Uttarakhand PWD Schedule of Rate

Download as pdf or txt
Download as pdf or txt
You are on page 1of 20

UTTARAKHAND

LOK NIRMAN VIBHAG

Th

CIRCLE TEHRI
SCHEDULE OF RATES
FOR
TEHRI DISTRICT

With Effect from 01-04-2009


(FOR OFFICE USE ONLY)

ANNEXTURE 1
UNIT WEIGHT OF MATERIALS
Bitumen
Bricks
Cement
Mild steel
Cast iron
Ply Wood (1 mm thick)
Stone ballast
Shingle 3mm to 38mm
Sand
Chir Wood
Deodar wood
Sal Wood
Teak Wood
Sheet glass 1 mm thick
Stone for masonry
Sita Tax Low density particle board
Black plain iron sheet
17
0.63 mm thick (24 Guage)
18 do- 0.8 mm thick (22 Guage)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

19 Snow load on roofs


20 Slacked lime
21 Loose Earth
22 Crusher grit

Approx

Approx

1000 kg per Cum


1750 kg per Cum
1350 kg per Cum
7830 kg per Cum
7080 kg per Cum
0.70 kg per Sqm
1600 kg per Cum
1460 kg per Cum
1600 kg per Cum
575 kg per Cum
545 kg per Cum
865 kg per Cum
640 kg per Cum
2.5 kg per Sqm
2000 kg per Cum
12 mm thick 3.7 kg per
4.95 kg per Sqm
6.3 kg per Sqm
2.5 kg/Per Sqm per cm
depth of snow
640 kg per Cum
1600 kg per Cum
1500 kg per Cum

Guide Lines & Important Instructions


1 The rates of item of works in Chapter (V) to (X VI) and chapter (XIX) will be
worked out on the basis of P.W.D Skelton and subsequent order,issued by
Chief Engineer from time to time.
2
On material to be issued by the Department cartage from the place of issue to
the site of work will be added. If the issue rates for such materials differs from
the rates given in chapter I then the difference in rates will be added or
deducted depending upon whether the issue rates is higher or lower.
3

The unit weights of materials (where necessary) shall be adopted as specified


in Annexure 1. For other materials unit weights as per I.S. standard or any
other Standard specification or as specified by the manufacturer or as per
actual observation, shall be adopted.

4 The quantities of materials consumed in different items of work and number of


labourers will be taken as per Skelton analysis rate for Almora Distt. and as
fixed by the chief Engineer P.W.D. from time to time.
5 The rates given in the Schedule are for one storey, above ground level (Ground
Floor) and one storey below ground level (Basement) Beyond this the rate for
each item may be increased by one percent for each floor i.e. 1% for first floor,
2% for second floor, 3% for third floor and so on. In case of workshop, halls
etc. 4M height above plinth level may be taken as equivalent to height of one
storey. The Duchhati or Stair case mumty will be paid for in the storey of the
building in which it falls i.e. stair case mumty shall be paid for in the storey
just below it.
6

For Building and Bridge works water allowance @ 1.5% may be added on the
items where water is required and the contractor has borne the entire
expenditure on water arrangements. No water allowance is to be added if water
is available within 100 M free of cost.

J.E. (Tech.)
8th Circle PWD New Tehri

7 For T&P sundries and lump-sum items in the Skelton for the analysis of rates
the provision will be made 25 Times that of the provision made in 1962
Almora Distt. Schedule of rates and 30 Times for R.C.C. work for Buildings
and bridges and 20 times and 25 times on Lucknow Skelton made in 1973
accordingly.
8 With the Analysis of rates and while working out. R.M.R., a site plan showing
the location of site of work, quarry, place of issue of materials etc, and
minimum distance by pucca/unmetalled road/bridle road/foot track must
invariably be enclosed. The Divisional Engineer should record a certificate
that the distances for the cartage of different materials are correct and is by
shortest possible route and that the material of desired specification is not
available at a lesser distance.
9 The method of measurements shall be as per 1962 Almora distt. Schedule of
rates/latest detailed P.W.D. specifications/circulars issued by the chief
Engineer.
10 The rates include material for centering / shuttering, scaffolding, (unless
otherwise specifically mentioned in particular items), sundries, gurras, nails,
carborandum stone, mansion polish, oxalic acid, saw dust, brushes, wooden
gullies, small springs for fixing of glass pans etc.
11 Wherever the word fine sand occurs in this schedule of rate, it will mean the
sand of fineness modulus 1.25. Where as course sand shall be of fineness
modulus ranging between 1.7 to 2.3
12 If the rates of any item given in this schedule superceded by any authority
higher than S.E., the same shall be applicable for those items.
13 For items which are not part of the PWD Skeleton will be taken as per
Standard data book of MOSRTH(Items related to hotmix plant,sign
boards,crash barrier)

