860.62 1,598.45 7,992.26
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 27.40 590.65 2,124.46 685.63 3,428.14
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 25.24 650.70 48,215.44 12,222.85 61,114.23
401a1i CONCRETE CLASS "A1" (Underground) CM 522.66 1,059.94 3,802.32 1,346.23 6,731.15
401a1ii CONCRETE CLASS "A1" (On ground) CM 522.66 1,059.94 4,079.79 1,415.60 7,077.99
401a1iii CONCRETE CLASS "A1" (Elevated) CM 522.66 1,059.94 4,634.74 1,554.33 7,771.67
401a2i CONCRETE CLASS "A2" (Underground) CM 522.66 1,059.94 4,180.32 1,440.73 7,203.65
401a2ii CONCRETE CLASS "A2" (On ground) CM 522.66 1,059.94 4,457.79 1,510.10 7,550.49
401a2iii CONCRETE CLASS "A2" (Elevated) CM 522.66 1,059.94 5,012.74 1,648.83 8,244.17
401a3i CONCRETE CLASS "A3" (Underground) CM 522.66 1,059.94 4,558.32 1,535.23 7,676.15
401a3ii CONCRETE CLASS "A3" (On ground) CM 522.66 1,059.94 4,835.79 1,604.60 8,022.99
401a3iii CONCRETE CLASS "A3" (Elevated) CM 522.66 1,059.94 5,390.74 1,743.33 8,716.67
401ci CONCRETE CLASS "C" (Underground) CM 508.01 500.55 3,358.60 1,091.79 5,458.95
401cii CONCRETE CLASS "C" (On ground) CM 508.01 500.55 3,476.94 1,121.38 5,606.88
401ciii CONCRETE CLASS "C" (Elevated) CM 508.01 500.55 3,713.63 1,180.55 5,902.74
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,690.12 947.15 4,785.87 1,855.79 9,278.93
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,690.12 947.15 5,541.87 2,044.79 10,223.93
401gii PRECAST CONCRETE CLASS "B" CM 1,690.12 947.15 4,589.10 1,806.59 9,032.97
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,690.12 947.15 5,919.87 2,139.29 10,696.43
Page 69
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Dera
Dera Ismail
Ismail Khan
Khan District Code: 12
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,690.12 947.15 6,297.87 2,233.79 11,168.93
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,690.12 947.15 6,675.87 2,328.29 11,641.43
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,633.53 781.47 60,206.00 15,655.25 78,276.25
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,633.53 781.47 67,556.00 17,492.75 87,463.75
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,299.70 5,393.81 56,161.26 15,713.69 78,568.47
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 2,832.66 15,659.05 133,811.69 38,075.85 190,379.24
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 112.88 - 310.41 105.82 529.11
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 112.88 - 309.31 105.55 527.73
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.53 2.67
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 18.71 69.68 116.93 51.33 256.65
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 372.35 1,654.04 1,189.34 803.93 4,019.66
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 558.52 2,481.06 1,784.01 1,205.90 6,029.49
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 558.52 2,481.06 1,480.77 1,130.09 5,650.44
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 930.86 4,135.11 1,979.92 1,761.47 8,807.36
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 797.88 4,884.94 2,386.41 2,017.31 10,086.55
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,396.30 6,909.78 2,695.36 2,750.36 13,751.79
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 20,478.32 45,769.30 100,985.02 41,808.16 209,040.80
407i PILE LOAD TEST UP TO 240 TON EACH 37,711.07 45,769.30 201,970.04 71,362.60 356,813.01
407j PILE LOAD TEST UP TO 360 TON EACH 54,943.82 50,188.38 302,955.06 102,021.82 510,109.08
407k CONFIRMATORY BORING (NX SIZE) M 196.36 1,582.02 6.37 446.19 2,230.94
411a STONE MASONRY RANDOM DRY CM 264.65 107.96 426.76 199.84 999.21
411b STONE MASONRY RANDOM WITH MORTAR CM 285.52 166.68 1,453.09 476.32 2,381.62
411c STONE MASONRY DRESSED UNCOURSED DRY CM 344.69 107.96 459.93 228.14 1,140.72
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 405.59 166.68 1,497.31 517.39 2,586.97
Page 70
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Dera
Dera Ismail
Ismail Khan
Khan District Code: 12
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 544.80 264.08 1,402.50 552.84 2,764.22
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 206.90 437.48 643.39 321.95 1,609.73
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 200.33 577.19 834.17 402.92 2,014.61
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 198.36 935.96 1,069.85 551.04 2,755.22
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 206.44 1,146.39 1,598.23 737.76 3,688.82
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 237.27 1,078.41 2,297.87 903.39 4,516.94
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 294.10 1,331.30 3,614.54 1,309.99 6,549.93
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 380.61 1,481.41 4,680.50 1,635.63 8,178.14
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 447.26 1,798.85 5,964.68 2,052.70 10,263.48
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 529.40 2,098.66 9,213.95 2,960.50 14,802.52
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 206.90 507.33 722.10 359.08 1,795.42
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 200.33 577.19 852.99 407.63 2,038.14
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 192.49 935.96 1,044.43 543.22 2,716.10
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 206.44 1,146.39 1,743.69 774.13 3,870.65
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 237.27 1,078.41 3,316.03 1,157.93 5,789.65
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 294.10 1,331.30 4,871.85 1,624.31 8,121.57
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 380.61 1,481.41 6,808.93 2,167.74 10,838.68
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 447.26 1,798.85 9,234.95 2,870.27 14,351.33
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 529.40 2,098.66 12,992.82 3,905.22 19,526.09
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 83.73 118.93 380.62 145.82 729.09
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 760.04 612.95 3,420.65 1,198.41 5,992.04
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 5.15 - 109.50 28.66 143.32
508a BRICK PAVING (SINGLE COURSE) SM 101.65 32.70 233.08 91.86 459.29
508b BRICK PAVING (DOUBLE COURSE) SM 181.69 32.70 462.34 169.18 845.92
Page 71
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Dera
Dera Ismail
Ismail Khan
Khan District Code: 12
509d GROUTED RIP RAP CLASS "A" CM 540.44 102.14 1,724.93 591.88 2,959.39
509e GROUTED RIP RAP CLASS "B" CM 520.74 81.72 1,577.58 545.01 2,725.05
509f GROUTED RIP RAP CLASS "C" CM 514.00 68.10 1,621.80 550.97 2,754.87
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 753.62 353.02 3,992.64 1,274.82 6,374.10
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 43.27 191.97 411.50 161.69 808.43
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 140.41 67.48 53.94 65.46 327.28
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 179.72 86.37 69.05 83.78 418.92
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 228.43 180.32 361.65 192.60 963.01
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 285.54 225.40 452.06 240.75 1,203.76
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 277.04 572.25 2,136.06 746.34 3,731.68
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 929.05 670.54 3,980.50 1,395.02 6,975.12
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 134.43 90.27 414.37 159.77 798.83
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 26.15 - 1,197.58 305.93 1,529.66
604d STEEL POST OF METAL GUARD RAIL EACH 89.55 976.73 3,776.31 1,210.65 6,053.23
605a CONCRETE BEAM GUARD RAIL M 69.11 30.82 586.17 171.53 857.64
605c CONCRETE POST FOR GUARD RAIL M 84.86 27.36 585.03 174.31 871.56
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 216.37 255.15 6,437.77 1,727.32 8,636.61
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 66.12 382.72 9,235.23 2,421.02 12,105.09
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 216.37 541.89 11,848.47 3,151.68 15,758.41
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 691.81 598.64 20,906.45 5,549.23 27,746.13
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 138.36 119.73 9,208.66 2,366.69 11,833.44
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.57 5.86 16.18 6.15 30.77
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.86 4.03 39.87 11.19 55.95
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.57 5.86 21.59 7.51 37.53
LINES OF 20 cm WIDTH
Page 72
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Dera
Dera Ismail
Ismail Khan
Khan District Code: 12
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.86 4.03 53.18 14.52 72.58
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 74.98 5.22 156.37 59.14 295.71
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 74.98 9.98 502.46 146.85 734.27
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.21 8.59 22.50 8.58 42.88
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.21 9.63 67.50 20.09 100.44
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.21 6.95 30.00 10.04 50.20
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.21 9.63 90.01 25.71 128.56
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 74.98 3.73 217.23 73.98 369.92
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 74.98 7.90 851.20 233.52 1,167.59
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 62.45 3.73 104.25 42.61 213.03
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 62.45 7.90 335.48 101.46 507.29
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 62.45 3.73 144.82 52.75 263.75
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 62.45 7.90 568.32 159.67 798.34
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 8.86 81.62 193.80 71.07 355.35
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 8.86 81.62 233.80 81.07 405.34
DOUBLE)
610b RIGHT OF WAY MARKER EACH 94.95 121.33 293.84 127.53 637.65
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 588.53 976.31 1,965.01 882.46 4,412.30
610d TEN KILOMETRE POST EACH 1,135.30 1,952.61 4,327.27 1,853.80 9,268.98
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT M 129.01 91.00 944.66 291.17 1,455.84
WITH PRECAST PRESTRESSED R.C.C. POST
Page 73
.
Page 74
NATIONAL HIGHWAY AUTHORITY
DIR
(15)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 75
.
Page 76
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Dir
Dir District Code: 15
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 7.89 190.65 1.28 49.96 249.79
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 22.57 502.19 2.89 131.91 659.57
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 90.30 2,008.78 11.56 527.66 2,638.29
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 136.18 347.93 55.90 135.00 675.01
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 18.53 371.79 - 97.58 487.90
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 12.13 288.63 - 75.19 375.95
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 136.18 347.93 55.90 135.00 675.01
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 21.66 347.63 - 92.32 461.62
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 9.36 290.32 - 74.92 374.59
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 7.93 151.36 0.42 39.93 199.64
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 70.05 315.83 77.89 115.94 579.70
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 120.34 469.72 37.27 156.83 784.15
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 101.56 321.79 - 105.84 529.18
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 61.89 262.75 - 81.16 405.80
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 7.40 192.18 5.60 51.30 256.48
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 21.75 530.73 59.45 152.98 764.91
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 16.31 458.38 2.66 119.34 596.69
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 8.47 195.20 8.73 53.10 265.51
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 6.68 83.95 5.60 24.06 120.29
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 15.59 121.32 3.33 35.06 175.30
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.50 30.07 1.60 8.29 41.47
Page 77
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Dir
Dir District Code: 15
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.09 20.03 0.85 5.49 27.47
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.92 16.79 0.87 4.65 23.23
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.36 17.13 0.99 4.87 24.34
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 75.50 1,615.88 6,628.48 2,079.96 10,399.82
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 78.02 1,615.88 7,091.14 2,196.26 10,981.29
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 83.51 1,687.69 6,617.69 2,097.22 10,486.12
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 83.51 1,681.30 7,250.21 2,253.75 11,268.77
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 254.73 979.45 57,998.83 14,808.25 74,041.26
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 254.73 979.45 56,310.23 14,386.10 71,930.52
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 99.46 120.69 1,055.84 319.00 1,594.99
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 154.09 2,608.60 6,271.64 2,258.58 11,292.91
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 109.53 135.11 813.69 264.58 1,322.91
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 1.83 48.19 1.34 12.84 64.20
207b DEEP PATCHING (16-30 cm) SM 1.83 42.45 1.34 11.41 57.03
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.26 118.35 0.73 30.34 151.68
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.45 23.67 0.15 6.07 30.34
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.31 1.68 41.16 10.79 53.95
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.30 1.68 45.95 11.98 59.92
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.12 0.62 17.23 4.49 22.47
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.12 0.62 20.10 5.21 26.05
Page 78
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Dir
Dir District Code: 15
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 70.81 1,593.58 7,780.91 2,361.33 11,806.63
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 70.81 1,538.91 8,401.79 2,502.88 12,514.38
"B")
307a DENSE GRADED HOT BIT-MAC CM 173.89 406.36 6,478.55 1,764.70 8,823.50
307b OPEN GRADED HOT BIT-MAC CM 173.89 406.36 6,296.47 1,719.18 8,595.90
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 29.84 631.99 2,260.77 730.65 3,653.25
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 27.59 696.25 49,560.77 12,571.15 62,855.77
401a1i CONCRETE CLASS "A1" (Underground) CM 571.24 1,112.93 4,231.39 1,478.89 7,394.46
401a1ii CONCRETE CLASS "A1" (On ground) CM 571.24 1,112.93 4,522.74 1,551.73 7,758.64
401a1iii CONCRETE CLASS "A1" (Elevated) CM 571.24 1,112.93 5,105.43 1,697.40 8,487.01
401a2i CONCRETE CLASS "A2" (Underground) CM 571.24 1,112.93 4,628.29 1,578.12 7,890.58
401a2ii CONCRETE CLASS "A2" (On ground) CM 571.24 1,112.93 4,919.64 1,650.95 8,254.77
401a2iii CONCRETE CLASS "A2" (Elevated) CM 571.24 1,112.93 5,502.33 1,796.63 8,983.13
401a3i CONCRETE CLASS "A3" (Underground) CM 571.24 1,112.93 5,025.19 1,677.34 8,386.71
401a3ii CONCRETE CLASS "A3" (On ground) CM 571.24 1,112.93 5,316.54 1,750.18 8,750.89
401a3iii CONCRETE CLASS "A3" (Elevated) CM 571.24 1,112.93 5,899.23 1,895.85 9,479.26
401ci CONCRETE CLASS "C" (Underground) CM 565.44 525.57 3,779.22 1,217.56 6,087.80
401cii CONCRETE CLASS "C" (On ground) CM 565.44 525.57 3,903.48 1,248.62 6,243.12
401ciii CONCRETE CLASS "C" (Elevated) CM 565.44 525.57 4,152.00 1,310.75 6,553.77
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,920.24 994.51 5,289.53 2,051.07 10,255.34
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,920.24 994.51 6,083.33 2,249.52 11,247.59
401gii PRECAST CONCRETE CLASS "B" CM 1,920.24 994.51 5,036.60 1,987.84 9,939.18
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,920.24 994.51 6,480.23 2,348.74 11,743.72
Page 79
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Dir
Dir District Code: 15
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,920.24 994.51 6,877.13 2,447.97 12,239.84
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,920.24 994.51 7,274.03 2,547.19 12,735.97
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,943.00 820.55 64,551.90 16,828.86 84,144.31
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,943.00 820.55 72,269.40 18,758.24 93,791.18
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,558.72 5,663.50 59,801.63 16,755.96 83,779.82
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 2,724.93 16,442.00 140,608.98 39,943.98 199,719.89
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 124.47 - 320.40 111.22 556.08
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 124.47 - 319.53 111.00 555.00
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.23 0.56 2.81
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 22.20 73.17 124.35 54.93 274.65
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 352.65 1,736.74 946.99 759.09 3,795.47
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 528.97 2,605.12 1,420.48 1,138.64 5,693.21
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 528.97 2,605.12 1,050.89 1,046.24 5,231.22
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 881.62 4,341.86 1,239.04 1,615.63 8,078.15
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 755.67 5,129.19 1,431.62 1,829.12 9,145.60
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,322.43 7,255.27 1,570.32 2,537.00 12,685.02
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 24,005.50 48,057.77 105,786.64 44,462.48 222,312.39
407i PILE LOAD TEST UP TO 240 TON EACH 44,686.18 48,057.77 211,573.28 76,079.31 380,396.53
407j PILE LOAD TEST UP TO 360 TON EACH 65,366.86 52,697.80 317,359.92 108,856.14 544,280.72
407k CONFIRMATORY BORING (NX SIZE) M 203.10 1,661.12 6.68 467.73 2,338.64
411a STONE MASONRY RANDOM DRY CM 316.53 113.36 484.88 228.69 1,143.47
411b STONE MASONRY RANDOM WITH MORTAR CM 343.07 175.02 1,611.88 532.49 2,662.45
411c STONE MASONRY DRESSED UNCOURSED DRY CM 415.56 113.36 541.62 267.64 1,338.18
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 491.62 175.02 1,667.88 583.63 2,918.14
Page 80
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Dir
Dir District Code: 15
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 663.15 277.29 1,568.33 627.19 3,135.96
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 248.78 472.48 696.45 354.43 1,772.15
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 242.16 623.36 902.81 442.08 2,210.41
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 236.38 1,010.84 1,157.66 601.22 3,006.09
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 247.12 1,238.10 1,728.68 803.47 4,017.37
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 283.10 1,164.69 2,484.29 983.02 4,915.10
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 350.67 1,437.80 3,907.46 1,423.98 7,119.91
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 453.81 1,599.92 5,058.67 1,778.10 8,890.50
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 531.56 1,942.76 6,446.39 2,230.18 11,150.88
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 633.15 2,266.55 9,956.36 3,214.02 16,070.08
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 248.78 547.92 783.04 394.94 1,974.68
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 242.16 623.36 923.13 447.16 2,235.82
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 230.53 1,010.84 1,130.21 592.89 2,964.46
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 247.12 1,238.10 1,885.20 842.60 4,213.02
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 283.10 1,164.69 3,584.20 1,258.00 6,289.98
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 350.67 1,437.80 5,265.35 1,763.46 8,817.28
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 453.81 1,599.92 7,357.37 2,352.78 11,763.88
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 531.56 1,942.76 9,978.28 3,113.15 15,565.75
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 633.15 2,266.55 14,037.53 4,234.31 21,171.54
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 96.93 128.44 436.56 165.48 827.41
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 847.98 661.98 3,905.12 1,353.77 6,768.85
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 6.35 - 119.56 31.48 157.39
508a BRICK PAVING (SINGLE COURSE) SM 126.61 35.32 275.99 109.48 547.40
508b BRICK PAVING (DOUBLE COURSE) SM 228.47 35.32 547.88 202.92 1,014.59
Page 81
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Dir
Dir District Code: 15
509d GROUTED RIP RAP CLASS "A" CM 676.55 110.32 1,932.48 679.84 3,399.18
509e GROUTED RIP RAP CLASS "B" CM 654.02 88.25 1,769.75 628.00 3,140.02
509f GROUTED RIP RAP CLASS "C" CM 646.88 73.54 1,818.99 634.85 3,174.27
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 896.07 381.27 4,511.67 1,447.25 7,236.26
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 51.39 207.33 434.53 173.31 866.56
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 172.54 72.87 64.41 77.46 387.28
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 220.85 93.28 82.44 99.14 495.71
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 283.44 194.75 398.78 219.24 1,096.20
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 354.30 243.44 498.47 274.05 1,370.25
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 308.92 613.92 2,414.48 834.33 4,171.65
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 1,079.33 711.97 4,427.36 1,554.66 7,773.32
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 155.77 97.09 467.55 180.10 900.51
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 24.86 - 1,221.53 311.60 1,557.98
604d STEEL POST OF METAL GUARD RAIL EACH 86.36 996.27 3,851.83 1,233.61 6,168.07
605a CONCRETE BEAM GUARD RAIL M 78.93 31.44 613.11 180.87 904.36
605c CONCRETE POST FOR GUARD RAIL M 96.92 27.91 614.57 184.85 924.25
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 245.41 260.25 7,001.87 1,876.88 9,384.41
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 74.54 390.38 9,453.66 2,479.64 12,398.22
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 245.41 552.72 12,144.23 3,235.59 16,177.95
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 794.46 610.62 21,406.96 5,703.01 28,515.04
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 158.89 122.12 9,405.08 2,421.52 12,107.62
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.79 5.98 16.49 6.31 31.57
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.93 4.11 40.53 11.39 56.96
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.79 5.98 22.01 7.69 38.47
LINES OF 20 cm WIDTH
Page 82
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Dir
Dir District Code: 15
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.93 4.11 54.06 14.77 73.87
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 82.49 5.32 159.36 61.79 308.97
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 82.49 10.18 510.75 150.86 754.28
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.49 8.76 22.93 8.80 43.98
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.49 9.82 68.85 20.54 102.71
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.49 7.09 30.58 10.29 51.45
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.49 9.82 91.81 26.28 131.40
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 82.49 3.80 221.44 76.93 384.66
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 82.49 8.06 868.22 239.69 1,198.46
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 68.43 3.80 106.24 44.62 223.09
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 68.43 8.06 341.02 104.37 521.87
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 68.43 3.80 147.63 54.96 274.82
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 68.43 8.06 579.69 164.04 820.22
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 9.84 83.25 197.74 72.71 363.54
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 9.85 83.25 238.54 82.91 414.54
DOUBLE)
610b RIGHT OF WAY MARKER EACH 107.35 123.75 311.17 135.57 677.83
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 673.03 995.83 2,104.23 943.27 4,716.36
610d TEN KILOMETRE POST EACH 1,289.81 1,991.66 4,612.08 1,973.39 9,866.95
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT M 141.09 95.67 989.87 306.66 1,533.30
WITH PRECAST PRESTRESSED R.C.C. POST
Page 83
.
Page 84
NATIONAL HIGHWAY AUTHORITY
HARIPUR HAZARA
(20-B)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 85
.
