07-Busbar Protection Busbar Protection RF
07-Busbar Protection Busbar Protection RF
F1 F2
Argues
z There are fewer faults on busbars than on other parts of the
power system.
z No risk of dislocation of system due to accidental operation of
busbar protection.
2 05/02/03
08/02 2
Without Busbar Protection
F1 F2
Drawbacks
z Slow fault clearance.
Busbar faults at F1 and F2 are cleared by remote time
delayed protection on circuits feeding the faults:
Time Delayed Overcurrent or
Time Delayed Distance Protection
3 05/02/03
08/02 3
With Busbar Protection
BUSBAR
ZONE
F1
4 05/02/03
08/02 4
With Busbar Protection
BUSBAR
ZONE
F1 F2
5 05/02/03
08/02 5
With Busbar Protection
1/2
SS SS SS
1 87BB 2 3
87BB
21 21
6 05/02/03
08/02 6
With Busbar Protection
2/2
87BB
87BB
21 21
7 05/02/03
08/02 7
With No Busbar Protection
1/2
21 21 21
21 21
8 05/02/03
08/02 8
With No Busbar Protection
2/2
21 21 21
21 21
9 05/02/03
08/02 9
With Busbar protection
87BB
87BB
21 21
21 21 21
21 21
1005/02/03
08/02 10
Busbar Faults Are Usually Permanent
z Insulation failures
z Circuit breaker failures
z Current transformer failures
z Isolators switchs operated on load or outside their ratings
z Safety earths left connected
Therefore :
Circuit breakers should be tripped and locked out by busbar
protection
1105/02/03
08/02 11
Busbar Protection must be :
z RELIABLE
– Failure to trip could cause widespread damage to the substation
z STABLE
– False tripping can cause widespread interruption of supplies to
customers / possible power system instability
z DISCRIMINATING
– Should trip the minimum number of breakers to clear the fault
z FAST
– To limit damage and possible power system instability
1205/02/03
08/02 12
Methods of Providing Busbar Protection
z Frame to Earth (Leakage) Protection
>I
Insulation
1305/02/03
08/02 13
Frame Leakage Protection
>I
Insulation
1505/02/03
08/02 15
Frame Leakage Busbar Protection
>I
1605/02/03
08/02 16
Frame Leakage Busbar Protection
>I
1705/02/03
08/02 17
Frame Leakage Busbar Protection
>I >I
1805/02/03
08/02 18
Frame Leakage Busbar Protection
1905/02/03
08/02 19
Frame Leakage Busbar Protection
Neutral Check
False Operation
because induced
loop
>I
>I
No operation
prevents from
2005/02/03
08/02 false trip 20
Frame Leakage Busbar Protection
Neutral Check
>I
>I
2105/02/03
08/02 21
Frame Leakage Busbar Protection
Neutral Check
>I
>I
2205/02/03
08/02 22
Blocking Scheme Protection
2405/02/03
08/02 24
Blocking Scheme Busbar Protection
2505/02/03
08/02 25
Blocking Scheme Busbar Protection
2605/02/03
08/02 26
High Impedance Protection
2805/02/03
08/02 28
Single Bus Substation
P1 S1 P1 S1 P1 S1
P2 S2 P2 S2 P2 S2
2905/02/03
08/02 29
Single Bus Substation
3005/02/03
08/02 30
Single Bus Substation
3105/02/03
08/02 31
Single Bus Substation
3205/02/03
08/02 32
Double Bus Substation
3305/02/03
08/02 33
Isolator Auxiliary Switches
Current switching
Bus A
Bus B
P1 S1
P2 S2
P1 S1 P1 S1 P1 S1 P2 S2
P2 S2 P2 S2 P2 S2 P1 S1
a Current
b
3405/02/03
08/02 34
Isolator Auxiliary Switches
Current switching
Bus A
Bus B
Current
a
b
3505/02/03
08/02 35
Isolator Auxiliary Switches
Current switching
Bus A
Bus B
a Current
b
3605/02/03
08/02 36
Isolator Auxiliary Switches
Current switching
Bus A
Bus B
Current
a
b
3705/02/03
08/02 37
Isolator Auxiliary Switches
Current switching
Bus A
Bus B
a Current
b
3805/02/03
08/02 38
Isolator Auxiliary Switches
Current switching
Bus A
Bus B
a Current
b
3905/02/03
08/02 39
Isolator Auxiliary Switches
Tripping switching
Bus A
Bus B
Tripping a
b
a
Current b
4005/02/03
08/02 40
Interposing CT are not acceptable
4105/02/03
08/02 41
Isolator Auxiliary Switches
Current switching
Bus A
Bus B
a
Current b
4205/02/03
08/02 42
Isolator Auxiliary Switches
Current switching
Bus A Bus A
Bus B Bus B
a a
Current b Current b
4305/02/03
08/02 43
Isolator Auxiliary Switches
On Load Transfer
Bus A
Bus B
a
Current b
4405/02/03
08/02 44
Isolator Auxiliary Switches
On Load Transfer
Bus A
Bus B
a
Current b
4505/02/03
08/02 45
Isolator Auxiliary Switches
On Load Transfer
Bus A
Bus B
a
Current b
4605/02/03
08/02 46
Isolator Auxiliary Switches
On Load Transfer
Bus A
Bus B
a
Current b
4705/02/03
08/02 47
Isolator Auxiliary Switches
On Load Transfer
Bus A
Bus B
Current a
b
4805/02/03
08/02 48
Isolator Auxiliary Switches
On Load Transfer
Bus A
Bus B
a
Current b
4905/02/03
08/02 49
Isolator Auxiliary Switches
On Load Transfer
Bus A
Bus B
a
Current b
5005/02/03
08/02 50
Isolator Auxiliary Switches
Check Zone
Bus A
Bus B
Trip Bus B
Trip Bus A
Zone A
Zone B
5105/02/03
08/02 51
Isolator Auxiliary Switches
Check Zone
Bus A
Bus B
Trip Bus B
Trip Bus A
Current
switching
failure
Zone A
Zone B
False
Tripping
5205/02/03
08/02 52
Isolator Auxiliary Switches
Check Zone
Bus A
Bus B
Trip Bus B
Trip Bus A
Zone A
Zone B
Check
Zone
5305/02/03
08/02 53
Isolator Auxiliary Switches
Check Zone
Bus A
Bus B
Trip Bus B
Trip Bus A
Zone A
Zone B
5405/02/03
08/02 54
Isolator Auxiliary Switches
Check Zone
Bus A
Bus B
Trip Bus B
Trip Bus A
Check
Zone
5505/02/03
08/02 55
One Breaker and a Half
Substation
5605/02/03
08/02 56
S1 P1
S2 P2
Bus A Bus
B
P1 P2 P2 P1
S1 S2 S2 S1
5705/02/03
08/02 57
Bus A Bus
B
5805/02/03
08/02 58
Bus A Bus
B
5905/02/03
08/02 59
Bus A Bus
B
6005/02/03
08/02 60
Bus A Bus
B
6105/02/03
08/02 61
Bus A Bus
B
6205/02/03
08/02 62
Bus A Bus
B
P1 P2 P2 P1
S1 S2 S2 S1
P1 P2 P2 P1
S1 S2 S2 S1
6305/02/03
08/02 63