The building permit approval process flowchart outlines the steps an applicant must go through to obtain a building permit. The applicant first submits all required documents to the front counter. If the submission is incomplete, deficiencies must be corrected and resubmitted. Once submitted documents are complete, the plans are routed for code review and outside agency approval. The applicant also may need to submit a storm water plan or engineered storm water plan. If all reviews are passed and outside agencies grant approval, the permit is issued.

Uploaded by

hoysauce
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views

Building Permit Approval Process Flowchart

The building permit approval process flowchart outlines the steps an applicant must go through to obtain a building permit. The applicant first submits all required documents to the front counter. If the submission is incomplete, deficiencies must be corrected and resubmitted. Once submitted documents are complete, the plans are routed for code review and outside agency approval. The applicant also may need to submit a storm water plan or engineered storm water plan. If all reviews are passed and outside agencies grant approval, the permit is issued.

Uploaded by

hoysauce
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

BUILDING PERMIT APPROVAL PROCESS FLOWCHART

Applicant submits all required Building,


Site risk assessment performed Permit Tech reviews
and Planning documents including
for storm water and erosion for completeness
plans to front counter. Plans must be
control issues
complete per the requirements checklist

Home
owner/contractor No deficiencies
storm water Applicant corrects
plan required deficiencies and Deficient
re-submits
OR

Engineered Plans routed for Code


storm water plan review and outside
required agency approval

Required corrections
completed

Corrections
required

Planners review for Plans Examiners review


compliance for Code compliance

Outside agencies review for their


specific requirement compliance.
The applicant is responsible to
assure that those requirements are
No storm water No corrections met. Approval must be granted No corrections
plan required required prior to issuance of permits required

PERMIT IS ISSUED