Page 86
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Haripur
Haripur Hazara
Hazara District Code: 20-B
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 7.68 173.32 1.17 45.54 227.71
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 21.41 456.54 2.63 120.14 600.72
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 85.64 1,826.16 10.51 480.58 2,402.89
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 141.07 316.30 50.82 127.05 635.23
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 18.09 337.99 - 89.02 445.10
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 11.92 262.40 - 68.58 342.89
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 141.07 316.30 50.82 127.05 635.23
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 22.55 316.03 - 84.64 423.22
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 9.15 263.92 - 68.27 341.34
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 8.48 137.60 0.38 36.62 183.08
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 66.07 287.11 70.80 106.00 529.98
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 125.25 427.01 33.88 146.54 732.69
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 104.76 292.53 - 99.32 496.62
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 64.42 238.86 - 75.82 379.10
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 7.48 174.71 5.09 46.82 234.10
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 21.53 482.48 54.04 139.51 697.57
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 16.15 416.71 2.42 108.82 544.10
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 8.40 177.46 7.94 48.45 242.24
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 6.68 76.32 5.09 22.02 110.12
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 15.21 110.29 3.03 32.13 160.65
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.52 27.34 1.46 7.58 37.90
Page 87
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Haripur
Haripur Hazara
Hazara District Code: 20-B
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.11 18.21 0.77 5.02 25.12
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.91 15.26 0.79 4.24 21.21
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.32 15.57 0.90 4.45 22.24
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 72.36 1,510.17 5,637.85 1,805.09 9,025.47
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 75.21 1,510.17 6,055.75 1,910.28 9,551.41
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 80.47 1,577.28 5,628.18 1,821.48 9,107.42
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 80.47 1,571.31 6,198.57 1,962.59 9,812.93
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 269.62 915.38 50,344.29 12,882.32 64,411.61
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 269.62 915.38 48,766.16 12,487.79 62,438.95
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 91.35 112.80 833.93 259.52 1,297.60
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 151.71 2,437.94 5,399.57 1,997.30 9,986.52
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 100.10 126.27 737.36 240.93 1,204.67
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 1.87 45.04 1.26 12.04 60.21
207b DEEP PATCHING (16-30 cm) SM 1.87 39.67 1.26 10.70 53.50
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.47 110.61 0.68 28.44 142.20
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.49 22.12 0.14 5.69 28.44
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.33 1.57 35.73 9.41 47.04
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.32 1.57 39.89 10.45 52.23
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.13 0.58 14.95 3.92 19.58
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.13 0.58 17.45 4.54 22.70
Page 88
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Haripur
Haripur Hazara
Hazara District Code: 20-B
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 69.13 1,489.33 6,628.07 2,046.63 10,233.15
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 69.13 1,438.23 7,146.65 2,163.50 10,817.51
"B")
307a DENSE GRADED HOT BIT-MAC CM 165.96 379.77 5,431.97 1,494.43 7,472.13
307b OPEN GRADED HOT BIT-MAC CM 165.96 379.77 5,305.64 1,462.84 7,314.22
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 28.58 590.65 1,992.08 652.83 3,264.14
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 29.19 650.70 42,343.60 10,755.87 53,779.36
401a1i CONCRETE CLASS "A1" (Underground) CM 536.49 1,059.94 3,830.96 1,356.85 6,784.23
401a1ii CONCRETE CLASS "A1" (On ground) CM 536.49 1,059.94 4,108.43 1,426.21 7,131.07
401a1iii CONCRETE CLASS "A1" (Elevated) CM 536.49 1,059.94 4,663.37 1,564.95 7,824.75
401a2i CONCRETE CLASS "A2" (Underground) CM 536.49 1,059.94 4,208.96 1,451.35 7,256.73
401a2ii CONCRETE CLASS "A2" (On ground) CM 536.49 1,059.94 4,486.43 1,520.71 7,603.57
401a2iii CONCRETE CLASS "A2" (Elevated) CM 536.49 1,059.94 5,041.37 1,659.45 8,297.25
401a3i CONCRETE CLASS "A3" (Underground) CM 536.49 1,059.94 4,586.96 1,545.85 7,729.23
401a3ii CONCRETE CLASS "A3" (On ground) CM 536.49 1,059.94 4,864.43 1,615.21 8,076.07
401a3iii CONCRETE CLASS "A3" (Elevated) CM 536.49 1,059.94 5,419.37 1,753.95 8,769.75
401ci CONCRETE CLASS "C" (Underground) CM 524.18 500.55 3,393.06 1,104.45 5,522.23
401cii CONCRETE CLASS "C" (On ground) CM 524.18 500.55 3,511.41 1,134.03 5,670.16
401ciii CONCRETE CLASS "C" (Elevated) CM 524.18 500.55 3,748.09 1,193.20 5,966.02
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,770.55 947.15 4,816.33 1,883.51 9,417.54
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,770.55 947.15 5,572.33 2,072.51 10,362.54
401gii PRECAST CONCRETE CLASS "B" CM 1,770.55 947.15 4,622.32 1,835.01 9,175.03
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,770.55 947.15 5,950.33 2,167.01 10,835.04
Page 89
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Haripur
Haripur Hazara
Hazara District Code: 20-B
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,770.55 947.15 6,328.33 2,261.51 11,307.54
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,770.55 947.15 6,706.33 2,356.01 11,780.04
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,629.06 781.47 59,358.00 15,442.13 77,210.66
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,629.06 781.47 66,708.00 17,279.63 86,398.16
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,280.39 5,393.81 55,550.69 15,556.22 77,781.12
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 2,816.57 15,659.05 133,836.01 38,077.91 190,389.53
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 114.51 - 299.99 103.62 518.12
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 114.51 - 299.23 103.44 517.18
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.53 2.67
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 20.54 69.68 117.26 51.87 259.36
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 354.77 1,654.04 898.09 726.73 3,633.63
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 532.15 2,481.06 1,347.14 1,090.09 5,450.45
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 532.15 2,481.06 995.00 1,002.05 5,010.27
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 886.92 4,135.11 1,170.29 1,548.08 7,740.40
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 760.22 4,884.94 1,347.81 1,748.24 8,741.21
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,330.38 6,909.78 1,480.92 2,430.27 12,151.35
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 22,545.15 45,769.30 100,541.50 42,213.99 211,069.95
407i PILE LOAD TEST UP TO 240 TON EACH 41,156.52 45,769.30 201,083.00 72,002.21 360,011.03
407j PILE LOAD TEST UP TO 360 TON EACH 59,767.89 50,188.38 301,624.50 102,895.19 514,475.97
407k CONFIRMATORY BORING (NX SIZE) M 194.25 1,582.02 6.37 445.66 2,228.30
411a STONE MASONRY RANDOM DRY CM 297.65 107.96 492.04 224.41 1,122.06
411b STONE MASONRY RANDOM WITH MORTAR CM 322.47 166.68 1,537.17 506.58 2,532.90
411c STONE MASONRY DRESSED UNCOURSED DRY CM 388.65 107.96 548.49 261.27 1,306.37
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 458.97 166.68 1,599.96 556.40 2,782.01
Page 90
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Haripur
Haripur Hazara
Hazara District Code: 20-B
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 616.14 264.08 1,505.16 596.35 2,981.73
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 229.32 437.48 643.98 327.70 1,638.48
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 221.35 577.19 834.87 408.35 2,041.76
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 220.74 935.96 1,070.67 556.84 2,784.21
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 228.87 1,146.39 1,599.19 743.61 3,718.06
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 263.94 1,078.41 2,298.83 910.30 4,551.48
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 329.16 1,331.30 3,615.93 1,319.10 6,595.49
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 425.97 1,481.41 4,681.88 1,647.31 8,236.57
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 499.52 1,798.85 5,966.36 2,066.18 10,330.91
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 595.70 2,098.66 9,215.91 2,977.57 14,887.84
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 229.32 507.33 723.27 364.98 1,824.91
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 221.35 577.19 853.69 413.06 2,065.29
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 216.08 935.96 1,045.25 549.32 2,746.62
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 228.87 1,146.39 1,744.43 779.92 3,899.62
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 263.94 1,078.41 3,317.10 1,164.86 5,824.32
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 329.16 1,331.30 4,873.24 1,633.42 8,167.12
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 425.97 1,481.41 6,810.31 2,179.42 10,897.11
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 499.52 1,798.85 9,236.63 2,883.75 14,418.76
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 595.70 2,098.66 12,994.77 3,922.28 19,611.42
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 93.39 118.93 440.73 163.26 816.32
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 787.63 612.95 3,454.98 1,213.89 6,069.44
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 5.70 - 109.41 28.78 143.89
508a BRICK PAVING (SINGLE COURSE) SM 115.12 32.70 244.13 97.99 489.94
508b BRICK PAVING (DOUBLE COURSE) SM 206.12 32.70 484.49 180.83 904.13
Page 91
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Haripur
Haripur Hazara
Hazara District Code: 20-B
509d GROUTED RIP RAP CLASS "A" CM 615.67 102.14 1,801.96 629.94 3,149.72
509e GROUTED RIP RAP CLASS "B" CM 593.46 81.72 1,652.87 582.01 2,910.06
509f GROUTED RIP RAP CLASS "C" CM 585.55 68.10 1,698.06 587.93 2,939.63
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 805.63 353.02 4,025.81 1,296.12 6,480.59
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 47.38 191.97 408.30 161.91 809.57
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 158.55 67.48 64.55 72.64 363.22
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 202.95 86.37 82.63 92.99 464.93
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 259.20 180.32 360.08 199.90 999.51
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 324.00 225.40 450.10 249.88 1,249.38
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 284.44 572.25 2,150.61 751.82 3,759.12
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 973.28 670.54 3,978.70 1,405.63 7,028.15
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 141.76 90.27 417.47 162.37 811.87
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 25.20 - 1,197.58 305.69 1,528.47
604d STEEL POST OF METAL GUARD RAIL EACH 95.54 976.73 3,776.31 1,212.14 6,060.72
605a CONCRETE BEAM GUARD RAIL M 74.35 30.82 583.43 172.15 860.75
605c CONCRETE POST FOR GUARD RAIL M 91.29 27.36 582.15 175.20 876.00
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 240.32 255.15 6,841.57 1,834.26 9,171.30
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 68.78 382.72 9,230.52 2,420.51 12,102.53
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 240.32 541.89 11,841.08 3,155.82 15,779.10
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 754.96 598.64 20,888.29 5,560.47 27,802.37
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 150.99 119.73 9,195.20 2,366.48 11,832.40
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.79 5.86 16.16 6.20 31.00
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.93 4.03 39.59 11.14 55.68
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.79 5.86 21.56 7.55 37.75
LINES OF 20 cm WIDTH
Page 92
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Haripur
Haripur Hazara
Hazara District Code: 20-B
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.93 4.03 52.80 14.44 72.20
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 77.02 5.22 156.10 59.59 297.93
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 77.02 9.98 498.88 146.47 732.36
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.48 8.59 22.47 8.64 43.18
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.48 9.63 67.50 20.16 100.78
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.48 6.95 29.96 10.10 50.50
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.48 9.63 90.01 25.78 128.90
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 77.02 3.73 216.96 74.43 372.14
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 77.02 7.90 851.20 234.03 1,170.15
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 64.14 3.73 104.07 42.98 214.92
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 64.14 7.90 333.09 101.28 506.42
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 64.14 3.73 144.64 53.13 265.64
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 64.14 7.90 568.32 160.09 800.46
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 9.05 81.62 193.82 71.12 355.61
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 9.05 81.62 233.82 81.12 405.61
DOUBLE)
610b RIGHT OF WAY MARKER EACH 102.01 121.33 294.06 129.35 646.74
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 642.60 976.31 1,964.08 895.75 4,478.73
610d TEN KILOMETRE POST EACH 1,228.85 1,952.61 4,324.10 1,876.39 9,381.95
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT M 134.15 91.00 945.78 292.73 1,463.66
WITH PRECAST PRESTRESSED R.C.C. POST
Page 93
.
Page 94
NATIONAL HIGHWAY AUTHORITY
KARAK
(27)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 95
.
Page 96
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Karak
Karak District Code: 27
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 8.13 173.32 1.17 45.65 228.27
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 22.72 456.54 2.63 120.47 602.36
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 90.87 1,826.16 10.51 481.89 2,409.43
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 151.45 316.30 50.82 129.64 648.21
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 20.00 337.99 - 89.50 447.49
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 13.12 262.40 - 68.88 344.40
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 151.45 316.30 50.82 129.64 648.21
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 24.20 316.03 - 85.06 425.28
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 10.13 263.92 - 68.51 342.57
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 8.93 137.60 0.38 36.73 183.64
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 69.76 287.11 70.80 106.92 534.60
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 134.42 427.01 33.88 148.83 744.14
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 113.02 292.53 - 101.39 506.95
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 69.13 238.86 - 77.00 384.99
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 8.15 174.71 5.09 46.99 234.93
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 23.30 482.48 54.04 139.95 699.77
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 17.47 416.71 2.42 109.15 545.75
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 9.13 177.46 7.94 48.63 243.16
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 7.26 76.32 5.09 22.17 110.84
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 16.39 110.29 3.03 32.43 162.13
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.64 27.34 1.46 7.61 38.04
Page 97
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Karak
Karak District Code: 27
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.19 18.21 0.77 5.04 25.21
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.97 15.26 0.79 4.26 21.28
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.43 15.57 0.90 4.47 22.37
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 78.57 1,510.17 5,942.49 1,882.81 9,414.04
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 81.74 1,510.17 6,397.70 1,997.40 9,987.02
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 87.29 1,577.28 5,932.13 1,899.17 9,495.87
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 87.29 1,571.31 6,546.67 2,051.32 10,256.58
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 281.09 915.38 53,974.23 13,792.67 68,963.37
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 281.09 915.38 52,396.10 13,398.14 66,990.71
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 97.69 112.80 830.30 260.20 1,300.98
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 165.47 2,437.94 5,642.02 2,061.36 10,306.79
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 107.33 126.27 744.05 244.41 1,222.07
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 2.02 45.04 1.26 12.08 60.39
207b DEEP PATCHING (16-30 cm) SM 2.02 39.67 1.26 10.74 53.69
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.54 110.61 0.68 28.46 142.29
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.51 22.12 0.14 5.69 28.46
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.35 1.57 38.31 10.06 50.29
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.34 1.57 42.76 11.17 55.85
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.14 0.58 16.03 4.19 20.94
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.14 0.58 18.70 4.86 24.28
Page 98
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Karak
Karak District Code: 27
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 75.36 1,489.33 7,021.16 2,146.46 10,732.32
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 75.36 1,438.23 7,583.42 2,274.25 11,371.26
"B")
307a DENSE GRADED HOT BIT-MAC CM 183.99 379.77 5,811.58 1,593.84 7,969.18
307b OPEN GRADED HOT BIT-MAC CM 183.99 379.77 5,666.56 1,557.58 7,787.90
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 32.29 590.65 2,077.65 675.15 3,375.73
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 29.98 650.70 46,081.36 11,690.51 58,452.55
401a1i CONCRETE CLASS "A1" (Underground) CM 571.52 1,059.94 3,809.45 1,360.23 6,801.14
401a1ii CONCRETE CLASS "A1" (On ground) CM 571.52 1,059.94 4,086.93 1,429.60 7,147.98
401a1iii CONCRETE CLASS "A1" (Elevated) CM 571.52 1,059.94 4,641.87 1,568.33 7,841.66
401a2i CONCRETE CLASS "A2" (Underground) CM 571.52 1,059.94 4,187.45 1,454.73 7,273.64
401a2ii CONCRETE CLASS "A2" (On ground) CM 571.52 1,059.94 4,464.93 1,524.10 7,620.48
401a2iii CONCRETE CLASS "A2" (Elevated) CM 571.52 1,059.94 5,019.87 1,662.83 8,314.16
401a3i CONCRETE CLASS "A3" (Underground) CM 571.52 1,059.94 4,565.45 1,549.23 7,746.14
401a3ii CONCRETE CLASS "A3" (On ground) CM 571.52 1,059.94 4,842.93 1,618.60 8,092.98
401a3iii CONCRETE CLASS "A3" (Elevated) CM 571.52 1,059.94 5,397.87 1,757.33 8,786.66
401ci CONCRETE CLASS "C" (Underground) CM 550.17 500.55 3,369.77 1,105.12 5,525.61
401cii CONCRETE CLASS "C" (On ground) CM 550.17 500.55 3,488.12 1,134.71 5,673.54
401ciii CONCRETE CLASS "C" (Elevated) CM 550.17 500.55 3,724.80 1,193.88 5,969.39
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,831.87 947.15 4,794.10 1,893.28 9,466.40
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,831.87 947.15 5,550.10 2,082.28 10,411.40
401gii PRECAST CONCRETE CLASS "B" CM 1,831.87 947.15 4,600.16 1,844.80 9,223.98
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,831.87 947.15 5,928.10 2,176.78 10,883.90
Page 99
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Karak
Karak District Code: 27
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,831.87 947.15 6,306.10 2,271.28 11,356.40
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,831.87 947.15 6,684.10 2,365.78 11,828.90
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,730.40 781.47 60,842.00 15,838.47 79,192.34
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,730.40 781.47 68,192.00 17,675.97 88,379.84
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,397.38 5,393.81 56,521.96 15,828.29 79,141.45
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 3,317.26 15,659.05 133,842.72 38,204.76 191,023.79
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 123.44 - 305.24 107.17 535.85
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 123.44 - 304.39 106.96 534.79
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.53 2.67
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 22.31 69.68 117.85 52.46 262.31
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 416.93 1,654.04 889.13 740.03 3,700.13
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 625.39 2,481.06 1,333.70 1,110.04 5,550.19
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 625.39 2,481.06 981.72 1,022.04 5,110.22
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 1,042.32 4,135.11 1,148.17 1,581.40 7,907.00
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 893.42 4,884.94 1,308.66 1,771.76 8,858.78
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,563.49 6,909.78 1,447.73 2,480.25 12,401.25
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 24,126.58 45,769.30 90,203.26 40,024.79 200,123.93
407i PILE LOAD TEST UP TO 240 TON EACH 44,046.27 45,769.30 180,406.52 67,555.52 337,777.62
407j PILE LOAD TEST UP TO 360 TON EACH 63,965.96 50,188.38 270,609.78 96,191.03 480,955.16
407k CONFIRMATORY BORING (NX SIZE) M 223.15 1,582.02 6.37 452.88 2,264.42
411a STONE MASONRY RANDOM DRY CM 291.16 107.96 429.91 207.26 1,036.29
411b STONE MASONRY RANDOM WITH MORTAR CM 312.23 166.68 1,456.24 483.79 2,418.94
411c STONE MASONRY DRESSED UNCOURSED DRY CM 377.55 107.96 481.39 241.73 1,208.63
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 441.81 166.68 1,518.77 531.82 2,659.08
Page 100
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Karak
Karak District Code: 27
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 593.53 264.08 1,423.96 570.39 2,851.97
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 237.69 437.48 643.39 329.64 1,648.20
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 229.73 577.19 834.17 410.27 2,051.36
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 230.49 935.96 1,069.85 559.08 2,795.38
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 239.72 1,146.39 1,598.23 746.08 3,730.42
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 277.90 1,078.41 2,297.87 913.55 4,567.73
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 346.22 1,331.30 3,614.54 1,323.02 6,615.08
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 448.05 1,481.41 4,680.50 1,652.49 8,262.45
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 529.02 1,798.85 5,964.68 2,073.14 10,365.69
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 624.86 2,098.66 9,213.95 2,984.37 14,921.85
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 237.69 507.33 722.10 366.78 1,833.90
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 229.73 577.19 852.99 414.98 2,074.88
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 224.56 935.96 1,044.43 551.24 2,756.19
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 239.72 1,146.39 1,743.69 782.45 3,912.25
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 277.90 1,078.41 3,316.03 1,168.09 5,840.43
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 346.22 1,331.30 4,871.85 1,637.34 8,186.72
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 448.05 1,481.41 6,808.93 2,184.60 10,922.99
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 529.02 1,798.85 9,234.95 2,890.71 14,453.54
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 624.86 2,098.66 12,992.82 3,929.08 19,645.42
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 98.08 118.93 287.07 126.02 630.09
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 844.07 612.95 3,430.89 1,221.98 6,109.89
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 5.88 - 110.38 29.06 145.32
508a BRICK PAVING (SINGLE COURSE) SM 112.13 32.70 259.16 101.00 504.99
508b BRICK PAVING (DOUBLE COURSE) SM 198.52 32.70 515.72 186.74 933.68
Page 101
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Karak
Karak District Code: 27
509d GROUTED RIP RAP CLASS "A" CM 591.93 102.14 1,728.08 605.54 3,027.69
509e GROUTED RIP RAP CLASS "B" CM 568.36 81.72 1,580.71 557.70 2,788.48
509f GROUTED RIP RAP CLASS "C" CM 560.02 68.10 1,624.95 563.27 2,816.34
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 825.33 353.02 4,002.36 1,295.18 6,475.90
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 50.95 191.97 333.54 144.11 720.57
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 155.26 67.48 54.45 69.30 346.49
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 198.74 86.37 69.70 88.70 443.51
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 250.14 180.32 351.30 195.44 977.20
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 312.68 225.40 439.12 244.30 1,221.50
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 303.07 572.25 2,139.59 753.73 3,768.64
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 1,005.85 670.54 3,998.01 1,418.60 7,092.99
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 146.31 90.27 414.78 162.84 814.21
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 28.60 - 1,197.58 306.54 1,532.72
604d STEEL POST OF METAL GUARD RAIL EACH 104.64 976.73 3,776.31 1,214.42 6,072.10
605a CONCRETE BEAM GUARD RAIL M 76.63 30.82 589.31 174.19 870.96
605c CONCRETE POST FOR GUARD RAIL M 94.09 27.36 588.49 177.49 887.43
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 250.32 255.15 6,843.99 1,837.37 9,186.83
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 71.20 382.72 9,228.48 2,420.60 12,103.01
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 250.32 541.89 11,838.59 3,157.70 15,788.50
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 793.86 598.64 20,882.85 5,568.84 27,844.20
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 158.77 119.73 9,194.76 2,368.32 11,841.58
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.99 5.86 16.17 6.25 31.27
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.00 4.03 39.75 11.19 55.96
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.99 5.86 21.58 7.61 38.03
LINES OF 20 cm WIDTH
Page 102
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Karak
Karak District Code: 27
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.00 4.03 53.01 14.51 72.55
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 78.08 5.22 156.25 59.89 299.43
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 78.08 9.98 500.87 147.23 736.16
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.73 8.59 22.49 8.70 43.51
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.73 9.63 67.50 20.22 101.09
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.73 6.95 29.98 10.17 50.83
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.73 9.63 90.01 25.84 129.21
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 78.08 3.73 217.11 74.73 373.64
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 78.08 7.90 851.20 234.29 1,171.47
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 65.44 3.73 104.17 43.33 216.67
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 65.44 7.90 334.42 101.94 509.69
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 65.44 3.73 144.74 53.48 267.38
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 65.44 7.90 568.32 160.42 802.08
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 9.54 81.62 193.80 71.24 356.20
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 9.54 81.62 233.80 81.24 406.19
DOUBLE)
610b RIGHT OF WAY MARKER EACH 107.15 121.33 294.85 130.83 654.16
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 649.01 976.31 1,975.98 900.32 4,501.61
610d TEN KILOMETRE POST EACH 1,255.89 1,952.61 4,349.06 1,889.39 9,446.95
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT M 142.80 91.00 945.48 294.82 1,474.11
WITH PRECAST PRESTRESSED R.C.C. POST
Page 103
.
