Table 2.1 - Number and Value of Projects Awarded by Status of Contractors As of March 2009

This document contains two tables summarizing Malaysian government construction project awards in 2006-2009. Table 2.1 shows the number and value of projects awarded by contractor status (local vs. foreign) and type of project (government vs. private). Table 2.2 breaks down projects by category, including residential, non-residential, social amenities, and infrastructure. In total over this period, over 25,000 projects were awarded worth over RM240 billion. The majority went to local contractors for government and private sector projects across various categories.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
106 views25 pages

Table 2.1 - Number and Value of Projects Awarded by Status of Contractors As of March 2009

This document contains two tables summarizing Malaysian government construction project awards in 2006-2009. Table 2.1 shows the number and value of projects awarded by contractor status (local vs. foreign) and type of project (government vs. private). Table 2.2 breaks down projects by category, including residential, non-residential, social amenities, and infrastructure. In total over this period, over 25,000 projects were awarded worth over RM240 billion. The majority went to local contractors for government and private sector projects across various categories.
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 25

Jadual 2.

1 - Bilangan dan Nilai Projek Diawad Berdasarkan Status Kontraktor Pada Mac 2009
Table 2.1 - Number and Value of Projects Awarded by Status of Contractors as of March 2009

Status kontraktor / Status of Contractors


Jumlah Jumlah Nilai Kontraktor Tempatan Kontraktor Asing
Tahun
Bilangan Projek Projek Local Contractors Foreign Contractors
Projek Kerajaan Projek Swasta Projek Kerajaan Projek Swasta
Total Number Total Project Government Projects Private Projects Government Projects Private Projects
Year
of Projects Value Bilangan Nilai (RM j) Bilangan Nilai (RM j) Bilangan Nilai (RM j) Bilangan Nilai (RM j)
Number Value (RM m) Number Value (RM m) Number Value (RM m) Number Value (RM m)
2006 5,854 60,926.99 1,643 21,377.16 4,137 35,592.06 3 1,077.81 71 2,879.96
2007 7,168 90,878.36 2,890 44,121.61 4,186 40,895.20 4 3,475.32 88 2,386.23
Jan. / Jan. 462 5,753.77 138 1,798.88 319 3,630.90 - - 5 323.99
Feb. / Feb 414 5,055.50 142 1,822.83 267 3,175.81 - - 5 56.86
Mac./ Mar 538 4,896.31 175 1,779.42 351 2,824.82 1 0.64 11 291.43
Apr. / Apr. 574 5,627.29 209 1,699.53 358 3,713.15 - - 7 214.61
Mei. / May 642 6,322.55 225 2,965.86 407 3,230.82 - - 10 125.87
Jun. / Jun. 582 4,985.02 204 2,179.01 372 2,697.08 - - 6 108.93
Jul. / Jul. 690 9,276.26 278 3,319.92 403 5,462.87 1 0.69 8 492.78
Ogos. / Aug. 681 6,341.20 313 2,894.23 358 3,411.02 - - 10 35.95
Sep. / Sep. 679 6,480.73 343 2,427.67 329 3,636.36 - - 7 416.70
Okt. / Oct. 675 6,069.35 351 3,366.01 315 2,586.68 - - 9 116.66
Nov. / Nov. 631 7,444.41 275 4,754.90 349 2,550.30 - - 7 139.21
Dis. / Dec 600 22,625.97 237 15,113.35 358 3,975.39 2 3,473.99 3 63.24
2008 5,693 74,164.28 2,425 30,564.40 3,205 39,149.15 2 2,219.00 61 2,231.73
Jan. / Jan. 559 6,180.10 251 2,772.09 304 3,298.54 1 19.00 3 90.47
Feb. / Feb 565 6,380.41 282 3,346.35 279 3,002.27 - - 4 31.79
Mac./ Mar 585 8,295.50 220 2,615.30 359 5,658.33 - - 6 21.87
Apr. / Apr. 525 8,174.86 190 3,144.00 328 4,899.35 - - 7 131.51
Mei. / May 496 7,286.02 159 2,351.01 325 3,500.91 - - 12 1,434.10
Jun. / Jun. 519 6,859.12 225 2,033.72 288 4,795.61 - - 6 29.79
Jul. / Jul. 507 4,860.26 206 2,194.26 290 2,384.97 - - 11 281.03
Ogos. / Aug. 449 4,796.12 196 2,431.41 251 2,339.89 - - 2 24.82
Sep. / Sep. 453 6,143.12 211 2,541.67 239 3,450.04 - - 3 151.41
Okt./ Oct 375 5,827.06 164 1,829.31 208 1,795.40 1 2200.00 2 2.35
Nov./ Nov. 348 3,497.45 175 2,100.47 169 1,365.58 - - 4 31.40
Dis./ Dec 312 5,864.26 146 3,204.81 165 2,658.26 - - 1 1.19
2009 414 6,141.58 161 2,958.46 251 2,515.47 0 0.00 2 667.65
Jan. / Jan. 210 3,252.05 87 1,273.75 122 1,313.30 - - 1 665.00
Feb. / Feb 162 2,515.93 60 1,573.82 101 939.46 - - 1 2.65
Mac./ Mar 42 373.60 14 110.89 28 262.71 - - - -
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification.
Jadual 2.2 - Bilangan dan Nilai Projek Diawad Berdasarkan Kategori Pada Mac 2009
Table 2.2 - Number and Value of Projects Awarded By Category as of March 2009
Kategori Pembangunan Projek / Project Category
Jumlah Jumlah Nilai Pembangunan
Kediaman Bukan Kediaman Kemudahan Sosial Infrastruktur Lain-lain
Tahun Bilangan Projek (RM Bercampur
Residential Non Residential Social Amenities Infrastructure Others
Projek j) Mix Development
Project
Total
Value Bilangan Nilai Bilangan Nilai Bilangan Nilai Bilangan Nilai Bilangan Nilai Bilangan Nilai
Year Number of
Range (RM Number Value Number Value Number Value Number Value Number Value Number Value
Projects
m)
2006 5,854 60,926.99 1,778 16,554.58 1,968 17,703.43 11 454.80 557 3,989.29 1,524 21,627.30 16 597.59
2007 7,168 90,878.36 1,784 16,594.22 2,229 25,075.95 11 115.33 1,365 11,540.21 1,742 37,362.95 37 189.70
Jan. / Jan. 462 5,753.78 134 1,481.26 165 1,519.05 - - 56 730.34 106 2,019.32 1 3.81
Feb. / Feb 414 5,055.49 107 1,457.68 140 1,255.24 - - 57 727.41 109 1,614.58 1 0.58
Mac./ Mar 538 4,896.32 119 835.47 192 2,462.18 1 0.68 100 924.34 123 667.98 3 5.67
Apr. / Apr. 574 5,627.29 150 1,391.41 167 2,337.77 2 5.50 126 1,280.95 125 594.74 4 16.92
Mei. / May 642 6,322.54 183 1,867.83 196 1,453.16 1 50.56 104 887.02 156 2,060.08 2 3.89
Jun. / Jun. 582 4,985.03 160 1,059.68 173 1,662.75 - - 70 542.86 177 1,704.57 2 15
Jul. / Jul. 690 9,276.25 166 1,643.02 204 2,154.96 1 25.21 116 1,063.07 199 4,366.72 4 23.27
Ogos. / Aug. 681 6,341.20 157 1,268.07 221 2,081.98 - - 131 647.28 168 2,333.99 4 9.88
Sep. / Sep. 679 6,480.72 141 1,667.87 190 2,532.33 3 8.23 193 1,161.71 147 1,088.21 5 22.37
Okt. / Oct. 675 6,069.36 187 1,390.08 166 2,131.90 1 5.81 182 1,339.01 136 1,195.57 3 6.99
Nov. / Nov. 631 7,444.41 140 1,057.55 196 2,224.55 1 1.11 141 1,528.44 147 2,578.58 6 54.18
Dis. / Dec 600 22,625.97 140 1,474.30 219 3,260.08 1 18.23 89 707.78 149 17,138.61 2 26.97
2008 5,693 74,164.23 1,266 15,054.87 1,858 18,736.34 17 1,196.21 1,146 19,116.00 1,373 19,971.91 33 88.90
Jan. / Jan. 559 6,180.09 156 1,799.31 176 1,531.06 2 32.00 121 1,318.65 102 1,492.13 2 6.94
Feb. / Feb 565 6,380.39 147 1,497.15 176 1,938.75 - - 141 1,993.73 101 950.76 - -
Mac./ Mar 585 8,295.51 152 1,533.58 190 1,542.40 4 798.52 117 2,225.66 121 2,192.92 1 2.43
Apr. / Apr. 525 8,174.85 122 1,508.71 175 1,133.01 2 14.24 92 3,381.39 132 2,133.46 2 4.04
Mei. / May 496 7,286.02 123 1,920.88 179 2,650.92 2 4.26 73 2,083.20 118 626.10 1 0.66
Jun. / Jun. 519 6,859.11 107 1,934.34 181 1,532.67 2 60.60 121 1,131.30 107 2,199.00 1 1.20
Jul. / Jul. 507 4,860.27 117 985.86 167 1,540.00 1 1.98 91 1,282.19 129 1,046.19 2 4.05
Ogos. / Aug. 449 4,796.12 94 905.59 143 1,618.36 1 1.93 83 888.84 125 1,366.75 3 14.65
Sep. / Sep. 453 6,143.10 76 949.86 160 1,457.07 - - 71 1,129.63 140 2,596.89 6 9.65
Okt. / Oct. 375 5,827.07 58 597.66 114 957.77 - - 89 1,168.07 109 3,083.33 5 20.24
Nov. / Nov. 348 3,497.44 66 861.04 100 848.02 2 5.68 65 1,153.38 114 626.18 1 3.14
Dis. / Dec 312 5,864.26 48 560.89 97 1,986.31 1 277.00 82 1,359.96 75 1,658.20 9 21.90
2009 414 6,141.58 85 771.42 141 2,806.50 0 0.00 68 1,329.98 116 1,220.41 4 13.27
Jan. / Jan. 210 3,252.05 36 306.16 74 1,936.06 - - 42 658.00 55 347.38 3 4.45
Feb. / Feb 162 2,515.92 36 371.76 51 648.79 - - 24 668.31 50 818.24 1 8.82
Mac./ Mar 42 373.61 13 93.50 16 221.65 - - 2 3.67 11 54.79 - -
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification.
Jadual 2.3 - Bilangan dan Nilai Projek Pembinaan Diawad Mengikut Julat Nilai Projek dan Gred Pendaftaran Kontraktor Bagi Tahun 2007
Table 2.3 - Number and Value of Project Awarded By Project Value Range and Contractor Registration Grade For 2007

