0% found this document useful (0 votes)
56 views

An Introduction To Solar

This document provides information about Gil Melear-Hough, who is the Tennessee Director of Renewable Programs. It lists their contact information including phone number, cell number and email. It also provides the website for Clean Energy, the organization they work for.

Uploaded by

Clean Energy
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views

An Introduction To Solar

This document provides information about Gil Melear-Hough, who is the Tennessee Director of Renewable Programs. It lists their contact information including phone number, cell number and email. It also provides the website for Clean Energy, the organization they work for.

Uploaded by

Clean Energy
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

Gil Melear-Hough

Project Coordinator,
Tennessee Director of Renewable Programs
(865) 637-6055 ext. 15
[email protected]
www.cleanenergy.org
Crystalline Silicon Cell Types Crystalline Module Evolution

Multi Mono
crystalline crystalline
BIPV Evolution – Crystalline
PV Thin Film Installations
BIPV - Flat Tile
Silicon

BIPV - Spanish Tile

Thin film Cadmium Telluride (CdTe)

The most aggressive leader in the thin film PV


industry is FirstSolar, which manufactures a
Cadmium Telluride (CdTe) thin film module.
They claim a production cost
approaching $1/watt, compared to a production
cost of about $1.70/watt for typical PV

Rigorous recycling program required due to


toxicity of Cadmium

First Solar
CdTe module
(efficiency 10%?)
Credit Curt Maxey, ORNL
A solar hot water
community in China

SWH GUIDELINES
Only install systems that are Solar Rating and Certification Corporation (SRCC)
certified (www.solarrating.org). The SRCC provides independent certification of
solar water and swimming pool heating collectors and systems. Some states
(Florida, for example) require their own certification. Install the simplest system
that will work in your climate. In most areas of the United States, SWH must
incorporate freeze protection.
www.dsireusa.org/solar/
www.dsireusa.org/solar/
Case Study provided by
LightWave Solar Electric
Freeman Webb Building in Nashville, TN
•! 10.8 kW system: Generates 12,960 kWh per year ($2,600/yr)
•! Initial investment: $90,700 (about 8.5 cents/watt)
•!TN-CET Grant: $36,280 ($12,698 tax on grant)
•!Federal tax credit: $27,210
•!MACRS over 6 years: $26,983
•!Net cost after grant, tax credit, and depreciation benefits: $12,900

•! 50-year system pays for itself in 5 years and generates revenue thereafter—
approx. $2,600 a year
•! 25-year warranty

•! Over 25 years, system will offset:


•!485,190 lbs of CO2
•!729 lbs of NOx,
•!2,241 lbs of SO2,
•!Equivalent to planting 68 acres
of trees
www.lightwavesolarelectric.com 615-641-4050
Energy efficiency is the most cost
effective way to reduce utility bills and
improve comfort. The less energy a
house requires, the smaller and less
expensive the solar equipment will be.
7.128kW system cost is $60,000.00
Less 30% federal tax credit $18,000.00
(less Generation Partners $500.)
Net system cost $41,000.00
7.128 x 1200( estimated annual production /kW) = 8554kWh x $.205 =
$1,754.00, $42,000.00/$1,754.00 = maximum 24 years simple pay
back.
Less depending on how fast electricity cost rise.
And not looking at the investment in the equity of your home
Gil Melear-Hough
Tennessee Director of Renewable Programs
(865) 637-6055 ext. 15
Cell (865) 789-5482
[email protected]
www.cleanenergy.org

You might also like