Page 104
NATIONAL HIGHWAY AUTHORITY
KOHAT
(34)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 105
.
Page 106
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kohat
Kohat District Code: 34
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 7.14 173.32 1.17 45.41 227.03
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 19.84 456.54 2.63 119.75 598.76
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 79.37 1,826.16 10.51 479.01 2,395.05
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 126.24 316.30 50.82 123.34 616.70
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 16.12 337.99 - 88.53 442.65
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 10.56 262.40 - 68.24 341.20
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 126.24 316.30 50.82 123.34 616.70
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 20.09 316.03 - 84.03 420.15
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 8.19 263.92 - 68.03 340.14
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 7.98 137.60 0.38 36.49 182.45
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 61.45 287.11 70.80 104.84 524.21
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 111.59 427.01 33.88 143.12 715.61
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 92.95 292.53 - 96.37 481.86
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 57.39 238.86 - 74.06 370.32
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 6.79 174.71 5.09 46.65 233.24
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 19.59 482.48 54.04 139.03 695.13
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 14.69 416.71 2.42 108.45 542.27
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 7.63 177.46 7.94 48.26 241.28
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 6.14 76.32 5.09 21.89 109.43
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 14.03 110.29 3.03 31.84 159.19
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.39 27.34 1.46 7.55 37.73
Page 107
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kohat
Kohat District Code: 34
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.04 18.21 0.77 5.01 25.03
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.86 15.26 0.79 4.23 21.14
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.25 15.57 0.90 4.43 22.15
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 65.21 1,510.17 6,167.01 1,935.60 9,677.99
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 67.55 1,510.17 6,600.97 2,044.67 10,223.36
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 72.29 1,577.28 6,156.63 1,951.55 9,757.76
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 72.29 1,571.31 6,750.75 2,098.59 10,492.94
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 243.07 915.38 54,737.79 13,974.06 69,870.30
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 243.07 915.38 53,159.66 13,579.53 67,897.64
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 83.92 112.80 897.88 273.65 1,368.26
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 136.80 2,437.94 5,802.67 2,094.35 10,471.77
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 91.14 126.27 722.78 235.05 1,175.24
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 1.75 45.04 1.26 12.01 60.05
207b DEEP PATCHING (16-30 cm) SM 1.75 39.67 1.26 10.67 53.35
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.37 110.61 0.68 28.42 142.08
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.47 22.12 0.14 5.68 28.42
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.30 1.57 38.85 10.18 50.90
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.29 1.57 43.37 11.31 56.53
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.12 0.58 16.26 4.24 21.20
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.12 0.58 18.97 4.92 24.58
Page 108
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kohat
Kohat District Code: 34
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 62.01 1,489.33 7,253.98 2,201.33 11,006.65
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 62.01 1,438.23 7,838.95 2,334.80 11,673.99
"B")
307a DENSE GRADED HOT BIT-MAC CM 151.13 379.77 6,048.94 1,644.96 8,224.81
307b OPEN GRADED HOT BIT-MAC CM 151.13 379.77 5,863.98 1,598.72 7,993.61
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 27.07 590.65 2,109.07 681.70 3,408.48
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 27.12 650.70 46,867.60 11,886.35 59,431.77
401a1i CONCRETE CLASS "A1" (Underground) CM 517.14 1,059.94 3,973.64 1,387.68 6,938.40
401a1ii CONCRETE CLASS "A1" (On ground) CM 517.14 1,059.94 4,251.11 1,457.05 7,285.24
401a1iii CONCRETE CLASS "A1" (Elevated) CM 517.14 1,059.94 4,806.06 1,595.78 7,978.92
401a2i CONCRETE CLASS "A2" (Underground) CM 517.14 1,059.94 4,351.64 1,482.18 7,410.90
401a2ii CONCRETE CLASS "A2" (On ground) CM 517.14 1,059.94 4,629.11 1,551.55 7,757.74
401a2iii CONCRETE CLASS "A2" (Elevated) CM 517.14 1,059.94 5,184.06 1,690.28 8,451.42
401a3i CONCRETE CLASS "A3" (Underground) CM 517.14 1,059.94 4,729.64 1,576.68 7,883.40
401a3ii CONCRETE CLASS "A3" (On ground) CM 517.14 1,059.94 5,007.11 1,646.05 8,230.24
401a3iii CONCRETE CLASS "A3" (Elevated) CM 517.14 1,059.94 5,562.06 1,784.78 8,923.92
401ci CONCRETE CLASS "C" (Underground) CM 507.28 500.55 3,516.30 1,131.03 5,655.16
401cii CONCRETE CLASS "C" (On ground) CM 507.28 500.55 3,634.64 1,160.62 5,803.08
401ciii CONCRETE CLASS "C" (Elevated) CM 507.28 500.55 3,871.32 1,219.79 6,098.94
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,690.71 947.15 4,979.69 1,904.39 9,521.93
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,690.71 947.15 5,735.69 2,093.39 10,466.93
401gii PRECAST CONCRETE CLASS "B" CM 1,690.71 947.15 4,708.59 1,836.61 9,183.07
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,690.71 947.15 6,113.69 2,187.89 10,939.43
Page 109
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kohat
Kohat District Code: 34
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,690.71 947.15 6,491.69 2,282.39 11,411.93
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,690.71 947.15 6,869.69 2,376.89 11,884.43
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,595.78 781.47 60,206.00 15,645.81 78,229.06
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,595.78 781.47 67,556.00 17,483.31 87,416.56
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,245.21 5,393.81 56,041.90 15,670.23 78,351.16
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 2,804.43 15,659.05 133,831.75 38,073.81 190,369.04
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 108.80 - 307.11 103.98 519.89
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 108.80 - 306.17 103.74 518.71
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.53 2.67
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 18.32 69.68 117.68 51.42 257.11
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 374.18 1,654.04 899.35 731.89 3,659.47
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 561.27 2,481.06 1,349.02 1,097.84 5,489.20
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 561.27 2,481.06 996.97 1,009.83 5,049.14
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 935.46 4,135.11 1,173.58 1,561.04 7,805.18
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 801.82 4,884.94 1,352.77 1,759.88 8,799.42
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,403.19 6,909.78 1,485.86 2,449.71 12,248.53
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 20,395.24 45,769.30 98,474.38 41,159.73 205,798.66
407i PILE LOAD TEST UP TO 240 TON EACH 37,393.75 45,769.30 196,948.76 70,027.95 350,139.77
407j PILE LOAD TEST UP TO 360 TON EACH 54,392.26 50,188.38 295,423.14 100,000.95 500,004.73
407k CONFIRMATORY BORING (NX SIZE) M 194.02 1,582.02 6.37 445.60 2,228.01
411a STONE MASONRY RANDOM DRY CM 281.11 107.96 426.43 203.87 1,019.37
411b STONE MASONRY RANDOM WITH MORTAR CM 304.36 166.68 1,490.36 490.35 2,451.75
411c STONE MASONRY DRESSED UNCOURSED DRY CM 365.39 107.96 477.63 237.74 1,188.72
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 430.79 166.68 1,543.20 535.17 2,675.84
Page 110
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kohat
Kohat District Code: 34
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 576.11 264.08 1,448.39 572.15 2,860.73
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 212.44 437.48 644.57 323.62 1,618.11
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 204.95 577.19 835.58 404.43 2,022.15
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 203.82 935.96 1,071.50 552.82 2,764.10
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 211.05 1,146.39 1,600.15 739.40 3,696.98
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 241.56 1,078.41 2,299.79 904.94 4,524.70
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 298.99 1,331.30 3,617.32 1,311.90 6,559.51
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 386.93 1,481.41 4,683.26 1,637.90 8,189.49
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 453.23 1,798.85 5,968.04 2,055.03 10,275.14
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 538.73 2,098.66 9,217.87 2,963.82 14,819.08
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 212.44 507.33 724.45 361.05 1,805.27
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 204.95 577.19 854.40 409.14 2,045.68
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 198.17 935.96 1,046.08 545.05 2,725.26
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 211.05 1,146.39 1,745.18 775.66 3,878.28
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 241.56 1,078.41 3,318.17 1,159.54 5,797.68
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 298.99 1,331.30 4,874.63 1,626.23 8,131.15
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 386.93 1,481.41 6,811.69 2,170.01 10,850.03
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 453.23 1,798.85 9,238.31 2,872.60 14,362.99
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 538.73 2,098.66 12,996.73 3,908.53 19,542.65
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 87.04 118.93 399.86 151.46 757.28
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 760.14 612.95 3,534.04 1,226.78 6,133.91
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 5.18 - 109.50 28.67 143.35
508a BRICK PAVING (SINGLE COURSE) SM 106.70 32.70 251.43 97.71 488.54
508b BRICK PAVING (DOUBLE COURSE) SM 190.98 32.70 499.32 180.75 903.76
Page 111
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kohat
Kohat District Code: 34
509d GROUTED RIP RAP CLASS "A" CM 569.88 102.14 1,748.10 605.03 3,025.15
509e GROUTED RIP RAP CLASS "B" CM 549.49 81.72 1,598.31 557.38 2,786.90
509f GROUTED RIP RAP CLASS "C" CM 542.20 68.10 1,643.41 563.43 2,817.13
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 771.05 353.02 4,099.51 1,305.90 6,529.48
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 43.73 191.97 400.99 159.17 795.86
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 148.51 67.48 53.89 67.47 337.35
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 190.10 86.37 68.98 86.36 431.80
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 242.42 180.32 362.76 196.38 981.88
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 303.02 225.40 453.45 245.47 1,227.35
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 274.07 572.25 2,225.15 767.86 3,839.32
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 929.75 670.54 4,081.29 1,420.39 7,101.96
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 135.10 90.27 430.75 164.03 820.14
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 26.80 - 1,197.58 306.09 1,530.47
604d STEEL POST OF METAL GUARD RAIL EACH 93.46 976.73 3,776.31 1,211.62 6,058.12
605a CONCRETE BEAM GUARD RAIL M 69.51 30.82 593.39 173.43 867.15
605c CONCRETE POST FOR GUARD RAIL M 85.34 27.36 593.85 176.64 883.20
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 217.01 255.15 6,848.29 1,830.11 9,150.57
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 68.95 382.72 9,243.83 2,423.88 12,119.38
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 217.01 541.89 11,864.05 3,155.74 15,778.69
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 685.96 598.64 20,920.35 5,551.24 27,756.18
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 137.19 119.73 9,200.07 2,364.25 11,821.24
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.70 5.86 16.16 6.18 30.91
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.90 4.03 39.68 11.15 55.76
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.70 5.86 21.57 7.53 37.67
LINES OF 20 cm WIDTH
Page 112
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kohat
Kohat District Code: 34
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.90 4.03 52.92 14.46 72.31
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 72.37 5.22 156.19 58.44 292.22
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 72.37 9.98 500.01 145.59 727.95
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.38 8.59 22.48 8.61 43.06
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.38 9.63 67.50 20.13 100.65
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.38 6.95 29.97 10.08 50.38
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.38 9.63 90.01 25.75 128.77
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 72.37 3.73 217.05 73.29 366.43
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 72.37 7.90 851.20 232.87 1,164.33
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 60.56 3.73 104.13 42.10 210.52
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 60.56 7.90 333.84 100.58 502.88
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 60.56 3.73 144.70 52.25 261.23
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 60.56 7.90 568.32 159.20 795.98
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 9.38 81.62 193.85 71.21 356.06
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 9.38 81.62 233.85 81.21 406.05
DOUBLE)
610b RIGHT OF WAY MARKER EACH 95.52 121.33 301.54 129.60 647.98
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 594.15 976.31 2,028.46 899.73 4,498.65
610d TEN KILOMETRE POST EACH 1,134.63 1,952.61 4,452.94 1,885.05 9,425.23
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT M 132.06 91.00 951.76 293.71 1,468.53
WITH PRECAST PRESTRESSED R.C.C. POST
Page 113
.
Page 114
NATIONAL HIGHWAY AUTHORITY
KOHISTAN DASU
(35)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 115
.
Page 116
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kohistan
Kohistan dasu
dasu District Code: 35
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 11.09 194.12 1.31 51.63 258.14
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 31.25 511.33 2.94 136.38 681.90
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 125.02 2,045.30 11.77 545.52 2,727.61
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 192.10 354.26 56.92 150.82 754.09
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 25.67 378.55 - 101.06 505.28
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 16.91 293.88 - 77.70 388.49
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 192.10 354.26 56.92 150.82 754.09
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 30.51 353.95 - 96.12 480.58
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 13.04 295.59 - 77.16 385.79
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 11.98 154.11 0.43 41.63 208.14
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 94.34 321.57 79.30 123.80 619.01
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 169.52 478.26 37.95 171.43 857.15
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 142.21 327.64 - 117.46 587.31
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 87.18 267.53 - 88.68 443.38
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 10.62 195.67 5.70 53.00 265.00
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 30.68 540.38 60.53 157.90 789.48
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 23.01 466.72 2.71 123.11 615.55
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 12.03 198.75 8.89 54.92 274.59
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 9.59 85.47 5.70 25.19 125.96
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 22.13 123.52 3.39 37.26 186.31
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 2.15 30.62 1.63 8.60 43.00
Page 117
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kohistan
Kohistan dasu
dasu District Code: 35
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.60 20.39 0.87 5.71 28.57
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 1.33 17.09 0.89 4.83 24.14
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.97 17.44 1.00 5.10 25.52
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 103.44 1,646.08 6,875.71 2,156.31 10,781.54
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 107.05 1,646.08 7,338.58 2,272.93 11,364.64
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 114.83 1,719.24 6,864.90 2,174.74 10,873.71
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 114.83 1,712.72 7,500.48 2,332.01 11,660.05
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 366.50 997.76 59,188.60 15,138.22 75,691.08
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 366.50 997.76 57,468.44 14,708.18 73,540.88
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 133.65 122.95 1,160.29 354.22 1,771.10
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 215.35 2,657.36 6,504.77 2,344.37 11,721.84
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 145.86 137.64 810.40 273.47 1,367.37
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 2.63 49.09 1.37 13.27 66.36
207b DEEP PATCHING (16-30 cm) SM 2.63 43.25 1.37 11.81 59.06
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 3.46 120.57 0.74 31.19 155.95
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.69 24.11 0.15 6.24 31.19
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.45 1.72 42.01 11.04 55.21
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.43 1.72 46.89 12.26 61.30
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.18 0.63 17.58 4.60 22.99
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.18 0.63 20.51 5.33 26.65
Page 118
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kohistan
Kohistan dasu
dasu District Code: 35
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 97.95 1,623.37 8,049.70 2,442.75 12,213.77
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 97.95 1,567.67 8,689.51 2,588.78 12,943.92
"B")
307a DENSE GRADED HOT BIT-MAC CM 240.34 413.95 6,715.99 1,842.57 9,212.85
307b OPEN GRADED HOT BIT-MAC CM 240.34 413.95 6,523.78 1,794.52 8,972.59
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 42.53 643.80 2,322.17 752.13 3,760.63
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 39.44 709.26 50,595.97 12,836.17 64,180.84
401a1i CONCRETE CLASS "A1" (Underground) CM 761.72 1,165.93 4,606.28 1,633.48 8,167.42
401a1ii CONCRETE CLASS "A1" (On ground) CM 761.72 1,165.93 4,911.50 1,709.79 8,548.94
401a1iii CONCRETE CLASS "A1" (Elevated) CM 761.72 1,165.93 5,521.94 1,862.40 9,311.99
401a2i CONCRETE CLASS "A2" (Underground) CM 761.72 1,165.93 5,022.08 1,737.43 8,687.17
401a2ii CONCRETE CLASS "A2" (On ground) CM 761.72 1,165.93 5,327.30 1,813.74 9,068.69
401a2iii CONCRETE CLASS "A2" (Elevated) CM 761.72 1,165.93 5,937.74 1,966.35 9,831.74
401a3i CONCRETE CLASS "A3" (Underground) CM 761.72 1,165.93 5,437.88 1,841.38 9,206.92
401a3ii CONCRETE CLASS "A3" (On ground) CM 761.72 1,165.93 5,743.10 1,917.69 9,588.44
401a3iii CONCRETE CLASS "A3" (Elevated) CM 761.72 1,165.93 6,353.54 2,070.30 10,351.49
401ci CONCRETE CLASS "C" (Underground) CM 756.12 550.60 4,146.95 1,363.42 6,817.09
401cii CONCRETE CLASS "C" (On ground) CM 756.12 550.60 4,277.13 1,395.96 6,979.81
401ciii CONCRETE CLASS "C" (Elevated) CM 756.12 550.60 4,537.48 1,461.05 7,305.25
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 2,528.19 1,041.87 5,732.19 2,325.56 11,627.81
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 2,528.19 1,041.87 6,563.79 2,533.46 12,667.31
401gii PRECAST CONCRETE CLASS "B" CM 2,528.19 1,041.87 5,457.45 2,256.87 11,284.37
401giii(1) PRECAST CONCRETE CLASS "D1" CM 2,528.19 1,041.87 6,979.59 2,637.41 13,187.06
Page 119
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kohistan
Kohistan dasu
dasu District Code: 35
401giii(2) PRECAST CONCRETE CLASS "D2" CM 2,528.19 1,041.87 7,395.39 2,741.36 13,706.81
401giii(3) PRECAST CONCRETE CLASS "D3" CM 2,528.19 1,041.87 7,811.19 2,845.31 14,226.56
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 2,269.93 859.62 67,625.80 17,688.84 88,444.19
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 2,269.93 859.62 75,710.80 19,710.09 98,550.44
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,791.78 5,933.20 62,730.55 17,613.88 88,069.41
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 3,585.21 17,224.95 147,324.91 42,033.77 210,168.84
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 160.01 - 338.37 124.60 622.98
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 160.01 - 337.24 124.31 621.57
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.03 - 2.33 0.59 2.95
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 27.56 76.65 129.89 58.53 292.63
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 461.25 1,819.45 1,094.63 843.83 4,219.16
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 691.88 2,729.17 1,641.95 1,265.75 6,328.75
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 691.88 2,729.17 1,204.56 1,156.40 5,782.01
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 1,153.13 4,548.62 1,403.66 1,776.35 8,881.76
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 988.40 5,373.43 1,607.96 1,992.45 9,962.24
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,729.70 7,600.76 1,765.77 2,774.06 13,870.28
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 32,702.74 50,346.23 117,420.05 50,117.26 250,586.28
407i PILE LOAD TEST UP TO 240 TON EACH 60,581.96 50,346.23 234,840.10 86,442.07 432,210.37
407j PILE LOAD TEST UP TO 360 TON EACH 88,461.19 55,207.22 352,260.15 123,982.14 619,910.70
407k CONFIRMATORY BORING (NX SIZE) M 264.58 1,740.22 7.00 502.95 2,514.75
411a STONE MASONRY RANDOM DRY CM 432.02 118.76 622.73 293.38 1,466.89
411b STONE MASONRY RANDOM WITH MORTAR CM 465.81 183.35 1,886.10 633.81 3,169.07
411c STONE MASONRY DRESSED UNCOURSED DRY CM 561.55 118.76 690.06 342.59 1,712.96
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 660.10 183.35 1,931.97 693.86 3,469.28
Page 120
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kohistan
Kohistan dasu
dasu District Code: 35
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 885.37 290.49 1,827.69 750.89 3,754.44
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 333.83 481.23 711.93 381.75 1,908.75
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 323.67 634.90 922.63 470.30 2,351.50
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 319.03 1,029.55 1,182.72 632.82 3,164.12
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 332.27 1,261.03 1,764.92 839.55 4,197.77
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 381.20 1,186.26 2,534.53 1,025.49 5,127.47
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 470.90 1,464.43 3,985.92 1,480.31 7,401.57
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 609.40 1,629.55 5,158.43 1,849.34 9,246.72
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 715.85 1,978.74 6,573.15 2,316.93 11,584.67
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 848.26 2,308.53 10,149.35 3,326.53 16,632.67
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 333.83 558.07 803.28 423.80 2,118.98
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 323.67 634.90 943.33 475.47 2,377.37
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 309.99 1,029.55 1,154.75 623.58 3,117.88
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 332.27 1,261.03 1,923.40 879.17 4,395.87
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 381.20 1,186.26 3,655.27 1,305.68 6,528.41
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 470.90 1,464.43 5,368.97 1,826.07 9,130.37
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 609.40 1,629.55 7,499.70 2,434.66 12,173.31
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 715.85 1,978.74 10,170.45 3,216.26 16,081.30
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 848.26 2,308.53 14,306.10 4,365.72 21,828.60
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 134.53 130.82 563.91 207.31 1,036.57
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 1,133.63 674.24 4,151.84 1,489.93 7,449.64
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 7.55 - 122.35 32.47 162.37
508a BRICK PAVING (SINGLE COURSE) SM 164.47 35.97 300.39 125.21 626.04
508b BRICK PAVING (DOUBLE COURSE) SM 294.00 35.97 595.85 231.46 1,157.28
Page 121
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kohistan
Kohistan dasu
dasu District Code: 35
509d GROUTED RIP RAP CLASS "A" CM 873.06 112.36 2,134.72 780.03 3,900.17
509e GROUTED RIP RAP CLASS "B" CM 841.49 89.89 1,962.67 723.51 3,617.57
509f GROUTED RIP RAP CLASS "C" CM 830.77 74.91 2,015.68 730.34 3,651.70
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 1,187.18 388.33 4,759.55 1,583.76 7,918.82
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 70.25 211.17 531.50 203.23 1,016.15
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 227.79 74.22 84.25 96.57 482.83
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 291.58 95.01 107.84 123.60 618.02
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 370.42 198.35 438.94 251.93 1,259.65
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 463.02 247.94 548.68 314.91 1,574.56
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 415.87 648.78 2,647.31 927.99 4,639.94
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 1,427.45 745.57 4,781.61 1,738.66 8,693.28
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 207.86 102.44 512.83 205.78 1,028.92
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 32.01 - 1,233.50 316.38 1,581.90
604d STEEL POST OF METAL GUARD RAIL EACH 117.97 1,006.03 3,889.60 1,253.40 6,267.00
605a CONCRETE BEAM GUARD RAIL M 100.22 31.75 625.42 189.35 946.74
605c CONCRETE POST FOR GUARD RAIL M 123.05 28.18 628.29 194.88 974.41
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 312.67 262.80 7,087.58 1,915.76 9,578.82
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 101.93 394.21 9,587.80 2,520.98 12,604.92
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 312.67 558.14 12,331.71 3,300.63 16,503.16
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 1,010.74 616.60 21,728.96 5,839.08 29,195.39
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 202.15 123.32 9,531.12 2,464.15 12,320.73
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.98 6.03 16.67 6.67 33.36
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.33 4.15 41.05 11.63 58.16
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.98 6.03 22.24 8.06 40.32
LINES OF 20 cm WIDTH
Page 122
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kohistan
Kohistan dasu
dasu District Code: 35
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.33 4.15 54.75 15.06 75.29
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 94.07 5.37 161.05 65.12 325.62
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 94.07 10.28 517.33 155.42 777.10
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.98 8.85 23.17 9.25 46.25
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.98 9.92 69.53 21.11 105.54
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.98 7.16 30.90 10.76 53.79
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.98 9.92 92.71 26.90 134.51
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 94.07 3.84 223.73 80.41 402.06
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 94.07 8.13 876.74 244.74 1,223.68
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 79.48 3.84 107.37 47.67 238.36
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 79.48 8.13 345.41 108.26 541.28
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 79.48 3.84 149.16 58.12 290.59
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 79.48 8.13 585.37 168.25 841.24
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 13.98 84.07 199.77 74.45 372.27
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 13.97 84.06 240.97 84.75 423.76
DOUBLE)
610b RIGHT OF WAY MARKER EACH 140.54 124.97 320.97 146.62 733.09
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 839.65 1,005.59 2,181.85 1,006.78 5,033.88
610d TEN KILOMETRE POST EACH 1,601.40 2,011.19 4,767.99 2,095.14 10,475.72
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT M 189.55 99.10 1,023.53 328.04 1,640.22
WITH PRECAST PRESTRESSED R.C.C. POST
Page 123
.
