Rwerwrv01 D PDF
Rwerwrv01 D PDF
Rwerwrv01 D PDF
Section
Quantity
[mm]
[nos]
Angle
40/40/5
610
Flat
100/6
-106
Weight
Working Drawing
kg / pc total kg
Assembly Details
2 holes 14
1.81
2
2125
185
1 hole 19
3 holes 14
Section A
2125
19
23 30
3.62B
0.46
0.92B
2
c/c walkway cables = 44 cm
Walkway cable
30 23
Flat
100/6
-85
0.38
23
54
23
to be welded
to part 1a
insert to part 1b
Plain Rod
8 -1480
rod to be inserted
21
14
IS 1363
19
2 holes 15
100
Hex Nut
M12
0.76B
before welding
0.015
14
0.06C
1f
before welding
180
0.58
Ri=25
1.16B
1b
1200
Rod
(J - Hook)
12 - 209
Ri
Ri=21
55
120
3
4
5
Hex Nut
M 12
0.19
Hex Bolt
M 12x70
0.40B
105
65
225
thread M12
2.1
0.015
1c
0.04C
35
145
obtain alignment
1d
0.005
6.3
0.04C
4.2
0.08
70
IS 1363
* or full threaded
B = 6.86 kg
C = 0.48 kg
Transportation Weight
B + C + 0.22 kg
All steelparts must be hot dip galvanized according to IS 2629 & 2633, min thickness = 80 m
Nepal
of holes
min 40*
A = 7.56 kg
Produced by
225
IS 1363
Plain
Washer
13
1a
2.1
Section B
nuts to be welded
centered to holes
50
70
0.34C
*Required Nos of
Crossbeams per bridge:
= Span in [m]
Span:
Steel Drawing:
Swiss Association for international Cooperation, in partnership with His Majestys Government of Nepal and funded and supported by the Swiss Government (SDC Nepal).