Melebihi Melebihi Melebihi


Melebihi Melebihi Melebihi Melebihi Melebihi Melebihi
Gred Julat Nilai Projek (RM juta) 100 hingga 300 hingga 500 hingga Jumlah
0.5 hingga 1 1 hingga 5 5 hingga 10 10 hingga 50 50 hingga 100 1,000
300 500 1,000
Exceeding Exceeding Exceeding Exceeding Exceeding Exceeding Exceeding Exceeding Exceeding
Grade Project Value Range (RM million) Total
0.5 to 1 1 to 5 5 to 10 10 to 50 50 to 100 100 to 300 300 to 500 500 to 1,000 1,000
Bilangan Kontraktor / No. of Contractors 24 33 3 2 1 - - - - 63
G1 Bilangan Projek / No. of Projects 26 33 3 3 1 - - - - 66
Nilai Projek (RM j) / Project Value (RM m) 18.23 71.78 24.53 52.57 81.40 - - - - 248.51
Bilangan Kontraktor / No. of Contractors 41 39 4 1 - - - - - 85
G2 Bilangan Projek / No. of Projects 46 45 4 1 - - - - - 96
Nilai Projek (RM j) / Project Value (RM m) 32.66 81.28 24.37 24.00 - - - - - 162.31
Bilangan Kontraktor / No. of Contractors 378 510 25 14 1 - - - - 928
G3 Bilangan Projek / No. of Projects 435 571 26 14 1 - - - - 1047
Nilai Projek (RM j) / Project Value (RM m) 329.98 1,113.78 179.25 348.13 79.64 - - - - 2,050.78
Bilangan Kontraktor / No. of Contractors 183 387 23 3 - - - - - 596
G4 Bilangan Projek / No. of Projects 221 510 26 3 - - - - - 760
Nilai Projek (RM j) / Project Value (RM m) 166.08 1,170.99 173.30 76.23 - - - - - 1,586.60
Bilangan Kontraktor / No. of Contractors 113 631 106 23 2 - - - - 875
G5 Bilangan Projek / No. of Projects 151 918 113 30 2 - - - - 1214
Nilai Projek (RM j) / Project Value (RM m) 113.67 2,652.00 756.06 551.63 110.19 - - - - 4,183.55
Bilangan Kontraktor / No. of Contractors 64 185 137 23 1 - - - - 410
G6 Bilangan Projek / No. of Projects 103 332 167 23 1 - - - - 626
Nilai Projek (RM j) / Project Value (RM m) 75.85 845.99 1,175.01 409.91 60.33 - - - - 2,567.09
Bilangan Kontraktor / No. of Contractors 234 611 413 728 132 74 12 3 2 2,209
G7 Bilangan Projek / No. of Projects 346 1,091 541 1036 148 88 12 3 2 3,267
Nilai Projek (RM j) / Project Value (RM m) 253.87 2,843.63 3,947.11 22,252.42 10,405.24 14,161.22 4,580.59 2,188.90 13,585.00 74,217.98
Bilangan Kontraktor / No. of Contractors 5 17 14 11 6 4 2 - 1 60
Asing
Bilangan Projek / No. of Projects 10 34 18 17 6 4 2 - 1 92
Foreign
Nilai Projek (RM j) / Project Value (RM m) 7.66 96.52 127.55 448.51 413.11 629.74 688.43 - 3,450.00 5,861.52
Bilangan Kontraktor / No. of Contractors 1,042 2,413 725 805 143 78 14 3 3 5,226
Jumlah
Bilangan Projek / No. of Projects 1,338 3,534 898 1,127 159 92 14 3 3 7,168
Total
Nilai Projek (RM j) / Project Value (RM m) 998.00 8,875.97 6,407.18 24,163.40 11,149.91 14,790.96 5,269.02 2,188.90 17,035.00 90,878.34
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification.
Jadual 2.3 - Bilangan dan Nilai Projek Pembinaan Diawad Mengikut Julat Nilai Projek dan Gred Pendaftaran Kontraktor Bagi Tahun 2008
Table 2.3 - Number and Value of Project Awarded By Project Value Range and Contractor Registration Grade For 2008
Melebihi Melebihi Melebihi
Melebihi Melebihi Melebihi Melebihi Melebihi Melebihi
Gred Julat Nilai Projek (RM juta) 100 hingga 300 hingga 500 hingga Jumlah
0.5 hingga 1 1 hingga 5 5 hingga 10 10 hingga 50 50 hingga 100 1,000
300 500 1,000
Exceeding Exceeding Exceeding Exceeding Exceeding Exceeding Exceeding Exceeding Exceeding
Grade Project Value Range (RM million) Total
0.5 to 1 1 to 5 5 to 10 10 to 50 50 to 100 100 to 300 300 to 500 500 to 1,000 1,000
Bilangan Kontraktor / No. of Contractors 15 19 2 1 - - - - - 37
G1 Bilangan Projek / No. of Projects 15 22 2 1 - - - - - 40
Nilai Projek (RM j) / Project Value (RM m) 11.97 50.33 15.55 11.52 - - - - - 89.37
Bilangan Kontraktor / No. of Contractors 43 34 3 1 - - - - - 81
G2 Bilangan Projek / No. of Projects 43 38 4 1 - - - - - 86
Nilai Projek (RM j) / Project Value (RM m) 30.65 68.10 25.99 13.06 - - - - - 137.80
Bilangan Kontraktor / No. of Contractors 357 415 28 15 2 2 - - - 819
G3 Bilangan Projek / No. of Projects 418 471 29 15 2 2 - - - 937
Nilai Projek (RM j) / Project Value (RM m) 318.85 927.96 203.35 263.78 127.50 406.66 - - - 2,248.10
Bilangan Kontraktor / No. of Contractors 124 334 25 6 - 1 - - - 490
G4 Bilangan Projek / No. of Projects 158 418 27 6 - 1 - - - 610
Nilai Projek (RM j) / Project Value (RM m) 119.74 978.10 174.31 163.65 - 109.00 - - - 1,544.80
Bilangan Kontraktor / No. of Contractors 98 510 111 32 3 - - - - 754
G5 Bilangan Projek / No. of Projects 124 702 120 37 3 - - - - 986
Nilai Projek (RM j) / Project Value (RM m) 93.87 2,116.98 825.27 711.42 235.02 - - - - 3,982.56
Bilangan Kontraktor / No. of Contractors 59 154 111 27 1 - - - - 352
G6 Bilangan Projek / No. of Projects 87 232 144 29 1 - - - - 493
Nilai Projek (RM j) / Project Value (RM m) 65.85 610.71 1,007.67 506.04 68.40 - - - - 2,258.67
Bilangan Kontraktor / No. of Contractors 163 457 314 590 132 87 5 9 1 1,758
G7 Bilangan Projek / No. of Projects 240 760 411 805 144 102 5 10 1 2,478
Nilai Projek (RM j) / Project Value (RM m) 177.30 2,027.49 3,038.40 17,743.14 9,808.05 16,177.89 1,866.99 7,112.99 1,500.00 59,452.25
Bilangan Kontraktor / No. of Contractors 5 8 5 12 4 2 1 1 1 39
Asing
Bilangan Projek / No. of Projects 12 21 5 15 5 2 1 1 1 63
Foreign
Nilai Projek (RM j) / Project Value (RM m) 9.57 46.23 38.26 300.33 379.08 408.92 460.74 607.60 2,200.00 4,450.73
Bilangan Kontraktor / No. of Contractors 864 1931 599 684 142 92 6 10 2 4,330
Jumlah
Bilangan Projek / No. of Projects 1,097 2,664 742 909 155 107 6 11 2 5,693
Total
Nilai Projek (RM j) / Project Value (RM m) 827.80 6,825.90 5,328.80 19,712.94 10,618.05 17,102.47 2,327.73 7,720.59 3,700.00 74,164.28
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification.
Jadual 2.3 - Bilangan dan Nilai Projek Pembinaan Diawad Mengikut Julat Nilai Projek dan Gred Pendaftaran Kontraktor Bagi Tahun Mac 2009
Table 2.3 - Number and Value of Project Awarded By Project Value Range and Contractor Registration Grade For March 2009
Melebihi Melebihi Melebihi
Melebihi Melebihi Melebihi Melebihi Melebihi Melebihi
Gred Julat Nilai Projek (RM juta) 100 hingga 300 hingga 500 hingga Jumlah
0.5 hingga 1 1 hingga 5 5 hingga 10 10 hingga 50 50 hingga 100 1,000
300 500 1 000
Exceeding Exceeding Exceeding Exceeding Exceeding Exceeding Exceeding Exceeding Exceeding
Grade Project Value Range (RM million) Total
0.5 to 1 1 to 5 5 to 10 10 to 50 50 to 100 100 to 300 300 to 500 500 to 1,000 1,000
Bilangan Kontraktor / No. of Contractors - 1 - - - - - - - 1
G1 Bilangan Projek / No. of Projects - 1 - - - - - - - 1
Nilai Projek (RM j) / Project Value (RM m) - 1.09 - - - - - - - 1.09
Bilangan Kontraktor / No. of Contractors 1 2 - - - - - - - 3
G2 Bilangan Projek / No. of Projects 1 2 - - - - - - - 3
Nilai Projek (RM j) / Project Value (RM m) 0.59 2.40 - - - - - - - 2.99
Bilangan Kontraktor / No. of Contractors 17 30 1 - - - - - - 48
G3 Bilangan Projek / No. of Projects 17 31 1 - - - - - - 49
Nilai Projek (RM j) / Project Value (RM m) 14.41 62.68 8.55 - - - - - - 85.64
Bilangan Kontraktor / No. of Contractors 11 17 - - - - - - - 28
G4 Bilangan Projek / No. of Projects 11 19 - - - - - - - 30
Nilai Projek (RM j) / Project Value (RM m) 8.58 42.31 - - - - - - - 50.89
Bilangan Kontraktor / No. of Contractors 8 39 10 2 - - - - - 59
G5 Bilangan Projek / No. of Projects 10 39 10 2 - - - - - 61
Nilai Projek (RM j) / Project Value (RM m) 7.21 105.09 75.43 24.46 - - - - - 212.19
Bilangan Kontraktor / No. of Contractors 7 13 15 1 - - - - - 36
G6 Bilangan Projek / No. of Projects 7 16 16 1 - - - - - 40
Nilai Projek (RM j) / Project Value (RM m) 4.81 35.53 112.42 37.70 - - - - - 190.46
Bilangan Kontraktor / No. of Contractors 25 53 41 64 14 8 - 1 - 206
G7 Bilangan Projek / No. of Projects 26 63 44 72 14 8 - 1 - 228
Nilai Projek (RM j) / Project Value (RM m) 18.74 170.28 307.26 1,560.94 1,045.51 1,283.06 - 544.90 - 4,930.69
Bilangan Kontraktor / No. of Contractors - 1 - - - - - 1 - 2
Asing
Bilangan Projek / No. of Projects - 1 - - - - - 1 - 2
Foreign
Nilai Projek (RM j) / Project Value (RM m) - 2.65 - - - - - 665.00 - 667.65
Bilangan Kontraktor / No. of Contractors 69 156 67 67 14 8 0 2 0 383
Jumlah
Bilangan Projek / No. of Projects 72 172 71 75 14 8 0 2 0 414
Total
Nilai Projek (RM j) / Project Value (RM m) 54.34 422.03 503.66 1,623.10 1,045.51 1,283.06 0.00 1,209.90 0.00 6,141.60
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification.
Jadual 2.4 - Bilangan dan Nilai Projek Diawad Berdasarkan Status Kontraktor dan Julat Nilai Projek Pada Mac 2009
Table 2.4 - Number and Value of Projects Awarded By Status of Contractors and Project Value Range as of March 2009