Page 124
NATIONAL HIGHWAY AUTHORITY
LUCKY MURWAT
(41-B)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 125
.
Page 126
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Lucky
Lucky Murwat
Murwat District Code: 41-B
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 8.04 173.32 1.17 45.63 228.16
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 23.36 456.54 2.63 120.63 603.16
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 93.44 1,826.16 10.51 482.53 2,412.64
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 132.61 316.30 50.82 124.93 624.67
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 18.39 337.99 - 89.10 445.48
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 11.98 262.40 - 68.59 342.97
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 132.61 316.30 50.82 124.93 624.67
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 21.06 316.03 - 84.27 421.36
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 9.25 263.92 - 68.29 341.47
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 7.48 137.60 0.38 36.37 181.83
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 69.85 287.11 70.80 106.94 534.71
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 117.00 427.01 33.88 144.47 722.37
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 99.12 292.53 - 97.91 489.56
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 60.17 238.86 - 74.76 373.80
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 7.19 174.71 5.09 46.75 233.74
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 21.58 482.48 54.04 139.53 697.63
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 16.19 416.71 2.42 108.83 544.15
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 8.36 177.46 7.94 48.44 242.20
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 6.53 76.32 5.09 21.98 109.92
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 15.59 110.29 3.03 32.23 161.13
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.47 27.34 1.46 7.57 37.83
Page 127
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Lucky
Lucky Murwat
Murwat District Code: 41-B
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.06 18.21 0.77 5.01 25.06
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.92 15.26 0.79 4.24 21.22
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.34 15.57 0.90 4.45 22.25
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 80.25 1,510.17 6,200.76 1,947.80 9,738.98
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 82.63 1,510.17 6,645.99 2,059.70 10,298.49
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 88.43 1,577.28 6,190.35 1,964.01 9,820.07
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 88.43 1,571.31 6,796.47 2,114.05 10,570.25
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 258.08 915.38 55,149.87 14,080.83 70,404.16
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 258.08 915.38 53,571.74 13,686.30 68,431.50
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 109.21 112.80 920.29 285.58 1,427.88
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 160.09 2,437.94 5,848.76 2,111.70 10,558.50
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 120.75 126.27 719.09 241.53 1,207.65
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 1.84 45.04 1.26 12.03 60.17
207b DEEP PATCHING (16-30 cm) SM 1.84 39.67 1.26 10.69 53.47
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.22 110.61 0.68 28.38 141.89
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.44 22.12 0.14 5.68 28.38
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.31 1.57 39.14 10.26 51.28
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.30 1.57 43.69 11.39 56.96
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.12 0.58 16.38 4.27 21.36
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.12 0.58 19.11 4.95 24.77
Page 128
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Lucky
Lucky Murwat
Murwat District Code: 41-B
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 74.21 1,489.33 7,300.44 2,216.00 11,079.98
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 74.21 1,438.23 7,888.15 2,350.15 11,750.74
"B")
307a DENSE GRADED HOT BIT-MAC CM 182.91 379.77 6,086.42 1,662.27 8,311.37
307b OPEN GRADED HOT BIT-MAC CM 182.91 379.77 5,911.72 1,618.60 8,093.00
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 30.69 590.65 2,123.13 686.12 3,430.59
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 28.39 650.70 47,291.92 11,992.75 59,963.76
401a1i CONCRETE CLASS "A1" (Underground) CM 585.32 1,059.94 3,924.75 1,392.50 6,962.51
401a1ii CONCRETE CLASS "A1" (On ground) CM 585.32 1,059.94 4,202.22 1,461.87 7,309.35
401a1iii CONCRETE CLASS "A1" (Elevated) CM 585.32 1,059.94 4,757.17 1,600.61 8,003.03
401a2i CONCRETE CLASS "A2" (Underground) CM 585.32 1,059.94 4,302.75 1,487.00 7,435.01
401a2ii CONCRETE CLASS "A2" (On ground) CM 585.32 1,059.94 4,580.22 1,556.37 7,781.85
401a2iii CONCRETE CLASS "A2" (Elevated) CM 585.32 1,059.94 5,135.17 1,695.11 8,475.53
401a3i CONCRETE CLASS "A3" (Underground) CM 585.32 1,059.94 4,680.75 1,581.50 7,907.51
401a3ii CONCRETE CLASS "A3" (On ground) CM 585.32 1,059.94 4,958.22 1,650.87 8,254.35
401a3iii CONCRETE CLASS "A3" (Elevated) CM 585.32 1,059.94 5,513.17 1,789.61 8,948.03
401ci CONCRETE CLASS "C" (Underground) CM 586.28 500.55 3,481.48 1,142.08 5,710.39
401cii CONCRETE CLASS "C" (On ground) CM 586.28 500.55 3,599.82 1,171.66 5,858.32
401ciii CONCRETE CLASS "C" (Elevated) CM 586.28 500.55 3,836.51 1,230.83 6,154.17
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 2,017.87 947.15 4,924.54 1,972.39 9,861.95
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 2,017.87 947.15 5,680.54 2,161.39 10,806.95
401gii PRECAST CONCRETE CLASS "B" CM 2,017.87 947.15 4,681.42 1,911.61 9,558.05
401giii(1) PRECAST CONCRETE CLASS "D1" CM 2,017.87 947.15 6,058.54 2,255.89 11,279.45
Page 129
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Lucky
Lucky Murwat
Murwat District Code: 41-B
401giii(2) PRECAST CONCRETE CLASS "D2" CM 2,017.87 947.15 6,436.54 2,350.39 11,751.95
401giii(3) PRECAST CONCRETE CLASS "D3" CM 2,017.87 947.15 6,814.54 2,444.89 12,224.45
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,802.64 781.47 60,842.00 15,856.53 79,282.64
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,802.64 781.47 68,192.00 17,694.03 88,470.14
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,448.99 5,393.81 56,542.49 15,846.32 79,231.62
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 2,873.81 15,659.05 133,838.87 38,092.93 190,464.67
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 131.45 - 305.68 109.28 546.41
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 131.45 - 304.89 109.08 545.42
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.53 2.67
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 22.67 69.68 119.04 52.85 264.24
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 375.34 1,654.04 903.13 733.13 3,665.64
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 563.00 2,481.06 1,354.70 1,099.69 5,498.45
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 563.00 2,481.06 1,002.75 1,011.70 5,058.52
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 938.34 4,135.11 1,183.21 1,564.16 7,820.82
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 804.29 4,884.94 1,368.56 1,764.45 8,822.24
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,407.51 6,909.78 1,500.29 2,454.40 12,271.98
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 26,948.44 45,769.30 90,203.26 40,730.25 203,651.26
407i PILE LOAD TEST UP TO 240 TON EACH 50,661.04 45,769.30 180,406.52 69,209.22 346,046.08
407j PILE LOAD TEST UP TO 360 TON EACH 74,373.63 50,188.38 270,609.78 98,792.95 493,964.74
407k CONFIRMATORY BORING (NX SIZE) M 225.35 1,582.02 6.37 453.43 2,267.17
411a STONE MASONRY RANDOM DRY CM 328.42 107.96 551.78 247.04 1,235.20
411b STONE MASONRY RANDOM WITH MORTAR CM 353.70 166.68 1,578.12 524.62 2,623.12
411c STONE MASONRY DRESSED UNCOURSED DRY CM 431.67 107.96 613.00 288.16 1,440.79
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 508.57 166.68 1,650.38 581.41 2,907.04
Page 130
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Lucky
Lucky Murwat
Murwat District Code: 41-B
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 689.78 264.08 1,555.58 627.36 3,136.80
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 265.21 437.48 643.39 336.52 1,682.61
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 259.02 577.19 834.17 417.59 2,087.97
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 248.57 935.96 1,069.85 563.60 2,817.98
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 261.90 1,146.39 1,598.23 751.63 3,758.15
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 299.40 1,078.41 2,297.87 918.92 4,594.60
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 368.40 1,331.30 3,614.54 1,328.56 6,642.80
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 476.75 1,481.41 4,680.50 1,659.66 8,298.32
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 560.86 1,798.85 5,964.68 2,081.10 10,405.49
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 665.51 2,098.66 9,213.95 2,994.53 14,972.66
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 265.21 507.33 722.10 373.66 1,868.31
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 259.02 577.19 852.99 422.30 2,111.50
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 242.64 935.96 1,044.43 555.76 2,778.79
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 261.90 1,146.39 1,743.69 788.00 3,939.98
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 299.40 1,078.41 3,316.03 1,173.46 5,867.31
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 368.40 1,331.30 4,871.85 1,642.89 8,214.44
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 476.75 1,481.41 6,808.93 2,191.77 10,958.86
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 560.86 1,798.85 9,234.95 2,898.67 14,493.33
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 665.51 2,098.66 12,992.82 3,939.25 19,696.24
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 102.61 118.93 287.07 127.15 635.75
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 851.42 612.95 3,505.19 1,242.39 6,211.95
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 6.08 - 110.38 29.11 145.57
508a BRICK PAVING (SINGLE COURSE) SM 128.91 32.70 250.12 102.93 514.66
508b BRICK PAVING (DOUBLE COURSE) SM 232.15 32.70 497.64 190.62 953.12
Page 131
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Lucky
Lucky Murwat
Murwat District Code: 41-B
509d GROUTED RIP RAP CLASS "A" CM 683.69 102.14 1,849.95 658.95 3,294.73
509e GROUTED RIP RAP CLASS "B" CM 660.31 81.72 1,701.61 610.91 3,054.54
509f GROUTED RIP RAP CLASS "C" CM 653.50 68.10 1,746.83 617.11 3,085.54
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 911.79 353.02 4,072.29 1,334.28 6,671.38
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 55.09 191.97 341.18 147.06 735.30
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 175.23 67.48 74.26 79.24 396.21
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 224.30 86.37 95.05 101.43 507.14
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 285.81 180.32 371.64 209.44 1,047.22
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 357.27 225.40 464.55 261.81 1,309.03
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 310.41 572.25 2,199.64 770.57 3,852.87
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 1,107.10 670.54 4,065.84 1,460.87 7,304.35
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 160.54 90.27 425.82 169.16 845.78
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 28.15 - 1,197.58 306.43 1,532.15
604d STEEL POST OF METAL GUARD RAIL EACH 92.54 976.73 3,776.31 1,211.39 6,056.97
605a CONCRETE BEAM GUARD RAIL M 87.77 30.82 594.26 178.21 891.06
605c CONCRETE POST FOR GUARD RAIL M 107.77 27.36 594.53 182.42 912.08
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 270.26 255.15 6,855.57 1,845.24 9,226.22
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 79.67 382.72 9,245.65 2,427.01 12,135.05
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 270.26 541.89 11,866.42 3,169.64 15,848.21
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 903.84 598.64 20,927.09 5,607.39 28,036.97
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 180.77 119.73 9,206.60 2,376.77 11,883.87
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.08 5.86 16.17 6.28 31.38
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.03 4.03 39.77 11.21 56.03
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.08 5.86 21.58 7.63 38.14
LINES OF 20 cm WIDTH
Page 132
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Lucky
Lucky Murwat
Murwat District Code: 41-B
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.03 4.03 53.05 14.53 72.63
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 89.41 5.22 156.28 62.73 313.63
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 89.41 9.98 501.20 150.15 750.75
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.84 8.59 22.49 8.73 43.65
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.84 9.63 67.50 20.24 101.22
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.84 6.95 29.99 10.20 50.98
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.84 9.63 90.01 25.87 129.35
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 89.41 3.73 217.14 77.57 387.84
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 89.41 7.90 851.20 237.13 1,185.64
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 74.25 3.73 104.19 45.54 227.70
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 74.25 7.90 334.64 104.20 520.98
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 74.25 3.73 144.76 55.68 278.41
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 74.25 7.90 568.32 162.62 813.09
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 10.34 81.62 193.80 71.44 357.20
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 10.34 81.62 233.80 81.44 407.19
DOUBLE)
610b RIGHT OF WAY MARKER EACH 121.74 121.33 300.09 135.79 678.95
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 745.53 976.31 2,018.48 935.08 4,675.39
610d TEN KILOMETRE POST EACH 1,440.50 1,952.61 4,434.84 1,956.99 9,784.95
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT M 151.04 91.00 950.20 298.06 1,490.31
WITH PRECAST PRESTRESSED R.C.C. POST
Page 133
.
Page 134
NATIONAL HIGHWAY AUTHORITY
MALAKAND
(42)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 135
.
Page 136
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Malakand
Malakand District Code: 42
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 6.10 173.32 1.17 45.15 225.74
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 17.23 456.54 2.63 119.10 595.50
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 68.93 1,826.16 10.51 476.40 2,382.00
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 108.10 316.30 50.82 118.81 594.03
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 14.48 337.99 - 88.12 440.60
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 9.55 262.40 - 67.99 339.93
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 108.10 316.30 50.82 118.81 594.03
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 17.16 316.03 - 83.30 416.49
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 7.35 263.92 - 67.82 339.10
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 6.61 137.60 0.38 36.15 180.74
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 55.47 287.11 70.80 103.35 516.73
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 95.34 427.01 33.88 139.06 695.29
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 80.06 292.53 - 93.15 465.74
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 49.03 238.86 - 71.97 359.87
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 5.92 174.71 5.09 46.43 232.15
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 17.17 482.48 54.04 138.42 692.11
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 12.88 416.71 2.42 108.00 540.01
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 6.70 177.46 7.94 48.02 240.12
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 5.37 76.32 5.09 21.69 108.47
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 12.33 110.29 3.03 31.41 157.05
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.20 27.34 1.46 7.50 37.49
Page 137
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Malakand
Malakand District Code: 42
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 0.89 18.21 0.77 4.97 24.84
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.75 15.26 0.79 4.20 21.00
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.10 15.57 0.90 4.39 21.95
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 58.31 1,510.17 6,021.56 1,897.51 9,487.54
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 60.29 1,510.17 6,435.32 2,001.44 10,007.22
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 64.88 1,577.28 6,011.52 1,913.42 9,567.11
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 64.88 1,571.31 6,582.07 2,054.56 10,272.82
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 210.59 915.38 52,944.03 13,517.50 67,587.50
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 210.59 915.38 51,365.90 13,122.97 65,614.84
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 76.35 112.80 897.86 271.75 1,358.76
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 121.06 2,437.94 5,683.23 2,060.56 10,302.80
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 83.33 126.27 756.53 241.53 1,207.66
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 1.52 45.04 1.26 11.95 59.77
207b DEEP PATCHING (16-30 cm) SM 1.52 39.67 1.26 10.61 53.07
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.00 110.61 0.68 28.32 141.61
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.40 22.12 0.14 5.66 28.32
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.25 1.57 37.58 9.85 49.25
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.24 1.57 41.94 10.94 54.70
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.10 0.58 15.73 4.10 20.51
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.10 0.58 18.35 4.76 23.79
Page 138
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Malakand
Malakand District Code: 42
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 55.04 1,489.33 7,064.48 2,152.21 10,761.06
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 55.04 1,438.23 7,628.62 2,280.47 11,402.36
"B")
307a DENSE GRADED HOT BIT-MAC CM 133.73 379.77 5,867.54 1,595.26 7,976.30
307b OPEN GRADED HOT BIT-MAC CM 133.73 379.77 5,688.56 1,550.52 7,752.58
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 23.37 590.65 2,066.44 670.11 3,350.57
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 22.51 650.70 45,020.56 11,423.44 57,117.21
401a1i CONCRETE CLASS "A1" (Underground) CM 470.65 1,059.94 3,957.32 1,371.98 6,859.88
401a1ii CONCRETE CLASS "A1" (On ground) CM 470.65 1,059.94 4,234.80 1,441.34 7,206.72
401a1iii CONCRETE CLASS "A1" (Elevated) CM 470.65 1,059.94 4,789.74 1,580.08 7,900.40
401a2i CONCRETE CLASS "A2" (Underground) CM 470.65 1,059.94 4,335.32 1,466.48 7,332.38
401a2ii CONCRETE CLASS "A2" (On ground) CM 470.65 1,059.94 4,612.80 1,535.84 7,679.22
401a2iii CONCRETE CLASS "A2" (Elevated) CM 470.65 1,059.94 5,167.74 1,674.58 8,372.90
401a3i CONCRETE CLASS "A3" (Underground) CM 470.65 1,059.94 4,713.32 1,560.98 7,804.88
401a3ii CONCRETE CLASS "A3" (On ground) CM 470.65 1,059.94 4,990.80 1,630.34 8,151.72
401a3iii CONCRETE CLASS "A3" (Elevated) CM 470.65 1,059.94 5,545.74 1,769.08 8,845.40
401ci CONCRETE CLASS "C" (Underground) CM 464.47 500.55 3,496.88 1,115.47 5,577.37
401cii CONCRETE CLASS "C" (On ground) CM 464.47 500.55 3,615.22 1,145.06 5,725.30
401ciii CONCRETE CLASS "C" (Elevated) CM 464.47 500.55 3,851.91 1,204.23 6,021.15
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,560.36 947.15 4,962.45 1,867.49 9,337.46
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,560.36 947.15 5,718.45 2,056.49 10,282.46
401gii PRECAST CONCRETE CLASS "B" CM 1,560.36 947.15 4,685.02 1,798.13 8,990.67
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,560.36 947.15 6,096.45 2,150.99 10,754.96
Page 139
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Malakand
Malakand District Code: 42
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,560.36 947.15 6,474.45 2,245.49 11,227.46
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,560.36 947.15 6,852.45 2,339.99 11,699.96
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,445.94 781.47 60,736.00 15,740.85 78,704.26
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,445.94 781.47 68,086.00 17,578.35 87,891.76
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,147.38 5,393.81 56,467.29 15,752.12 78,760.60
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 2,333.44 15,659.05 133,885.80 37,969.57 189,847.87
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 100.44 - 304.79 101.31 506.54
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 100.44 - 303.87 101.08 505.38
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.01 - 2.12 0.53 2.67
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 16.84 69.68 118.30 51.21 256.03
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 306.83 1,654.04 910.36 717.81 3,589.04
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 460.24 2,481.06 1,365.55 1,076.71 5,383.56
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 460.24 2,481.06 1,013.47 988.69 4,943.46
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 767.06 4,135.11 1,201.08 1,525.81 7,629.07
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 657.48 4,884.94 1,400.09 1,735.63 8,678.15
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,150.59 6,909.78 1,527.11 2,396.87 11,984.35
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 18,577.21 45,769.30 98,475.26 40,705.44 203,527.21
407i PILE LOAD TEST UP TO 240 TON EACH 34,351.60 45,769.30 196,950.52 69,267.86 346,339.28
407j PILE LOAD TEST UP TO 360 TON EACH 50,125.99 50,188.38 295,425.78 98,935.04 494,675.20
407k CONFIRMATORY BORING (NX SIZE) M 167.77 1,582.02 6.37 439.04 2,195.20
411a STONE MASONRY RANDOM DRY CM 262.81 107.96 534.02 226.20 1,130.99
411b STONE MASONRY RANDOM WITH MORTAR CM 285.56 166.68 1,579.15 507.85 2,539.24
411c STONE MASONRY DRESSED UNCOURSED DRY CM 343.37 107.96 593.83 261.29 1,306.45
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 406.40 166.68 1,645.31 554.60 2,772.98
Page 140
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Malakand
Malakand District Code: 42
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 544.76 264.08 1,550.50 589.84 2,949.18
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 192.55 437.48 643.98 318.50 1,592.52
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 186.80 577.19 834.87 399.72 1,998.58
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 184.85 935.96 1,070.67 547.87 2,739.36
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 191.95 1,146.39 1,599.19 734.38 3,671.91
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 219.17 1,078.41 2,298.83 899.10 4,495.52
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 271.40 1,331.30 3,615.93 1,304.66 6,523.28
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 351.22 1,481.41 4,681.88 1,628.63 8,143.13
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 410.23 1,798.85 5,966.36 2,043.86 10,219.30
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 489.73 2,098.66 9,215.91 2,951.08 14,755.38
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 192.55 507.33 723.27 355.79 1,778.94
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 186.80 577.19 853.69 404.42 2,022.10
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 180.16 935.96 1,045.25 540.34 2,701.71
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 191.95 1,146.39 1,744.43 770.69 3,853.47
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 219.17 1,078.41 3,317.10 1,153.67 5,768.36
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 271.40 1,331.30 4,873.24 1,618.98 8,094.92
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 351.22 1,481.41 6,810.31 2,160.73 10,803.67
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 410.23 1,798.85 9,236.63 2,861.43 14,307.14
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 489.73 2,098.66 12,994.77 3,895.79 19,478.96
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 76.13 118.93 399.87 148.73 743.66
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 679.54 612.95 3,510.51 1,200.75 6,003.75
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 4.67 - 109.86 28.63 143.16
508a BRICK PAVING (SINGLE COURSE) SM 100.24 32.70 249.17 95.53 477.65
508b BRICK PAVING (DOUBLE COURSE) SM 180.80 32.70 494.80 177.08 885.38
Page 141
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Malakand
Malakand District Code: 42
509d GROUTED RIP RAP CLASS "A" CM 537.11 102.14 1,843.94 620.80 3,103.99
509e GROUTED RIP RAP CLASS "B" CM 519.35 81.72 1,694.51 573.89 2,869.47
509f GROUTED RIP RAP CLASS "C" CM 513.35 68.10 1,740.03 580.37 2,901.84
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 709.53 353.02 4,077.28 1,284.96 6,424.80
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 39.62 191.97 396.45 157.01 785.06
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 138.03 67.48 71.37 69.22 346.09
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 176.67 86.37 91.36 88.60 443.00
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 227.10 180.32 371.17 194.65 973.24
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 283.87 225.40 463.97 243.31 1,216.55
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 249.42 572.25 2,216.57 759.56 3,797.80
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 858.11 670.54 4,083.35 1,403.00 7,015.00
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 124.48 90.27 428.88 160.91 804.54
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 22.09 - 1,197.58 304.92 1,524.58
604d STEEL POST OF METAL GUARD RAIL EACH 76.16 976.73 3,776.31 1,207.30 6,036.50
605a CONCRETE BEAM GUARD RAIL M 64.28 30.82 595.22 172.58 862.90
605c CONCRETE POST FOR GUARD RAIL M 78.92 27.36 595.78 175.52 877.58
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 202.15 255.15 6,850.96 1,827.07 9,135.33
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 64.50 382.72 9,242.90 2,422.53 12,112.66
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 202.15 541.89 11,862.60 3,151.66 15,758.30
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 640.54 598.64 20,918.75 5,539.48 27,697.42
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 128.11 119.73 9,201.80 2,362.41 11,812.04
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.41 5.86 16.16 6.11 30.54
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.80 4.03 39.65 11.12 55.61
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.41 5.86 21.56 7.46 37.29
LINES OF 20 cm WIDTH
Page 142
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Malakand
Malakand District Code: 42
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.80 4.03 52.89 14.43 72.15
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 69.38 5.22 156.16 57.69 288.44
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 69.38 9.98 499.68 144.76 723.80
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.01 8.59 22.48 8.52 42.60
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.01 9.63 67.50 20.04 100.19
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.01 6.95 29.97 9.98 49.92
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.01 9.63 90.01 25.66 128.32
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 69.38 3.73 217.02 72.53 362.65
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 69.38 7.90 851.20 232.12 1,160.60
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 57.58 3.73 104.11 41.35 206.76
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 57.58 7.90 333.62 99.77 498.87
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 57.58 3.73 144.68 51.49 257.47
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 57.58 7.90 568.32 158.45 792.25
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 8.82 81.62 193.82 71.07 355.33
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 8.82 81.62 233.82 81.07 405.33
DOUBLE)
610b RIGHT OF WAY MARKER EACH 87.31 121.33 301.53 127.54 637.70
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 556.83 976.31 2,030.11 890.81 4,454.06
610d TEN KILOMETRE POST EACH 1,062.01 1,952.61 4,457.19 1,867.95 9,339.76
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT M 118.43 91.00 951.06 290.13 1,450.63
WITH PRECAST PRESTRESSED R.C.C. POST
Page 143
.