J.E. (Tech.)
8th Circle PWD New Tehri

CHAPTER - 1
Note:
The rates for item 2, 3, 38, 39 and 41 are quarry rates inclusive of royality but exclusive of sales tax and
Contractor's profit.
The rates for all others items are at nearst rail head inclusive of octroi, royalty, sales tax and also carriage
2
upto Municipal limit (except for item 1, 45 and 46) but exclusive of Contractor's profit.
Wastage @ 2% for grit, shingle and sand and @ 1% for stone ballast shall be applicable for preparing
3
RMR for road work.
No Voids shall be deducted while taking supply of stone ballast, grit and split boulder.
4
Five percent contractor's profit may be given while taking the supply through some agency other than
5
direct supplier.
No quarring charges shall be paid on item 2, 3, 38, 39, 41
6
Item No.
Material
Unit
Rate (Rs.)
1a)
Bricks M-100 (Standard size) At Rishikesh Rail Head
1000 No.
2700.00
1b)
Straight over burnt
1000 No.
1800.00
2
Ballast/grit (hard stone)
Graded/hand broken at quarry (road side)
(a) 20 M.M. size
Per Cum
400.00
(b) 20 M.M. to 40 M.M.
Per Cum
360.00
(c ) 40 mm size
Per Cum
330.00
(d) 53 to 22.40 M.M.
Per Cum
320.00
(e) 45 to 63 M.M.
Per Cum
275.00
(f) 90 to 45 M.M.
Per Cum
250.00
(g) Split Boulder 100-150 M.M.
Per Cum
155.00
(h) River boulder at quarry minimum weight 50 Kg.
Per Cum
150.00
(i) Brick ballast(over burnt 40mm gauge)
Per Cum
550.00
(j) Brick ballast(Class 100 25mm gauge)
Per Cum
680.00
3
(a) River shingle or stone girt quarried from Hill side at
Quarry
10 M.M. to 16 M.M.
Per Cum
290.00
16 M.M. to 22.40 M.M.
Per Cum
265.00
(b) For stone Crushed grit
(i) Sizes 10 MM to 16 Mm
Per Cum
425.00
(ii) Sizes 16 MM to 22.40 Mm
Per Cum
425.00
(iii) Sizes 5 MM to 10 Mm
Per Cum
410.00
(iv) Stone dust 2.60 MM or below
Per Cum
360.00
(v) Sizes 10 MM to 16 Mm (11.20 M.M. nominal size)
Per Cum
425.00
(vi) Sizes 16 MM to 22.40 Mm (13.20 M.M. nominal size)
Per Cum
425.00
(vii)Granular Sub base(G.S.B)Material of specified size.
Per Cum
360.00
(viii)River bed material
Per Cum
380.00
4
Bolt and nuts etc.
(a) upto 6 M.M. dia
Per Kg
70.00
(b) above 6 M.M. to 12 M.M dia
Per Kg
65.00
(c ) above 12 M.M. to 25 M.M. dia
Per Kg
60.00
5
Bolts and nuts 13 M.M. dia to 22 M.M. dia
Deleted
6
Bees Wax
Deleted
7
Bamboos
(a) 25 cm to 4 cm dia
Per R.M.
As per Van Nigam
(b) above 4 cm and upto 8 cm dia
Per R.M.
Rates
8 (A) Bellies Sal
(a) 8 cm (mean) dia
Per R.M.
(b) 10 cm (mean) dia
Per R.M.
As per Van Nigam
(c ) 12.5 cm (mean) dia
Per R.M.
Rates
(d) 15 cm (mean) dia
Per R.M.
(e) 20 cm (mean) dia
Per R.M.
8 (B) Eucalyptus Bellies
(a) 9 cm (mean) dia
Per R.M.
(b) 12 cm (mean) dia
Per R.M.
(c ) 15 cm (mean) dia
Per R.M.
As per Van Nigam
(d) 18 cm (mean) dia
Per R.M.
Rates
(e) 30 cm (mean) dia
Per R.M.
9
Cement port Land (43 Grade)
Per bag of 50 kg.
240.00
10
Cement (White)
Per bag of 50 kg.
618.00
1

J.E. (Tech.)
8th Circle PWD New Tehri

Item No.

Material

Unit

Rate (Rs.)

11

Coaltar

12

Caustic Soda

Per Kg.

36.00

13

Cinder

Deleted

14

Cotton Rope

Per Kg.

95.00

15

(a) Oil Distemper


(First quality of burger or equivalent)
(b) Dry Distemper

16

Glass ordinary
(a) 5.0 M.M. thick plain Best Quality cut to size
(b) 5.0 M.M. thick frosted including wastage
(c) 5.0 M.M. thick pin point
(d) 4.0 M.M. thick plain
(e) 4.0 M.M. thick frosted
(f) 4.0 M.M. thick pin point
(g) 3.0 M.M. thick plain
(h) 3.0 M.M. thick frosted
(i) 3.0 M.M. thick pin point

as per Rate of I.O.C., H.P., B.P. at Depo

in 5 Kg. Tin
in 1.5 Kg. Packet

as per price list of


standard
manufacturing Firms

Per Sqm
Per Sqm
Per Sqm
Per Sqm
Per Sqm
Per Sqm
Per Sqm
Per Sqm
Per Sqm

350.00
360.00
215.00
220.00
285.00
180.00
230.00
250.00
160.00

(j) Glass strips 5.0 M.M. thick (40 M.M. wide )


(k) Glass strips 3.0 M.M. thick (40 M.M. wide)
(l) Glass strips 5.0 M.M. thick (25 M.M. wide)
(m) Glass strips 3.0 M.M. thick (25 M.M. wide)
Lime white (Unslacked)
(i) For Building
(ii) For Road

Per R.M.
Per R.M.
Per R.M.
Per R.M.