Jumlah Nilai
Jumlah Bilangan Projek Kerajaan / Government
Julat Nilai Projek (RM juta) Projek (RM Projek Swasta / Private Project
Projek Projects
juta)

Total Project
Total Number of Bilangan / Nilai (RM j) Bilangan / Nilai (RM j)
Project Value Range (RM million) Value
Projects Number Value (RM m) Number Value (RM m)
(RM million)
2007 7,168 90,878.32 2,894 47,596.92 4,274 43,281.40
Melebihi 0.5 hingga 1 / Exceeding 0.5 to 1 1,338 997.99 484 363.01 854 634.98
Melebihi 1 hingga 5 / Exceeding 1 to 5 3,534 8,875.97 1,512 3,910.48 2,022 4,965.49
Melebihi 5 hingga 10 / Exceeding 5 to 10 898 6,407.18 319 2,276.71 579 4,130.47
Melebihi 10 hingga 50 / Exceeding 10 to 50 1,127 24,163.40 459 10,133.60 668 14,029.80
Melebihi 50 hingga 100 / Exceeding 50 to 100 159 11,149.91 66 4,505.83 93 6,644.08
Melebihi 100 hingga 300 / Exceeding 100 to 300 92 14,790.95 43 6,696.46 49 8,094.49
Melebihi 300 hingga 500 / Exceeding 300 to 500 14 5,269.02 7 2,555.83 7 2,713.19
Melebihi 500 hingga 1,000 / Exceeding 500 to 1,000 3 2,188.90 2 1,220.00 1 968.90
Melebihi 1,000 / Exceeding 1,000 3 17,035.00 2 15,935.00 1 1,100.00
2008 5,693 74,164.28 2,427 32,783.40 3,266 41,380.88
Melebihi 0.5 hingga 1 / Exceeding 0.5 to 1 1,097 827.79 459 348.19 638 479.60
Melebihi 1 hingga 5 / Exceeding 1 to 5 2,664 6,825.90 1,186 3,093.99 1,478 3,731.91
Melebihi 5 hingga 10 / Exceeding 5 to 10 742 5,328.80 288 2,070.63 454 3,258.17
Melebihi 10 hingga 50 / Exceeding 10 to 50 909 19,712.95 365 8,395.52 544 11,317.43
Melebihi 50 hingga 100 / Exceeding 50 to 100 155 10,618.05 71 4,886.51 84 5,731.54
Melebihi 100 hingga 300 / Exceeding 100 to 300 107 17,102.47 51 8,309.41 56 8,793.06
Melebihi 300 hingga 500 / Exceeding 300 to 500 6 2,327.73 2 724.25 4 1,603.48
Melebihi 500 hingga 1,000 / Exceeding 500 to 1,000 11 7,720.59 4 2,754.90 7 4,965.69
Melebihi 1,000 / Exceeding 1,000 2 3,700.00 1 2,200.00 1 1,500.00
2009 414 6,141.59 161 2,958.46 253 3,183.13
Melebihi 0.5 hingga 1 / Exceeding 0.5 to 1 72 54.34 25 20.12 47 34.22
Melebihi 1 hingga 5 / Exceeding 1 to 5 172 422.02 58 143.92 114 278.10
Melebihi 5 hingga 10 / Exceeding 5 to 10 71 503.66 28 195.64 43 308.02
Melebihi 10 hingga 50 / Exceeding 10 to 50 75 1,623.10 35 795.83 40 827.27
Melebihi 50 hingga 100 / Exceeding 50 to 100 14 1,045.51 8 629.11 6 416.40
Melebihi 100 hingga 300 / Exceeding 100 to 300 8 1,283.06 7 1,173.84 1 109.22
Melebihi 300 hingga 500 / Exceeding 300 to 500 0 0.00 - - - -
Melebihi 500 hingga 1,000 / Exceeding 500 to 1,000 2 1,209.90 - - 2 1,209.90
Melebihi 1,000 / Exceeding 1,000 0 0.00 - - - -
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification.
Jadual 2.5 - Bilangan Projek Diawad Berdasarkan Julat Nilai Projek dan Kategori Pembangunan Projek Pada Jun 2008
Table 2.5 - Number of Projects Awarded By Project Value Range and Project Category as of June 2008

Jumlah Melebihi Melebihi Melebihi Melebihi Melebihi Melebihi Melebihi Melebihi


Kategori Pembangunan Projek Melebihi 1,000
Bilangan 0.5 hingga 1 1 hingga 5 5 hingga 10 10 hingga 50 50 hingga 100 100 hingga 300 300 hingga 500 500 hingga 1000
Total Number Exceeding Exceeding Exceeding Exceeding Exceeding Exceeding Exceeding Exceeding Exceeding to
Project Category
of Projects 0.5 to 1 1 to 5 5 to 10 10 to 50 50 to 100 100 to 300 300 to 500 500 to 1,000 1,000

2007 7,168 1,338 3,534 898 1,127 159 92 14 3 3


Kediaman
1,784 289 840 252 359 29 13 2 - -
Residential
Bukan Kediaman
2,229 446 1,072 289 317 65 35 4 1 -
Non Residential
Pembangunan
Bercampur 11 1 6 1 2 1 - - - -
Mix Development
Kemudahan Sosial
1,365 208 756 150 218 19 12 2 - -
Social Amenities
Infrastruktur
1,742 387 841 200 226 45 32 6 2 3
Infrastructure
Lain-lain
37 7 19 6 5 - - - - -
Others
2008 5,693 1,097 2,664 742 909 155 107 6 11 2
Kediaman
1,266 193 562 207 249 34 18 2 1 -
Residential
Bukan Kediaman
1,858 336 945 242 251 48 35 - 1 -
Non Residential
Pembangunan
Bercampur 17 2 9 - 4 - 1 - 1 -
Mix Development
Kemudahan Sosial
1,146 222 528 121 192 46 31 2 3 1
Social Amenities
Infrastruktur
1,373 335 600 169 212 27 22 2 5 1
Infrastructure
Lain-lain
33 9 20 3 1 - - - - -
Others
2009 414 72 172 71 75 14 8 0 2 0
Kediaman
85 18 26 16 23 2 - - - -
Residential
Bukan Kediaman
141 24 60 23 25 5 2 - 2 -
Non Residential
Pembangunan
Bercampur 0 * - - - - - - - -
Mix Development
Kemudahan Sosial
68 9 24 12 16 3 4 - - -
Social Amenities
Infrastruktur
116 19 61 19 11 4 2 - - -
Infrastructure
Lain-lain
4 2 1 1 - - - - - -
Others
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification.
Jadual 2.6 - Nilai Projek Diawad Berdasarkan Julat Nilai Projek dan Kategori Pembangunan Projek Pada Mac 2009
Table 2.6 - Value of Projects Awarded By Project Value Range and Project Category as of March 2009

Kategori Pembangunan Jumlah Nilai Projek Melebihi Melebihi Melebihi Melebihi Melebihi Melebihi Melebihi Melebihi
Melebihi 1,000
Projek (RM j) 0.5 hingga 1 1 hingga 5 5 hingga 10 10 hingga 50 50 hingga 100 100 hingga 300 300 hingga 500 500 hingga 1000
Project Value Exceeding Exceeding Exceeding Exceeding Exceeding Exceeding Exceeding Exceeding Exceeding
Project Category
Range (RM m) 0.5 to 1 1 to 5 5 to 10 10 to 50 50 to 100 100 to 300 300 to 500 500 to 1,000 1 ,000
2007 90,878.32 997.99 8,875.98 6,407.19 24,163.40 11,149.89 14,790.95 5,269.02 2,188.90 17,035.00
Kediaman
16,594.23 223.92 2,114.23 1,817.42 7,502.60 1,991.72 2,189.39 754.95 - -
Residential
Bukan Kediaman
25,075.94 331.03 2,598.85 2,055.66 7,185.31 4,657.98 5,992.63 1,604.48 650.00 -
Non Residential
Pembangunan Bercampur
115.34 0.68 14.85 5.81 43.44 50.56 - - - -
Mix Development
Kemudahan Sosial
11,540.16 154.03 2,048.84 1,059.10 4,343.86 1,290.26 1,794.87 849.20 - -
Social Amenities
Infrastruktur
37,362.95 283.22 2,055.47 1,420.48 4,996.06 3,159.37 4,814.06 2,060.39 1,538.90 17,035.00
Infrastructure
Lain-lain
189.70 5.11 43.74 48.72 92.13 - - - - -
Others
2008 74,164.28 827.79 6,825.89 5,328.81 19,712.95 10,618.05 17,102.47 2,327.73 7,720.59 3,700.00
Kediaman
15,054.89 148.62 1,437.49 1,479.42 5,025.32 2,331.63 3,171.13 921.48 539.80 -
Residential
Bukan Kediaman
18,736.35 253.88 2,358.36 1,763.58 5,612.45 3,136.22 4,919.00 - 692.86 -
Non Residential
Pembangunan Bercampur
1,196.22 1.63 21.27 - 104.41 - 277.00 - 791.91 -
Mix Development
Kemudahan Sosial
19,116.00 166.96 1,464.84 839.83 4,388.03 3,232.65 4,912.73 724.25 1886.71 1500.00
Social Amenities
Infrastruktur
19,971.91 250.17 1,494.37 1,223.83 4,572.07 1,917.55 3,822.61 682.00 3809.31 2200.00
Infrastructure
Lain-lain
88.91 6.53 49.56 22.15 10.67 - - -
Others
2009 6,141.60 54.35 422.02 503.66 1,623.10 1,045.51 1,283.06 0.00 1,209.90 0.00
Kediaman
771.41 13.43 60.63 117.86 464.41 115.08 - - - -
Residential
Bukan Kediaman
2,806.50 17.57 152.92 154.68 551.91 392.30 327.22 - 1,209.90 -
Non Residential
Pembangunan Bercampur
0.00 - - - - - - - - -
Mix Development
Kemudahan Sosial
1,329.99 6.95 61.04 80.83 374.24 241.98 564.95 - - -
Social Amenities
Infrastruktur
1,220.42 14.76 144.61 141.47 232.54 296.15 390.89 - - -
Infrastructure
Lain-lain
13.28 1.64 2.82 8.82 - - - - - -
Others
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jadual 2.7 - Bilangan Projek Diawad Berdasarkan Lokasi Tapak dan Julat Nilai Projek Pada Mac 2009
Table 2.7 - Number of Projects Awarded By Site Location and Value Range as of March 2009

