Table 2.1 - Number and Value of Projects Awarded by Status of Contractors As of March 2009
Table 2.1 - Number and Value of Projects Awarded by Status of Contractors As of March 2009
1 - Bilangan dan Nilai Projek Diawad Berdasarkan Status Kontraktor Pada Mac 2009
Table 2.1 - Number and Value of Projects Awarded by Status of Contractors as of March 2009
Jumlah Nilai
Jumlah Bilangan Projek Kerajaan / Government
Julat Nilai Projek (RM juta) Projek (RM Projek Swasta / Private Project
Projek Projects
juta)
Total Project
Total Number of Bilangan / Nilai (RM j) Bilangan / Nilai (RM j)
Project Value Range (RM million) Value
Projects Number Value (RM m) Number Value (RM m)
(RM million)
2007 7,168 90,878.32 2,894 47,596.92 4,274 43,281.40
Melebihi 0.5 hingga 1 / Exceeding 0.5 to 1 1,338 997.99 484 363.01 854 634.98
Melebihi 1 hingga 5 / Exceeding 1 to 5 3,534 8,875.97 1,512 3,910.48 2,022 4,965.49
Melebihi 5 hingga 10 / Exceeding 5 to 10 898 6,407.18 319 2,276.71 579 4,130.47
Melebihi 10 hingga 50 / Exceeding 10 to 50 1,127 24,163.40 459 10,133.60 668 14,029.80
Melebihi 50 hingga 100 / Exceeding 50 to 100 159 11,149.91 66 4,505.83 93 6,644.08
Melebihi 100 hingga 300 / Exceeding 100 to 300 92 14,790.95 43 6,696.46 49 8,094.49
Melebihi 300 hingga 500 / Exceeding 300 to 500 14 5,269.02 7 2,555.83 7 2,713.19
Melebihi 500 hingga 1,000 / Exceeding 500 to 1,000 3 2,188.90 2 1,220.00 1 968.90
Melebihi 1,000 / Exceeding 1,000 3 17,035.00 2 15,935.00 1 1,100.00
2008 5,693 74,164.28 2,427 32,783.40 3,266 41,380.88
Melebihi 0.5 hingga 1 / Exceeding 0.5 to 1 1,097 827.79 459 348.19 638 479.60
Melebihi 1 hingga 5 / Exceeding 1 to 5 2,664 6,825.90 1,186 3,093.99 1,478 3,731.91
Melebihi 5 hingga 10 / Exceeding 5 to 10 742 5,328.80 288 2,070.63 454 3,258.17
Melebihi 10 hingga 50 / Exceeding 10 to 50 909 19,712.95 365 8,395.52 544 11,317.43
Melebihi 50 hingga 100 / Exceeding 50 to 100 155 10,618.05 71 4,886.51 84 5,731.54
Melebihi 100 hingga 300 / Exceeding 100 to 300 107 17,102.47 51 8,309.41 56 8,793.06
Melebihi 300 hingga 500 / Exceeding 300 to 500 6 2,327.73 2 724.25 4 1,603.48
Melebihi 500 hingga 1,000 / Exceeding 500 to 1,000 11 7,720.59 4 2,754.90 7 4,965.69
Melebihi 1,000 / Exceeding 1,000 2 3,700.00 1 2,200.00 1 1,500.00
2009 414 6,141.59 161 2,958.46 253 3,183.13
Melebihi 0.5 hingga 1 / Exceeding 0.5 to 1 72 54.34 25 20.12 47 34.22
Melebihi 1 hingga 5 / Exceeding 1 to 5 172 422.02 58 143.92 114 278.10
Melebihi 5 hingga 10 / Exceeding 5 to 10 71 503.66 28 195.64 43 308.02
Melebihi 10 hingga 50 / Exceeding 10 to 50 75 1,623.10 35 795.83 40 827.27
Melebihi 50 hingga 100 / Exceeding 50 to 100 14 1,045.51 8 629.11 6 416.40
Melebihi 100 hingga 300 / Exceeding 100 to 300 8 1,283.06 7 1,173.84 1 109.22
Melebihi 300 hingga 500 / Exceeding 300 to 500 0 0.00 - - - -
Melebihi 500 hingga 1,000 / Exceeding 500 to 1,000 2 1,209.90 - - 2 1,209.90
Melebihi 1,000 / Exceeding 1,000 0 0.00 - - - -
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification.