7.00
4.50
4.50
4.00

Per Kg.
Per Kg.

6.00
4.50

19

(a) Lead red powder (Sindoor)


(b) Lead white (Safeda)
(c ) Red Lead

Per Kg.
Per Kg.
Per Lit.

55.00
45.00
57.00

20

(a1) M.S. Flats Angles. Tess


(a2)Channel and like wise
(b) M.S. Round upto 12 M.M. dia
(c ) M.S. Round above 12 M.M. dia
(d) R.S. Joist
(e) G.I. Barbed wire (hot dip)
(f) Galvanized iron plain sheet
(20 B.W.G. to 24 B.W.G.)
(g) Galvanized iron corrugated sheet
(24 B.W.G.)
(h) B.P sheet
(i) Ribbed/tor steel bars
(ii) upto 12 M.M. dia
(iii) above 12 M.M. dia
(j) Galvanized iron wire gauge(24x14)machine made
(k) Expended Metal
2.0 cm 16/17 gauge

Per Qtl
Per Qtl
Per Qtl
Per Qtl
Per Qtl
Per Qtl
Per Qtl

3600.00
4300.00
3600.00
3550.00
3575.00
5400.00
4300.00

Per Qtl

4400.00

Per Qtl

4000.00

Per Qtl
Per Qtl
Per Qtl
Per Sqm

3600.00
3550.00
4000.00
160.00

18

J.E. (Tech.)
8th Circle PWD New Tehri

Item No.

Unit

Rate (Rs.)

Marble Chips (3 M.M. Size)


(a) White
(b) Black
(c ) Other Colour

Per Qtl
Per Qtl
Per Qtl

185.00
225.00
225.00

22

Marble dust

Per Qtl

210.00

23

Masonite sheet 3 M.M. thick

Deleted

24
25

Nails (ordinary)
Nails (wire)

Per Kg.
Per Kg.

55.00
55.00

26

(a) Linseed (Double boiled) oil


(b) Turpentine oil

Per Lit
Per Lit

85.00
55.00

27

Synthetic enamel paint


(a) Superior Quality
(b) Paint (ordinary Quality)
(c ) Paint (anti corrosive bituminous)
(d) Paint (Black Japan)
(e) Paint (Red oxide primer) for steel
(f) Paint (for roofing)
(g) Paint (Aluminum)
(h) Paint (Primer) for wood
(i) Paint (Road marking) spirit base
(j) (i) Cement primer
(ii) Water proof cement paint
(Snowcem or equivalent)
(k) Varnish
(i) Synthetic
(ii) Copal
(iii) Ordinary

21

Material

Per Ltr.
Per Ltr.
Per Ltr.
Per Ltr.
Per Ltr.
Per Ltr.
Per Ltr.
Per Ltr.
Per Ltr.
Per Ltr.
(50 Kg. Drum)

As per actual
price list of
standard
Manufacturing Firm

Per Ltr.
Per Ltr.
Per Ltr.

28

Water proofing compound I.S.I Mark

Per Kg.

48.00

29

Polish (masnion of wax)

Per Kg.

225.00

30

P.V.C. pipe (Rain water) I.S.I Mark


(a) 8cm/9cm dia
(b) 10 cm/11cm dia
(c ) 15cm/16cm dia

31

32

33

Per R.M.
Per R.M.
Per R.M.

P.V.C. pipe (Plain, bend, shoe-head) I.S.I Mark


(a) 8cm/9cm dia
(b) 10 cm/11cm dia
(c ) 15cm/16cm dia

Each
Each
Each

P.V.C. pipe (bend, with access door) I.S.I Mark


(a) 8cm/9cm dia
(b) 10 cm/11cm dia
(c ) 15cm/16cm dia

Each
Each
Each

Cast iron pipe (Rain water) I.S.I Mark


(a) 5 cm dia (4.5 to 5 kg per RM)
(b) 10 cm dia (11 to 12 kg per RM)

J.E. (Tech.)
8th Circle PWD New Tehri

Per RM
Per RM

As per price list


of standard
Manufacturing Firms

Item No.
Material
34
Cast iron pipe (Rain water)
(a) Rose cowl 15 cm dia
(b) -do- but 10 cm dia
(c ) Head 5 cm dia
(d) -do- but 10 cm dia
(e) Shoe 5 cm dia
(f) -do- 10 cm dia
(g) Bend 5 cm dia
(h) -d- but 10 cm dia

Unit

Rate (Rs.)

