04b Takt Time Calculator

This document calculates takt time based on customer demand, available work time, and downtime. It shows that with a customer demand of 100 units per day, available work time of 540 minutes per shift after accounting for breaks and downtime, the takt time is 282 seconds or 4.7 minutes per piece.

Uploaded by

lam nguyen
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
52 views1 page

04b Takt Time Calculator

This document calculates takt time based on customer demand, available work time, and downtime. It shows that with a customer demand of 100 units per day, available work time of 540 minutes per shift after accounting for breaks and downtime, the takt time is 282 seconds or 4.7 minutes per piece.

Uploaded by

lam nguyen
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Instructions: Manually enter information into the yellow shaded cells.

Takt Time Calculator


Working Shifts per Day 1 Shifts
Hours per Shift 9 Hours
Break Time per Shift 30 Minutes
Lunch Time per Shift 30 Minutes
Planned Downtime per Shift 10 Minutes
Customer Demand per Day 100 Units

Available Time per Shift 540 Minutes


Net Working Time per Shift 470 Minutes
Net Working Time per Shift 28,200 Seconds
Net Available Time per Day 28,200 Seconds
Takt Time = 282 Seconds per Piece
Takt Time = 4.7 Minutes per Piece