2nd Week Lecture: ROLE OF PETROLEUM GEOLOGIST IN OIL AND GAS INDUSTRY Page # 1
Figure 7 Typical structural (anticline - left and normal fault – right) related Traps
• Source- The source rock is where the oil was formed (if you accept the
organic theory). It is little porous and non-permeable, so it can not hold oil in
appreciable amounts. Reservoir- Oil migrates in to the porous rock unit like
sandstone or limestone that collects the hydrocarbons expelled from the
source rock and holds them inside a trap. It is possible for oil to move through
the reservoir rock all the way to the surface of the earth, if it is not sealed.
• Seal- The rock unit that inhibits the oil or gas from escaping vertically out of
a hydrocarbon bearing reservoir rock.
• Trap- Structural or stratigraphic feature that captures migrating
hydrocarbons into an economically producible accumulation.
• Timing- Geologic events must occur in a certain order e.g. that the trap
formed before migration rather than after.
• Maturation- The process of thermal maturing of a source rock, leading to
the cracking of its organic matter into oil and gas.
• Migration- The movement of the (less dense) oil or gas from the source rock
into a reservoir rock and then into a trap.
2nd Week Lecture: ROLE OF PETROLEUM GEOLOGIST IN OIL AND GAS INDUSTRY Page # 2
Exploration geologist, well site / drilling geologist and development geologist are
synonym names used for Petroleum geologist at different stages of exploration and
development of oil/ gas field, in petroleum industry. Petroleum geologist job never
ends, who work together with seismologist, surface / subsurface geophysicist.
Petroleum geologist correlates fragmented data derived from geology, petrophysics
and engineering disciplines. Information from such different fields is assembled
together (Figures 8 to 11 and tables 3 to 5) on various maps (structural,
stratigraphic, cross sections, facies, thickness, productivity and geothermal etc.)
and are fitted together in the mind of petroleum geologist, where it is interpreted
and translated into the best place to drill an exploratory well that will penetrate a
trap below the surface of the ground and thereby enable the well to test the
reservoir trap’s content.
All these maps and data do not tell themselves the whole story. In order to
use them in
petroleum discovery, they must be interpreted, correlated and integrated. Both
geologic and economic evaluation will justify the drilling of a wildcat well. After
exploring economic oil and
Figure 8 Layered rock sequence illustrating relative age and deposition of strata in
horizontal layers
2nd Week Lecture: ROLE OF PETROLEUM GEOLOGIST IN OIL AND GAS INDUSTRY Page # 3
Figure 9 Conceptual diagram for correlation of strata, in Pakistan
2nd Week Lecture: ROLE OF PETROLEUM GEOLOGIST IN OIL AND GAS INDUSTRY Page # 4
petroleum geologist judges that the 280
Carboniferous 280 5
rocks and structures are favorable to the
360
trapping of petroleum under a certain 360
Devonian 415 1
area. He does not know whether that
415
area is oil or gas pool, until a discovery Cambrian-Silurian 580 1
well has been drilled. Drilling well Total
basin.
2nd Week Lecture: ROLE OF PETROLEUM GEOLOGIST IN OIL AND GAS INDUSTRY Page # 5
Figure 10. Temperature Gradient i.e. Temperature vs. Depth
2nd Week Lecture: ROLE OF PETROLEUM GEOLOGIST IN OIL AND GAS INDUSTRY Page # 6
Table 4 - Lapotin’s time and temperature analysis
million years, then at 140o C it will generate
Hydrocarbons Temprature
hydrocarbons in 35 million years and at
range, in o C
o
150 C in 17.5 million years. This method is Biogenic gas 69 - 82
known as Lapotin’s time and temperature only
Oil and gas
analysis, which has been very effectively
((the oil 82 - 132
used to predict the presence of
window)
hydrocarbons in a given area with known Gas 132 -163
geothermal gradients and burial history. condensate
Dry gas 163- 260
However, for the areas which have not gone
Barren > More than
through major tectonic phases in the post
260
Table 5 - Table showing existence of
hydrocarbons in different
temperature ranges.
geological history the following temperature ranges (table 5) are given for
generation of different types of hydrocarbons by various authors:
Pressure Gradient
Most pressure that effect rocks is due to the weight of overlying rocks and is called
overburden pressure. Overburden pressure is a function of depth and increases
one pound per square inch (PSI) for each foot of depth. At 3000 feet, for example,
the overburden pressure would be 3,000 pounds per square inch (psi).