Each
Each
Each
Each
Each
Each
Each
Each

As per price list


of standard
Manufacturing Firms

35

(a) Rope (Moonj)


(b) Rope (Hemp) (Manila)
(c ) Rope (cooten)
(d) Rope (G.I. Wire) 7 ply
(e) Rope (nylon)

Per Kg.
Per Kg.
Deleted
Deleted
Deleted

40.00
75.00
-

36

(a) Rivets (G.K.W)


(b) Rivets (I.S.I)

Per Kg.
Per Kg.

54.00
60.00

37

Sheet (celotex or equivalent)

Deleted

38

Coarse sand at nearest approved quarry

Per Cum

500.00

39

Fine sand (of fineness modulus 1.25)


at nearest approved quarry

Per Cum

400.00

40

Surkhi

Deleted

--

41

Stone
(a) Stone for building
(b) Stone for site development

Per Cum
Per Cum

300.00
250.00

42

Whiting

Deleted

--

43

(a) Washer (Limpet)


(b) Washer (Bitumen)

100No's
100No's

28.00
18.00

44

Wood preservative

Per Ltr.

As per price list of


standard
manufacturing
Firms

45

(a) Wood chaukhat section (C.P. Teek)


(b) -do- (Shisham)
(c ) -do- (Indian sal)
(d) -do- (Deodar)
(e) -do- (Country)
(f) -do- (Chirr)
(a) Wood planks (C.P. Teek)
(b) -do- (Shisham)
(c ) -do- (Indian sal)
(d) -do- (Deodar)
(e) -do- (Country)
(f) -do- (Chirr)
Fuel wood

Per Cum
Per Cum
Per Cum
Per Cum
Per Cum
Per Cum
Per Cum
Per Cum
Per Cum
Per Cum
Per Cum
Per Cum
Per Qtl

As per Van Nigam


Rates

Wire crate prepared with 8SWG wire of I.S.I specification


mesh size15x15 cm

Per Sqm

110.00

46

47
48

J.E. (Tech.)
8th Circle PWD New Tehri

As per Van Nigam


or Market Rates

300.00

CHAPTER - 2
LABOUR
0 la0
1

4
(a)
(b)

Ekn
vdq'ky Jfed&
csynkj] pkSdhnkj] okVjeSu] ekyh] etnwj] ySueSau] gSYij] Mkdjuj] lQkbZ uk;d iw.kZ
dkfyQ fHkf'r] VsyhQksu] ,sVsUMsV] gSejeeSau] iEi ,sVsUMsV
v)Z dq'ky Jfed%&
gkSy fMyj] jkWd dVj] OgkbV ok'kj] usikyh Jfed] [kku Jfed] ySc lgk;d] xst
jhMj] Dyhuj] odZ ,tsaV] esV] odZ lqijokbtj] feDlj vkijsVj] e'khu vkijsVj] iEi
vkijsVj] tujsVj dEizslj vkijsVj 10 KV rd dqd] Cyw fizaVj] QksVks LVsV e'khu
vkijsVj] foUp vkijsVj] twfu;j fQVj] LVksu dVj@Mslj] foVqfeu csynkj] dEizs'kj
vkijsVj] ,slhlsVsaV cksjjA
dq'ky Jfed%&
v feL=h] vehu
c eSlu] dkjisUVj] CySdfLEkFk] isUVj] IyEcj] Vslj] losZ;j] fjosVj] oSYMj] fQVj]
VuZj] bySfDVf'k;u] odZ lqijokbtj] Mkboj] dEIVwj vkijsVj] eksyMj] ekjdj]
eSdsfud] gS.MiEi cksjj] lk;jA
vU; yscj njsa%&
vkneh ,d [kPpj ds lkFk
vfrfjDr [kPpj gsrq

J.E. (Tech.)
8th Circle PWD New Tehri

Lohd`r nj
120.00

135.00

220.00
210.00

255.00
165.00

CHAPTER-3
CARTAGE OF MATERIALS
Note:1
Index for distance and height shall not be applicable to the cartage rates.
2
The rates include contractor's profit except item no 141
The cartage rates are, for both side journey i.e. return journey cartage shall not be added in these
3
rates.
Unit
Rate (Rs.)
Item
Description
141
Cartage of materials like ballast, sand, grit, stone, coal, wood
(a)
(excluding fuel wood) etc. Including loading unloading goods tax
(if any) but excluding stacking
1st Km.
Per cum/km.
77.00
2nd and 3rd Km.
Per cum/km.
12.00
4th and 5th Km.
Per cum/km.
11.00
6th to 10th Km.
Per cum/km.
10.00
11th to 20th Km.
Per cum/km.
7.80
21st to 30th Km.
Per cum/km.
7.00
31st to 50th Km.
Per cum/km.
6.60
Beyond 50 Km.
Per cum/km.
5.80
141
Cartage of materials like cement, steel, fuel wood, lime etc.
(b)
including loading, unloading and good tax (if any) but excluding
stacking.
1st Km.
Per MT/km.
57.00
2nd and 3rd Km.
Per MT /km.
11.00
4th and 5th Km.
Per MT/km.
8.00
6th to 10th Km.
Per MT/km.
7.00
11th to 20th Km.
Per MT/km.
6.00
21st to 30th Km.
Per MT /km.
5.40
31st to 50th Km.
Per MT /km.
4.60
Beyond 50 Km.
Per MT/km.
3.70
141 (c) Same as item No. 141 (b) but for Cartage of maxphalt.(packed)
1st Km.
Per MT/km.
59.00
2nd and 3rd Km.
Per MT /km.
12.00
4th and 5th Km.
Per MT/km.
9.00
6th to 10th Km.
Per MT/km.
7.70
11th to 20th Km.
Per MT/km.
6.00
21st to 30th Km.
Per MT /km.
5.80
31st to 50th Km.
Per MT /km.
5.00
Beyond 50 Km.
Per MT/km.
4.10
As per tanker rate of I.O.C.L
141(d) For cartage of Bulk Bitumen