Jadual 2.5 - Bilangan Projek Diawad Berdasarkan Julat Nilai Projek dan Kategori Pembangunan Projek Pada Jun 2008
Table 2.5 - Number of Projects Awarded By Project Value Range and Project Category as of June 2008
Kategori Pembangunan Jumlah Nilai Projek Melebihi Melebihi Melebihi Melebihi Melebihi Melebihi Melebihi Melebihi
Melebihi 1,000
Projek (RM j) 0.5 hingga 1 1 hingga 5 5 hingga 10 10 hingga 50 50 hingga 100 100 hingga 300 300 hingga 500 500 hingga 1000
Project Value Exceeding Exceeding Exceeding Exceeding Exceeding Exceeding Exceeding Exceeding Exceeding
Project Category
Range (RM m) 0.5 to 1 1 to 5 5 to 10 10 to 50 50 to 100 100 to 300 300 to 500 500 to 1,000 1 ,000
2007 90,878.32 997.99 8,875.98 6,407.19 24,163.40 11,149.89 14,790.95 5,269.02 2,188.90 17,035.00
Kediaman
16,594.23 223.92 2,114.23 1,817.42 7,502.60 1,991.72 2,189.39 754.95 - -
Residential
Bukan Kediaman
25,075.94 331.03 2,598.85 2,055.66 7,185.31 4,657.98 5,992.63 1,604.48 650.00 -
Non Residential
Pembangunan Bercampur
115.34 0.68 14.85 5.81 43.44 50.56 - - - -
Mix Development
Kemudahan Sosial
11,540.16 154.03 2,048.84 1,059.10 4,343.86 1,290.26 1,794.87 849.20 - -
Social Amenities
Infrastruktur
37,362.95 283.22 2,055.47 1,420.48 4,996.06 3,159.37 4,814.06 2,060.39 1,538.90 17,035.00
Infrastructure
Lain-lain
189.70 5.11 43.74 48.72 92.13 - - - - -
Others
2008 74,164.28 827.79 6,825.89 5,328.81 19,712.95 10,618.05 17,102.47 2,327.73 7,720.59 3,700.00
Kediaman
15,054.89 148.62 1,437.49 1,479.42 5,025.32 2,331.63 3,171.13 921.48 539.80 -
Residential
Bukan Kediaman
18,736.35 253.88 2,358.36 1,763.58 5,612.45 3,136.22 4,919.00 - 692.86 -
Non Residential
Pembangunan Bercampur
1,196.22 1.63 21.27 - 104.41 - 277.00 - 791.91 -
Mix Development
Kemudahan Sosial
19,116.00 166.96 1,464.84 839.83 4,388.03 3,232.65 4,912.73 724.25 1886.71 1500.00
Social Amenities
Infrastruktur
19,971.91 250.17 1,494.37 1,223.83 4,572.07 1,917.55 3,822.61 682.00 3809.31 2200.00
Infrastructure
Lain-lain
88.91 6.53 49.56 22.15 10.67 - - -
Others
2009 6,141.60 54.35 422.02 503.66 1,623.10 1,045.51 1,283.06 0.00 1,209.90 0.00
Kediaman
771.41 13.43 60.63 117.86 464.41 115.08 - - - -
Residential
Bukan Kediaman
2,806.50 17.57 152.92 154.68 551.91 392.30 327.22 - 1,209.90 -
Non Residential
Pembangunan Bercampur
0.00 - - - - - - - - -
Mix Development
Kemudahan Sosial
1,329.99 6.95 61.04 80.83 374.24 241.98 564.95 - - -
Social Amenities
Infrastruktur
1,220.42 14.76 144.61 141.47 232.54 296.15 390.89 - - -
Infrastructure
Lain-lain
13.28 1.64 2.82 8.82 - - - - - -
Others
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jadual 2.7 - Bilangan Projek Diawad Berdasarkan Lokasi Tapak dan Julat Nilai Projek Pada Mac 2009
