0% found this document useful (0 votes)
73 views5 pages

Complete QA Training (Manual Testing + Win Runner + Load Runner + QTP + Test Director)

This 6-day training document outlines a complete QA training program covering manual testing, automation tools like WinRunner, LoadRunner, QTP and Test Director. The training will take place over 6 days, totaling 48 hours. It will provide overview of key QA concepts and techniques, hands-on exercises with the automation tools, and help with job interviews and certifications. Additional benefits include ongoing server access and technical support.

Uploaded by

rnjava
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
73 views5 pages

Complete QA Training (Manual Testing + Win Runner + Load Runner + QTP + Test Director)

This 6-day training document outlines a complete QA training program covering manual testing, automation tools like WinRunner, LoadRunner, QTP and Test Director. The training will take place over 6 days, totaling 48 hours. It will provide overview of key QA concepts and techniques, hands-on exercises with the automation tools, and help with job interviews and certifications. Additional benefits include ongoing server access and technical support.

Uploaded by

rnjava
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Complete

QA Training (Manual Testing + Win runner + Load Runner + QTP + Test Director)
www.smartsoftconsulting.com
[email protected]

Total Estimated Time: 48 hours

Target Audience: Any Bachelors or Masters degree

Day 1:
Overview
 General Testing Concepts
 Client/Server and Web Application
 SDLC (Software Development Life Cycle)
 FRC (Functional Requirement Specification)
 SDS (System Design Specification)

Testing Strategy
 Test Plan
 Test Case
 Test Summary Report
 STLC (Software Test Life Cycle)
 V – Model
 Traceability Matrix

Testing Techniques
 Black Box Testing
 White Box Testing
 Path Testing

Testing Types
 Unit Testing
 Integration Testing
 System Testing
 Regression Testing
 Functionality Testing
 Load /Performance Testing
 Stress Testing

Lab Session
 How to create Test Cases
 Defining Check list
 Executing Test cases

Day-2:

Testing Types
 Compatibility Testing
 UAT
 Smoke testing
 Sanity Checking/Testing
 Backend testing

Bug or Defect Reporting Process


 Defect Lifecycle

www.smartsoftconsulting.com
Nj, USA-08873
Phone: 732 917 4581
Complete
QA Training (Manual Testing + Win runner + Load Runner + QTP + Test Director)
www.smartsoftconsulting.com
[email protected]

 Defect Tracking
 Defect Priority
 Defect Report
 Impact Analysis
 Gap Analysis

21 CFR Part 11 and Computer System Validation


 21 CFR Part 11
 IQ/OQ/PQ
 Change Management
 Version Control
 Document History
 Document Review
 Document Approval
 GDP
Lab Session
 Creating Positive Test Cases
 Creating Negative Test Cases
 Executing Both Positive and Negative Test Cases
 Black Box Testing

Day 3: (Mercury WinRunner)

Test Automation
Overview on Test Automation
 Automation Testing Process
 Importance of Automation Testing
 Test Case selection for Automation Testing
Mercury WinRunner

Recording and Running Scripts


Recording a Test Script
Setting initial Condition

Introduction to GUI Map


 How the GUI Map works
 Two methods for GUI Map maintenance
 Logical Names and Physical Descriptions
 Loading and Unloading a GUI Map file

Synchronizing Script and Application


 Creating Synchronization points

Verification with Standard Checkpoints


 Implementing GUI Checkpoints
 Implementing Bitmap checkpoints

www.smartsoftconsulting.com
Nj, USA-08873
Phone: 732 917 4581
Complete
QA Training (Manual Testing + Win runner + Load Runner + QTP + Test Director)
www.smartsoftconsulting.com
[email protected]

Data – Driven Test


 Understanding parameters
 Using the Data Driver Wizard

Creating and Using GUI Maps


 How the GUI Map is recorded and used
 Using the Rapid Test Script Wizard

Batch Testing
 Running Tests in Batch Mode
 Calling a Test from another Test

Test Script Language (TSL)


 Functions,Variables,constants and Operators
 Sending messages to the Test Results window

Lab Session
 Creating Test Scripts
 Execution of Test Scripts
 Execution of Test Scripts with checkpoints
Day 4: (QTP)

User Defined Functions and Reusable Libraries


 Creating Functions and Compiled modules(libraries)
 Return codes and error handling

Advanced Data Driving


 Reading from and writing to the Data Table
 Writing to spread sheets and to Text Files

Managing Custom Objects in an application


 Leaning the properties of Custom Objects
 Mapping custom objects to standard classes

Lab Session
 Creating Test scripts using Data Tables and Test Files
 Execution of Test Scripts using Data Tables and Test Files
 Real WinRunner Projects, scenarios and scripts

QTP
Fundamentals of Quick Test Professional (QTP)
 Quick Test Benefits in Test Automation
 Overview on Quick Test Professional
 Record and Playback Basic Script
 Object Identification and Object Spy
 Synchronizing Tests
 Standard and Text Checkpoints
 Parameterize tests
 Create data – driven tests
 Local and Global Data tables.

www.smartsoftconsulting.com
Nj, USA-08873
Phone: 732 917 4581
Complete
QA Training (Manual Testing + Win runner + Load Runner + QTP + Test Director)
www.smartsoftconsulting.com
[email protected]

Lab Session
 Creating Test scripts using Standard and Text Checkpoints
 Execution of Test Scripts
 Real QTP Projects, scenarios and scripts

Day5: (Test Director, Load Runner)

Test Director
 Introduction to Test Director
 Test Director Testing process
 Specifying Testing Requirements
 Planning test in Test Director
 Generating Automated Test Templates

Lab Session
 Defining and adding Tests to the Test set.
 Execution of Test Manually and Automatically
 Generating Reports and Graphs

Load Runner
 Requirements and Planning an Effective Load Test
 LoadRunner Overview and Architecture
 Virtual User Generator (VuGen) Recording and Playback
 Script Enhancements (Multiple Actions and Transactions)
 Data Parameterization
 Understanding Correlation
Lab Session
 Designing and Creating Scenario
 Scheduling an Executing Scenario
 Results Analysis
 Load Runner Project Discussion

Day6:

Oracle and Unix

 SQL Commands
 Unit Commands
 Interview Guidance
 Mock Interviews
 Exam on all above topics

Other Benefits
 Interview Guidance
 Certification Guidance
 Support for future Projects
 24/7 server access for 3 months
 Real Time scenarios
 Mock Interview Questions

www.smartsoftconsulting.com
Nj, USA-08873
Phone: 732 917 4581
Complete
QA Training (Manual Testing + Win runner + Load Runner + QTP + Test Director)
www.smartsoftconsulting.com
[email protected]

 Hands on Real Time scenarios


 Free technical support for your first project
 Placement assistance

www.smartsoftconsulting.com
Nj, USA-08873
Phone: 732 917 4581

You might also like