Page 144
NATIONAL HIGHWAY AUTHORITY
MANSEHRA
(43)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 145
.
Page 146
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Mansehra
Mansehra District Code: 43
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 6.87 173.32 1.17 45.34 226.69
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 18.96 456.54 2.63 119.53 597.66
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 75.83 1,826.16 10.51 478.12 2,390.62
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 134.43 316.30 50.82 125.39 626.93
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 17.55 337.99 - 88.89 444.43
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 11.57 262.40 - 68.49 342.46
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 134.43 316.30 50.82 125.39 626.93
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 21.50 316.03 - 84.38 421.92
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 8.91 263.92 - 68.21 341.05
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 7.98 137.60 0.38 36.49 182.45
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 61.11 287.11 70.80 104.76 523.79
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 119.46 427.01 33.88 145.09 725.45
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 100.28 292.53 - 98.20 491.02
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 61.44 238.86 - 75.08 375.38
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 7.20 174.71 5.09 46.75 233.75
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 20.32 482.48 54.04 139.21 696.05
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 15.24 416.71 2.42 108.59 542.96
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 7.98 177.46 7.94 48.34 241.72
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 6.40 76.32 5.09 21.95 109.76
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 14.16 110.29 3.03 31.87 159.34
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.44 27.34 1.46 7.56 37.79
Page 147
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Mansehra
Mansehra District Code: 43
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.05 18.21 0.77 5.01 25.03
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.84 15.26 0.79 4.22 21.12
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.24 15.57 0.90 4.43 22.14
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 65.74 1,510.17 5,984.60 1,890.13 9,450.63
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 68.62 1,510.17 6,393.95 1,993.18 9,965.92
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 73.41 1,577.28 5,974.66 1,906.34 9,531.69
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 73.41 1,571.31 6,539.97 2,046.17 10,230.85
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 246.88 915.38 52,507.71 13,417.49 67,087.46
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 246.88 915.38 50,929.58 13,022.96 65,114.80
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 79.47 112.80 897.90 272.54 1,362.72
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 140.98 2,437.94 5,653.69 2,058.15 10,290.76
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 87.07 126.27 788.83 250.54 1,252.72
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 1.78 45.04 1.26 12.02 60.08
207b DEEP PATCHING (16-30 cm) SM 1.78 39.67 1.26 10.68 53.38
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.27 110.61 0.68 28.39 141.95
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.45 22.12 0.14 5.68 28.39
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.31 1.57 37.27 9.79 48.94
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.30 1.57 41.60 10.87 54.34
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.12 0.58 15.60 4.08 20.38
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.12 0.58 18.20 4.72 23.62
Page 148
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Mansehra
Mansehra District Code: 43
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 63.78 1,489.33 7,016.99 2,142.53 10,712.63
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 63.78 1,438.23 7,575.87 2,269.47 11,347.36
"B")
307a DENSE GRADED HOT BIT-MAC CM 154.10 379.77 5,821.73 1,588.90 7,944.50
307b OPEN GRADED HOT BIT-MAC CM 154.10 379.77 5,644.92 1,544.70 7,723.50
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 27.21 590.65 2,056.08 668.48 3,342.42
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 25.81 650.70 44,571.28 11,311.95 56,559.74
401a1i CONCRETE CLASS "A1" (Underground) CM 511.44 1,059.94 3,936.44 1,376.95 6,884.77
401a1ii CONCRETE CLASS "A1" (On ground) CM 511.44 1,059.94 4,213.91 1,446.32 7,231.61
401a1iii CONCRETE CLASS "A1" (Elevated) CM 511.44 1,059.94 4,768.86 1,585.06 7,925.29
401a2i CONCRETE CLASS "A2" (Underground) CM 511.44 1,059.94 4,314.44 1,471.45 7,357.27
401a2ii CONCRETE CLASS "A2" (On ground) CM 511.44 1,059.94 4,591.91 1,540.82 7,704.11
401a2iii CONCRETE CLASS "A2" (Elevated) CM 511.44 1,059.94 5,146.86 1,679.56 8,397.79
401a3i CONCRETE CLASS "A3" (Underground) CM 511.44 1,059.94 4,692.44 1,565.95 7,829.77
401a3ii CONCRETE CLASS "A3" (On ground) CM 511.44 1,059.94 4,969.91 1,635.32 8,176.61
401a3iii CONCRETE CLASS "A3" (Elevated) CM 511.44 1,059.94 5,524.86 1,774.06 8,870.29
401ci CONCRETE CLASS "C" (Underground) CM 489.90 500.55 3,475.15 1,116.40 5,582.01
401cii CONCRETE CLASS "C" (On ground) CM 489.90 500.55 3,593.50 1,145.99 5,729.93
401ciii CONCRETE CLASS "C" (Elevated) CM 489.90 500.55 3,830.18 1,205.16 6,025.79
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,624.82 947.15 4,939.82 1,877.95 9,389.74
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,624.82 947.15 5,695.82 2,066.95 10,334.74
401gii PRECAST CONCRETE CLASS "B" CM 1,624.82 947.15 4,662.43 1,808.60 9,042.99
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,624.82 947.15 6,073.82 2,161.45 10,807.24
Page 149
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Mansehra
Mansehra District Code: 43
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,624.82 947.15 6,451.82 2,255.95 11,279.74
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,624.82 947.15 6,829.82 2,350.45 11,752.24
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,538.63 781.47 60,126.50 15,611.65 78,058.26
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,538.63 781.47 67,476.50 17,449.15 87,245.76
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,246.10 5,393.81 56,040.58 15,670.12 78,350.62
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 2,860.52 15,659.05 133,865.31 38,096.22 190,481.10
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 107.88 - 304.56 103.11 515.56
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 107.88 - 303.62 102.88 514.38
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.53 2.67
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 19.52 69.68 117.64 51.71 258.55
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 353.91 1,654.04 910.51 729.62 3,648.08
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 530.87 2,481.06 1,365.77 1,094.43 5,472.13
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 530.87 2,481.06 1,013.72 1,006.41 5,032.06
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 884.78 4,135.11 1,201.50 1,555.35 7,776.73
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 758.38 4,884.94 1,400.63 1,760.99 8,804.94
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,327.17 6,909.78 1,527.73 2,441.17 12,205.85
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 19,648.26 45,769.30 100,542.38 41,489.99 207,449.94
407i PILE LOAD TEST UP TO 240 TON EACH 35,422.66 45,769.30 201,084.76 70,569.18 352,845.90
407j PILE LOAD TEST UP TO 360 TON EACH 51,197.05 50,188.38 301,627.14 100,753.14 503,765.72
407k CONFIRMATORY BORING (NX SIZE) M 184.51 1,582.02 6.37 443.23 2,216.13
411a STONE MASONRY RANDOM DRY CM 266.97 107.96 613.48 247.10 1,235.52
411b STONE MASONRY RANDOM WITH MORTAR CM 289.72 166.68 1,639.82 524.06 2,620.28
411c STONE MASONRY DRESSED UNCOURSED DRY CM 347.53 107.96 679.65 283.79 1,418.93
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 410.56 166.68 1,717.03 573.57 2,867.84
Page 150
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Mansehra
Mansehra District Code: 43
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 548.92 264.08 1,622.22 608.81 3,044.04
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 199.53 437.48 643.39 320.10 1,600.51
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 192.30 577.19 834.17 400.91 2,004.57
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 196.60 935.96 1,069.85 550.60 2,753.02
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 202.63 1,146.39 1,598.23 736.81 3,684.06
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 234.98 1,078.41 2,297.87 902.82 4,514.08
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 295.38 1,331.30 3,614.54 1,310.31 6,551.53
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 382.26 1,481.41 4,680.50 1,636.04 8,180.20
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 447.92 1,798.85 5,964.68 2,052.86 10,264.32
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 533.71 2,098.66 9,213.95 2,961.58 14,807.90
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 199.53 507.33 722.10 357.24 1,786.21
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 192.30 577.19 852.99 405.62 2,028.09
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 191.91 935.96 1,044.43 543.07 2,715.37
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 202.63 1,146.39 1,743.69 773.18 3,865.88
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 234.98 1,078.41 3,316.03 1,157.36 5,786.79
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 295.38 1,331.30 4,871.85 1,624.63 8,123.17
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 382.26 1,481.41 6,808.93 2,168.15 10,840.74
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 447.92 1,798.85 9,234.95 2,870.43 14,352.16
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 533.71 2,098.66 12,992.82 3,906.30 19,531.48
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 81.78 118.93 428.06 157.19 785.95
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 743.29 612.95 3,487.40 1,210.91 6,054.55
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 5.17 - 109.00 28.54 142.71
508a BRICK PAVING (SINGLE COURSE) SM 102.38 32.70 242.44 94.38 471.90
508b BRICK PAVING (DOUBLE COURSE) SM 182.94 32.70 481.10 174.18 870.92
Page 151
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Mansehra
Mansehra District Code: 43
509d GROUTED RIP RAP CLASS "A" CM 548.26 102.14 1,911.65 640.51 3,202.56
509e GROUTED RIP RAP CLASS "B" CM 528.26 81.72 1,762.81 593.20 2,965.99
509f GROUTED RIP RAP CLASS "C" CM 520.78 68.10 1,808.53 599.35 2,996.75
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 734.97 353.02 4,055.43 1,285.86 6,429.28
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 41.96 191.97 469.98 175.98 879.90
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 141.19 67.48 84.28 73.24 366.18
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 180.72 86.37 107.88 93.74 468.71
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 231.14 180.32 379.89 197.84 989.19
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 288.93 225.40 474.86 247.30 1,236.49
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 271.10 572.25 2,205.69 762.26 3,811.30
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 893.74 670.54 4,058.90 1,405.79 7,028.97
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 129.98 90.27 426.74 161.75 808.74
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 23.58 - 1,197.58 305.29 1,526.44
604d STEEL POST OF METAL GUARD RAIL EACH 90.29 976.73 3,776.31 1,210.83 6,054.16
605a CONCRETE BEAM GUARD RAIL M 65.50 30.82 591.73 172.01 860.06
605c CONCRETE POST FOR GUARD RAIL M 80.43 27.36 591.86 174.91 874.56
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 219.42 255.15 6,853.75 1,832.08 9,160.40
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 63.61 382.72 9,243.69 2,422.51 12,112.53
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 219.42 541.89 11,862.38 3,155.92 15,779.60
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 666.44 598.64 20,924.05 5,547.28 27,736.41
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 133.29 119.73 9,208.26 2,365.32 11,826.60
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.52 5.86 16.16 6.13 30.67
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.84 4.03 39.67 11.14 55.68
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.52 5.86 21.57 7.49 37.43
LINES OF 20 cm WIDTH
Page 152
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Mansehra
Mansehra District Code: 43
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.84 4.03 52.91 14.45 72.23
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 70.48 5.22 156.18 57.97 289.85
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 70.48 9.98 499.94 145.10 725.51
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.14 8.59 22.48 8.55 42.77
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.14 9.63 67.50 20.07 100.35
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.14 6.95 29.97 10.02 50.09
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.14 9.63 90.01 25.70 128.48
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 70.48 3.73 217.04 72.81 364.06
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 70.48 7.90 851.20 232.39 1,161.97
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 58.68 3.73 104.12 41.63 208.16
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 58.68 7.90 333.80 100.09 500.47
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 58.68 3.73 144.69 51.77 258.87
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 58.68 7.90 568.32 158.72 793.62
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 8.60 81.62 193.80 71.01 355.03
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 8.60 81.62 233.80 81.00 405.02
DOUBLE)
610b RIGHT OF WAY MARKER EACH 89.22 121.33 300.02 127.64 638.21
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 567.83 976.31 2,014.67 889.70 4,448.51
610d TEN KILOMETRE POST EACH 1,084.00 1,952.61 4,427.28 1,865.97 9,329.87
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT M 123.61 91.00 949.61 291.05 1,455.27
WITH PRECAST PRESTRESSED R.C.C. POST
Page 153
.
Page 154
NATIONAL HIGHWAY AUTHORITY
MARDAN
(44)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 155
.