Jumlah
Julat Nilai Projek
Bilangan
(RM juta)
Projek Negeri Pulau Kuala
Johor Kedah Kelantan Melaka Pahang Perak Perlis Selangor Terengganu Sabah Sarawak Labuan
Sembilan Pinang Lumpur
Value Range Total Number
(RM million) of Projects
2007 7,168 1,079 412 162 250 309 436 441 503 68 1,591 381 472 335 702 27
Melebihi 0.5 hingga 1
1,338 211 57 30 41 72 89 59 92 21 320 59 77 67 139 4
Exceeding 0.5 to 1
Melebihi 1 hingga 5
3,534 587 233 61 153 155 237 208 301 37 677 204 206 148 313 14
Exceeding 1 to 5
Melebihi 5 hingga 10
898 129 49 23 25 38 46 66 49 4 224 46 82 40 73 4
Exceeding 5 to 10
Melebihi 10 hingga 50
1,127 127 57 44 23 36 55 95 51 4 308 55 90 53 124 5
Exceeding 10 to 50
Melebihi 50 hingga 100
159 13 11 4 2 4 6 11 4 - 42 12 11 12 27 -
Exceeding 50 to 100
Melebihi 100 hingga 300
92 10 2 - 6 3 3 2 5 1 16 5 5 13 21 -
Exceeding 100 to 300
Melebihi 300 hingga 500
14 1 3 - - - - - 1 - 3 - 1 2 3 -
Exceeding 300 to 500
Melebihi 500 hingga 1,000
3 1 - - - - - - - - - - - - 2 -
Exceeding 500 to 1,000
Melebihi 1,000
3 - - - - 1 - - - 1 1 - - - - -
Exceeding 1,000
2008 5,693 799 294 171 244 224 360 337 361 56 1,309 337 383 299 503 16
Melebihi 0.5 hingga 1
1,097 173 46 34 47 36 86 64 77 12 241 69 69 65 76 2
Exceeding 0.5 to 1
Melebihi 1 hingga 5
2,664 366 165 82 121 110 195 148 193 29 572 181 162 119 212 9
Exceeding 1 to 5
Melebihi 5 hingga 10
742 106 42 31 25 38 31 49 45 4 190 33 44 43 60 1
Exceeding 5 to 10
Melebihi 10 hingga 50
909 115 34 21 40 29 41 56 38 8 246 42 79 48 109 3
Exceeding 10 to 50
Melebihi 50 hingga 100
155 18 7 1 7 8 6 12 2 2 39 6 14 13 20 -
Exceeding 50 to 100
Melebihi 100 hingga 300
107 17 - 2 4 3 1 5 5 1 18 5 15 9 21 1
Exceeding 100 to 300
Melebihi 300 hingga 500
6 1 - - - - - 2 1 - - - - - 2 -
Exceeding 300 to 500
Melebihi 500 hingga 1,000
11 3 - - - - - - - - 3 - - 2 3 -
Exceeding 500 to 1,000
Melebihi 1,000
2 - - - - - - 1 - - - 1 - - - -
Exceeding 1,000
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jadual 2.7 - Bilangan Projek Diawad Berdasarkan Lokasi Tapak dan Julat Nilai Projek Pada Mac 2009
Table 2.7 - Number of Projects Awarded By Site Location and Value Range as of March 2009

Jumlah
Julat Nilai Projek
Bilangan
(RM juta)
Projek Negeri Pulau Kuala
Johor Kedah Kelantan Melaka Pahang Perak Perlis Selangor Terengganu Sabah Sarawak Labuan
Sembilan Pinang Lumpur
Value Range Total Number
(RM million) of Projects
2009 414 73 24 12 16 12 23 11 32 4 103 21 21 25 37 0
Melebihi 0.5 hingga 1
72 16 7 2 2 3 2 1 4 1 15 4 2 2 11 -
Exceeding 0.5 to 1
Melebihi 1 hingga 5
172 33 7 3 8 - 15 7 11 1 44 13 9 12 9 -
Exceeding 1 to 5
Melebihi 5 hingga 10
71 9 7 7 1 3 1 3 10 - 15 1 5 3 6 -
Exceeding 5 to 10
Melebihi 10 hingga 50
75 13 1 - 5 5 3 - 7 1 23 2 3 5 7 -
Exceeding 10 to 50
Melebihi 50 hingga 100
14 1 2 - - - 1 - - - 4 1 2 1 2 -
Exceeding 50 to 100
Melebihi 100 hingga 300
8 1 - - - 1 1 - - 1 2 - - 2 - -
Exceeding 100 to 300
Melebihi 300 hingga 500
0 - - - - - - - - - - - - - - -
Exceeding 300 to 500
Melebihi 500 hingga 1,000
2 - - - - - - - - - - - - - 2 -
Exceeding 500 to 1,000
Melebihi 1,000
0 - - - - - - - - - - - - - - -
Exceeding 1,000
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jadual 2.8 - Nilai Projek Diawad Berdasarkan Lokasi Tapak dan Julat Nilai Projek Pada Mac 2009
Table 2.8 - Value of Projects Awarded By Site Location and Value Range as of March 2009

Julat Nilai Projek Jumlah Nilai


(RM juta) Projek
Negeri Pulau Kuala
Johor Kedah Kelantan Melaka Pahang Perak Perlis Selangor Terengganu Sabah Sarawak Labuan
Value Range Total Project Sembilan Pinang Lumpur
(RM million) Value
2007 90,878.35 8,733.29 4,099.35 1,503.12 2,084.88 5,727.19 3,126.43 4,122.26 3,744.81 12,808.02 17,723.15 3,787.70 5,181.06 5,362.04 12,705.92 169.13
Melebihi 0.5 hingga 1
998.01 155.78 44.68 24.18 30.55 53.72 68.58 41.95 69.15 15.80 234.56 46.05 59.89 46.59 103.76 2.77
Exceeding 0.5 to 1
Melebihi 1 hingga 5
8,875.98 1,381.61 605.92 156.93 394.28 420.03 571.90 559.93 772.90 99.85 1,691.43 556.02 484.75 376.30 771.49 32.64
Exceeding 1 to 5
Melebihi 5 hingga 10
6,407.17 919.50 350.70 160.50 173.26 266.05 319.29 472.24 350.56 31.57 1,571.21 327.44 611.43 296.78 527.34 29.30
Exceeding 5 to 10
Melebihi 10 hingga 50
24,163.39 2,336.11 1,048.20 895.98 463.25 841.82 1,187.45 1,917.11 1,046.41 60.80 6,572.84 1,330.04 2,244.34 1,262.14 2,852.48 104.42
Exceeding 10 to 50
Melebihi 50 hingga 100
11,149.92 821.78 749.88 265.53 117.80 313.50 439.05 778.41 278.27 - 2,993.99 834.97 744.75 810.49 2,001.50 -
Exceeding 50 to 100
Melebihi 100 hingga 300
14,790.96 1,683.36 218.74 - 905.74 382.07 540.16 352.62 860.92 115.00 2,382.24 693.18 717.90 1,914.43 4,024.60 -
Exceeding 100 to 300
Melebihi 300 hingga 500
5,269.02 466.25 1,081.23 - - - - - 366.60 - 1,176.88 - 318.00 655.31 1,204.75 -
Exceeding 300 to 500
Melebihi 500 hingga 1,000
2,188.90 968.90 - - - - - - - - - - - - 1,220.00 -
Exceeding 500 to 1,000
Melebihi 1,000
17,035.00 - - - - 3,450.00 - - - 12,485.00 1,100.00 - - - - -
Exceeding 1,000
2008 74,164.25 10,056.80 1,937.12 1,288.38 2,661.90 2,264.78 2,091.91 6,506.81 2,945.95 554.26 16,313.27 4,560.15 6,078.31 5,512.59 11,110.23 281.79
Melebihi 0.5 hingga 1
827.79 134.05 35.08 24.99 33.23 25.77 65.85 49.14 59.74 9.77 178.98 53.83 50.09 47.16 58.47 1.64
Exceeding 0.5 to 1
Melebihi 1 hingga 5
6,825.87 910.44 415.73 217.14 324.24 305.35 461.84 404.15 477.24 83.20 1,438.49 523.81 405.74 313.60 518.49 26.41
Exceeding 1 to 5
Melebihi 5 hingga 10
5,328.81 778.62 307.97 207.66 157.83 270.55 209.11 366.92 334.92 27.75 1,346.41 232.85 329.71 310.69 439.62 8.20
Exceeding 5 to 10
Melebihi 10 hingga 50
19,712.95 2,074.30 674.50 372.57 981.64 667.53 870.29 1,223.48 825.46 144.50 5,426.85 983.60 1,792.45 1,109.86 2,515.38 50.54
Exceeding 10 to 50
Melebihi 50 hingga 100
10,618.04 1,171.90 503.84 70.00 491.47 521.78 352.82 794.55 144.00 115.94 2,668.23 440.00 1,043.03 915.00 1,385.48 -
Exceeding 50 to 100
Melebihi 100 hingga 300
17,102.47 2,524.11 - 396.02 673.49 473.80 132.00 786.57 685.34 173.10 2,896.81 826.06 2,457.29 1,549.02 3,333.86 195
Exceeding 100 to 300
Melebihi 300 hingga 500
2,327.73 305.00 - - - - - 682.00 419.25 - - - - - 921.48 -
Exceeding 300 to 500
Melebihi 500 hingga 1,000
7,720.59 2,158.38 - - - - - - - - 2,357.50 - - 1,267.26 1,937.45 -
Exceeding 500 to 1,000
Melebihi 1,000
3,700.00 - - - - - - 2,200.00 - - - 1,500.00 - - - -
Exceeding 1,000
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jadual 2.8 - Nilai Projek Diawad Berdasarkan Lokasi Tapak dan Julat Nilai Projek Pada Mac 2009
Table 2.8 - Value of Projects Awarded By Site Location and Value Range as of March 2009

