Front Pge and Content

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

Summer Training Report

On

“Working Capital in NTPC Limited.”


Submitted by
Aksh Vardhan
Registration No. 3510930010
MBA Batch 2009-11

In Partial Fulfillment of the Requirements of the Degree of Master of


Business Administration

Submitted To
Corporate Guide Academic Guide
Mr. Kuldeep Shatriya Dr. (Prof.) N.C. Bansal
Senior Manger Finance HOD
NTPC Ltd. SRM University
Badarpur, Delhi Delhi-Meerut Road
Modi Nagar

SRM University
Ghaziabad Campus
August, 2010
Contents

Chapte
r Topic Page No.
Declaration I
Acknowledgement Ii
Certificate by company Iii
Certificate by faculty guide Iv
Executive Summary V
1. Power Sector 1
Introduction 2
Growth in Indian Power sector 3
Structure of power supply industry 4
Map of India 6
2. Company Profile 7
About NTPC 8
Vision, Mission 8
Role in Nation Building 8
Power Generation 8
Evolution of NTPC 9
Performance of NTPC 10
Company timeline 12
Award detail 15
SWOT analysis 16
Thermal power plants 19
Introduction to BTPS 20
Finance at BTPS 21
3. Working Capital 27
Introduction to working capital 28
Need of working capital 28
Gross working capital and net working capital 29
Types of working capital 30
Determinants of working capital 30
4. Research Methodology 33
Research methodology 34
Types of data collection 34
Objective of study 35
Scope of study 36
Limitations of study 36
5. Working capital level and analysis 37
Working capital level 38
Working capital trend analysis 38
Current assets analysis 40
Composition of current assets 41
Chapte
r Topic Page No.
Current liability analysis 42
Change in working capital 43
6. Working Capital Ratio Analysis 45
Introduction 45
Role of Ratio Analysis 46
Limitations of ratio analysis 53
7. Conclusion and recommendations 54
Conclusion 55
Recommendations 56
Bibliography 57
Annexure 58