Table 2.7 - Number of Projects Awarded By Site Location and Value Range as of March 2009
Jumlah
Julat Nilai Projek
Bilangan
(RM juta)
Projek Negeri Pulau Kuala
Johor Kedah Kelantan Melaka Pahang Perak Perlis Selangor Terengganu Sabah Sarawak Labuan
Sembilan Pinang Lumpur
Value Range Total Number
(RM million) of Projects
2007 7,168 1,079 412 162 250 309 436 441 503 68 1,591 381 472 335 702 27
Melebihi 0.5 hingga 1
1,338 211 57 30 41 72 89 59 92 21 320 59 77 67 139 4
Exceeding 0.5 to 1
Melebihi 1 hingga 5
3,534 587 233 61 153 155 237 208 301 37 677 204 206 148 313 14
Exceeding 1 to 5
Melebihi 5 hingga 10
898 129 49 23 25 38 46 66 49 4 224 46 82 40 73 4
Exceeding 5 to 10
Melebihi 10 hingga 50
1,127 127 57 44 23 36 55 95 51 4 308 55 90 53 124 5
Exceeding 10 to 50
Melebihi 50 hingga 100
159 13 11 4 2 4 6 11 4 - 42 12 11 12 27 -
Exceeding 50 to 100
Melebihi 100 hingga 300
92 10 2 - 6 3 3 2 5 1 16 5 5 13 21 -
Exceeding 100 to 300
Melebihi 300 hingga 500
14 1 3 - - - - - 1 - 3 - 1 2 3 -
Exceeding 300 to 500
Melebihi 500 hingga 1,000
3 1 - - - - - - - - - - - - 2 -
Exceeding 500 to 1,000
Melebihi 1,000
3 - - - - 1 - - - 1 1 - - - - -
Exceeding 1,000
2008 5,693 799 294 171 244 224 360 337 361 56 1,309 337 383 299 503 16
Melebihi 0.5 hingga 1
1,097 173 46 34 47 36 86 64 77 12 241 69 69 65 76 2
Exceeding 0.5 to 1
Melebihi 1 hingga 5
2,664 366 165 82 121 110 195 148 193 29 572 181 162 119 212 9
Exceeding 1 to 5
Melebihi 5 hingga 10
742 106 42 31 25 38 31 49 45 4 190 33 44 43 60 1
Exceeding 5 to 10
Melebihi 10 hingga 50
909 115 34 21 40 29 41 56 38 8 246 42 79 48 109 3
Exceeding 10 to 50
Melebihi 50 hingga 100
155 18 7 1 7 8 6 12 2 2 39 6 14 13 20 -
Exceeding 50 to 100
Melebihi 100 hingga 300
107 17 - 2 4 3 1 5 5 1 18 5 15 9 21 1
Exceeding 100 to 300
Melebihi 300 hingga 500
6 1 - - - - - 2 1 - - - - - 2 -
Exceeding 300 to 500
Melebihi 500 hingga 1,000
11 3 - - - - - - - - 3 - - 2 3 -
Exceeding 500 to 1,000
Melebihi 1,000
2 - - - - - - 1 - - - 1 - - - -
Exceeding 1,000
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jadual 2.7 - Bilangan Projek Diawad Berdasarkan Lokasi Tapak dan Julat Nilai Projek Pada Mac 2009
Table 2.7 - Number of Projects Awarded By Site Location and Value Range as of March 2009
Jumlah
Julat Nilai Projek
Bilangan
(RM juta)
Projek Negeri Pulau Kuala
Johor Kedah Kelantan Melaka Pahang Perak Perlis Selangor Terengganu Sabah Sarawak Labuan
Sembilan Pinang Lumpur
Value Range Total Number
(RM million) of Projects
2009 414 73 24 12 16 12 23 11 32 4 103 21 21 25 37 0
Melebihi 0.5 hingga 1
72 16 7 2 2 3 2 1 4 1 15 4 2 2 11 -
Exceeding 0.5 to 1
Melebihi 1 hingga 5
172 33 7 3 8 - 15 7 11 1 44 13 9 12 9 -
Exceeding 1 to 5
Melebihi 5 hingga 10
71 9 7 7 1 3 1 3 10 - 15 1 5 3 6 -