Condition for items 141 (a), 141 (b) and 141 (c)
1

2
3

The above rates are for pucca roads, for katcha roads 33% extra up to 5 km. and 20% extra beyond 5
km. is allowed. Roads up to soling stage to be treated as katcha road, inter coat and above to be taken
as pucca roads.
For cartage of 1000 Nos. of bricks multiply the rate of item no, 141 (a) by 2.40 times.
For cartage of Bridge Part (Unwieldy loads) 15% extra will be allowed on item 141(b)

142 (a) Cartage of stone boulder, ballast. Coal, sand and similar materials by head load including loading and
unloading but excluding stacking.
(i) up to 3 chains (90 m )
per cum/chain
15.00
(ii) Beyond 3 chain up to 10 chains (90 m to 300 M)
per cum/chain
11.50
143(a)
As in item No. 142 (a) above but for cement, steel, timber, wood and other such materials.
(i) up to 3 chains (90 m )
per qtl/chain
1.40
(ii) Beyond 3 chain up to 10 chains (90 m to 300 M)
per qtl/chain
1.10

Note:- Item No142-143 shallnot be given to stock material.

J.E. (Tech.)
8th Circle PWD New Tehri

Item
Description
Unit
144 As in item no. 142 (a) and 143 (a) above but when mules are
used in cartage.
(i) Up to 0.5 Km.
Per qtl./0.5km.
(ii) Beyond 0.5 km.
Per qtl./0.5 km.

Rate (Rs.)

Unit
Item
Description
145 As in item no 142(a) and 143 above but for unwieldy loads
requiring cartage by more than two laborers simul tancously.
(a) For regular bridle roads.
Per qtl./0.5km.
(b) For foot tracks.
Per qtl./0.5km.

Rate (Rs.)

146

147

148

(a) Loading of materials like ballast, coal, grit etc. but excluding
stacking.
(b) Same as item 146 (a) above but like cement, maxphalt, steel,
lime etc.
(c) Loading of bricks into truck.
(d) Loading of unwieldy materials.
(e) Loading of hume pipe of NP-2
(i) Up to 30 cm. dia.
ii) Above 30 cm. but upto 90 cm. dia,
iii) Beyond 90 cm. dia.
(f) Loading of maxphalt drums.
(a) Unloading of materials like ballast, coal, grit, sand,
etc.
excluding stacking.
(b)Unloading of materials like cement, steel, maxphalt, lime etc.
but excluding stacking.
(c) Unloading of bricks including stacking
(d) Unloding of unwieldy materials.
(e) Unloading of hume pipe.
(i) Up to 30 cm. dia.
ii) Above 30 cm. but upto 90 cm. dia,
iii) Beyond 90 cm. dia.
(f) i) Unloading of cement, steel, and other items from Railway
wagon and stacking on the plate from
ii) Same as above but for Maxphalt.
(a) Stacking of stone ballast, grit, and stone boulders etc.
(b) Same as item 148 (a) but for cement, coal and maxphalt, lime
etc.
(c) Stacking of maxphalt drums including shifting up to 30 mtr.
(d) Stacking of bricks.

J.E. (Tech.)
8th Circle PWD New Tehri

10.00
5.00

33.00
44.00

Per Cum

14.00

Per M.T.
Per%0
Per M.T.

13.00
30.00
30.00

Each
Each
Each
Per M.T.

9.80
18.70
23.00
45.00

Per cum

11.30

Per M.T.
Per%0
Per M.T.

10.00
20.00
25.00

Each
Each

15.00
20.00
40.00

Per M.T.
Per M.T.

28.00
25.30

Per cum
Per M.T.

13.00
13.00

Per M.T.
Per %0

16.00
15.00

CHAPTER - 4
EARTH WORK
Item No.
Material
151
Earthwork in cutting or in embankment in ordinary soil
excavation to be in the form of regular pits not exceeding
1/2 meter (20") in depth and earth work in embankment
to be in 20 cm (8") layers including ramming dressing the
surface to required level and slopes and also including
1.5 meter (5") lifts and 30 meter (100 ft.) lead, the earth
from cutting to be used in making embankment or to be
deposited as soil bank with in 30 mtrs (100 ft) distance
as directed by the Engineer in Charge.