Page 156
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Mardan
Mardan District Code: 44
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 6.31 173.32 1.17 45.20 226.00
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 17.91 456.54 2.63 119.27 596.35
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 71.64 1,826.16 10.51 477.08 2,385.39
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 112.43 316.30 50.82 119.89 599.44
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 15.27 337.99 - 88.32 441.58
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 10.01 262.40 - 68.10 340.51
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 112.43 316.30 50.82 119.89 599.44
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 17.88 316.03 - 83.48 417.39
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 7.74 263.92 - 67.91 339.57
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 6.62 137.60 0.38 36.15 180.75
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 56.23 287.11 70.80 103.54 517.69
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 99.35 427.01 33.88 140.06 700.30
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 83.79 292.53 - 94.08 470.40
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 51.09 238.86 - 72.49 362.45
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 6.13 174.71 5.09 46.48 232.42
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 17.81 482.48 54.04 138.58 692.92
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 13.36 416.71 2.42 108.12 540.61
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 6.96 177.46 7.94 48.09 240.45
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 5.53 76.32 5.09 21.74 108.68
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 12.71 110.29 3.03 31.51 157.53
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.24 27.34 1.46 7.51 37.54
Page 157
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Mardan
Mardan District Code: 44
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 0.90 18.21 0.77 4.97 24.86
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.76 15.26 0.79 4.20 21.01
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.12 15.57 0.90 4.40 21.98
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 61.68 1,510.17 5,777.65 1,837.37 9,186.87
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 63.84 1,510.17 6,173.08 1,936.77 9,683.85
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 68.42 1,577.28 5,768.09 1,853.45 9,267.23
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 68.42 1,571.31 6,315.89 1,988.90 9,944.52
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 213.30 915.38 50,523.06 12,912.93 64,564.67
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 213.30 915.38 48,944.93 12,518.40 62,592.01
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 80.01 112.80 877.89 267.67 1,338.36
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 127.52 2,437.94 5,490.02 2,013.87 10,069.36
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 87.86 126.27 706.61 230.19 1,150.94
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 1.55 45.04 1.26 11.96 59.81
207b DEEP PATCHING (16-30 cm) SM 1.55 39.67 1.26 10.62 53.11
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.94 110.61 0.68 28.31 141.54
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.39 22.12 0.14 5.66 28.31
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.26 1.57 35.86 9.42 47.12
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.25 1.57 40.03 10.46 52.32
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.10 0.58 15.01 3.92 19.61
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.10 0.58 17.51 4.55 22.74
Page 158
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Mardan
Mardan District Code: 44
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 58.27 1,489.33 6,764.70 2,078.07 10,390.37
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 58.27 1,438.23 7,296.61 2,198.28 10,991.39
"B")
307a DENSE GRADED HOT BIT-MAC CM 142.97 379.77 5,576.28 1,524.76 7,623.78
307b OPEN GRADED HOT BIT-MAC CM 142.97 379.77 5,416.47 1,484.80 7,424.02
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 24.90 590.65 2,005.10 655.16 3,275.81
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 22.81 650.70 42,527.68 10,800.30 54,001.48
401a1i CONCRETE CLASS "A1" (Underground) CM 478.37 1,059.94 3,893.71 1,358.00 6,790.02
401a1ii CONCRETE CLASS "A1" (On ground) CM 478.37 1,059.94 4,171.18 1,427.37 7,136.86
401a1iii CONCRETE CLASS "A1" (Elevated) CM 478.37 1,059.94 4,726.13 1,566.11 7,830.54
401a2i CONCRETE CLASS "A2" (Underground) CM 478.37 1,059.94 4,271.71 1,452.50 7,262.52
401a2ii CONCRETE CLASS "A2" (On ground) CM 478.37 1,059.94 4,549.18 1,521.87 7,609.36
401a2iii CONCRETE CLASS "A2" (Elevated) CM 478.37 1,059.94 5,104.13 1,660.61 8,303.04
401a3i CONCRETE CLASS "A3" (Underground) CM 478.37 1,059.94 4,649.71 1,547.00 7,735.02
401a3ii CONCRETE CLASS "A3" (On ground) CM 478.37 1,059.94 4,927.18 1,616.37 8,081.86
401a3iii CONCRETE CLASS "A3" (Elevated) CM 478.37 1,059.94 5,482.13 1,755.11 8,775.54
401ci CONCRETE CLASS "C" (Underground) CM 469.86 500.55 3,435.35 1,101.44 5,507.20
401cii CONCRETE CLASS "C" (On ground) CM 469.86 500.55 3,553.70 1,131.02 5,655.12
401ciii CONCRETE CLASS "C" (Elevated) CM 469.86 500.55 3,790.38 1,190.20 5,950.98
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,580.65 947.15 4,890.66 1,854.62 9,273.08
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,580.65 947.15 5,646.66 2,043.62 10,218.08
401gii PRECAST CONCRETE CLASS "B" CM 1,580.65 947.15 4,629.05 1,789.21 8,946.07
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,580.65 947.15 6,024.66 2,138.12 10,690.58
Page 159
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Mardan
Mardan District Code: 44
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,580.65 947.15 6,402.66 2,232.62 11,163.08
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,580.65 947.15 6,780.66 2,327.12 11,635.58
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,458.73 781.47 59,888.00 15,532.05 77,660.25
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,458.73 781.47 67,238.00 17,369.55 86,847.75
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,173.23 5,393.81 55,999.50 15,641.63 78,208.17
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 2,507.06 15,659.05 133,859.15 38,006.31 190,031.56
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 103.49 - 300.83 101.08 505.39
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 103.49 - 300.00 100.87 504.37
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.53 2.67
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 17.71 69.68 119.24 51.66 258.30
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 323.80 1,654.04 806.65 696.12 3,480.62
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 485.70 2,481.06 1,209.98 1,044.19 5,220.93
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 485.70 2,481.06 903.50 967.57 4,837.83
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 809.51 4,135.11 1,078.79 1,505.85 7,529.25
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 693.86 4,884.94 1,256.91 1,708.93 8,544.65
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,214.26 6,909.78 1,377.98 2,375.50 11,877.52
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 19,634.37 45,769.30 96,405.50 40,452.29 202,261.46
407i PILE LOAD TEST UP TO 240 TON EACH 36,326.85 45,769.30 192,811.00 68,726.79 343,633.94
407j PILE LOAD TEST UP TO 360 TON EACH 53,019.33 50,188.38 289,216.50 98,106.05 490,530.26
407k CONFIRMATORY BORING (NX SIZE) M 178.73 1,582.02 6.37 441.78 2,208.90
411a STONE MASONRY RANDOM DRY CM 259.24 107.96 479.37 211.64 1,058.21
411b STONE MASONRY RANDOM WITH MORTAR CM 280.49 166.68 1,496.30 485.87 2,429.34
411c STONE MASONRY DRESSED UNCOURSED DRY CM 338.84 107.96 538.34 246.28 1,231.42
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 399.89 166.68 1,568.66 533.81 2,669.04
Page 160
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Mardan
Mardan District Code: 44
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 537.84 264.08 1,473.85 568.94 2,844.72
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 197.92 437.48 643.10 319.63 1,598.13
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 192.30 577.19 833.82 400.82 2,004.12
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 189.99 935.96 1,069.44 548.85 2,744.23
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 198.01 1,146.39 1,597.75 735.54 3,677.68
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 227.18 1,078.41 2,297.39 900.75 4,503.73
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 281.75 1,331.30 3,613.85 1,306.73 6,533.63
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 364.62 1,481.41 4,679.80 1,631.46 8,157.29
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 427.58 1,798.85 5,963.84 2,047.57 10,237.83
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 508.27 2,098.66 9,212.97 2,954.98 14,774.88
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 197.92 507.33 721.51 356.69 1,783.46
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 192.30 577.19 852.64 405.53 2,027.65
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 185.02 935.96 1,044.02 541.25 2,706.25
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 198.01 1,146.39 1,743.31 771.93 3,859.64
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 227.18 1,078.41 3,315.50 1,155.27 5,776.37
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 281.75 1,331.30 4,871.16 1,621.05 8,105.26
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 364.62 1,481.41 6,808.23 2,163.57 10,817.83
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 427.58 1,798.85 9,234.11 2,865.14 14,325.68
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 508.27 2,098.66 12,991.84 3,899.69 19,498.46
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 78.25 118.93 371.64 142.21 711.03
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 693.45 612.95 3,457.82 1,191.06 5,955.28
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 4.76 - 109.50 28.56 142.82
508a BRICK PAVING (SINGLE COURSE) SM 99.86 32.70 230.48 90.76 453.80
508b BRICK PAVING (DOUBLE COURSE) SM 179.45 32.70 457.66 167.45 837.26
Page 161
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Mardan
Mardan District Code: 44
509d GROUTED RIP RAP CLASS "A" CM 532.35 102.14 1,771.66 601.54 3,007.69
509e GROUTED RIP RAP CLASS "B" CM 513.98 81.72 1,624.51 555.05 2,775.25
509f GROUTED RIP RAP CLASS "C" CM 507.91 68.10 1,668.93 561.24 2,806.18
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 717.03 353.02 4,027.56 1,274.40 6,372.02
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 41.33 191.97 468.44 175.44 877.19
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 136.95 67.48 62.49 66.73 333.65
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 175.30 86.37 79.99 85.41 427.07
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 224.14 180.32 352.19 189.16 945.81
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 280.17 225.40 440.24 236.45 1,182.27
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 253.58 572.25 2,183.31 752.28 3,761.42
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 868.46 670.54 4,028.38 1,391.84 6,959.22
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 126.00 90.27 422.40 159.67 798.33
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 22.92 - 1,197.58 305.12 1,525.62
604d STEEL POST OF METAL GUARD RAIL EACH 78.80 976.73 3,776.31 1,207.96 6,039.79
605a CONCRETE BEAM GUARD RAIL M 65.70 30.82 588.84 171.34 856.71
605c CONCRETE POST FOR GUARD RAIL M 80.67 27.36 588.47 174.13 870.63
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 208.46 255.15 6,845.59 1,827.30 9,136.51
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 63.97 382.72 9,229.86 2,419.14 12,095.69
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 208.46 541.89 11,839.98 3,147.58 15,737.92
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 666.64 598.64 20,883.54 5,537.20 27,686.02
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 133.33 119.73 9,191.86 2,361.23 11,806.15
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.43 5.86 16.16 6.11 30.56
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.81 4.03 39.60 11.11 55.56
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.43 5.86 21.56 7.46 37.31
LINES OF 20 cm WIDTH
Page 162
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Mardan
Mardan District Code: 44
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.81 4.03 52.82 14.42 72.08
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 69.01 5.22 156.11 57.58 287.92
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 69.01 9.98 499.08 144.52 722.59
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.04 8.59 22.47 8.53 42.63
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.04 9.63 67.50 20.04 100.22
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.04 6.95 29.96 9.99 49.94
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.04 9.63 90.01 25.67 128.35
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 69.01 3.73 216.97 72.43 362.13
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 69.01 7.90 851.20 232.03 1,160.13
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 57.42 3.73 104.08 41.30 206.52
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 57.42 7.90 333.22 99.63 498.17
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 57.42 3.73 144.65 51.45 257.24
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 57.42 7.90 568.32 158.41 792.05
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 8.62 81.62 193.79 71.01 355.04
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 8.62 81.62 233.79 81.00 405.02
DOUBLE)
610b RIGHT OF WAY MARKER EACH 90.22 121.33 297.85 127.35 636.74
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 562.34 976.31 1,996.14 883.70 4,418.48
610d TEN KILOMETRE POST EACH 1,078.31 1,952.61 4,390.39 1,855.33 9,276.63
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT M 120.23 91.00 947.65 289.72 1,448.60
WITH PRECAST PRESTRESSED R.C.C. POST
Page 163
.
Page 164
NATIONAL HIGHWAY AUTHORITY
NOWSHERA
(49-C)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 165
.
Page 166
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Nowshera
Nowshera District Code: 49-C
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 6.64 173.32 1.17 45.28 226.41
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 18.79 456.54 2.63 119.49 597.45
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 75.17 1,826.16 10.51 477.96 2,389.80
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 119.95 316.30 50.82 121.77 608.84
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 16.54 337.99 - 88.63 443.17
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 10.85 262.40 - 68.31 341.55
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 119.95 316.30 50.82 121.77 608.84
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 19.05 316.03 - 83.77 418.85
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 8.41 263.92 - 68.08 340.41
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 7.12 137.60 0.42 36.29 181.43
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 59.47 287.11 70.80 104.35 521.74
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 105.83 427.01 33.88 141.68 708.41
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 89.41 292.53 - 95.48 477.42
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 54.43 238.86 - 73.32 366.61
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 6.65 174.71 5.59 46.74 233.68
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 19.12 482.48 54.36 138.99 694.95
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 14.34 416.71 2.66 108.43 542.14
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 7.50 177.46 8.44 48.35 241.75
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 6.00 76.32 5.59 21.98 109.89
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 13.64 110.29 3.32 31.81 159.07
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.33 27.34 1.60 7.57 37.83
Page 167
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Nowshera
Nowshera District Code: 49-C
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 0.97 18.21 0.85 5.01 25.04
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.81 15.26 0.87 4.24 21.18
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.21 15.57 0.97 4.44 22.20
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 65.29 1,510.17 5,834.90 1,852.59 9,262.95
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 67.61 1,510.17 6,343.50 1,980.32 9,901.59
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 72.53 1,577.28 5,825.39 1,868.80 9,344.00
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 72.53 1,571.31 6,484.94 2,032.19 10,160.96
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 225.00 915.38 50,453.37 12,898.44 64,492.18
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 225.00 915.38 48,875.24 12,503.90 62,519.52
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 83.80 112.80 1,147.10 335.92 1,679.62
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 136.21 2,437.94 5,661.44 2,058.90 10,294.50
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 91.82 126.27 721.47 234.89 1,174.45
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 1.68 45.04 1.38 12.02 60.12
207b DEEP PATCHING (16-30 cm) SM 1.68 39.67 1.38 10.68 53.42
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.09 110.61 0.75 28.36 141.80
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.42 22.12 0.15 5.67 28.36
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.28 1.57 35.81 9.42 47.08
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.27 1.57 39.97 10.45 52.27
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.11 0.58 14.99 3.92 19.60
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.11 0.58 17.48 4.54 22.72
Page 168
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Nowshera
Nowshera District Code: 49-C
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 61.96 1,489.33 6,872.70 2,106.00 10,529.99
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 61.96 1,438.23 7,411.62 2,227.95 11,139.76
"B")
307a DENSE GRADED HOT BIT-MAC CM 153.19 379.77 5,639.30 1,543.07 7,715.33
307b OPEN GRADED HOT BIT-MAC CM 153.19 379.77 5,486.07 1,504.76 7,523.79
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 27.23 590.65 2,012.90 657.70 3,288.48
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 23.68 650.70 42,455.92 10,782.58 53,912.88
401a1i CONCRETE CLASS "A1" (Underground) CM 510.16 1,059.94 4,023.50 1,398.40 6,991.99
401a1ii CONCRETE CLASS "A1" (On ground) CM 510.16 1,059.94 4,300.97 1,467.77 7,338.83
401a1iii CONCRETE CLASS "A1" (Elevated) CM 510.16 1,059.94 4,855.91 1,606.50 8,032.51
401a2i CONCRETE CLASS "A2" (Underground) CM 510.16 1,059.94 4,401.50 1,492.90 7,464.49
401a2ii CONCRETE CLASS "A2" (On ground) CM 510.16 1,059.94 4,678.97 1,562.27 7,811.33
401a2iii CONCRETE CLASS "A2" (Elevated) CM 510.16 1,059.94 5,233.91 1,701.00 8,505.01
401a3i CONCRETE CLASS "A3" (Underground) CM 510.16 1,059.94 4,779.50 1,587.40 7,936.99
401a3ii CONCRETE CLASS "A3" (On ground) CM 510.16 1,059.94 5,056.97 1,656.77 8,283.83
401a3iii CONCRETE CLASS "A3" (Elevated) CM 510.16 1,059.94 5,611.91 1,795.50 8,977.51
401ci CONCRETE CLASS "C" (Underground) CM 497.42 500.55 3,632.12 1,157.52 5,787.61
401cii CONCRETE CLASS "C" (On ground) CM 497.42 500.55 3,750.46 1,187.11 5,935.54
401ciii CONCRETE CLASS "C" (Elevated) CM 497.42 500.55 3,987.14 1,246.28 6,231.39
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,653.45 947.15 5,026.30 1,906.73 9,533.63
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,653.45 947.15 5,782.30 2,095.73 10,478.63
401gii PRECAST CONCRETE CLASS "B" CM 1,653.45 947.15 4,917.35 1,879.49 9,397.44
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,653.45 947.15 6,160.30 2,190.23 10,951.13
Page 169
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Nowshera
Nowshera District Code: 49-C
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,653.45 947.15 6,538.30 2,284.73 11,423.63
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,653.45 947.15 6,916.30 2,379.23 11,896.13
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,542.00 781.47 59,358.00 15,420.37 77,101.84
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,542.00 781.47 66,708.00 17,257.87 86,289.34
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,245.40 5,393.81 55,550.84 15,547.51 77,737.56
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 2,589.53 15,659.05 133,835.34 38,020.98 190,104.90
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 109.40 - 299.97 102.34 511.71
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 109.40 - 299.21 102.15 510.76
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.53 2.67
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 18.44 69.68 117.23 51.34 256.69
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 331.42 1,654.04 721.20 676.67 3,383.33
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 497.13 2,481.06 1,081.80 1,015.00 5,075.00
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 497.13 2,481.06 821.16 949.84 4,749.20
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 828.56 4,135.11 1,002.57 1,491.56 7,457.79
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 710.19 4,884.94 1,187.44 1,695.64 8,478.21
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,242.83 6,909.78 1,297.97 2,362.65 11,813.23
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 20,456.69 45,769.30 94,337.50 40,140.87 200,704.37
407i PILE LOAD TEST UP TO 240 TON EACH 37,790.54 45,769.30 188,675.00 68,058.71 340,293.55
407j PILE LOAD TEST UP TO 360 TON EACH 55,124.39 50,188.38 283,012.50 97,081.32 485,406.59
407k CONFIRMATORY BORING (NX SIZE) M 183.77 1,582.02 6.99 443.20 2,215.98
411a STONE MASONRY RANDOM DRY CM 268.29 107.96 354.71 182.74 913.69
411b STONE MASONRY RANDOM WITH MORTAR CM 289.35 166.68 1,418.88 468.73 2,343.64
411c STONE MASONRY DRESSED UNCOURSED DRY CM 348.93 107.96 400.18 214.27 1,071.34
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 410.32 166.68 1,467.00 511.00 2,554.99
Page 170
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Nowshera
Nowshera District Code: 49-C
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 550.54 264.08 1,372.19 546.70 2,733.52
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 205.55 437.48 645.26 322.07 1,610.36
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 199.71 577.19 836.33 403.31 2,016.53
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 198.90 935.96 1,072.37 551.81 2,759.04
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 207.09 1,146.39 1,601.34 738.70 3,693.52
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 237.82 1,078.41 2,300.98 904.30 4,521.52
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 294.72 1,331.30 3,619.02 1,311.26 6,556.30
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 381.40 1,481.41 4,685.47 1,637.07 8,185.34
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 448.08 1,798.85 5,970.71 2,054.41 10,272.06
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 530.47 2,098.66 9,221.00 2,962.53 14,812.65
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 205.55 507.33 725.14 359.50 1,797.52
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 199.71 577.19 855.15 408.01 2,040.05
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 192.99 935.96 1,046.95 543.98 2,719.88
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 207.09 1,146.39 1,745.98 774.86 3,874.32
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 237.82 1,078.41 3,319.59 1,158.95 5,794.77
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 294.72 1,331.30 4,876.33 1,625.59 8,127.94
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 381.40 1,481.41 6,813.90 2,169.18 10,845.88
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 448.08 1,798.85 9,240.99 2,871.98 14,359.91
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 530.47 2,098.66 12,999.86 3,907.25 19,536.23
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 81.95 118.93 343.94 136.20 681.02
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 741.53 612.95 3,723.09 1,269.39 6,346.95
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 4.88 - 109.41 28.57 142.86
508a BRICK PAVING (SINGLE COURSE) SM 102.19 32.70 229.36 91.06 455.30
508b BRICK PAVING (DOUBLE COURSE) SM 182.83 32.70 455.62 167.79 838.93
Page 171
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Nowshera
Nowshera District Code: 49-C
509d GROUTED RIP RAP CLASS "A" CM 542.23 102.14 1,676.62 580.25 2,901.25
509e GROUTED RIP RAP CLASS "B" CM 522.86 81.72 1,527.46 533.01 2,665.04
509f GROUTED RIP RAP CLASS "C" CM 516.36 68.10 1,572.02 539.12 2,695.59
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 753.12 353.02 4,223.93 1,332.52 6,662.60
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 43.69 191.97 348.97 146.16 730.79
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 140.98 67.48 42.23 62.67 313.36
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 180.46 86.37 54.06 80.22 401.11
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 229.56 180.32 340.30 187.55 937.73
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 286.96 225.40 425.37 234.43 1,172.16
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 270.40 572.25 2,250.96 773.40 3,867.02
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 908.20 670.54 4,087.99 1,416.68 7,083.41
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 131.78 90.27 439.39 165.36 826.80
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 23.26 - 1,197.58 305.21 1,526.04
604d STEEL POST OF METAL GUARD RAIL EACH 81.31 976.73 3,776.31 1,208.59 6,042.93
605a CONCRETE BEAM GUARD RAIL M 67.96 30.82 592.48 172.82 864.08
605c CONCRETE POST FOR GUARD RAIL M 83.44 27.36 593.14 175.99 879.93
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 216.80 255.15 6,861.40 1,833.34 9,166.68
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 68.98 382.72 9,264.49 2,429.05 12,145.24
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 216.80 541.89 11,901.10 3,164.94 15,824.72
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 690.91 598.64 20,975.29 5,566.21 27,831.05
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 138.18 119.73 9,208.96 2,366.72 11,833.59
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.63 5.86 16.16 6.16 30.81
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.88 4.03 39.59 11.12 55.62
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.63 5.86 21.56 7.51 37.56
LINES OF 20 cm WIDTH
Page 172
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Nowshera
Nowshera District Code: 49-C
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.88 4.03 52.80 14.43 72.13
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 70.24 5.22 156.10 57.89 289.44
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 70.24 9.98 498.88 144.78 723.88
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.29 8.59 22.47 8.59 42.93
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.29 9.63 67.50 20.11 100.53
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.29 6.95 29.96 10.05 50.25
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.29 9.63 90.01 25.73 128.66
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 70.24 3.73 216.96 72.73 363.65
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 70.24 7.90 851.20 232.33 1,161.67
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 58.75 3.73 104.07 41.64 208.18
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 58.75 7.90 333.09 99.93 499.67
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 58.75 3.73 144.64 51.78 258.89
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 58.75 7.90 568.32 158.74 793.71
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 9.52 81.62 193.85 71.25 356.24
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 9.52 81.62 233.85 81.25 406.23
DOUBLE)
610b RIGHT OF WAY MARKER EACH 94.09 121.33 303.65 129.77 648.83
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 575.57 976.31 2,041.81 898.42 4,492.10
610d TEN KILOMETRE POST EACH 1,105.19 1,952.61 4,479.36 1,884.29 9,421.44
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT M 126.08 91.00 957.59 293.67 1,468.35
WITH PRECAST PRESTRESSED R.C.C. POST
Page 173
.
Page 174
NATIONAL HIGHWAY AUTHORITY
PESHAWAR
(52)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 175
.