Julat Nilai Projek Jumlah Nilai


(RM juta) Projek
Negeri Pulau Kuala
Johor Kedah Kelantan Melaka Pahang Perak Perlis Selangor Terengganu Sabah Sarawak Labuan
Value Range Total Project Sembilan Pinang Lumpur
(RM million) Value
2009 6,141.56 729.90 241.24 53.69 95.71 275.18 428.08 45.38 243.89 161.94 1,365.29 140.40 257.15 503.94 1,599.77 0.00
Melebihi 0.5 hingga 1
54.33 11.76 5.30 1.81 1.70 2.07 1.53 0.70 3.67 0.82 10.98 2.99 1.11 1.47 8.42 -
Exceeding 0.5 to 1
Melebihi 1 hingga 5
422.02 91.58 19.73 8.27 15.15 - 33.84 19.21 26.25 1.89 101.02 33.06 21.99 25.22 24.81 -
Exceeding 1 to 5
Melebihi 5 hingga 10
503.65 63.44 48.43 43.61 7.59 25.75 8.22 25.47 63.18 - 106.41 7.95 41.42 22.65 39.53 -
Exceeding 5 to 10
Melebihi 10 hingga 50
1,623.09 237.06 44.98 - 71.27 108.97 68.74 - 150.79 23.00 560.95 27.50 49.13 109.73 170.97 -
Exceeding 10 to 50
Melebihi 50 hingga 100
1,045.51 72.32 122.80 - - - 97.75 - - - 295.60 68.90 143.50 98.50 146.14 -
Exceeding 50 to 100
Melebihi 100 hingga 300
1,283.06 253.74 - - - 138.39 218.00 - - 136.23 290.33 - - 246.37 - -
Exceeding 100 to 300
Melebihi 300 hingga 500
0.00 - - - - - - - - - - - - - - -
Exceeding 300 to 500
Melebihi 500 hingga 1,000
1,209.90 - - - - - - - - - - - - - 1,209.90 -
Exceeding 500 to 1,000
Melebihi 1,000
0.00 - - - - - - - - - - - - - - -
Exceeding 1,000
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jadual 2.9 - Bilangan dan Nilai Projek Diawad Berdasarkan Status Kontraktor dan Julat Nilai Projek Pada Mac 2009
Table 2.9 - Number and Value of Projects Awarded By Status of Contractors and Value Range as of March 2009

Jumlah Nilai Projek


Julat Nilai Projek (RM juta) Jumlah Bilangan Projek Kontraktor Tempatan / Local Contractors Kontraktor Asing / Foreign Contractors
(RM juta)
Total Project Value (RM Bilangan Nilai (RM j) Bilangan Nilai (RM j)
Value Range (RM million) Total Number of Projects
million) Number Value (RM m) Number Value (RM m)
2007 7,168 90,878.33 92 5,861.52 7,076 85,016.81
Melebihi 0.5 hingga 1 / Exceeding 0.5 to 1 1,338 997.99 10 7.66 1,328 990.33
Melebihi 1 hingga 5 / Exceeding 1 to 5 3,534 8,875.97 34 96.52 3,500 8,779.45
Melebihi 5 hingga 10 / Exceeding 5 to 10 898 6,407.18 18 127.55 880 6,279.63
Melebihi 10 hingga 50 / Exceeding 10 to 50 1,127 24,163.40 17 448.51 1,110 23,714.89
Melebihi 50 hingga 100 / Exceeding 50 to 100 159 11,149.91 6 413.11 153 10,736.80
Melebihi 100 hingga 300 / Exceeding 100 to 300 92 14,790.96 4 629.74 88 14,161.22
Melebihi 300 hingga 500 / Exceeding 300 to 500 14 5,269.02 2 688.43 12 4,580.59
Melebihi 500 hingga 1,000 / Exceeding 500 to 1,000 3 2,188.90 - - 3 2,188.90
Melebihi 1,000 / Exceeding 1,000 3 17,035.00 1 3,450.00 2 13,585.00
2008 5,693 74,164.27 63 4,450.73 5,630 69,713.54
Melebihi 0.5 hingga 1 / Exceeding 0.5 to 1 1,097 827.79 12 9.57 1,085 818.22
Melebihi 1 hingga 5 / Exceeding 1 to 5 2,664 6,825.89 21 46.23 2,643 6,779.66
Melebihi 5 hingga 10 / Exceeding 5 to 10 742 5,328.79 5 38.26 737 5,290.53
Melebihi 10 hingga 50 / Exceeding 10 to 50 909 19,712.95 15 300.33 894 19,412.62
Melebihi 50 hingga 100 / Exceeding 50 to 100 155 10,618.06 5 379.08 150 10,238.98
Melebihi 100 hingga 300 / Exceeding 100 to 300 107 17,102.47 2 408.92 105 16,693.55
Melebihi 300 hingga 500 / Exceeding 300 to 500 6 2,327.73 1 460.74 5 1,866.99
Melebihi 500 hingga 1,000 / Exceeding 500 to 1,000 11 7,720.59 1 607.60 10 7,112.99
Melebihi 1,000 / Exceeding 1,000 2 3,700.00 1 2,200.00 1 1,500.00
2009 414 6,141.59 2 667.65 412 5,473.94
Melebihi 0.5 hingga 1 / Exceeding 0.5 to 1 72 54.34 - - 72 54.34
Melebihi 1 hingga 5 / Exceeding 1 to 5 172 422.02 1 2.65 171 419.37
Melebihi 5 hingga 10 / Exceeding 5 to 10 71 503.66 - - 71 503.66
Melebihi 10 hingga 50 / Exceeding 10 to 50 75 1,623.10 - - 75 1,623.10
Melebihi 50 hingga 100 / Exceeding 50 to 100 14 1,045.51 - - 14 1,045.51
Melebihi 100 hingga 300 / Exceeding 100 to 300 8 1,283.06 - - 8 1,283.06
Melebihi 300 hingga 500 / Exceeding 300 to 500 0 0.00 - - - -
Melebihi 500 hingga 1,000 / Exceeding 500 to 1,000 2 1,209.90 1 665.00 1 544.90
Melebihi 1,000 / Exceeding 1,000 0 0.00 - - - -
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jadual 2.10 - Bilangan Projek Diawad Berdasarkan Lokasi Tapak dan Kategori Pembangunan Projek Pada Mac 2009
Table 2.10 - Number of Projects Awarded By Site Location and Project Category as of March 2009

Kategori Pembangunan Jum. Bilangan


Projek Projek Negeri Pulau Kuala
Johor Kedah Kelantan Melaka Pahang Perak Perlis Selangor Terengganu Sabah Sarawak Labuan
Sembilan Pinang Lumpur
Total Number of
Project Category
Projects

2007 7,168 1,079 412 162 250 309 436 441 503 68 1,591 381 472 335 702 27
Kediaman
1,784 235 111 37 66 76 98 125 126 19 483 54 76 78 197 3
Residential
Bukan Kediaman
2,229 298 111 37 96 69 108 172 135 14 528 106 140 117 291 7
Non Residential

Pembangunan Bercampur
11 - 1 - - - 2 - - - 6 - - - 2 -
Mix Development

Kemudahan Sosial
1,365 205 124 56 40 79 129 63 99 21 171 114 84 57 116 7
Social Amenities
Infrastruktur
1,742 332 65 32 47 82 97 78 140 14 395 104 169 82 96 9
Infrastructure
Lain-lain
37 9 - - 1 3 2 3 3 - 8 3 3 1 - 1
Others
2008 5,693 799 294 171 244 224 360 337 361 56 1,309 337 383 299 503 16
Kediaman
1,266 181 59 22 54 47 74 74 88 5 343 62 82 55 116 4
Residential
Bukan Kediaman
1,858 265 81 42 78 46 102 127 116 12 444 87 115 98 238 7
Non Residential

Pembangunan Bercampur
17 4 - - - - - 1 - - 9 - 2 - 1 -
Mix Development

Kemudahan Sosial
1,146 106 99 57 56 66 94 77 70 21 183 126 57 53 80 1
Social Amenities
Infrastruktur
1,373 239 51 50 54 63 84 56 87 17 322 61 127 91 67 4
Infrastructure
Lain-lain
33 4 4 - 2 2 6 2 - 1 8 1 - 2 1 -
Others
2009 414 73 24 12 16 12 23 11 32 4 103 21 21 25 37 0
Kediaman
85 13 8 1 6 4 5 2 9 - 25 3 1 1 7 -
Residential
Bukan Kediaman
141 20 10 2 6 2 5 6 13 1 33 6 7 10 20 -
Non Residential

Pembangunan Bercampur
0 - - - - - - - - - - - - - - -
Mix Development

Kemudahan Sosial
68 13 2 6 1 2 4 1 2 3 18 3 3 5 5 -
Social Amenities
Infrastruktur
116 27 4 2 3 4 9 1 8 - 25 9 10 9 5 -
Infrastructure
Lain-lain
4 - - 1 - - - 1 - - 2 - - - - -
Others
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jadual 2.11 - Nilai Projek Diawad Berdasarkan Lokasi Tapak dan Kategori Pembangunan Projek Pada Mac 2009
Table 2.11 - Value of Projects Awarded By Site Location and Project Category as of March 2009

Jumlah Nilai
Kategori Pembangunan
Projek
Projek
(RM j)
Negeri Pulau
Johor Kedah Kelantan Melaka Pahang Perak Perlis Selangor Terengganu Sabah Sarawak Kuala Lumpur Labuan
Total Project Sembilan Pinang
Project Category Value
(RM m)

2007 90,878.31 8,733.29 4,099.37 1,503.12 2,084.88 5,727.17 3,126.40 4,122.26 3,744.81 12,808.03 17,723.13 3,787.70 5,181.06 5,362.04 12,705.91 169.14
Kediaman
16,594.22 1,545.42 566.86 149.40 288.79 369.60 435.91 1,693.10 578.60 50.91 5,536.58 300.63 715.27 289.19 4,047.52 26.44
Residential
Bukan Kediaman
25,075.91 3,608.95 1,403.83 353.60 832.74 345.67 986.77 1,354.12 815.59 45.18 5,101.89 508.30 1,152.93 2,031.04 6,476.71 58.59
Non Residential

Pembangunan Bercampur
115.34 - 4.07 - - - 1.79 - - - 101.98 - - - 7.50 -
Mix Development