152

153

154

155

156

157

158

159

160

161

Unit

Rate (Rs.)

Per % cum

3600.00

Per % cum

3600.00

Per % cum

3000.00

As in item (152) above but excavation in soft rock and


soft shale

Per % cum

3800.00

As in item (152) above but excavation in medium rock


and medium shale

Per % cum

4500.00

As in item (152) above but excavation in hard rock and


hard shale

Per % cum

7000.00

As in item (152) above but excavation in very hard rock


and very hard shale and blasting boulders

Per % cum

12000.00

As in item (152) above but excavation in soil with earth


mixed with boulders.

Per % cum

4000.00

As in item (152) above but excavation in homogeneous


rock

Per % cum

Deleted

As in item (152) above but excavation in soil in


conglomerate.

Per % cum

Deleted

As in item 151 to 157 above for every additional lead of


30 meters or part there of or for every addional lift of 1.5
meters of part there of.

Per % cum

600.00

Filling earth and stone in plinth including watering


dressing ramming and carriage from a distance not
exceeding 60 meters from the site of work

Per cum

33.00

Or
Hill side cutting in ordinary soil including removal and
disposal of surplus excavated material and debris upto a
distance of 30mtr from road side as directed by E.I.C
make the Roadway as per plan and L section and as per
P.W.D specification and also including cost of all
labour,T&P and machinery etc required for proper
completion of the work.
As in item (151) above but excavation in soil mixed with
moorum shingle etc. required the use of special T&P
such as pickaxes, sabbals etc.

162

deleted

163

Stone filling in wire crates (stone size not less than 20


cm.)

Per cum

250.00

Hand packed stone filling (As directed by Engineer-inCharge.)including cost of material,royalty,T&P etc
complete.

Per cum

125.00

164

J.E. (Tech.)
8th Circle PWD New Tehri

Item No.
Material
165
Excavation in foundation in all types of soil including lift
upto 1.5 meter and lead upto 30 meters and including
filling watering and ramming of excavated earth into the
trenches or into the space between the building and the
sides of foundation trenches or into the plinth and
removal and disposal of surplus earth as directed by the
Engineer-in-charge upto a distance of 30 meters form
the foundation trenches.
(a) For building and bridge work
(b) For road work
165. (a) Same as in item No. 165 but excavation in soil mixed
with gravel and boulders.

Unit

Rate (Rs.)

Per cum
Per cum

50.00
40.00

Per cum

60.00

Per cum
Per cum

55.00
50.00

(C) To achieve 97% Proctor density


For removal of defect in hill side cutting 50% extra may

Per cum

45.00

be given on above rates

Per cum

50% extra

New item.
1

As in item No 151 but with Mechanical compaction of


earth including arrangement of water,roller charges also
including cost of all labour ,T&P etc required for proper
completion of the work.(for improvement works only)
(A) To achieve 97% Proctor density
(B) To achieve 97% Proctor density

Condition:
Item No 152 to 160 will be allowed only after 100% personal verification & classification & quantities
checked by Asistant Engineer,and 5% personal verification by the Executive Engineer and also after
recording a certificate to this effect.

J.E. (Tech.)
8th Circle PWD New Tehri

CHAPTER - 5
ROAD WORK
Item No.
491

492
493
494

494(B)
494
495
495(B)
496

496(B)
497

498(A)

498(B)

499

500

500(B)
501

501(B)

The Rates include Contractor's Profit@10%


Material

Unit

Rate (Rs.)

Per % cum

2500.00

Per % cum

3000.00

Per % cum

4500.00

Per Cum
Per Cum
Per Cum

77.00
145.00
60.00

Per Cum
Per Cum

80.00
155.00

Per Cum
Per Cum

74.00
140.00

Per K.M.

700.00

Per R.M.

22.00

Per Sqm

675.00

Per Cum

18.00

Per Sqm
Per Sqm

10.00
13.50

Per Sqm
Per Sqm

5.50
9.00

Slip clearance of loose earth and other small loose material


including disposal as directed by Engineer-in-Charge

As item 491 above but of earth and boulders


As item 491 above but of boulders only including blasting
required
Consolidation of stone ballast of 11 cm (41/2") thickness by
road roller including opening out stacks, sorting stone ballast,
repairing patches, in existing road surface with stone ballast
picking up old surface, spreading stone ballast, making
medhi to retain water and ramming and also including
carriage of metal upto 30 mr. (100 ft.) carriage of water and
its supply. Supply and maintenance of barriers, caution
boards/posts lights at night and flages in day, and including
all T&P required for proper completion of work. Labour rate
only (Stone ballast to be supplied free of cost)
Same as above item No 494 but including roller charges.
Same as above item No 494 but in RBM
As in item No. 494 above but of 7.5 cm (3") thickness (stone
ballast to supplied free of cost) labour rate only
Same as above item No 495 but including roller charges.
As in item No. 494 above but with 40-90 mm gauge stone
ballast upto 15 cm (6") thickness (Stone ballast to be
supplied free of cost) labour rate only.
Same as above item No 496 but including roller charges.
Dagbelling 15 cm (6") deep in one line aligned with flags and
Jhandies as directed by Engineer-in-charge.
Painting white traffic lines 8 cm (3") wide in three coat with
approved white paint as directed by the Engineer-in-charge
including all materials, labour and T&P etc. required for
proper completion of work.
Painting white traffic lines in three coast with approved white
paint as directed by the Engineer-in-charge including all
materials, labour and T&P etc. required for proper completion
of work.
Stacking of road metal to the required template after
Screening at road side including dressing of the side berms
as required where metal is to be stacked and including a lead
upto 60 m (200 ft)
Bitumen painting over W.B.M. surface (1st cost) excluding
supply of bitumen, grit and fuel wood ,maintenance of side
patries and watering them during operation for proper
completion of the work as directed by the Engineer-in-charge
also excluding roller charges and its fuel but including the
wages of fireman and tar boiler man-Labour rate only
Same as above item No 500 but including roller charges.
As in item 500 above but subsequent coat of painting over
previously painted surface (second coat/renewal coat) Labour rate only
Same as above item No 501 but including roller charges.

J.E. (Tech.)
8th Circle PWD New Tehri

Item No.
503
Deleted
504

Material

Unit

Rate (Rs.)

Per Sqm

11.00

505

Scrapping old painted surface including disposal of all


scrapped material up to a distance of 30 M (100 ft.) as
directed by the Engineer-in-Charge
Deleted

506

Deleted

507

Blinding of W.B.M. surface with local earth having plasticity


index less then 6 by spreading evenly to an average depth of
15 mm and filling all interstices of the road metal (labour rate
only)

Per K.M.

1550.00

Joint filling in C.C. surface lengths (after raking out the joint
and removing the old tar or other materials) with suitable
materials as directed by the Engineer-In-Charge (labour rate
only)

Per K.M.

500.00

Consolidation of stone ballast in patch repair by hand


rammer including opening out stacks, picking out old surface
upto 8 cm in rectangular form making 5 cm wide drain
around the patch upto depth or 12 cm carriage of stone
ballast and water, staking the unserviceable materials,
basichot next day and blinding the same as directed by the
Engineer-In-Charge (but excluding supply of stone ballast
labour rate only.)

Per Cum

250.00

Per Cum

1000.00

Per Cum

850.00

Per Sqm

13.00
17.00
1035.00

508

509

510

510(A)
511

511(A)
512
513

513(A)
514
514(A)

Path repair of painted surface with tar or bitumen including


heating of the paint upto the required temperature, pouring it
on the surface, spreading of necessary quantity of grit and
ramming hard the same with hand roller or rammer and also
including cleaning with brushes etc. The existing surface,
after scarifying in to the W.B.M. and in rectangular shape and
spreading the distmantled material on the patries as directed
by the Engineer-In-Charge (labour rate only)
Same as above but with Bitumen Emulsion
Cleaning of the existing painted surface and laying premix
carpet 2 cm thick over a tack coat with graded approved grit
and bitumen including heating the paint to the required
temperature and mixing either in mixaul or in hand drums
including cartage of materials maintenance of side patries
and watering them during operation for proper completion of
the work as directed by the Engineer-In-Charge (labour rate
only)
Same as above but also including cost of roller charges.
As in item 511 above in patches.
Cleaning the premix surface and laying seal coat with
approved 6 mm graded grit and bitumen including heating
the paint to the required temperature including cartage of
materials and maintenance of side patries and and watering
them during operation, all labour and T&P as directed by the
Engineer-In-Charge (Labour rate only)
Same as above but also including cost of roller charges.
As in item 511 above but on W.B.M. surface
Same as above but also including cost of roller charges.

J.E. (Tech.)
8th Circle PWD New Tehri

Per Cum

Per Sqm
Per Sqm

4.20
6.10
15.00
18.00

Item No.

Material

Unit

Rate (Rs.)

515

Randum rubble stone masonry in one white lime and two


local sand mortal in breast wall/retaining wall, parapet and
scuppers etc. including supply of materials, labour, T&P etc.
required for proper completion of the work including cost of
stone, royality and carriage upto 150 M

Per Sqm

Per Cum

325.00

Per Cum
Per Cum

220.00
320.00

Per Cum

220.00

Per Cum

300.00

Per Cum

220.00

Each

40.00

Per Cum

180.00

Per Cum

600.00

516
516(a)

517
517(a)

518

518(a)