Exceeding 5 to 10
Melebihi 10 hingga 50
75 13 1 - 5 5 3 - 7 1 23 2 3 5 7 -
Exceeding 10 to 50
Melebihi 50 hingga 100
14 1 2 - - - 1 - - - 4 1 2 1 2 -
Exceeding 50 to 100
Melebihi 100 hingga 300
8 1 - - - 1 1 - - 1 2 - - 2 - -
Exceeding 100 to 300
Melebihi 300 hingga 500
0 - - - - - - - - - - - - - - -
Exceeding 300 to 500
Melebihi 500 hingga 1,000
2 - - - - - - - - - - - - - 2 -
Exceeding 500 to 1,000
Melebihi 1,000
0 - - - - - - - - - - - - - - -
Exceeding 1,000
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jadual 2.8 - Nilai Projek Diawad Berdasarkan Lokasi Tapak dan Julat Nilai Projek Pada Mac 2009
Table 2.8 - Value of Projects Awarded By Site Location and Value Range as of March 2009
2007 7,168 1,079 412 162 250 309 436 441 503 68 1,591 381 472 335 702 27
Kediaman
1,784 235 111 37 66 76 98 125 126 19 483 54 76 78 197 3
Residential
Bukan Kediaman
2,229 298 111 37 96 69 108 172 135 14 528 106 140 117 291 7
Non Residential
Pembangunan Bercampur
11 - 1 - - - 2 - - - 6 - - - 2 -
Mix Development
Kemudahan Sosial
1,365 205 124 56 40 79 129 63 99 21 171 114 84 57 116 7
Social Amenities
Infrastruktur
1,742 332 65 32 47 82 97 78 140 14 395 104 169 82 96 9
Infrastructure
Lain-lain
37 9 - - 1 3 2 3 3 - 8 3 3 1 - 1
Others
2008 5,693 799 294 171 244 224 360 337 361 56 1,309 337 383 299 503 16
Kediaman
1,266 181 59 22 54 47 74 74 88 5 343 62 82 55 116 4
Residential
Bukan Kediaman
1,858 265 81 42 78 46 102 127 116 12 444 87 115 98 238 7
Non Residential
Pembangunan Bercampur
17 4 - - - - - 1 - - 9 - 2 - 1 -
Mix Development
Kemudahan Sosial
1,146 106 99 57 56 66 94 77 70 21 183 126 57 53 80 1
Social Amenities
Infrastruktur
1,373 239 51 50 54 63 84 56 87 17 322 61 127 91 67 4
Infrastructure
Lain-lain
33 4 4 - 2 2 6 2 - 1 8 1 - 2 1 -
Others
2009 414 73 24 12 16 12 23 11 32 4 103 21 21 25 37 0
Kediaman
85 13 8 1 6 4 5 2 9 - 25 3 1 1 7 -
Residential
Bukan Kediaman
141 20 10 2 6 2 5 6 13 1 33 6 7 10 20 -
Non Residential
Pembangunan Bercampur
0 - - - - - - - - - - - - - - -
Mix Development
Kemudahan Sosial
68 13 2 6 1 2 4 1 2 3 18 3 3 5 5 -
Social Amenities
Infrastruktur
116 27 4 2 3 4 9 1 8 - 25 9 10 9 5 -
Infrastructure
Lain-lain
4 - - 1 - - - 1 - - 2 - - - - -
Others
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jadual 2.11 - Nilai Projek Diawad Berdasarkan Lokasi Tapak dan Kategori Pembangunan Projek Pada Mac 2009
Table 2.11 - Value of Projects Awarded By Site Location and Project Category as of March 2009
Jumlah Nilai
Kategori Pembangunan
Projek
Projek
(RM j)
Negeri Pulau
Johor Kedah Kelantan Melaka Pahang Perak Perlis Selangor Terengganu Sabah Sarawak Kuala Lumpur Labuan
Total Project Sembilan Pinang
Project Category Value
(RM m)