Kemudahan Sosial
11,540.19 825.05 676.32 549.44 358.10 510.15 1,030.15 397.46 1,017.01 174.06 2,206.46 1,117.72 903.75 1,078.73 670.94 24.85
Social Amenities
Infrastruktur
37,362.96 2,696.06 1,448.29 450.68 603.66 4,482.46 667.16 659.92 1,315.28 12,537.88 4,715.34 1,857.11 2,405.94 1,962.45 1,503.24 57.49
Infrastructure
Lain-lain
189.69 57.81 - - 1.59 19.29 4.62 17.66 18.33 - 60.88 3.94 3.17 0.63 - 2
Others
2008 74,164.26 10,056.80 1,937.13 1,288.38 2,661.90 2,264.79 2,091.92 6,506.82 2,945.94 554.25 16,313.27 4,560.16 6,078.32 5,512.56 11,110.23 281.79
Kediaman
15,054.87 1,067.74 381.70 81.77 310.58 398.68 250.67 1,107.00 609.89 7.24 4,383.75 277.62 911.60 187.07 5,060.91 18.65
Residential
Bukan Kediaman
18,736.35 2,235.92 347.83 208.68 1,232.20 409.83 523.39 1,116.99 950.56 39.02 4,387.87 727.45 1,221.15 1,722.69 3,568.89 43.88
Non Residential
Pembangunan Bercampur
1,196.21 21.10 - - - - - 30.41 - - 1,100.65 - 4.55 - 39.50 -
Mix Development
Kemudahan Sosial
19,116.00 2,632.83 822.49 340.29 682.70 984.55 833.34 1,147.74 807.52 361.49 3,157.02 2,520.93 1,928.89 831.86 2,063.41 0.94
Social Amenities
Infrastruktur
19,971.93 4,092.47 377.14 657.64 422.04 468.30 480.04 3,098.77 577.97 145.07 3,249.36 1,029.83 2,012.13 2,767.95 374.90 218.32
Infrastructure
Lain-lain
88.90 6.74 7.97 - 14.38 3.43 4.48 5.91 - 1.43 34.62 4.33 - 2.99 2.62 -
Others
2009 6,141.58 729.88 241.24 53.70 95.72 275.18 428.07 45.38 243.89 161.94 1,365.29 140.40 257.17 503.95 1,599.77 0.00
Kediaman
771.42 87.30 37.35 7.64 28.57 42.62 9.75 16.65 59.29 - 360.90 5.51 9.80 11.33 94.71 -
Residential
Bukan Kediaman
2,806.48 127.49 183.28 5.45 33.34 23.08 279.80 16.61 100.42 23.00 360.94 20.40 26.13 222.07 1,384.47 -
Non Residential

Pembangunan Bercampur
0.00 - - - - - - - - - - - - - - -
Mix Development

Kemudahan Sosial
1,329.98 153.89 5.30 27.89 20.00 146.94 103.63 0.70 23.35 138.94 566.68 31.05 17.84 69.64 24.13 -
Social Amenities
Infrastruktur
1,220.42 361.20 15.31 9.90 13.81 62.54 34.89 2.60 60.83 - 75.13 83.44 203.40 200.91 96.46 -
Infrastructure
Lain-lain
13.28 - - 2.82 - - - 8.82 - - 1.64 - - - - -
Others
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jadual 2.12 - Bilangan Projek Diawad Berdasarkan Lokasi Tapak dan Sektor Pada Mac 2009
Table 2.12 - Number of Projects Awarded By Site Location and Sector as of March 2009

Jum. Bilangan
Sektor
Projek Negeri Pulau Terenggan Kuala
Johor Kedah Kelantan Melaka Pahang Perak Perlis Selangor Sabah Sarawak Labuan
Total Number Sembilan Pinang u Lumpur
Sector
of Projects
2007 7,168 1,079 412 162 250 309 436 441 503 68 1,591 381 472 335 702 27
Projek Kerajaan
Government 2,894 387 222 123 99 152 260 122 238 48 328 279 268 119 234 15
Projects
Projek Swasta
4,274 692 190 39 151 157 176 319 265 20 1,263 102 204 216 468 12
Private Projects
2008 5,693 799 294 171 244 224 360 337 361 56 1,309 337 383 299 503 16
Projek Kerajaan
Government 2,427 223 165 131 114 124 218 107 179 50 303 236 255 126 188 8
Projects
Projek Swasta
3,266 576 129 40 130 100 142 230 182 6 1,006 101 128 173 315 8
Private Projects
2009 414 73 24 12 16 12 23 11 32 4 103 21 21 25 37 0
Projek Kerajaan
Government 161 26 7 12 6 4 17 3 13 4 21 11 15 13 9 -
Projects
Projek Swasta
253 47 17 - 10 8 6 8 19 - 82 10 6 12 28 -
Private Projects
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jadual 2.13 - Nilai Projek Diawad Berdasarkan Lokasi Tapak dan Sektor Pada Mac 2009
Table 2.13 - Value of Projects Awarded By Site Location and Sector as of March 2009

Jumlah Nilai Projek


Sektor
(RM juta) Negeri Pulau Kuala
Johor Kedah Kelantan Melaka Pahang Perak Perlis Selangor Terengganu Sabah Sarawak Labuan
Total Project Value Sembilan Pinang Lumpur
Sector
( RM million)
2007 90,878.32 8,733.30 4,099.35 1,503.12 2,084.87 5,727.17 3,126.42 4,122.25 3,744.81 12,808.03 17,723.14 3,787.70 5,181.06 5,362.05 12,705.91 169.14

Projek Kerajaan
47,596.92 2,498.77 2,752.13 1,206.67 1,151.49 4,787.45 2,072.07 845.34 1,897.94 12,770.59 4,459.80 3,279.16 3,546.53 3,380.26 2,857.89 90.83
Government Projects
Projek Swasta
43,281.40 6,234.53 1,347.22 296.45 933.38 939.72 1,054.35 3,276.91 1,846.87 37.44 13,263.34 508.54 1,634.53 1,981.79 9,848.02 78.31
Private Projects
2008 74,164.24 10,056.81 1,937.14 1,288.37 2,661.90 2,264.78 2,091.91 6,506.82 2,945.95 554.27 16,313.25 4,560.15 6,078.31 5,512.57 11,110.23 281.78

Projek Kerajaan
32,783.37 4,438.21 1,178.74 972.21 1,211.18 1,487.84 1,419.68 3,565.83 2,033.19 491.67 3,402.26 2,283.92 4,476.43 2,848.81 2,742.98 230.42
Government Projects
Projek Swasta
41,380.87 5,618.60 758.40 316.16 1,450.72 776.94 672.23 2,940.99 912.76 62.60 12,910.99 2,276.23 1,601.88 2,663.76 8,367.25 51.36
Private Projects
2009 6,141.59 729.89 241.25 53.69 95.72 275.18 428.07 45.38 243.89 161.94 1,365.29 140.40 257.16 503.95 1,599.78 0.00

Projek Kerajaan
2,958.48 431.28 122.78 53.69 63.12 206.05 416.89 11.44 147.22 161.94 541.51 118.86 224.06 352.69 106.95 -
Government Projects
Projek Swasta
3,183.11 298.61 118.47 - 32.60 69.13 11.18 33.94 96.67 - 823.78 21.54 33.10 151.26 1,492.83 -
Private Projects
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jadual 2.14 - Bilangan dan Nilai Projek Diawad Berdasarkan Status Kontraktor dan Kategori Pembangunan Projek Pada Mac 2009
Table 2.14 - Number and Value of Projects Awarded By Status of Contractors and Project Category as of March 2009

Kontraktor Tempatan Kontraktor Asing


Local Contractors Foreign Contractors
Jumlah
Jumlah Nilai Projek Kerajaan Projek Swasta Projek Kerajaan Projek Swasta
Kategori Pembangunan Projek Bilangan
Projek (RM juta) Government Projects Private Project Government Projects Private Project
Projek
Total Project Nilai (RM juta) Nilai (RM juta) Nilai (RM juta)
Total Number Bilangan Bilangan Nilai (RM juta) Bilangan Bilangan
Project Category Value (RM Value (RM Value (RM Value (RM
of Projects Number Number Value (RM million) Number Number
million) million) million) million)
2007 7,168 90,878.35 2,890 44,121.61 4,186 40,895.20 4 3,475.32 88 2,386.22
Kediaman / Residential 1,784 16,594.23 227 1,964.35 1,552 14,285.21 - - 5 344.67
Bukan Kediaman / Non Residential 2,229 25,075.93 511 6,840.09 1,654 16,523.87 1 23.99 63 1,687.98
Pembangunan Bercampur / Mix Development 11 115.33 1 1.11 10 114.22 - - - -
Kemudahan Sosial / Social Amenities 1,365 11,540.20 1,168 10,425.22 193 1,094.50 1 0.64 3 19.84
Infrastruktur / Infrastructure 1,742 37,362.96 964 24,812.53 759 8,766.01 2 3,450.69 17 333.73
Lain-lain / Others 37 189.70 19 78.31 18 111.39 - - - -
2008 5,693 74,164.27 2,425 30,564.40 3,205 39,149.14 2 2,219.00 61 2,231.73
Kediaman / Residential 1,266 15,054.88 215 1,766.58 1,044 12,685.24 - - 7 603.06
Bukan Kediaman / Non Residential 1,858 18,736.35 492 5,073.47 1,315 12,703.44 1 19.00 50 940.44
Pembangunan Bercampur / Mix Development 17 1,196.22 - - 17 1,196.22 - - - -
Kemudahan Sosial / Social Amenities 1,146 19,116.00 979 14,964.69 165 3,533.32 - - 2 617.99
Infrastruktur / Infrastructure 1,373 19,971.92 725 8,723.26 645 8,978.42 1 2,200.00 2 70.24
Lain-lain / Others 33 88.90 14 36.40 19 52.50 - - - -
2009 414 6,141.58 161 2,958.46 251 2,515.47 0 0.00 2 667.65
Kediaman / Residential 85 771.42 12 66.61 73 704.81 - - - -
Bukan Kediaman / Non Residential 141 2,806.50 32 710.69 107 1,428.16 - - 2 667.65
Pembangunan Bercampur / Mix Development 0 0.00 - - - - - - - -
Kemudahan Sosial / Social Amenities 68 1,329.98 55 1,127.72 13 202.26 - - - -
Infrastruktur / Infrastructure 116 1,220.41 60 1,041.81 56 178.60 - - - -
Lain-lain / Others 4 13.27 2 11.63 2 1.64 - - - -
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jadual 2.15 - Bilangan dan Nilai Projek Diawad Berdasarkan Jenis Kontrak dan Kategori Pembangunan Projek Pada Mac 2009
Table 2.15 - Number and Value of Projects Awarded By Type of Contract and Project Category as of March 2009