Page 176
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Peshawar
Peshawar District Code: 52
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 7.25 173.32 1.17 45.43 227.17
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 20.90 456.54 2.63 120.02 600.08
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 83.60 1,826.16 10.51 480.07 2,400.33
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 120.09 316.30 50.82 121.80 609.01
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 16.91 337.99 - 88.73 443.63
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 10.99 262.40 - 68.35 341.73
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 120.09 316.30 50.82 121.80 609.01
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 19.01 316.03 - 83.76 418.80
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 8.56 263.92 - 68.12 340.60
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 7.05 137.60 0.38 36.26 181.29
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 63.35 287.11 70.80 105.32 526.58
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 105.61 427.01 33.88 141.63 708.13
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 89.47 292.53 - 95.50 477.51
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 54.31 238.86 - 73.29 366.47
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 6.69 174.71 5.09 46.62 233.12
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 19.78 482.48 54.04 139.08 695.38
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 14.84 416.71 2.42 108.49 542.46
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 7.71 177.46 7.94 48.28 241.39
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 6.10 76.32 5.09 21.88 109.38
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 14.35 110.29 3.03 31.92 159.58
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.35 27.34 1.46 7.54 37.68
Page 177
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Peshawar
Peshawar District Code: 52
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 0.99 18.21 0.77 4.99 24.97
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.85 15.26 0.79 4.23 21.13
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.26 15.57 0.90 4.43 22.16
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 71.94 1,510.17 6,008.75 1,897.71 9,488.57
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 74.08 1,510.17 6,426.94 2,002.80 10,013.99
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 79.29 1,577.28 5,998.73 1,913.83 9,569.13
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 79.29 1,571.31 6,573.83 2,056.11 10,280.54
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 229.99 915.38 52,980.39 13,531.44 67,657.19
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 229.99 915.38 51,402.26 13,136.91 65,684.53
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 96.57 112.80 894.28 275.91 1,379.56
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 145.67 2,437.94 5,677.41 2,065.26 10,326.28
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 106.17 126.27 744.50 244.24 1,221.19
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 1.72 45.04 1.26 12.00 60.02
207b DEEP PATCHING (16-30 cm) SM 1.72 39.67 1.26 10.66 53.32
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.08 110.61 0.68 28.34 141.72
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.42 22.12 0.14 5.67 28.34
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.28 1.57 37.60 9.86 49.32
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.27 1.57 41.97 10.95 54.77
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.11 0.58 15.74 4.11 20.54
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.11 0.58 18.36 4.76 23.82
Page 178
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Peshawar
Peshawar District Code: 52
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 66.97 1,489.33 7,054.66 2,152.74 10,763.69
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 66.97 1,438.23 7,617.63 2,280.71 11,403.54
"B")
307a DENSE GRADED HOT BIT-MAC CM 167.94 379.77 5,855.80 1,600.88 8,004.39
307b OPEN GRADED HOT BIT-MAC CM 167.94 379.77 5,681.91 1,557.41 7,787.03
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 29.52 590.65 2,066.62 671.70 3,358.48
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 25.16 650.70 45,058.00 11,433.46 57,167.32
401a1i CONCRETE CLASS "A1" (Underground) CM 555.13 1,059.94 3,950.88 1,391.49 6,957.44
401a1ii CONCRETE CLASS "A1" (On ground) CM 555.13 1,059.94 4,228.35 1,460.86 7,304.28
401a1iii CONCRETE CLASS "A1" (Elevated) CM 555.13 1,059.94 4,783.30 1,599.59 7,997.96
401a2i CONCRETE CLASS "A2" (Underground) CM 555.13 1,059.94 4,328.88 1,485.99 7,429.94
401a2ii CONCRETE CLASS "A2" (On ground) CM 555.13 1,059.94 4,606.35 1,555.36 7,776.78
401a2iii CONCRETE CLASS "A2" (Elevated) CM 555.13 1,059.94 5,161.30 1,694.09 8,470.46
401a3i CONCRETE CLASS "A3" (Underground) CM 555.13 1,059.94 4,706.88 1,580.49 7,902.44
401a3ii CONCRETE CLASS "A3" (On ground) CM 555.13 1,059.94 4,984.35 1,649.86 8,249.28
401a3iii CONCRETE CLASS "A3" (Elevated) CM 555.13 1,059.94 5,539.30 1,788.59 8,942.96
401ci CONCRETE CLASS "C" (Underground) CM 554.77 500.55 3,495.49 1,137.70 5,688.51
401cii CONCRETE CLASS "C" (On ground) CM 554.77 500.55 3,613.83 1,167.29 5,836.44
401ciii CONCRETE CLASS "C" (Elevated) CM 554.77 500.55 3,850.52 1,226.46 6,132.29
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,873.57 947.15 4,953.74 1,943.61 9,718.07
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,873.57 947.15 5,709.74 2,132.61 10,663.07
401gii PRECAST CONCRETE CLASS "B" CM 1,873.57 947.15 4,688.65 1,877.34 9,386.71
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,873.57 947.15 6,087.74 2,227.11 11,135.57
Page 179
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Peshawar
Peshawar District Code: 52
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,873.57 947.15 6,465.74 2,321.61 11,608.07
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,873.57 947.15 6,843.74 2,416.11 12,080.57
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,679.56 781.47 59,517.00 15,494.51 77,472.54
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,679.56 781.47 66,867.00 17,332.01 86,660.04
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,347.37 5,393.81 55,564.70 15,576.47 77,882.36
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 2,533.18 15,659.05 133,834.60 38,006.71 190,033.53
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 120.32 - 303.49 105.95 529.77
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 120.32 - 302.69 105.75 528.76
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.54 2.68
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 19.65 69.68 117.21 51.64 258.18
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 332.38 1,654.04 689.73 669.04 3,345.20
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 498.58 2,481.06 1,034.60 1,003.56 5,017.80
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 498.58 2,481.06 773.98 938.41 4,692.03
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 830.96 4,135.11 923.94 1,472.50 7,362.51
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 712.25 4,884.94 1,056.02 1,663.30 8,316.51
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,246.44 6,909.78 1,180.02 2,334.06 11,670.30
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 23,557.91 45,769.30 90,203.26 39,882.62 199,413.09
407i PILE LOAD TEST UP TO 240 TON EACH 44,237.21 45,769.30 180,406.51 67,603.26 338,016.29
407j PILE LOAD TEST UP TO 360 TON EACH 64,916.51 50,188.38 270,609.77 96,428.67 482,143.33
407k CONFIRMATORY BORING (NX SIZE) M 197.07 1,582.02 6.36 446.36 2,231.82
411a STONE MASONRY RANDOM DRY CM 308.88 107.96 407.06 205.97 1,029.87
411b STONE MASONRY RANDOM WITH MORTAR CM 333.77 166.68 1,459.88 490.08 2,450.42
411c STONE MASONRY DRESSED UNCOURSED DRY CM 404.62 107.96 456.73 242.33 1,211.63
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 477.38 166.68 1,513.97 539.51 2,697.54
Page 180
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Peshawar
Peshawar District Code: 52
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 643.96 264.08 1,419.17 581.80 2,909.01
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 236.91 437.48 644.22 329.65 1,648.27
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 231.33 577.19 835.16 410.92 2,054.60
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 224.30 935.96 1,071.01 557.82 2,789.08
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 235.24 1,146.39 1,599.58 745.30 3,726.51
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 268.33 1,078.41 2,299.22 911.49 4,557.46
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 330.28 1,331.30 3,616.50 1,319.52 6,597.60
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 427.42 1,481.41 4,682.44 1,647.82 8,239.09
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 501.24 1,798.85 5,967.04 2,066.78 10,333.92
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 594.03 2,098.66 9,216.71 2,977.35 14,886.76
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 236.91 507.33 723.76 367.00 1,835.00
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 231.33 577.19 853.98 415.63 2,078.13
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 217.41 935.96 1,045.59 549.74 2,748.69
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 235.24 1,146.39 1,744.74 781.59 3,907.96
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 268.33 1,078.41 3,317.53 1,166.07 5,830.35
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 330.28 1,331.30 4,873.81 1,633.85 8,169.24
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 427.42 1,481.41 6,810.87 2,179.93 10,899.63
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 501.24 1,798.85 9,237.32 2,884.35 14,421.76
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 594.03 2,098.66 12,995.57 3,922.07 19,610.33
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 91.45 118.93 287.07 124.36 621.81
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 807.16 612.95 3,516.06 1,234.04 6,170.21
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 5.27 - 110.25 28.88 144.40
508a BRICK PAVING (SINGLE COURSE) SM 119.09 32.70 243.91 98.93 494.63
508b BRICK PAVING (DOUBLE COURSE) SM 214.83 32.70 485.21 183.19 915.93
Page 181
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Peshawar
Peshawar District Code: 52
509d GROUTED RIP RAP CLASS "A" CM 633.45 102.14 1,721.73 614.33 3,071.66
509e GROUTED RIP RAP CLASS "B" CM 612.45 81.72 1,572.83 566.75 2,833.75
509f GROUTED RIP RAP CLASS "C" CM 606.12 68.10 1,617.51 572.93 2,864.66
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 865.81 353.02 4,082.58 1,325.35 6,626.77
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 49.42 191.97 333.54 143.73 718.66
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 162.73 67.48 50.74 70.24 351.19
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 208.30 86.37 64.95 89.90 449.52
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 266.51 180.32 349.62 199.11 995.56
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 333.13 225.40 437.03 248.89 1,244.45
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 294.22 572.25 2,213.17 769.91 3,849.54
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 1,028.38 670.54 4,053.46 1,438.10 7,190.48
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 149.20 90.27 425.90 166.34 831.71
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 24.73 - 1,197.61 305.59 1,527.93
604d STEEL POST OF METAL GUARD RAIL EACH 82.12 976.73 3,776.44 1,208.82 6,044.11
605a CONCRETE BEAM GUARD RAIL M 78.78 30.82 589.38 174.75 873.73
605c CONCRETE POST FOR GUARD RAIL M 96.73 27.36 589.34 178.36 891.79
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 241.22 255.15 6,843.57 1,834.99 9,174.93
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 79.52 382.72 9,234.28 2,424.13 12,120.66
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 241.22 541.89 11,847.68 3,157.70 15,788.49
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 794.57 598.64 20,892.36 5,571.39 27,856.97
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 158.91 119.73 9,189.01 2,366.91 11,834.56
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.89 5.86 16.16 6.23 31.13
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.96 4.03 39.61 11.15 55.75
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.89 5.86 21.56 7.58 37.88
LINES OF 20 cm WIDTH
Page 182
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Peshawar
Peshawar District Code: 52
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.96 4.03 52.83 14.46 72.28
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 77.67 5.22 156.12 59.75 298.75
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 77.67 9.98 499.17 146.70 733.52
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.61 8.59 22.47 8.67 43.34
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.61 9.63 67.51 20.19 100.93
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.61 6.95 29.96 10.13 50.65
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.61 9.63 90.01 25.81 129.06
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 77.67 3.73 216.98 74.59 372.96
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 77.67 7.90 851.21 234.19 1,170.97
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 65.03 3.73 104.08 43.21 216.04
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 65.03 7.90 333.28 101.55 507.76
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 65.03 3.73 144.65 53.35 266.76
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 65.03 7.90 568.33 160.31 801.57
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 10.74 81.62 193.83 71.55 357.74
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 10.74 81.62 233.83 81.55 407.73
DOUBLE)
610b RIGHT OF WAY MARKER EACH 109.35 121.33 299.80 132.62 663.10
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 659.88 976.31 2,011.42 911.90 4,559.51
610d TEN KILOMETRE POST EACH 1,262.32 1,952.61 4,419.25 1,908.55 9,542.74
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT M 139.93 91.00 950.34 295.32 1,476.60
WITH PRECAST PRESTRESSED R.C.C. POST
Page 183
.
Page 184
NATIONAL HIGHWAY AUTHORITY
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 185
.
Page 186
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Swat
Swat Saidu
Saidu Sharif
Sharif District Code: 66
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 7.49 190.65 1.28 49.86 249.28
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 21.09 502.19 2.89 131.54 657.72
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 84.36 2,008.78 11.56 526.17 2,630.87
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 136.07 347.93 55.90 134.98 674.88
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 18.55 371.79 - 97.59 487.93
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 12.21 288.63 - 75.21 376.06
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 136.07 347.93 55.90 134.98 674.88
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 21.60 347.63 - 92.31 461.54
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 9.45 290.32 - 74.94 374.70
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 8.27 151.36 0.42 40.01 200.06
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 67.13 315.83 77.89 115.21 576.05
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 119.99 469.72 37.27 156.74 783.72
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 101.07 321.79 - 105.71 528.57
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 61.71 262.75 - 81.11 405.57
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 7.54 192.18 5.60 51.33 256.65
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 21.63 530.73 59.45 152.95 764.75
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 16.22 458.38 2.66 119.32 596.58
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 8.48 195.20 8.73 53.11 265.53
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 6.82 83.95 5.60 24.09 120.46
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 15.45 121.32 3.33 35.02 175.12
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.51 30.07 1.60 8.30 41.48
Page 187
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Swat
Swat Saidu
Saidu Sharif
Sharif District Code: 66
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.12 20.03 0.85 5.50 27.50
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.93 16.79 0.87 4.65 23.23
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.38 17.13 0.99 4.87 24.37
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 70.60 1,615.88 6,556.04 2,060.63 10,303.14
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 73.12 1,615.88 7,027.42 2,179.10 10,895.52
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 78.62 1,687.69 6,544.95 2,077.82 10,389.08
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 78.62 1,681.30 7,187.48 2,236.85 11,184.24
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 251.48 979.45 58,400.85 14,907.95 74,539.73
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 251.48 979.45 56,712.25 14,485.80 72,428.98
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 90.56 120.69 960.73 293.00 1,464.99
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 148.13 2,608.60 6,188.36 2,236.27 11,181.36
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 98.84 135.11 797.29 257.81 1,289.06
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 1.87 48.19 1.34 12.85 64.25
207b DEEP PATCHING (16-30 cm) SM 1.87 42.45 1.34 11.42 57.08
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.39 118.35 0.73 30.37 151.84
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.48 23.67 0.15 6.07 30.37
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.31 1.68 41.45 10.86 54.30
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.30 1.68 46.27 12.06 60.31
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.12 0.62 17.35 4.52 22.61
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.12 0.62 20.24 5.25 26.23
Page 188
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Swat
Swat Saidu
Saidu Sharif
Sharif District Code: 66
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 67.12 1,593.58 7,718.04 2,344.68 11,723.42
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 67.12 1,538.91 8,338.29 2,486.08 12,430.40
"B")
307a DENSE GRADED HOT BIT-MAC CM 164.78 406.36 6,424.00 1,748.78 8,743.92
307b OPEN GRADED HOT BIT-MAC CM 164.78 406.36 6,239.88 1,702.75 8,513.77
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 29.37 631.99 2,252.70 728.52 3,642.58
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 26.41 696.25 49,974.74 12,674.35 63,371.74
401a1i CONCRETE CLASS "A1" (Underground) CM 539.58 1,112.93 4,127.95 1,445.12 7,225.58
401a1ii CONCRETE CLASS "A1" (On ground) CM 539.58 1,112.93 4,419.29 1,517.95 7,589.76
401a1iii CONCRETE CLASS "A1" (Elevated) CM 539.58 1,112.93 5,001.99 1,663.62 8,318.12
401a2i CONCRETE CLASS "A2" (Underground) CM 539.58 1,112.93 4,524.85 1,544.34 7,721.70
401a2ii CONCRETE CLASS "A2" (On ground) CM 539.58 1,112.93 4,816.19 1,617.18 8,085.88
401a2iii CONCRETE CLASS "A2" (Elevated) CM 539.58 1,112.93 5,398.89 1,762.85 8,814.25
401a3i CONCRETE CLASS "A3" (Underground) CM 539.58 1,112.93 4,921.75 1,643.57 8,217.83
401a3ii CONCRETE CLASS "A3" (On ground) CM 539.58 1,112.93 5,213.09 1,716.40 8,582.01
401a3iii CONCRETE CLASS "A3" (Elevated) CM 539.58 1,112.93 5,795.79 1,862.07 9,310.37
401ci CONCRETE CLASS "C" (Underground) CM 526.36 525.57 3,657.00 1,177.23 5,886.16
401cii CONCRETE CLASS "C" (On ground) CM 526.36 525.57 3,781.25 1,208.30 6,041.48
401ciii CONCRETE CLASS "C" (Elevated) CM 526.36 525.57 4,029.77 1,270.43 6,352.13
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,744.25 994.51 5,177.22 1,978.99 9,894.97
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,744.25 994.51 5,971.02 2,177.44 10,887.22
401gii PRECAST CONCRETE CLASS "B" CM 1,744.25 994.51 4,920.45 1,914.80 9,574.01
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,744.25 994.51 6,367.92 2,276.67 11,383.35
Page 189
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Swat
Swat Saidu
Saidu Sharif
Sharif District Code: 66
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,744.25 994.51 6,764.82 2,375.89 11,879.47
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,744.25 994.51 7,161.72 2,475.12 12,375.60
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,636.04 820.55 63,884.10 16,585.17 82,925.86
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,636.04 820.55 71,601.60 18,514.55 92,572.74
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,311.76 5,663.50 59,328.59 16,575.96 82,879.82
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 2,740.86 16,442.00 140,581.54 39,941.10 199,705.50
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 115.17 - 323.26 109.61 548.04
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 115.17 - 322.19 109.34 546.70
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.23 0.56 2.80
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 19.47 73.17 124.08 54.18 270.90
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 352.67 1,736.74 957.83 761.81 3,809.07
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 529.01 2,605.12 1,436.75 1,142.72 5,713.60
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 529.01 2,605.12 1,067.14 1,050.32 5,251.58
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 881.68 4,341.86 1,266.13 1,622.42 8,112.09
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 755.73 5,129.19 1,478.20 1,840.78 9,203.89
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,322.52 7,255.27 1,610.94 2,547.18 12,735.92
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 21,597.58 48,057.77 96,884.82 41,635.04 208,175.22
407i PILE LOAD TEST UP TO 240 TON EACH 39,798.12 48,057.77 193,769.65 70,406.38 352,031.92
407j PILE LOAD TEST UP TO 360 TON EACH 57,998.66 52,697.80 290,654.47 100,337.73 501,688.67
407k CONFIRMATORY BORING (NX SIZE) M 193.65 1,661.12 6.68 465.36 2,326.82
411a STONE MASONRY RANDOM DRY CM 285.65 113.36 469.03 217.01 1,085.05
411b STONE MASONRY RANDOM WITH MORTAR CM 307.77 175.02 1,566.42 512.30 2,561.50
411c STONE MASONRY DRESSED UNCOURSED DRY CM 370.33 113.36 524.50 252.05 1,260.23
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 434.78 175.02 1,628.55 559.59 2,797.93
Page 190
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Swat
Swat Saidu
Saidu Sharif
Sharif District Code: 66
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 582.02 277.29 1,529.00 597.08 2,985.39
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 224.95 472.48 695.50 348.23 1,741.16
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 218.15 623.36 901.66 435.79 2,178.97
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 218.10 1,010.84 1,156.33 596.32 2,981.58
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 226.64 1,238.10 1,727.12 797.97 3,989.83
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 260.05 1,164.69 2,482.73 976.87 4,884.34
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 321.85 1,437.80 3,905.21 1,416.22 7,081.08
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 416.51 1,599.92 5,056.43 1,768.22 8,841.08
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 489.52 1,942.76 6,443.67 2,218.99 11,094.93
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 579.42 2,266.55 9,953.19 3,199.79 15,998.95
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 224.95 547.92 781.13 388.50 1,942.50
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 218.15 623.36 921.99 440.88 2,204.38
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 211.72 1,010.84 1,128.87 587.86 2,939.29
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 226.64 1,238.10 1,883.99 837.18 4,185.91
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 260.05 1,164.69 3,582.47 1,251.80 6,259.00
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 321.85 1,437.80 5,263.10 1,755.69 8,778.44
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 416.51 1,599.92 7,355.13 2,342.89 11,714.46
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 489.52 1,942.76 9,975.56 3,101.96 15,509.80
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 579.42 2,266.55 14,034.36 4,220.08 21,100.41
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 90.79 128.44 340.49 139.93 699.66
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 811.63 661.98 3,791.86 1,316.37 6,581.84
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 5.37 - 120.04 31.35 156.75
508a BRICK PAVING (SINGLE COURSE) SM 111.01 35.32 276.89 105.80 529.02
508b BRICK PAVING (DOUBLE COURSE) SM 198.11 35.32 550.72 196.04 980.18
Page 191
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Swat
Swat Saidu
Saidu Sharif
Sharif District Code: 66
509d GROUTED RIP RAP CLASS "A" CM 588.32 110.32 1,897.14 648.94 3,244.72
509e GROUTED RIP RAP CLASS "B" CM 566.85 88.25 1,736.52 597.90 2,989.52
509f GROUTED RIP RAP CLASS "C" CM 559.47 73.54 1,784.92 604.48 3,022.42
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 817.55 381.27 4,403.91 1,400.68 7,003.41
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 47.88 207.33 354.56 152.44 762.21
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 154.14 72.87 61.76 72.19 360.96
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 197.29 93.28 79.05 92.40 462.02
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 250.33 194.75 387.83 208.23 1,041.14
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 312.91 243.44 484.79 260.28 1,301.42
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 291.78 613.92 2,359.65 816.34 4,081.68
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 976.66 711.97 4,353.63 1,510.56 7,552.81
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 141.70 97.09 456.08 173.72 868.59
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 24.18 - 1,221.53 311.43 1,557.14
604d STEEL POST OF METAL GUARD RAIL EACH 85.49 996.27 3,851.83 1,233.40 6,166.98
605a CONCRETE BEAM GUARD RAIL M 69.70 31.44 606.30 176.86 884.30
605c CONCRETE POST FOR GUARD RAIL M 85.58 27.91 606.63 180.03 900.14
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 222.52 260.25 6,990.06 1,868.21 9,341.04
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 71.37 390.38 9,430.74 2,473.12 12,365.60
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 222.52 552.72 12,104.56 3,219.95 16,099.76
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 706.81 610.62 21,346.53 5,665.99 28,329.95
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 141.36 122.12 9,390.54 2,413.51 12,067.53
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.78 5.98 16.49 6.31 31.56
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.93 4.11 40.51 11.39 56.93
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.78 5.98 22.00 7.69 38.45
LINES OF 20 cm WIDTH
Page 192
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Swat
Swat Saidu
Saidu Sharif
Sharif District Code: 66
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.93 4.11 54.03 14.77 73.83
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 72.11 5.32 159.35 59.19 295.97
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 72.11 10.18 510.48 148.19 740.97
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.47 8.76 22.93 8.79 43.96
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.47 9.82 68.85 20.54 102.69
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.47 7.09 30.58 10.29 51.43
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.47 9.82 91.81 26.28 131.38
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 72.11 3.80 221.42 74.33 371.66
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 72.11 8.06 868.22 237.10 1,185.48
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 60.39 3.80 106.23 42.60 213.02
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 60.39 8.06 340.84 102.32 511.60
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 60.39 3.80 147.61 52.95 264.75
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 60.39 8.06 579.69 162.03 810.17
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 9.97 83.25 197.70 72.73 363.64
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 9.97 83.25 238.50 82.93 414.64
DOUBLE)
610b RIGHT OF WAY MARKER EACH 96.67 123.75 306.28 131.68 658.38
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 591.75 995.83 2,060.78 912.09 4,560.44
610d TEN KILOMETRE POST EACH 1,136.62 1,991.66 4,526.27 1,913.64 9,568.19
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT M 133.38 95.67 984.00 303.26 1,516.32
WITH PRECAST PRESTRESSED R.C.C. POST
Page 193
.
Page 194
NATIONAL HIGHWAY AUTHORITY
SWABI
(66-A)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 195
.
