Standard Work Sheet

This document is a standard work combination sheet used to record tasks, timing, and other information related to manufacturing processes. It includes sections to record the part number, operation number, date, operator, task descriptions, timing for each step, total time, and takt time. The sheet provides a template for collecting data from time observations to calculate standard work times for manufacturing processes.

Uploaded by

lalodevera
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
526 views2 pages

Standard Work Sheet

This document is a standard work combination sheet used to record tasks, timing, and other information related to manufacturing processes. It includes sections to record the part number, operation number, date, operator, task descriptions, timing for each step, total time, and takt time. The sheet provides a template for collecting data from time observations to calculate standard work times for manufacturing processes.

Uploaded by

lalodevera
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

STANDARD WORK COMBINATION SHEET (SWCS)

PART NUMBER OPERATION NUMBER REV. LETTER SUM. LETTER DATE OPERATOR MANUAL
AUTOMATIC
PART NAME DEPARTMENT NUMBER / NAME PREPARED BY TAKT TIME WALK VVVVVVVVVV
WAIT

STEP PCS /
MAN - TASK TIME : 1 LINE = ________ MINUTES SECONDS
DESCRIPTION OF TASK MACH MAN AUTO WALK
NO. LOAD
CAP

TOTAL

TIME PER PIECE USE MINUTES PER PIECE FOR STANDARD WORK DATABASE

ENTRY
1. Fill in information
STANDARD WORK COMBINATION SHEET (SWCS)
PART NUMBER OPERATION NUMBER REV. LETTER SUM. LETTER DATE OPERATOR MANUAL
For Std. Work AUTOMATIC
PART NAME Measurement Only
DEPARTMENT NUMBER / NAME PREPARED BY TAKT TIME WALK VVVVVVVVVV
WAIT

STEP PCS /
MAN - TASK TIME : 1 LINE = ________ MINUTES SECONDS
DESCRIPTION OF TASK MACH MAN AUTO WALK
NO. LOAD
CAP

2. Insert task from time


observation
4. Set scale based on
total time

3. Fill in time and


compute total time

6. Graph according to legend

5. Takt time is RED line

TOTAL

TIME PER PIECE USE MINUTES PER PIECE FOR STANDARD WORK DATABASE

ENTRY