Jenis Kontrak / Type of Contract

Jumlah Bina, Kendali & Pindah Engineering, Procurement,


Jumlah Nilai Konvensional Reka & Bina
Kategori Pembangunan Projek Bilangan Turnkey Built, Operate & Transfer Construction and
Projek (RM j) Conventional Design & Build
Projek (BOT) Commissioning (EPCC)

Total
Total Project Bilangan Nilai Bilangan Nilai Bilangan Nilai Bilangan Nilai Bilangan Nilai
Project Category Number of
Value (RM m) Number Value Number Value Number Value Number Value Number Value
Projects
2007 7,168 90,878.33 6,728 72,635.75 330 14,423.42 52 2,703.72 9 490.12 49 625.32
Kediaman
1,784 16,594.22 1,744 15,179.40 34 1,283.11 6 131.71 - - - -
Residential
Bukan Kediaman
2,229 25,075.94 2,041 19,181.98 120 4,815.56 18 201.54 5 329.40 45 547.46
Non Residential
Pembangunan Bercampur
11 115.34 11 115.34 - - - - - - - -
Mix Development
Kemudahan Sosial
1,365 11,540.19 1,300 8,642.71 56 1,824.05 5 912.71 4 160.72 - -
Social Amenities
Infrastruktur
1,742 37,362.94 1,595 29,326.62 120 6,500.70 23 1,457.76 - - 4 77.86
Infrastructure
Lain-lain
37 189.70 37 189.70 - - - - - - - -
Others
2008 5,693 74,164.27 5,361 58,748.30 248 10,954.61 63 1,847.75 6 1,513.57 15 1,100.04
Kediaman
1,266 15,054.88 1,240 14,710.02 19 200.66 6 142.46 1 1.74 - -
Residential
Bukan Kediaman
1,858 18,736.33 1,741 17,107.17 85 1,023.93 23 464.82 - - 9 140.41
Non Residential
Pembangunan Bercampur
17 1,196.22 15 1,180.84 1 13.40 1 1.98 - - - -
Mix Development
Kemudahan Sosial
1,146 19,116.00 1,079 13,725.93 59 3,361.95 6 527.29 2 1,500.83 - -
Social Amenities
Infrastruktur
1,373 19,971.93 1,259 11,947.85 80 6,346.86 26 708.34 2 9.25 6 959.63
Infrastructure
Lain-lain
33 88.91 27 76.49 4 7.81 1 2.86 1 1.75 - -
Others
2009 414 6,141.59 393 5,565.06 16 315.00 3 256.62 1 1.11 1 3.80
Kediaman
85 771.42 84 765.49 1 5.93 - - - - - -
Residential
Bukan Kediaman
141 2,806.50 129 2,655.31 8 143.40 2 2.88 1 1.11 1 3.80
Non Residential
Pembangunan Bercampur
0 0.00 - - - - - - - - - -
Mix Development
Kemudahan Sosial
68 1,329.99 63 1,172.48 5 157.51 - - - - - -
Social Amenities
Infrastruktur
116 1,220.41 113 958.51 2 8.16 1 253.74 - - - -
Infrastructure
Lain-lain
4 13.27 4 13.27 - - - - - - - -
Others
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jadual 2.16 - Bilangan dan Nilai Projek Diawad Berdasarkan Status Kontraktor dan Pengkhususan Kerja Pada Mac 2009
Table 2.16 - Number and Value of Projects Awarded By Status of Contractors and Work Specialisation as of March 2009

Kontraktor Tempatan Kontraktor Asing


Local Contractors Foreign Contractors
Jumlah Bilangan Jumlah Nilai Projek Kerajaan Projek Swasta Projek Kerajaan Projek Swasta
Pengkhususan Kerja
Projek Projek (RM j) Government Projects Private Project Government Projects Private Project
Total Number of Total Project Bilangan Nilai Bilangan Nilai Bilangan Nilai Bilangan Nilai
Work Specialisation
Projects Value (RM m) Number Value Number Value Number Value Number Value
2007 7,168 90,878.34 2,890 44,121.61 4,186 40,895.19 4 3,475.32 88 2,386.22
Bangunan / Building 4,603 50,591.01 1,658 19,129.54 2,893 29,856.83 2 24.68 50 1,579.96
Kejuruteraan Awam / Civil Engineering 2,098 36,254.17 1,120 24,278.15 961 8,273.45 1 3,450.00 16 252.57
Elektrik / Electrical 257 1,727.79 66 439.59 183 1,144.17 - - 8 144.03
Mekanikal / Mechanical 210 2,305.37 46 274.33 149 1,620.74 1 0.64 14 409.66
2008 5,693 74,164.26 2,425 30,564.40 3,205 39,149.13 2 2,219.00 61 2,231.73
Bangunan / Building 3,568 50,412.23 1,385 20,310.41 2,139 28,272.36 1 19.00 43 1,810.46
Kejuruteraan Awam / Civil Engineering 1,717 20,206.93 888 9,140.32 817 8,566.34 1 2,200.00 11 300.27
Elektrik / Electrical 239 2,393.47 90 840.75 149 1,552.72 - - - -
Mekanikal / Mechanical 169 1,151.63 62 272.92 100 757.71 - - 7 121.00
2009 414 6,141.59 161 2,958.46 251 2,515.48 0 0.00 2 667.65
Bangunan / Building 236 4,585.78 75 1,841.66 159 2,076.47 - - 2 667.65
Kejuruteraan Awam / Civil Engineering 155 1,362.64 78 1,084.74 77 277.90 - - - -
Elektrik / Electrical 12 39.56 5 21.61 7 17.95 - - - -
Mekanikal / Mechanical 11 153.61 3 10.45 8 143.16 - - - -
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jadual 2.17 - Bilangan dan Nilai Projek Diawad Berdasarkan Jenis Kerja dan Pengkhususan Kerja Pada Mac 2009
Table 2.17 - Number and Value of Projects Awarded By Type of Work and Work Specialisation as of March 2009

Jenis Kerja / Type of Work


Jumlah
Jumlah Nilai Projek Baru Naik Taraf Pembesaran Penyelenggaraan Baik Pulih Ubah Suai
Pengkhususan Kerja Bilangan
Projek (RM j) New Project Upgrading Expansion Maintenance Repair Renovation
Projek
Total
Total Project Bilangan Nilai Bilangan Nilai Bilangan Nilai Bilangan Nilai Bilangan Nilai Bilangan Nilai
Work Specialisation Number of
Value (RM m) Number Value Number Value Number Value Number Value Number Value Number Value
Projects

2007 7,168 90,878.32 5,709 82,952.53 429 3,042.86 344 1,832.02 166 1,008.41 260 1,239.25 260 803.25

Bangunan / Building 4,603 50,590.99 3,911 46,817.27 96 598.79 298 1,677.36 26 268.70 54 512.10 218 716.77

Kejuruteraan Awam / Civil Engineering 2,098 36,254.17 1,436 32,406.62 306 2,357.00 33 143.08 100 588.81 191 686.93 32 71.73

Elektrik / Electrical 257 1,727.80 203 1,569.53 10 19.04 9 5.91 23 103.56 8 25.55 4 4.21

Mekanikal / Mechanical 210 2,305.36 159 2,159.11 17 68.03 4 5.67 17 47.34 7 14.67 6 10.54

2008 5,693 74,164.28 4,247 62,596.04 491 4,988.73 268 3,469.43 222 1,120.10 223 1,026.95 242 963.03

Bangunan / Building 3,568 50,412.24 2,851 44,371.26 171 2,132.43 223 2,474.14 38 333.11 71 227.27 214 874.03

Kejuruteraan Awam / Civil Engineering 1,717 20,206.93 1,136 15,272.31 265 2,522.31 32 947.70 123 625.49 144 777.02 17 62.10

Elektrik / Electrical 239 2,393.48 163 2,093.93 33 223.69 7 19.61 30 40.69 4 14.02 2 1.54

Mekanikal / Mechanical 169 1,151.63 97 858.54 22 110.30 6 27.98 31 120.81 4 8.64 9 25.36

2009 414 6,141.59 315 5,487.46 38 392.41 23 146.72 10 29.64 13 45.99 15 39.37

Bangunan / Building 236 4,585.77 191 4,211.18 13 227.92 19 111.79 - - 2 10.99 11 23.89

Kejuruteraan Awam / Civil Engineering 155 1,362.65 109 1,118.40 23 161.97 4 34.93 7 9.87 10 29.12 2 8.36

Elektrik / Electrical 12 39.57 8 17.49 1 0.60 - - 2 16.48 - - 1 5.00

Mekanikal / Mechanical 11 153.60 7 140.39 1 1.92 - - 1 3.29 1 5.88 1 2.12

Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jadual 2.18 - Bilangan dan Nilai Projek Diawad Berdasarkan Status Kontraktor dan Jenis Kontrak Pada Mac 2009
Table 2.18 - Number and Value of Projects Awarded By Status of Contractors and Type of Contract as of March 2009

Kontraktor Tempatan / Local Contractors Kontraktor Asing / Foreign Contractors


Jumlah
Jumlah Nilai Projek Kerajaan Projek Swasta Private Projek Kerajaan Projek Swasta
Jenis Kontrak Bilangan
Projek (RM j) Government Projects Project Government Projects Private Project
Projek
Total Number Total Project Bilangan Bilangan Bilangan Nilai Bilangan
Type of Contract Nilai Value Nilai Value Nilai Value
of Projects Value (RM m) Number Number Number Value Number
2007 7,168 90,878.35 2,890 44,121.60 4,186 40,895.21 4 3,475.32 88 2,386.22

Konvensional / Conventional 6,728 72,635.75 2,693 35,952.13 3,960 34,770.39 3 25.32 72 1,887.91

Reka & Bina / Design & Build 330 14,423.43 178 6,500.00 141 4,136.76 1 3,450.00 10 336.67

Turnkey 52 2,703.72 15 1,282.78 35 1,415.74 - - 2 5.20

Built, Operate & Transfer (BOT) 9 490.12 4 386.69 5 103.43 - - - -

Engineering, Procurement, Construction


49 625.33 - - 45 468.89 - - 4 156.44
and Commissioning (EPCC)

2008 5,693 74,164.27 2,425 3,205 39,149.14 2 2,219.00 61 2,231.73

Konvensional / Conventional 5,361 58,748.31 2,282 23,359.55 3,025 33,300.41 1 19.00 53 2,069.35

Reka & Bina / Design & Build 248 10,954.61 125 6,307.63 114 2,284.60 1 2,200.00 8 162.38

