0% found this document useful (0 votes)
64 views1 page

Construction Management Suppose That A Site Preparation and Concrete Slab Foundation Construction Project Consists of Nine Different Activities

This document outlines 9 activities for a construction project: site clearing, tree removal, general excavation, grading, utility trench excavation, formwork and reinforcement installation, sewer line installation, other utility installation, and concrete pouring.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views1 page

Construction Management Suppose That A Site Preparation and Concrete Slab Foundation Construction Project Consists of Nine Different Activities

This document outlines 9 activities for a construction project: site clearing, tree removal, general excavation, grading, utility trench excavation, formwork and reinforcement installation, sewer line installation, other utility installation, and concrete pouring.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Construction management

Suppose that a site preparation and concrete slab foundation construction project consists of
nine different activities:
A. Site clearing (of brush and minor debris),
B. Removal of trees,
C. General excavation,
D. Grading general area,
E. Excavation for utility trenches,
F. Placing formwork and reinforcement for concrete,
G. Installing sewer lines,
H. Installing other utilities,
I. Pouring concrete.