Hydrocarbons evolve from an immature stage to oil generation, oil cracking (wet
gas stage), and finally to dry gas generation because of overburden pressure and
the associated increase in temperature (Fig. 11).
2nd Week Lecture: ROLE OF PETROLEUM GEOLOGIST IN OIL AND GAS INDUSTRY Page # 7
Figure 11 Hydrocarbon formation as a function of burial depth of the source rock
Bringing oil and gas to earth surface is a complex task in petroleum industry
performed by petroleum geologist, geophysicist and petroleum engineer. All of
them are working side by side, starting from surface geophysical survey, geological
exploration, drilling, subsurface geophysical survey appraisal, development and
production of oil, gas or both. Different types of wells drilled in the industry and
phases involved are summarized below:
DIFFERENT WELLS TERMINOLOGY USED IN OIL INDUSTRY
Wildcat well – It is also known as exploratory well, drilled in the hope of
discovering a new pool (petroleum bearing area). Before such well, very little is
2nd Week Lecture: ROLE OF PETROLEUM GEOLOGIST IN OIL AND GAS INDUSTRY Page # 8
known about subsurface geology of the area. If it hit petroleum reservoir then it is
called exploratory well, if not then will be either dry hole or wet well.
Discovery well – If the well traps a deposit of petroleum, it is called a discovery
well (discovery oil well or discovery gas well, according to which kind of petroleum
is found).
Dry hole – If the discovery well produces neither oil nor gas, but only water, it is
called a dry hole, or a wet well.
Test well – It is the well drilled, to know actual location and size of a petroleum
deposit / reservoir in the earth.
Confirmation well – The next well after a discovery confirms, such a well is called
confirmation well.
Development wells – Well drilled into the same reservoir after a discovery has
been made are called development wells.
Producer well – After successful exploration and development of oil / gas field,
producing wells, drilled into the reservoir, produce fluids (gas, oil or water), in order
to drain the field.
Injection well – A well in which fluids are injected rather than produced, the
primary objective typically being to maintain reservoir pressure. Two main types of
injection are common: gas and water.
Separated gas from production wells or possibly imported gas may be reinjected
into the upper gas section of the reservoir.
Water-injection wells are common offshore, where filtered and treated seawater is
injected into a lower water-bearing section of the reservoir.
DIFFERENT PHASES IN PETROLEUM INDUSTRY
Exploration The initial phase in petroleum operations that includes generation of a
prospect or play or both, and drilling of an exploration well. Appraisal, development
and production phases follow successful exploration.
Generation The formation of hydrocarbons from a source rock as bitumen forms
from kerogen and accumulates as oil or gas. Generation depends on three main
factors: the presence of organic matter rich enough to yield hydrocarbons,
adequate temperature, and sufficient time to bring the source rock to maturity.
Pressure and the presence of bacteria and catalysts also affect generation.
Generation is a critical phase in the development of a petroleum system.
2nd Week Lecture: ROLE OF PETROLEUM GEOLOGIST IN OIL AND GAS INDUSTRY Page # 9
Prospect An area of exploration in which hydrocarbons have been predicted to
exist in economic quantity. A prospect is commonly an anomaly, such as a geologic
structure or a seismic amplitude anomaly, which is recommended by explorationists
for drilling a well. Justification for drilling a prospect is made by assembling
evidence for:
- an active petroleum system, or reasonable probability of encountering reservoir-
quality rock,
- a trap of sufficient size,
- adequate sealing rock, and
- appropriate conditions for generation and migration of hydrocarbons to fill
the trap.
A single drilling location is also called a prospect, but the term is more properly
used in the context of exploration. A group of prospects of a similar nature
constitutes a play.
Appraisal The phase of petroleum operations that immediately follows successful
exploratory drilling. During appraisal, delineation wells might be drilled to determine
the size of the oil or gas field and how to develop it most efficiently.
Development The phase of petroleum operations that occurs after exploration has
proven successful, and before full-scale production. The newly discovered oil or gas
field is assessed during an appraisal phase, a plan to fully and efficiently exploit it is
created, and additional wells (Development wells) are usually drilled.
Production The phase that occurs after successful exploration and development
and during which hydrocarbons are drained from an oil or gas field.
2nd Week Lecture: ROLE OF PETROLEUM GEOLOGIST IN OIL AND GAS INDUSTRY Page # 10