Turnkey 63 1,847.75 16 894.65 47 953.10 - - - -

Built, Operate & Transfer (BOT) 6 1,513.56 2 2.57 4 1,510.99 - - - -

Engineering, Procurement, Construction


15 1,100.04 - - 15 1,100.04 - - - -
and Commissioning (EPCC)
2009 414 6,141.59 161 2,958.47 251 2,515.47 0 0.00 2 667.65

Konvensional / Conventional 393 5,565.06 149 2,403.50 242 2,493.91 - - 2 667.65

Reka & Bina / Design & Build 16 315.00 11 301.23 5 13.77 - - - -

Turnkey 3 256.62 1 253.74 2 2.88 - - - -

Built, Operate & Transfer (BOT) 1 1.11 - - 1 1.11 - - - -

Engineering, Procurement, Construction


1 3.80 - - 1 3.80 - - - -
and Commissioning (EPCC)
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jadual 2.19 - Bilangan dan Nilai Projek Diawad Berdasarkan Jenis Kerja dan Jenis Kontrak Pada Mac 2009
Table 2.19 - Number and Value of Projects Awarded By Type of Work and Type of Contract as of March 2009

Jenis Kerja / Type of Work


Jumlah Jumlah Nilai
Projek Baru Naik Taraf Pembesaran Penyelenggaraan Baik Pulih Ubah Suai
Jenis Kontrak Bilangan Projek
New Project Upgrading Expansion Maintenance Repair Renovation
Projek (RM j)
Total Project
Total Number Bilangan Nilai Bilangan Nilai Bilangan Nilai Bilangan Nilai Bilangan Nilai Bilangan Nilai
Type of Contract Value
of Projects Number Value Number Value Number Value Number Value Number Value Number Value
(RM m)
2007 7,168 90,878.34 5,709 82,952.54 429 3,042.87 344 1,832.01 166 1,008.41 260 1,239.25 260 803.26

Konvensional / Conventional 6,728 72,635.75 5,335 65,882.01 407 2,662.69 332 1,462.45 160 789.95 248 1,085.62 246 753.03

Reka & Bina / Design & Build 330 14,423.42 282 13,655.67 18 326.21 7 52.74 3 210.46 9 144.08 11 34.26

Turnkey 52 2,703.72 39 2,616.23 4 53.97 - - 3 8.00 3 9.55 3 15.97

Built, Operate & Transfer (BOT) 9 490.12 5 241.15 - - 4 248.97 - - - - - -

Engineering, Procurement, Construction


49 625.33 48 557.48 - - 1 67.85 - - - - - -
and Commissioning (EPCC)

2008 5,693 74,164.27 4,247 62,596.03 490 4,988.73 268 3,469.43 222 1,120.11 224 1,026.94 242 963.03

Konvensional / Conventional 5,362 58,748.32 4,009 49,044.38 454 4,131.67 261 3,120.59 205 863.01 214 819.47 219 769.20

Reka & Bina / Design & Build 248 10,954.60 175 9,279.48 29 778.87 3 318.94 11 185.41 8 198.78 22 193.12

Turnkey 62 1,847.74 47 1,773.94 4 31.67 3 20.71 5 12.02 2 8.69 1 0.71

Built, Operate & Transfer (BOT) 6 1,513.57 5 1,512.74 1 0.83 - - - - - - - -

Engineering, Procurement, Construction


15 1,100.04 11 985.49 2 45.69 1 9.19 1 59.67 - - - -
and Commissioning (EPCC)
2009 414 6,141.60 315 5,487.46 38 392.41 23 146.72 10 29.64 13 45.99 15 39.38

Konvensional / Conventional 393 5,565.06 302 4,975.46 37 347.43 22 145.22 9 27.42 12 38.99 11 30.54

Reka & Bina / Design & Build 16 315.01 9 251.58 1 44.98 1 1.50 1 2.22 1 7.00 3 7.73

Turnkey 3 256.62 3 256.62 - - - - - - - - - -

Built, Operate & Transfer (BOT) 1 1.11 - - - - - - - - - - 1 1

Engineering, Procurement, Construction


1 3.80 1 3.80 - - - - - - - - - -
and Commissioning (EPCC)
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jadual 2.20 - Bilangan dan Nilai Projek Diawad Berdasarkan Jenis Kerja dan Kategori Pembangunan Projek Pada Mac 2009
Table 2.20 - Number and Value of Projects Awarded By Type of Work and Projek Category as of March 2009

Jenis Kerja / Type of Work

Jumlah Jumlah Nilai


Projek Baru Naik Taraf Pembesaran Penyelenggaraan Baik Pulih Ubah Suai
Kategori Pembangunan Projek Bilangan Projek
New Project Upgrading Expansion Maintenance Repair Renovation
Projek (RM j)
Total Total Project
Bilangan Nilai Bilangan Nilai Bilangan Nilai Bilangan Nilai Bilangan Nilai Bilangan Nilai
Project Category Number of Value
Number Value Number Value Number Value Number Value Number Value Number Value
Projects (RM m)
2007 7,168 90,878.33 5,709 82,952.53 429 3,042.86 344 1,832.01 166 1,008.40 260 1,239.27 260 803.26
Kediaman
1,784 16,594.22 1,752 16,394.00 5 12.73 11 30.70 5 20.66 5 123.59 6 12.54
Residential
Bukan Kediaman
2,229 25,075.93 1,757 22,826.42 98 507.35 98 863.01 37 109.24 40 213.97 199 555.94
Non Residential
Pembangunan Bercampur
11 115.33 10 114.22 - - - - 1 1.11 - - - -
Mix Development
Kemudahan Sosial
1,365 11,540.20 1,006 10,047.39 45 241.32 200 839.51 39 87.02 28 176.99 47 147.97
Social Amenities
Infrastruktur
1,742 37,362.95 1,150 33,391.22 280 2,278.68 35 98.79 83 786.37 186 721.08 8 86.81
Infrastructure
Lain-lain
37 189.70 34 179.28 1 2.78 - - 1 4.00 1 3.64 - -
Others
2008 5,693 74,164.23 4,247 62,596.02 491 4,988.72 268 3,469.43 222 1,120.10 223 1,026.94 242 963.02
Kediaman
1,266 15,054.88 1,198 14,246.23 14 505.48 6 162.81 13 55.94 12 20.30 23 64.12
Residential
Bukan Kediaman
1,858 18,736.33 1,365 16,089.85 94 639.32 97 1,044.92 82 281.62 45 88.60 175 592.02
Non Residential
Pembangunan Bercampur
17 1,196.22 17 1,196.22 - - - - - - - - - -
Mix Development
Kemudahan Sosial
1,146 19,115.99 771 15,794.49 149 1,440.72 141 1,368.16 20 212.95 28 88.85 37 210.82
Social Amenities
Infrastruktur
1,373 19,971.91 868 15,190.10 232 2,398.00 24 893.54 104 565.02 138 829.19 7 96.06
Infrastructure
Lain-lain
33 88.90 28 79.13 2 5.20 - - 3 4.57 - - - -
Others
2009 414 6,141.59 315 5,487.46 38 392.41 23 146.72 10 29.64 13 45.98 15 39.38
Kediaman
85 771.42 81 727.40 2 40.94 1 0.73 1 2.35 - - - -
Residential
Bukan Kediaman
141 2,806.50 113 2,659.43 5 53.00 10 58.86 2 3.92 2 9.87 9 21.42
Non Residential
Pembangunan Bercampur
0 0.00 - - - - - - - - - - - -
Mix Development
Kemudahan Sosial
68 1,329.98 42 1074.75 10 182.64 9 56.83 1 0.70 2 8.05 4 7.01
Social Amenities
Infrastruktur
116 1,220.42 75 1012.61 21 115.83 3 30.30 6 22.67 9 28.06 2 10.95
Infrastructure
Lain-lain
4 13.27 4 13.27 - - - - - - - - - -
Others
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jadual 2.21 - Bilangan dan Nilai Projek Diawad Berdasarkan Status Kontraktor dan Jenis Kerja Pada Mac 2009
Table 2.21 - Number and Value of Projects Awarded By Status of Contractors and Type of Work as of March 2009

Kontraktor Tempatan Kontraktor Asing


Local Contractors Foreign Contractors
Jumlah Bilangan Jumlah Nilai Projek Kerajaan Projek Swasta Projek Kerajaan Projek Swasta
Jenis Kerja
Projek Projek (RM j) Government Projects Private Project Government Projects Private Project
Total Number of Total Project Bilangan Nilai Bilangan Nilai Bilangan Nilai Bilangan Nilai
Type of Work
Projects Value (RM m) Number Value Number Value Number Value Number Value
2007 7,168 90,878.35 2,890 44,121.59 4,186 40,895.21 4 3,475.32 88 2,386.23

Projek Baru / New Project 5,709 82,952.54 1,940 38,368.14 3,700 39,029.80 3 3,474.68 66 2,079.92

Naik Taraf / Upgrading 429 3,042.87 344 2,629.42 84 412.81 1 0.64 - -

Pembesaran / Expansion 344 1,832.01 206 1,200.03 131 476.92 - - 7 155.06

Penyelenggaraan / Maintenance 166 1,008.41 132 830.47 31 141.48 - - 3 36.46

Baik Pulih / Repair 260 1,239.27 182 789.39 76 385.72 - - 2 64.16

Ubah Suai / Renovation 260 803.25 86 304.14 164 448.48 - - 10 50.63

2008 5,693 74,164.25 2,425 30,564.39 3,205 39,149.13 2 2,219.00 61 2,231.73

Projek Baru / New Project 4,247 62,596.02 1,480 22,727.01 2,727 35,600.15 2 2,219.00 38 2,049.86

Naik Taraf / Upgrading 491 4,988.72 393 4,443.74 96 534.05 - - 2 10.93

Pembesaran / Expansion 268 3,469.43 158 1,519.38 105 1,834.41 - - 5 115.64

Penyelenggaraan / Maintenance 222 1,120.11 149 860.14 71 256.42 - - 2 3.55

Baik Pulih / Repair 223 1,026.94 165 703.25 58 323.69 - - - -

Ubah Suai / Renovation 242 963.03 80 310.87 148 600.41 - - 14 51.75

2009 414 6,141.58 161 2,958.45 251 2,515.48 0 0.00 2 667.65

Projek Baru / New Project 315 5,487.46 99 2,428.98 214 2,390.83 - - 2 667.65

Naik Taraf / Upgrading 38 392.41 27 356.08 11 36.33 - - - -

Pembesaran / Expansion 23 146.71 12 104.69 11 42.02 - - - -

Penyelenggaraan / Maintenance 10 29.63 9 26.34 1 3.29 - - - -

Baik Pulih / Repair 13 45.99 10 35.35 3 10.64 - - - -

Ubah Suai / Renovation 15 39.38 4 7.01 11 32.37 - - - -


Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification