IAP Grading Schedule

The document outlines a local internship programme plan for Ngee Ann Polytechnic students from October 2010 to February 2011. It details the 17 week programme, with students expected to upload interim and final reports to an ePortfolio system. Assessment is based on competency, reports, presentations, project scope documentation, weekly reports, final reports, and interviews. Students are evaluated on criteria like attitude, report quality, and presentation skills. The programme aims to provide students with practical work experience through supervised internship positions.

Uploaded by

xxcxxzz
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
145 views1 page

IAP Grading Schedule

The document outlines a local internship programme plan for Ngee Ann Polytechnic students from October 2010 to February 2011. It details the 17 week programme, with students expected to upload interim and final reports to an ePortfolio system. Assessment is based on competency, reports, presentations, project scope documentation, weekly reports, final reports, and interviews. Students are evaluated on criteria like attitude, report quality, and presentation skills. The programme aims to provide students with practical work experience through supervised internship positions.

Uploaded by

xxcxxzz
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Ngee Ann Polytechnic

Multidiscipline Engineering Division


Local Internship Programme Plan (October 2010 Semester)

Module Title: 21INT6/22INT6/23INT6/34INT6 Level : 3


Module Coordinator: Lim Chor Pee Module Lecturers : MDE

Duration: 13 September 2010 to 29 February 2011

Week Week Starts Description Remarks


No. From
1 13 Sept 2010 Start of Attachment; Setup ePortfolio in MeL
Weekly report commence
2 20 Sept 2010 Provide LO with Supervisor's project details
3 27 Sept 2010 Update training programme in MeL
4 4 Oct 2010
5 11 Oct 2010
6 18 Oct 2010
7 25 Oct 2010 Semester starts
8 1 Nov 2010
9 8 Nov 2010
10 15 Nov 2010
11 22 Nov 2010 Upload Interim Report to MeL
12 29 Nov 2010 Interim Assessment at company
13 6 Dec 2010
14 13 Dec 2010
15 20 Dec 2010
16 27 Dec 2010
17 3 Jan 2011
18 10 Jan 2011
19 17 Jan 2011 Upload Final Report to MeL End of Attachment
20 24 Jan 2011 Preparation for Final Assessment & Final
Assessment & Presentation (at NP)
22 Feb 2011 Final Viva & Presentation

Assessment Weightage:

EI BPQE LMGT ISCM


S01 Competency and attitude 10% 15% 10% 10%
S02 Interim Report 10% 15% 10% 10%
S03 Presentation/Interview 5% 5% 10% 10%
S04/S09 Project scope or Terms Of Reference (TOR) / 5% 5% 5% 5%
ePortfolio
S05 Weekly/Monthly Report 10% 10% 20% 20%
S06 Final Report 30% 30% 25% 25%
S07 Final Interview/Presentation 10% 20% 20% 20%
S08 Demonstration 20% N.A. N.A. N.A.
Total 100% 100% 100% 100%