2007 90,878.31 8,733.29 4,099.37 1,503.12 2,084.88 5,727.17 3,126.40 4,122.26 3,744.81 12,808.03 17,723.13 3,787.70 5,181.06 5,362.04 12,705.91 169.14
Kediaman
16,594.22 1,545.42 566.86 149.40 288.79 369.60 435.91 1,693.10 578.60 50.91 5,536.58 300.63 715.27 289.19 4,047.52 26.44
Residential
Bukan Kediaman
25,075.91 3,608.95 1,403.83 353.60 832.74 345.67 986.77 1,354.12 815.59 45.18 5,101.89 508.30 1,152.93 2,031.04 6,476.71 58.59
Non Residential
Pembangunan Bercampur
115.34 - 4.07 - - - 1.79 - - - 101.98 - - - 7.50 -
Mix Development
Kemudahan Sosial
11,540.19 825.05 676.32 549.44 358.10 510.15 1,030.15 397.46 1,017.01 174.06 2,206.46 1,117.72 903.75 1,078.73 670.94 24.85
Social Amenities
Infrastruktur
37,362.96 2,696.06 1,448.29 450.68 603.66 4,482.46 667.16 659.92 1,315.28 12,537.88 4,715.34 1,857.11 2,405.94 1,962.45 1,503.24 57.49
Infrastructure
Lain-lain
189.69 57.81 - - 1.59 19.29 4.62 17.66 18.33 - 60.88 3.94 3.17 0.63 - 2
Others
2008 74,164.26 10,056.80 1,937.13 1,288.38 2,661.90 2,264.79 2,091.92 6,506.82 2,945.94 554.25 16,313.27 4,560.16 6,078.32 5,512.56 11,110.23 281.79
Kediaman
15,054.87 1,067.74 381.70 81.77 310.58 398.68 250.67 1,107.00 609.89 7.24 4,383.75 277.62 911.60 187.07 5,060.91 18.65
Residential
Bukan Kediaman
18,736.35 2,235.92 347.83 208.68 1,232.20 409.83 523.39 1,116.99 950.56 39.02 4,387.87 727.45 1,221.15 1,722.69 3,568.89 43.88
Non Residential
Pembangunan Bercampur
1,196.21 21.10 - - - - - 30.41 - - 1,100.65 - 4.55 - 39.50 -
Mix Development
Kemudahan Sosial
19,116.00 2,632.83 822.49 340.29 682.70 984.55 833.34 1,147.74 807.52 361.49 3,157.02 2,520.93 1,928.89 831.86 2,063.41 0.94
Social Amenities
Infrastruktur
19,971.93 4,092.47 377.14 657.64 422.04 468.30 480.04 3,098.77 577.97 145.07 3,249.36 1,029.83 2,012.13 2,767.95 374.90 218.32
Infrastructure
Lain-lain
88.90 6.74 7.97 - 14.38 3.43 4.48 5.91 - 1.43 34.62 4.33 - 2.99 2.62 -
Others
2009 6,141.58 729.88 241.24 53.70 95.72 275.18 428.07 45.38 243.89 161.94 1,365.29 140.40 257.17 503.95 1,599.77 0.00
Kediaman
771.42 87.30 37.35 7.64 28.57 42.62 9.75 16.65 59.29 - 360.90 5.51 9.80 11.33 94.71 -
Residential
Bukan Kediaman
2,806.48 127.49 183.28 5.45 33.34 23.08 279.80 16.61 100.42 23.00 360.94 20.40 26.13 222.07 1,384.47 -
Non Residential
Pembangunan Bercampur
0.00 - - - - - - - - - - - - - - -
Mix Development
Kemudahan Sosial
1,329.98 153.89 5.30 27.89 20.00 146.94 103.63 0.70 23.35 138.94 566.68 31.05 17.84 69.64 24.13 -
Social Amenities
Infrastruktur
1,220.42 361.20 15.31 9.90 13.81 62.54 34.89 2.60 60.83 - 75.13 83.44 203.40 200.91 96.46 -
Infrastructure
Lain-lain
13.28 - - 2.82 - - - 8.82 - - 1.64 - - - - -
Others
