0% found this document useful (0 votes)
205 views3 pages

Mazak Multiple Pull Transfer Example - Towmeup Console Swivel

The document contains machining program instructions for a TOWMEUP CONSOLE SWIVEL part. The program includes 18 units that will: 1) face and drill the stock on one side; 2) transfer and extend the stock to machine the opposite side; and 3) run a manual program to complete the machining. Tools used include general cutters, drills, and taps. The program positions and machines both sides of the part using a combination of machining centers, transfer units, and manual programming.

Uploaded by

Arturo Lopez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
205 views3 pages

Mazak Multiple Pull Transfer Example - Towmeup Console Swivel

The document contains machining program instructions for a TOWMEUP CONSOLE SWIVEL part. The program includes 18 units that will: 1) face and drill the stock on one side; 2) transfer and extend the stock to machine the opposite side; and 3) run a manual program to complete the machining. Tools used include general cutters, drills, and taps. The program positions and machines both sides of the part using a combination of machining centers, transfer units, and manual programming.

Uploaded by

Arturo Lopez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Solutionware Corporation

--

Mazak Print
Fri Dec 21 22:49:09 2007

FileName: TOWMEUP-CONSOLE-SWIVEL.PBF
Machine: MatrixT
WorkNumber:
1 TOWMEUP CONSOLE SWIVEL - EXTEND 5IN FROM HD1
Size (number of blocks): 47
Machine: MatrixT
UNo. MAT
0 ALUMINUM
TPC Clearance U3
0.
p1z
p2x0.
p2z
TPC Clearance U3
0.
p1z
p2x0.
p2z

OD-MAX
1.55
U4
0.

ID-MIN
0.
U5
0.

p3x
U4
0.

p3z
U5
0.

p3x

p3z

LENGTH
13.35
U6
5.8393

UNo. UNIT
PART POS-B
FIN-Z
1 FACING
FCE 90.
0.005
SNo TOOL
NOM.
No.
PAT. DEP-1
R 1 GNL OUT 36.
B
<> 0.1
F 2 GNL OUT 36.
B
<> <>
FIG
SPT-X
SPT-Z
FPT-X
1
1.55
0.1
0.
UNo. UNIT
PART POS-B
2 BAR
OUT
90.
SNo TOOL
NOM.
No.
R 1 GNL OUT 36.
B
F 2 GNL OUT 36.
B
FIG PTN S-CNR
SPT-X
1 /^\
0.
2 TPR
1.52
UNO
3
SNo
1
FIG
1
2

WORK-FACE ATC-MODE RPM


0.1
0
2750
P95 Parameters
0
0
0
25
0

U6

P95 Parameters
0
0
1

0.

25

DEP-2/NUM DEP-3 FIN-X


<>
<>
<>
<>
<>
<>
FPT-Z
0.

LTUR-DIA

FIN-Z
<>
0.

p1x

p1x

C-SP FR
950 0.011
1500 0.005
RGH
6

M
8
8

M
M
153
153

C-SP FR
950 0.011
1500 0.005
RGH
6
6

M
8
8

M
M
153
153

CPT-X
CPT-Z
FIN-X
FIN-Z
1.53
0.
0.01
0.005
PAT. DEP-1 DEP-2/NUM DEP-3 FIN-X FIN-Z
3
0.1
0.1
<>
<>
<>
<> <>
<>
<>
0.
0.
SPT-Z
FPT-X
FPT-Z
F-CNR/$
R/th
0.
1.52
0.76
0.76
0.76
1.53
0.85

UNIT
MODE POS-B POS-C
DIA
DEPTH
CHMF
DRILLING ZC
<>
<>
0.75
1.75
0.
TOOL
NOM-D
No. HOLE-D HOLE-DEP PRE-DIA PRE-DEP RGH DEPTH C-SP FR
DRILL
0.75 E
0.75
1.75
0.
100
DRL T0.225 232 0.012
SHP
SPT-R/x SPT-C/y SPT-Z
SPT-Y
NUM
ANGLE
Q R
PT
R0.775
A0.
1.
0.
<>
<>
<> 0
PT
R0.775
A0.
3.75
0.
<>
<>
<> 0