Page 196
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Swabi
Swabi District Code: 66-A
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 6.83 173.32 1.17 45.33 226.65
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 19.75 456.54 2.63 119.73 598.65
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 79.01 1,826.16 10.51 478.92 2,394.60
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 115.80 316.30 50.82 120.73 603.65
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 15.83 337.99 - 88.46 442.28
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 10.38 262.40 - 68.19 340.96
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 115.80 316.30 50.82 120.73 603.65
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 18.42 316.03 - 83.61 418.07
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 7.97 263.92 - 67.97 339.86
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 6.56 137.60 0.38 36.13 180.67
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 59.39 287.11 70.80 104.33 521.64
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 102.35 427.01 33.88 140.81 704.06
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 86.54 292.53 - 94.77 473.84
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 52.64 238.86 - 72.88 364.38
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 6.24 174.71 5.09 46.51 232.54
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 18.59 482.48 54.04 138.78 693.89
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 13.94 416.71 2.42 108.27 541.34
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 7.21 177.46 7.94 48.15 240.76
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 5.64 76.32 5.09 21.76 108.81
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 13.35 110.29 3.03 31.67 158.33
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.27 27.34 1.46 7.52 37.58
Page 197
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Swabi
Swabi District Code: 66-A
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 0.92 18.21 0.77 4.98 24.88
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.79 15.26 0.79 4.21 21.05
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.14 15.57 0.90 4.40 22.01
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 67.93 1,510.17 5,778.04 1,839.04 9,195.18
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 70.07 1,510.17 6,174.12 1,938.59 9,692.94
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 75.10 1,577.28 5,768.48 1,855.22 9,276.08
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 75.10 1,571.31 6,316.97 1,990.85 9,954.23
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 226.34 915.38 50,544.27 12,921.50 64,607.49
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 226.34 915.38 48,966.14 12,526.97 62,634.83
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 91.45 112.80 877.87 270.53 1,352.66
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 136.49 2,437.94 5,491.01 2,016.36 10,081.81
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 101.09 126.27 749.01 244.09 1,220.46
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 1.59 45.04 1.26 11.97 59.85
207b DEEP PATCHING (16-30 cm) SM 1.59 39.67 1.26 10.63 53.15
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 1.95 110.61 0.68 28.31 141.55
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.39 22.12 0.14 5.66 28.31
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.27 1.57 35.87 9.43 47.15
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.26 1.57 40.04 10.47 52.35
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.11 0.58 15.01 3.93 19.63
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.11 0.58 17.52 4.55 22.75
Page 198
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Swabi
Swabi District Code: 66-A
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 63.13 1,489.33 6,765.75 2,079.55 10,397.76
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 63.13 1,438.23 7,297.74 2,199.78 10,998.88
"B")
307a DENSE GRADED HOT BIT-MAC CM 153.74 379.77 5,576.99 1,527.63 7,638.13
307b OPEN GRADED HOT BIT-MAC CM 153.74 379.77 5,417.72 1,487.81 7,439.03
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 25.54 590.65 2,005.61 655.45 3,277.24
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 24.55 650.70 42,549.52 10,806.19 54,030.96
401a1i CONCRETE CLASS "A1" (Underground) CM 489.47 1,059.94 3,906.42 1,363.96 6,819.78
401a1ii CONCRETE CLASS "A1" (On ground) CM 489.47 1,059.94 4,183.89 1,433.33 7,166.63
401a1iii CONCRETE CLASS "A1" (Elevated) CM 489.47 1,059.94 4,738.84 1,572.06 7,860.31
401a2i CONCRETE CLASS "A2" (Underground) CM 489.47 1,059.94 4,284.42 1,458.46 7,292.28
401a2ii CONCRETE CLASS "A2" (On ground) CM 489.47 1,059.94 4,561.89 1,527.83 7,639.13
401a2iii CONCRETE CLASS "A2" (Elevated) CM 489.47 1,059.94 5,116.84 1,666.56 8,332.81
401a3i CONCRETE CLASS "A3" (Underground) CM 489.47 1,059.94 4,662.42 1,552.96 7,764.78
401a3ii CONCRETE CLASS "A3" (On ground) CM 489.47 1,059.94 4,939.89 1,622.33 8,111.63
401a3iii CONCRETE CLASS "A3" (Elevated) CM 489.47 1,059.94 5,494.84 1,761.06 8,805.31
401ci CONCRETE CLASS "C" (Underground) CM 490.97 500.55 3,447.73 1,109.81 5,549.07
401cii CONCRETE CLASS "C" (On ground) CM 490.97 500.55 3,566.07 1,139.40 5,696.99
401ciii CONCRETE CLASS "C" (Elevated) CM 490.97 500.55 3,802.76 1,198.57 5,992.85
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,696.86 947.15 4,904.66 1,887.17 9,435.84
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,696.86 947.15 5,660.66 2,076.17 10,380.84
401gii PRECAST CONCRETE CLASS "B" CM 1,696.86 947.15 4,644.46 1,822.12 9,110.59
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,696.86 947.15 6,038.66 2,170.67 10,853.34
Page 199
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Swabi
Swabi District Code: 66-A
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,696.86 947.15 6,416.66 2,265.17 11,325.84
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,696.86 947.15 6,794.66 2,359.67 11,798.34
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,485.94 781.47 59,888.00 15,538.85 77,694.27
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,485.94 781.47 67,238.00 17,376.35 86,881.77
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,194.94 5,393.81 56,028.38 15,654.28 78,271.42
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 2,485.02 15,659.05 133,861.53 38,001.40 190,007.00
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 108.69 - 301.89 102.65 513.23
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 108.69 - 300.97 102.41 512.07
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.53 2.67
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 19.35 69.68 117.72 51.69 258.45
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 320.97 1,654.04 815.01 697.51 3,487.53
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 481.45 2,481.06 1,222.52 1,046.26 5,231.30
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 481.45 2,481.06 916.20 969.68 4,848.39
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 802.42 4,135.11 1,099.96 1,509.37 7,546.86
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 687.79 4,884.94 1,292.09 1,716.21 8,581.03
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,203.63 6,909.78 1,409.73 2,380.79 11,903.93
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 22,611.50 45,769.30 92,271.26 40,163.02 200,815.08
407i PILE LOAD TEST UP TO 240 TON EACH 42,307.39 45,769.30 184,542.52 68,154.80 340,774.01
407j PILE LOAD TEST UP TO 360 TON EACH 62,003.27 50,188.38 276,813.78 97,251.36 486,256.80
407k CONFIRMATORY BORING (NX SIZE) M 190.29 1,582.02 6.37 444.67 2,223.35
411a STONE MASONRY RANDOM DRY CM 285.39 107.96 628.81 255.54 1,277.69
411b STONE MASONRY RANDOM WITH MORTAR CM 308.64 166.68 1,655.14 532.62 2,663.08
411c STONE MASONRY DRESSED UNCOURSED DRY CM 375.66 107.96 696.80 295.10 1,475.52
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 444.05 166.68 1,734.18 586.23 2,931.13
Page 200
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Swabi
Swabi District Code: 66-A
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 601.35 264.08 1,639.37 626.20 3,131.00
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 224.62 437.48 643.39 326.37 1,631.87
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 219.04 577.19 834.17 407.60 2,037.99
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 211.49 935.96 1,069.85 554.33 2,771.63
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 222.11 1,146.39 1,598.23 741.68 3,708.41
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 254.21 1,078.41 2,297.87 907.62 4,538.11
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 314.06 1,331.30 3,614.54 1,314.98 6,574.88
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 406.44 1,481.41 4,680.50 1,642.09 8,210.43
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 476.92 1,798.85 5,964.68 2,060.11 10,300.57
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 568.40 2,098.66 9,213.95 2,970.25 14,851.27
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 224.62 507.33 722.10 363.51 1,817.56
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 219.04 577.19 852.99 412.30 2,061.52
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 207.06 935.96 1,044.43 546.86 2,734.32
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 222.11 1,146.39 1,743.69 778.05 3,890.23
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 254.21 1,078.41 3,316.03 1,162.16 5,810.82
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 314.06 1,331.30 4,871.85 1,629.30 8,146.52
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 406.44 1,481.41 6,808.93 2,174.19 10,870.96
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 476.92 1,798.85 9,234.95 2,877.68 14,388.41
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 568.40 2,098.66 12,992.82 3,914.97 19,574.84
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 86.90 118.93 315.27 130.27 651.36
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 712.01 612.95 3,471.10 1,199.01 5,995.06
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 5.18 - 109.50 28.67 143.35
508a BRICK PAVING (SINGLE COURSE) SM 112.10 32.70 259.21 101.00 505.01
508b BRICK PAVING (DOUBLE COURSE) SM 202.38 32.70 515.58 187.66 938.32
Page 201
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Swabi
Swabi District Code: 66-A
509d GROUTED RIP RAP CLASS "A" CM 597.66 102.14 1,926.98 656.70 3,283.48
509e GROUTED RIP RAP CLASS "B" CM 577.71 81.72 1,778.01 609.36 3,046.80
509f GROUTED RIP RAP CLASS "C" CM 571.70 68.10 1,823.85 615.91 3,079.56
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 774.65 353.02 4,039.99 1,291.92 6,459.59
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 46.27 191.97 348.49 146.68 733.42
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 152.15 67.48 86.78 76.60 383.00
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 194.75 86.37 111.07 98.05 490.24
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 249.46 180.32 372.92 200.68 1,003.38
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 311.83 225.40 466.15 250.84 1,254.22
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 259.57 572.25 2,189.96 755.45 3,777.23
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 931.32 670.54 4,035.66 1,409.38 7,046.89
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 135.38 90.27 423.54 162.30 811.48
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 23.81 - 1,197.58 305.35 1,526.74
604d STEEL POST OF METAL GUARD RAIL EACH 80.29 976.73 3,776.31 1,208.33 6,041.66
605a CONCRETE BEAM GUARD RAIL M 73.86 30.82 589.31 173.50 867.50
605c CONCRETE POST FOR GUARD RAIL M 90.69 27.36 589.04 176.77 883.87
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 230.86 255.15 6,846.99 1,833.25 9,166.25
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 67.23 382.72 9,233.84 2,420.95 12,104.75
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 230.86 541.89 11,846.66 3,154.85 15,774.25
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 760.60 598.64 20,895.12 5,563.59 27,817.96
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 152.12 119.73 9,196.07 2,366.98 11,834.90
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.59 5.86 16.16 6.15 30.76
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.86 4.03 39.65 11.14 55.68
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 2.59 5.86 21.56 7.50 37.51
LINES OF 20 cm WIDTH
Page 202
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Swabi
Swabi District Code: 66-A
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 0.86 4.03 52.89 14.44 72.22
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 74.48 5.22 156.16 58.96 294.81
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 74.48 9.98 499.68 146.03 730.17
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.23 8.59 22.48 8.57 42.87
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.23 9.63 67.50 20.09 100.46
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.23 6.95 29.97 10.04 50.19
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.23 9.63 90.01 25.72 128.59
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 74.48 3.73 217.02 73.80 369.02
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 74.48 7.90 851.20 233.39 1,166.97
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 61.79 3.73 104.11 42.41 212.03
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 61.79 7.90 333.62 100.83 504.14
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 61.79 3.73 144.68 52.55 262.75
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 61.79 7.90 568.32 159.50 797.52
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 8.69 81.62 193.80 71.03 355.14
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 8.69 81.62 233.80 81.03 405.13
DOUBLE)
610b RIGHT OF WAY MARKER EACH 101.91 121.33 298.33 130.39 651.96
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 632.56 976.31 1,999.97 902.21 4,511.04
610d TEN KILOMETRE POST EACH 1,214.38 1,952.61 4,397.63 1,891.15 9,455.77
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT M 127.74 91.00 948.31 291.76 1,458.81
WITH PRECAST PRESTRESSED R.C.C. POST
Page 203
.
Page 204
NATIONAL HIGHWAY AUTHORITY
TANK
(70-A)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 205
.
Page 206
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Tank
Tank District Code: 70-A
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 8.02 173.32 1.17 45.63 228.13
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 23.27 456.54 2.63 120.61 603.04
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 93.07 1,826.16 10.51 482.44 2,412.18
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 131.49 316.30 50.82 124.65 623.27
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 18.24 337.99 - 89.06 445.29
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 11.82 262.40 - 68.55 342.77
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 131.49 316.30 50.82 124.65 623.27
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 20.88 316.03 - 84.23 421.14
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 9.18 263.92 - 68.27 341.37
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 7.42 137.60 0.38 36.35 181.75
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 67.61 287.11 70.80 106.38 531.91
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 116.01 427.01 33.88 144.23 721.13
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 98.27 292.53 - 97.70 488.51
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 59.66 238.86 - 74.63 373.16
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 7.14 174.71 5.09 46.73 233.67
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 21.41 482.48 54.04 139.48 697.41
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 16.06 416.71 2.42 108.80 543.98
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 8.30 177.46 7.94 48.42 242.12
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 6.48 76.32 5.09 21.97 109.86
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 15.46 110.29 3.03 32.19 160.97
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.46 27.34 1.46 7.56 37.81
Page 207
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Tank
Tank District Code: 70-A
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.05 18.21 0.77 5.01 25.04
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.91 15.26 0.79 4.24 21.21
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.33 15.57 0.90 4.45 22.24
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 79.77 1,510.17 6,311.32 1,975.31 9,876.57
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 82.13 1,510.17 6,759.22 2,087.88 10,439.39
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 87.67 1,577.28 6,300.90 1,991.46 9,957.32
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 87.67 1,571.31 6,910.49 2,142.37 10,711.83
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 252.16 915.38 55,731.63 14,224.79 71,123.96
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 252.16 915.38 54,153.50 13,830.26 69,151.30
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 108.26 112.80 968.33 297.35 1,486.73
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 159.20 2,437.94 5,949.21 2,136.59 10,682.94
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 119.69 126.27 716.25 240.55 1,202.77
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 1.83 45.04 1.26 12.03 60.15
207b DEEP PATCHING (16-30 cm) SM 1.83 39.67 1.26 10.69 53.45
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.17 110.61 0.68 28.37 141.83
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.43 22.12 0.14 5.67 28.37
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.31 1.57 39.55 10.36 51.80
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.30 1.57 44.15 11.51 57.53
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.12 0.58 16.55 4.31 21.57
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.12 0.58 19.31 5.00 25.02
Page 208
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Tank
Tank District Code: 70-A
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 73.82 1,489.33 7,424.24 2,246.85 11,234.24
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 73.82 1,438.23 8,021.83 2,383.47 11,917.34
"B")
307a DENSE GRADED HOT BIT-MAC CM 183.61 379.77 6,203.46 1,691.71 8,458.56
307b OPEN GRADED HOT BIT-MAC CM 183.61 379.77 6,023.39 1,646.69 8,233.47
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 31.25 590.65 2,146.11 692.00 3,460.01
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 28.14 650.70 47,890.96 12,142.45 60,712.24
401a1i CONCRETE CLASS "A1" (Underground) CM 563.03 1,059.94 3,990.87 1,403.46 7,017.30
401a1ii CONCRETE CLASS "A1" (On ground) CM 563.03 1,059.94 4,268.34 1,472.83 7,364.14
401a1iii CONCRETE CLASS "A1" (Elevated) CM 563.03 1,059.94 4,823.29 1,611.56 8,057.82
401a2i CONCRETE CLASS "A2" (Underground) CM 563.03 1,059.94 4,368.87 1,497.96 7,489.80
401a2ii CONCRETE CLASS "A2" (On ground) CM 563.03 1,059.94 4,646.34 1,567.33 7,836.64
401a2iii CONCRETE CLASS "A2" (Elevated) CM 563.03 1,059.94 5,201.29 1,706.06 8,530.32
401a3i CONCRETE CLASS "A3" (Underground) CM 563.03 1,059.94 4,746.87 1,592.46 7,962.30
401a3ii CONCRETE CLASS "A3" (On ground) CM 563.03 1,059.94 5,024.34 1,661.83 8,309.14
401a3iii CONCRETE CLASS "A3" (Elevated) CM 563.03 1,059.94 5,579.29 1,800.56 9,002.82
401ci CONCRETE CLASS "C" (Underground) CM 562.20 500.55 3,553.89 1,154.16 5,770.80
401cii CONCRETE CLASS "C" (On ground) CM 562.20 500.55 3,672.24 1,183.75 5,918.73
401ciii CONCRETE CLASS "C" (Elevated) CM 562.20 500.55 3,908.92 1,242.92 6,214.59
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,925.20 947.15 4,996.03 1,967.10 9,835.48
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,925.20 947.15 5,752.03 2,156.10 10,780.48
401gii PRECAST CONCRETE CLASS "B" CM 1,925.20 947.15 4,751.80 1,906.04 9,530.20
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,925.20 947.15 6,130.03 2,250.60 11,252.98
Page 209
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Tank
Tank District Code: 70-A
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,925.20 947.15 6,508.03 2,345.10 11,725.48
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,925.20 947.15 6,886.03 2,439.60 12,197.98
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,733.04 781.47 61,478.00 15,998.13 79,990.64
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,733.04 781.47 68,828.00 17,835.63 89,178.14
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,393.24 5,393.81 57,035.76 15,955.70 79,778.52
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 2,848.15 15,659.05 133,847.57 38,088.69 190,443.47
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 127.30 - 310.06 109.34 546.70
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 127.30 - 308.96 109.06 545.32
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.53 2.67
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 21.96 69.68 118.12 52.44 262.21
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 371.93 1,654.04 898.40 731.09 3,655.46
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 557.89 2,481.06 1,347.60 1,096.64 5,483.20
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 557.89 2,481.06 995.75 1,008.68 5,043.38
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 929.82 4,135.11 1,171.54 1,559.12 7,795.59
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 796.99 4,884.94 1,347.88 1,757.45 8,787.26
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,394.73 6,909.78 1,482.79 2,446.83 12,234.13
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 26,707.83 45,769.30 90,203.26 40,670.10 203,350.49
407i PILE LOAD TEST UP TO 240 TON EACH 50,208.71 45,769.30 180,406.52 69,096.13 345,480.66
407j PILE LOAD TEST UP TO 360 TON EACH 73,709.58 50,188.38 270,609.78 98,626.94 493,134.68
407k CONFIRMATORY BORING (NX SIZE) M 223.34 1,582.02 6.37 452.93 2,264.66
411a STONE MASONRY RANDOM DRY CM 304.78 107.96 385.27 199.50 997.51
411b STONE MASONRY RANDOM WITH MORTAR CM 325.65 166.68 1,430.40 480.68 2,403.41
411c STONE MASONRY DRESSED UNCOURSED DRY CM 398.75 107.96 414.30 230.25 1,151.26
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 466.61 166.68 1,465.77 524.76 2,623.82
Page 210
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Tank
Tank District Code: 70-A
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 633.67 264.08 1,370.97 567.18 2,835.90
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 258.71 437.48 643.98 335.04 1,675.22
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 252.58 577.19 834.87 416.16 2,080.80
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 242.26 935.96 1,070.67 562.22 2,811.12
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 255.85 1,146.39 1,599.19 750.36 3,751.78
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 293.01 1,078.41 2,298.83 917.56 4,587.81
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 359.49 1,331.30 3,615.93 1,326.68 6,633.40
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 465.22 1,481.41 4,681.88 1,657.13 8,285.64
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 550.00 1,798.85 5,966.36 2,078.80 10,394.02
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 648.30 2,098.66 9,215.91 2,990.72 14,953.59
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 258.71 507.33 723.27 372.33 1,861.65
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 252.58 577.19 853.69 420.86 2,104.32
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 235.80 935.96 1,045.25 554.25 2,771.27
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 255.85 1,146.39 1,744.43 786.67 3,933.34
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 293.01 1,078.41 3,317.10 1,172.13 5,860.65
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 359.49 1,331.30 4,873.24 1,641.01 8,205.04
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 465.22 1,481.41 6,810.31 2,189.23 10,946.17
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 550.00 1,798.85 9,236.63 2,896.37 14,481.86
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 648.30 2,098.66 12,994.77 3,935.43 19,677.17
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 101.72 118.93 287.07 126.93 634.64
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 830.63 612.95 3,570.55 1,253.53 6,267.65
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 5.81 - 113.36 29.79 148.97
508a BRICK PAVING (SINGLE COURSE) SM 119.42 32.70 226.96 94.77 473.84
508b BRICK PAVING (DOUBLE COURSE) SM 213.39 32.70 451.31 174.35 871.75
Page 211
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Tank
Tank District Code: 70-A
509d GROUTED RIP RAP CLASS "A" CM 627.51 102.14 1,695.19 606.21 3,031.05
509e GROUTED RIP RAP CLASS "B" CM 604.33 81.72 1,546.95 558.25 2,791.24
509f GROUTED RIP RAP CLASS "C" CM 597.58 68.10 1,591.28 564.24 2,821.19
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 869.39 353.02 4,132.53 1,338.74 6,693.68
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 54.62 191.97 348.64 148.81 744.04
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 163.28 67.48 47.20 69.49 347.44
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 209.00 86.37 60.42 88.95 444.73
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 263.28 180.32 351.87 198.87 994.34
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 329.10 225.40 439.83 248.58 1,242.92
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 298.65 572.25 2,234.22 776.28 3,881.40
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 1,055.20 670.54 4,116.24 1,460.49 7,302.47
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 153.09 90.27 432.59 168.99 844.93
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 27.89 - 1,197.58 306.37 1,531.84
604d STEEL POST OF METAL GUARD RAIL EACH 91.71 976.73 3,776.31 1,211.19 6,055.94
605a CONCRETE BEAM GUARD RAIL M 84.45 30.82 599.67 178.74 893.68
605c CONCRETE POST FOR GUARD RAIL M 103.70 27.36 600.77 182.96 914.79
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 258.99 255.15 6,867.24 1,845.35 9,226.73
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 76.04 382.72 9,265.98 2,431.19 12,155.93
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 258.99 541.89 11,900.41 3,175.32 15,876.60
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 877.48 598.64 20,983.30 5,614.86 28,074.28
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 175.50 119.73 9,225.46 2,380.17 11,900.85
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.05 5.86 16.18 6.27 31.37
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.02 4.03 39.87 11.23 56.15
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.05 5.86 21.59 7.63 38.13
LINES OF 20 cm WIDTH
Page 212
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Tank
Tank District Code: 70-A
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.02 4.03 53.18 14.56 72.78
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 82.69 5.22 156.37 61.07 305.35
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 82.69 9.98 502.46 148.78 743.92
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.81 8.59 22.50 8.73 43.63
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.81 9.63 67.50 20.24 101.19
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.81 6.95 30.00 10.19 50.96
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.81 9.63 90.01 25.86 129.32
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 82.69 3.73 217.23 75.91 379.56
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 82.69 7.90 851.20 235.45 1,177.24
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 69.16 3.73 104.25 44.28 221.42
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 69.16 7.90 335.48 103.14 515.68
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 69.16 3.73 144.82 54.43 272.14
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 69.16 7.90 568.32 161.35 806.73
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 9.89 81.62 193.82 71.33 356.66
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 9.89 81.62 233.82 81.33 406.66
DOUBLE)
610b RIGHT OF WAY MARKER EACH 119.12 121.33 303.51 135.99 679.94
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 704.70 976.31 2,049.32 932.58 4,662.90
610d TEN KILOMETRE POST EACH 1,370.99 1,952.61 4,495.94 1,954.89 9,774.43
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT M 146.16 91.00 953.85 297.75 1,488.76
WITH PRECAST PRESTRESSED R.C.C. POST
Page 213
.