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jadual 2.12 - Bilangan Projek Diawad Berdasarkan Lokasi Tapak dan Sektor Pada Mac 2009
Table 2.12 - Number of Projects Awarded By Site Location and Sector as of March 2009
Jum. Bilangan
Sektor
Projek Negeri Pulau Terenggan Kuala
Johor Kedah Kelantan Melaka Pahang Perak Perlis Selangor Sabah Sarawak Labuan
Total Number Sembilan Pinang u Lumpur
Sector
of Projects
2007 7,168 1,079 412 162 250 309 436 441 503 68 1,591 381 472 335 702 27
Projek Kerajaan
Government 2,894 387 222 123 99 152 260 122 238 48 328 279 268 119 234 15
Projects
Projek Swasta
4,274 692 190 39 151 157 176 319 265 20 1,263 102 204 216 468 12
Private Projects
2008 5,693 799 294 171 244 224 360 337 361 56 1,309 337 383 299 503 16
Projek Kerajaan
Government 2,427 223 165 131 114 124 218 107 179 50 303 236 255 126 188 8
Projects
Projek Swasta
3,266 576 129 40 130 100 142 230 182 6 1,006 101 128 173 315 8
Private Projects
2009 414 73 24 12 16 12 23 11 32 4 103 21 21 25 37 0
Projek Kerajaan
Government 161 26 7 12 6 4 17 3 13 4 21 11 15 13 9 -
Projects
Projek Swasta
253 47 17 - 10 8 6 8 19 - 82 10 6 12 28 -
Private Projects
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jadual 2.13 - Nilai Projek Diawad Berdasarkan Lokasi Tapak dan Sektor Pada Mac 2009
Table 2.13 - Value of Projects Awarded By Site Location and Sector as of March 2009
Projek Kerajaan
47,596.92 2,498.77 2,752.13 1,206.67 1,151.49 4,787.45 2,072.07 845.34 1,897.94 12,770.59 4,459.80 3,279.16 3,546.53 3,380.26 2,857.89 90.83
Government Projects
Projek Swasta
43,281.40 6,234.53 1,347.22 296.45 933.38 939.72 1,054.35 3,276.91 1,846.87 37.44 13,263.34 508.54 1,634.53 1,981.79 9,848.02 78.31
Private Projects
2008 74,164.24 10,056.81 1,937.14 1,288.37 2,661.90 2,264.78 2,091.91 6,506.82 2,945.95 554.27 16,313.25 4,560.15 6,078.31 5,512.57 11,110.23 281.78
Projek Kerajaan
32,783.37 4,438.21 1,178.74 972.21 1,211.18 1,487.84 1,419.68 3,565.83 2,033.19 491.67 3,402.26 2,283.92 4,476.43 2,848.81 2,742.98 230.42
Government Projects
Projek Swasta
41,380.87 5,618.60 758.40 316.16 1,450.72 776.94 672.23 2,940.99 912.76 62.60 12,910.99 2,276.23 1,601.88 2,663.76 8,367.25 51.36
Private Projects
2009 6,141.59 729.89 241.25 53.69 95.72 275.18 428.07 45.38 243.89 161.94 1,365.29 140.40 257.16 503.95 1,599.78 0.00
Projek Kerajaan
2,958.48 431.28 122.78 53.69 63.12 206.05 416.89 11.44 147.22 161.94 541.51 118.86 224.06 352.69 106.95 -
Government Projects
Projek Swasta
3,183.11 298.61 118.47 - 32.60 69.13 11.18 33.94 96.67 - 823.78 21.54 33.10 151.26 1,492.83 -
Private Projects
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jadual 2.14 - Bilangan dan Nilai Projek Diawad Berdasarkan Status Kontraktor dan Kategori Pembangunan Projek Pada Mac 2009
Table 2.14 - Number and Value of Projects Awarded By Status of Contractors and Project Category as of March 2009
Total
Total Project Bilangan Nilai Bilangan Nilai Bilangan Nilai Bilangan Nilai Bilangan Nilai
Project Category Number of
Value (RM m) Number Value Number Value Number Value Number Value Number Value
Projects
2007 7,168 90,878.33 6,728 72,635.75 330 14,423.42 52 2,703.72 9 490.12 49 625.32
Kediaman
1,784 16,594.22 1,744 15,179.40 34 1,283.11 6 131.71 - - - -
Residential
Bukan Kediaman
2,229 25,075.94 2,041 19,181.98 120 4,815.56 18 201.54 5 329.40 45 547.46
Non Residential
Pembangunan Bercampur
11 115.34 11 115.34 - - - - - - - -
Mix Development
Kemudahan Sosial
1,365 11,540.19 1,300 8,642.71 56 1,824.05 5 912.71 4 160.72 - -
Social Amenities
Infrastruktur
1,742 37,362.94 1,595 29,326.62 120 6,500.70 23 1,457.76 - - 4 77.86
Infrastructure
Lain-lain
37 189.70 37 189.70 - - - - - - - -
Others
2008 5,693 74,164.27 5,361 58,748.30 248 10,954.61 63 1,847.75 6 1,513.57 15 1,100.04
Kediaman
1,266 15,054.88 1,240 14,710.02 19 200.66 6 142.46 1 1.74 - -
Residential
Bukan Kediaman
1,858 18,736.33 1,741 17,107.17 85 1,023.93 23 464.82 - - 9 140.41
Non Residential
Pembangunan Bercampur
17 1,196.22 15 1,180.84 1 13.40 1 1.98 - - - -
Mix Development
Kemudahan Sosial
1,146 19,116.00 1,079 13,725.93 59 3,361.95 6 527.29 2 1,500.83 - -
Social Amenities
Infrastruktur
1,373 19,971.93 1,259 11,947.85 80 6,346.86 26 708.34 2 9.25 6 959.63
Infrastructure
Lain-lain
33 88.91 27 76.49 4 7.81 1 2.86 1 1.75 - -
Others
2009 414 6,141.59 393 5,565.06 16 315.00 3 256.62 1 1.11 1 3.80
Kediaman
85 771.42 84 765.49 1 5.93 - - - - - -
Residential
Bukan Kediaman
141 2,806.50 129 2,655.31 8 143.40 2 2.88 1 1.11 1 3.80
Non Residential
Pembangunan Bercampur
0 0.00 - - - - - - - - - -
Mix Development
Kemudahan Sosial
68 1,329.99 63 1,172.48 5 157.51 - - - - - -
Social Amenities
Infrastruktur
116 1,220.41 113 958.51 2 8.16 1 253.74 - - - -
Infrastructure
Lain-lain
4 13.27 4 13.27 - - - - - - - -
Others
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jadual 2.16 - Bilangan dan Nilai Projek Diawad Berdasarkan Status Kontraktor dan Pengkhususan Kerja Pada Mac 2009
Table 2.16 - Number and Value of Projects Awarded By Status of Contractors and Work Specialisation as of March 2009
2007 7,168 90,878.32 5,709 82,952.53 429 3,042.86 344 1,832.02 166 1,008.41 260 1,239.25 260 803.25
Bangunan / Building 4,603 50,590.99 3,911 46,817.27 96 598.79 298 1,677.36 26 268.70 54 512.10 218 716.77
Kejuruteraan Awam / Civil Engineering 2,098 36,254.17 1,436 32,406.62 306 2,357.00 33 143.08 100 588.81 191 686.93 32 71.73
Elektrik / Electrical 257 1,727.80 203 1,569.53 10 19.04 9 5.91 23 103.56 8 25.55 4 4.21
