0% found this document useful (0 votes)
318 views1 page

Sales Module Flow Chart

The document outlines the steps in DDC Wizzard's sales module flow chart for construction value engineering. It involves reviewing mechanical plans and specifications to input solution names and mark up graphical take-offs. It also includes transferring scheduled part types to focused take-offs for fans, dampers, and valves to generate estimates for controllers, power sources, enclosures, and labor. The final steps are reviewing and adjusting the overall estimate summary and solution details.

Uploaded by

ezhumalai05
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
318 views1 page

Sales Module Flow Chart

The document outlines the steps in DDC Wizzard's sales module flow chart for construction value engineering. It involves reviewing mechanical plans and specifications to input solution names and mark up graphical take-offs. It also includes transferring scheduled part types to focused take-offs for fans, dampers, and valves to generate estimates for controllers, power sources, enclosures, and labor. The final steps are reviewing and adjusting the overall estimate summary and solution details.

Uploaded by

ezhumalai05
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Construction Value DDC Wizzard

DDC WIZZARD Sales Module Flow Chart Documents Added Input or Output

WIZZARD Step

Review Schedules & Control


Diagrams on Mechanical Plans
Solution TO & Specifications Input Solution Names
into Solution Take Off

Review Sequences, Control


Graphical Take Print Graphical TO Diagrams and/or Points List
Off’s and Worksheets based on to mark up Graphical TO Input Device Windows
Material Entry Solution T. O. Worksheets w/DW to input. into Graphical Take Off
or Material Entry UI

Take Off Select price point sizes in


Scheduled Transfer Scheduled Print FMS, Damper and Valve Take Offs - then transfer
Parts and Part Types to FMS, Take Offs & review Mech TO to Schedules & fine
Transfer to Damper & Valve plans & Schedules for sizes tune to post cost.
Schedules Take Offs

Controllers Review individual Pick controllers to generate or


Take Off Solutions to determine manually input Controllers into
point counts Controller Take Off

Review Device Window,


Power Scheduled and Controller
Generate and/or manually input Parts to confirm Power
Sources
Power Sources into Power Source requirements are
Take Off
Sources Take Off meet

Review Mechanical Plans


Enclosures & Solutions to determine Name Enclosures to generate
Take Off Enclosure requirements or manually input Enclosures
into Enclosures Take Off

Review Labor Summary Use Labor Rounding and/or


Labor
and/or Solution Take Off Labor Rates to adjust final
Summary
to fine tune labor hrs. hours & costs for Labor
Estimate

Estimate & Review Estimate & Generate hardcopy


Solution Solutions Summary, Make any final Estimate Summary and/
Summaries Material Entry adjustments to or Estimate Detail
Estimate

You might also like