M
M
153 8

UNo. UNIT MODE


POS-B
POS-C
NOM-0
MAJOR-0
PITCH TAP-DEP
CHMF
4 TAPPING ZC <>
<>
1/2-13
0.5
0.0769 0.8
0.
SNo TOOL
NOM-D
No. HOLE-D HOLE-DEP PRE-DIA PRE-DEP RGH DEPTH C-SP FR
M
1 DRILL
0.42 E
0.43
1.
0.
100
DRL T0.129 131 0.0092 8
2 TAP-UN
1/2-13E
0.5
0.8
TAP
<>
FIX 0.077 127 0.0769 8
FIG SHP
SPT-R/x SPT-C/y SPT-Z
SPT-Y
NUM
ANGLE
Q R
1 PT
R0.775
A90.
1.
0.
<>
<>
<> 0
2 PT
R0.775
A90.
3.75
0.
<>
<>
<> 0
UNO
UNIT
5 MANL-PRG
UNO. MODE No.#
6 M-CODE

TOOL
GNL OUT
M1
9

NOM-DIA
36.
E
M2
154

M3

M4

No.
M5

M6

POS-B
0.
M7

M8

M
M
153
153

CHANGE-PT
RETURN
M9

THIS UNIT MOVES SUBSPINDLE UP OVER STOCK AND CLAMPS IT IN PLACE


UNo. UNIT
PAT HEAD SPDL PUSH CHUCK W1
W2
Z-OFFSET C1
7 TRANSFER BAR 2
4
<> 1 -36.83
<>
<>
0.

M10

C2
0.

M11

M12

C-OFFSET LTUR ESC TNo


0.

THIS UNIT OPENS HEAD 1 AND PULLS STOCK OUT 6.3" AND CLAMPS BOTH HEADS
UNo. UNIT
PAT HEAD SPDL PUSH CHUCK W1
W2
Z-OFFSET C1
C2
8 TRANSFER BAR 1
4
<> 1 <>
-30.53 -2.4393 0.
0.

C-OFFSET LTUR ESC TNo


0.

THIS UNIT MOVES SUBSPINDLE FORWARD TO LEAVE APPROX 3" OF STOCK EXTENDING FROM HEAD 2
UNo. UNIT
PAT HEAD SPDL PUSH CHUCK W1
W2
Z-OFFSET C1
C2
C-OFFSET LTUR ESC TNo
9 TRANSFER BAR 2
4
<> 1 -37.53
<>
<>
0.
0.
0.

THIUS UNIT PULLS STOCK OUT OF HEAD 1 COMPLETELY AND FREES STOCK FROM HEAD 1
UNo. UNIT
PAT HEAD SPDL PUSH CHUCK W1
W2
Z-OFFSET C1
C2
C-OFFSET LTUR ESC TNo
10 TRANSFER BAR 1
4
<> 1 <>
-32.53 -7.4393 0.
0.
0.
UNo. UNIT
11 HEAD

PAT.
HEAD
SINGLE 2

SPDL
<>

THIS UNIT SENDS HEAD 2 BACK TO W HOME POSITION, AND RESETS THE OFFSET TO THE ORIGINAL FACE OF
PART TO MACHINE SIDE 2
UNo. UNIT
PAT HEAD SPDL PUSH CHUCK W1
W2
Z-OFFSET C1
C2
C-OFFSET LTUR ESC TNo
12 TRANSFER MOV <>
<>
<> <> <>
0.
47.7422
UNo. UNIT
PART POS-B
FIN-Z
13 FACING
BAK 90.
0.005
SNo TOOL
NOM.
No.
PAT. DEP-1
R 1 GNL OUT 36.
E
<> 0.1
F 2 GNL OUT 36.
E
<> <>
FIG
SPT-X
SPT-Z
FPT-X
1
1.55
-13.4
0.
UNo. UNIT
PART POS-B
14 BAR
OUT
90.
SNo TOOL
NOM.
No.
R 1 GNL OUT 36.
E
F 2 GNL OUT 36.
E
FIG PTN S-CNR
SPT-X
1 /^\
0.
2 TPR
1.52
UNO
15
SNo
1
FIG
1

DEP-2/NUM DEP-3 FIN-X


<>
<>
<>
<>
<>
<>
FPT-Z
-13.25

FIN-Z
<>
0.

CPT-X
CPT-Z
FIN-X
FIN-Z
1.55
13.25
0.01
0.005
PAT. DEP-1 DEP-2/NUM DEP-3 FIN-X FIN-Z
3
0.1
0.1
<>
<>
<>
<> <>
<>
<>
0.
0.
SPT-Z
FPT-X
FPT-Z
F-CNR/$
R/th
13.25
1.52
12.49
0.76
12.49
1.53
12.465

C-SP FR
950 0.011
1500 0.005
RGH
6

M
8
8

M
M
153
153

C-SP FR
950 0.011
1500 0.005
RGH
6
6

M
8
8

M
M
153
153

UNIT
MODE POS-B POS-C
DIA
DEPTH
CHMF
DRILLING ZC
<>
<>
0.75
1.75
0.
TOOL
NOM-D
No. HOLE-D HOLE-DEP PRE-DIA PRE-DEP RGH DEPTH C-SP FR
DRILL
0.75 E
0.75
1.75
0.
100
DRL T0.225 232 0.012
SHP
SPT-R/x SPT-C/y SPT-Z
SPT-Y
NUM
ANGLE
Q R
PT
R0.775
A0.
12.25
0.
<>
<>
<> 0

M
M
153 8

UNo. UNIT MODE


POS-B
POS-C
NOM-0
MAJOR-0
PITCH TAP-DEP
CHMF
16 TAPPING ZC <>
<>
1/2-13
0.5
0.0769 0.8
0.
SNo TOOL
NOM-D
No. HOLE-D HOLE-DEP PRE-DIA PRE-DEP RGH DEPTH C-SP FR
M
1 DRILL
0.42 E
0.43
1.
0.
100
DRL T0.129 131 0.0092 8
2 TAP-UN
1/2-13E
0.5
0.8
TAP
<>
FIX 0.077 127 0.0769 8
FIG SHP
SPT-R/x SPT-C/y SPT-Z
SPT-Y
NUM
ANGLE
Q R
1 PT
R0.775
A90.
12.25
0.
<>
<>
<> 0
UNO
UNIT
17 MANL-PRG
UNo. UNIT
18 END

TOOL
GNL OUT

CONTI. REPEAT SHIFT


0

NOM-DIA
36.
B
NUMBER ATC
1
0

No.

POS-B
0.

RETURN
ToolChg

LOW-RET.

M
M
153
153

CHANGE-PT
RETURN
Work-No.

EXECTE
YES

Program Layout
Pri SNo Tool
R 1 GNL
F 2 GNL
R 1 GNL
F 2 GNL
1 DRILL
1 DRILL
2 TAP-UN
GNL

R
F
R
F

1
2
1
2
1
1
2

GNL
GNL
GNL
GNL
DRILL
DRILL
TAP-UN
GNL

OUT
OUT
OUT
OUT

OUT

OUT
OUT
OUT
OUT

OUT

NOM-0
36.
36.
36.
36.
0.75
0.42
1/2-13
36.

B
B
B
B
E
E
E
E

36.
36.
36.
36.
0.75
0.42
1/2-13
36.

E
E
E
E
E
E
E
B

UNo
1
1
2
2
3
4
4
5
6
7
8
9
10
11
12
13
13
14
14
15
16
16
17

Unit
FACING
FCE
FACING
FCE
BAR
OUT
BAR
OUT
DRILLING ZC
TAPPING
ZC
TAPPING
ZC
MANL-PRG
M
TRANSFER BAR
TRANSFER BAR
TRANSFER BAR
TRANSFER BAR
HEAD SINGLE 2
TRANSFER MOV
FACING
BAK
FACING
BAK
BAR
OUT
BAR
OUT
DRILLING ZC
TAPPING
ZC
TAPPING
ZC
MANL-PRG

Angle

You might also like