Mekanikal / Mechanical 210 2,305.36 159 2,159.11 17 68.03 4 5.67 17 47.34 7 14.67 6 10.54
2008 5,693 74,164.28 4,247 62,596.04 491 4,988.73 268 3,469.43 222 1,120.10 223 1,026.95 242 963.03
Bangunan / Building 3,568 50,412.24 2,851 44,371.26 171 2,132.43 223 2,474.14 38 333.11 71 227.27 214 874.03
Kejuruteraan Awam / Civil Engineering 1,717 20,206.93 1,136 15,272.31 265 2,522.31 32 947.70 123 625.49 144 777.02 17 62.10
Elektrik / Electrical 239 2,393.48 163 2,093.93 33 223.69 7 19.61 30 40.69 4 14.02 2 1.54
Mekanikal / Mechanical 169 1,151.63 97 858.54 22 110.30 6 27.98 31 120.81 4 8.64 9 25.36
2009 414 6,141.59 315 5,487.46 38 392.41 23 146.72 10 29.64 13 45.99 15 39.37
Bangunan / Building 236 4,585.77 191 4,211.18 13 227.92 19 111.79 - - 2 10.99 11 23.89
Kejuruteraan Awam / Civil Engineering 155 1,362.65 109 1,118.40 23 161.97 4 34.93 7 9.87 10 29.12 2 8.36
Jumlah tidak semestinya sama disebabkan oleh pembundaran angka. Total may not necessarily add up due to rounding.
Nota : Semua angka tertakluk kepada penyelarasan pemakluman lewat. Note : Figures are subject to change due to late notification
Jadual 2.18 - Bilangan dan Nilai Projek Diawad Berdasarkan Status Kontraktor dan Jenis Kontrak Pada Mac 2009
Table 2.18 - Number and Value of Projects Awarded By Status of Contractors and Type of Contract as of March 2009
Konvensional / Conventional 6,728 72,635.75 2,693 35,952.13 3,960 34,770.39 3 25.32 72 1,887.91
Reka & Bina / Design & Build 330 14,423.43 178 6,500.00 141 4,136.76 1 3,450.00 10 336.67
Konvensional / Conventional 5,361 58,748.31 2,282 23,359.55 3,025 33,300.41 1 19.00 53 2,069.35
Reka & Bina / Design & Build 248 10,954.61 125 6,307.63 114 2,284.60 1 2,200.00 8 162.38
Konvensional / Conventional 6,728 72,635.75 5,335 65,882.01 407 2,662.69 332 1,462.45 160 789.95 248 1,085.62 246 753.03
Reka & Bina / Design & Build 330 14,423.42 282 13,655.67 18 326.21 7 52.74 3 210.46 9 144.08 11 34.26
2008 5,693 74,164.27 4,247 62,596.03 490 4,988.73 268 3,469.43 222 1,120.11 224 1,026.94 242 963.03
Konvensional / Conventional 5,362 58,748.32 4,009 49,044.38 454 4,131.67 261 3,120.59 205 863.01 214 819.47 219 769.20
Reka & Bina / Design & Build 248 10,954.60 175 9,279.48 29 778.87 3 318.94 11 185.41 8 198.78 22 193.12
Konvensional / Conventional 393 5,565.06 302 4,975.46 37 347.43 22 145.22 9 27.42 12 38.99 11 30.54
Reka & Bina / Design & Build 16 315.01 9 251.58 1 44.98 1 1.50 1 2.22 1 7.00 3 7.73
Projek Baru / New Project 5,709 82,952.54 1,940 38,368.14 3,700 39,029.80 3 3,474.68 66 2,079.92
Projek Baru / New Project 4,247 62,596.02 1,480 22,727.01 2,727 35,600.15 2 2,219.00 38 2,049.86
Projek Baru / New Project 315 5,487.46 99 2,428.98 214 2,390.83 - - 2 667.65