519

520

As in item 515 above but in cement and local sand mortar


(Specified) excluding cost of cement and sand)
Same as above but when stone is not available near the
site(quarry rates and cost of cartage from quarry to site of
work will be paid extra)
As in item 515 above but in mud mortar
Same as above but when stone is not available near the
site(quarry rates and cost of cartage from quarry to site of
work will be paid extra)
Randum rubble stone masonry laid dry in breast, walls,
retaining walls, parapets, scuppers etc. Including supply of
material, labour, T&P and Royalty etc. required for proper
completion of the work
(This including lead of stone upto to 100 M i.e. 3 chains. In
case of stone is carted from a distance more, than 100 M the
Executive Engineer, after satisfying himself that stone is not
available from a distance lesser than 100 M and that the
proposed extra lead is correct, can provide for extra lead in
proposal/estimates as under, (but the tenders will always be
invited including all leads.)
Same as above but when stone is not available near the
site(quarry rates and cost of cartage from quarry to site of
work will be paid extra)
Placing of wire crate at site and fixing into rigid position to the
required size
Coolie walling including stone, all materials, labour, T&P etc.
complete.

521

Deleted

522

Cement Plum Masonry with 60% cement concrete in


proportion 1:3:7 consisting of one part cement, three part
approved coarse sand and 7 part approved stone ballast
including labour and T&P etc. required for proper completion
of work. ( Labour rates only)

523

Deleted

524
525

Per Cum

125.00

Per Cum

deleted

526

Precoating of grit (labour rate only)


R.R. stone masonry laid dry as in item No. 518 and
strengthening with square Sal timber or salwood ballies 10
cm dia/section minimum on miter c-/-c including cost of timber/ballies & nails and hot coaltaring and also including all
T&P etc. materials and labour required for proper completion
of the work.
Fixing 90 cm and above dia Hume pipe

Per R.M.

300.00

527

Fixing 60 cm to 90 cm dia Hume pipe

Per R.M.

250.00

Unit

Rate (Rs.)

Item No.

J.E. (Tech.)
8th Circle PWD New Tehri

Material

530

531

(b) Same as above but without catch pit


(c ) Construction of catch pit as per standard drawing if catch
pit against 530 (a) in not constructed deduction will be made
for catch pit)
LABOUR RATES FOR DEPARTMENTAL LABOUR
(A) Cleaning of scupper and Catch pit including disposal of
surplus material within road boundary including dressing &
levelling and ramming for same as directed by Engineer I/C.
(b) As above but half chocked

532

533

534
535

536

As
per
actual
measurements and
quantities

(a) Construction of 1 Meter wide scupper on hill roads as per


standard drawing No. 224/84 date 9.3.84 approved by Chief
Engineer (Hills) Pauri including construction of catch pit.

Same as item 531 above but cleaning of road side drain


including minor slips and making continuous where required
to drain of water
Dressing of Katcha road including failling of ruts Khud and
cutting where required to proper shape including disposal of
surplus earth as directed by Engineer I/C
(a) Motor Roads
(b) L.V. Roads
(c ) Bridle Road
White washing of road (side edge stone, drums, hill side) etc.
Lime consumption not to exceed 60 kg per Km.
Dressing of patries including dressing surface, filling upto 8
cm. and making namunas on either side of road true to patri
template with side slops as directed by Engineer-In-Charge
for proper completion of the work.
(a) Hill Roads
(b) Plain Roads

Per R.M.
Per R.M.

Each

Each
Each

1200.00
750.00

Per Km.

5500.00

Per Km
Per Km
Per Km

4800.00
3500.00
2000.00

Per Km

400.00

Per Km
Per Km

3000
Deleted

Preliminary and detail survey.


Part-A

Preliminary survey for alignment(ghat tracing, clearance of


jungle etc.) and prepair alignment report in three copies.

Per Km

3000.00

White washing on Alignment line and level line after


preliminary survey.

Per Km

1000.00

3
4
5
6

Construction of 0.60 meter wide trace cut.

Per Km

14000.00

Detail survey work.( For new construction or improvement)


Construction of Job, Level and back cutting pillars.
Cost of paint, rope, pegs and marking back cutting line with
lime.

Per Km
Per Km

6000.00
13000.00

Per Km

1000.00

Total

38000.00

Part-B

Prepair drawing docket in five copies. ( ploting and tracing of


Plan, L- Section and X-Scction)

Per Km

5000.00

2
3

Prepair detail estimate in five copies.

Per Km

2000.00

Prepair Land acquisition & forest proposal in five copies as


per check list and fact sheet of forest department.

Per Km

5000.00

Total

12000.00

Per Km

2000.00

Part-C(For B.M ,S.D.B.C works only)


1

Taking & Recording level after and before construction of


Bituminous surface as per MOSRTH (One time only)

J.E. (Tech.)
8th Circle PWD New Tehri

Bridge
New item Bridge 01:-Supply & fabrication of steel truss(girder)
Bridge/Suspension Bridge as per detailed drawing. Supply of all structural steel
confirming to I.S.226-1969 required for proper completion of bridge including ground
erection of the bridge and including one coat of approved quality anticorrosive red
oxide paint conforming I.S.5660 as per specification & drawing.including all T&P etc.
nuts and bolts,Washers and also including supply and fixing of shop rivets reffered as
per drawing. The rates shall include ground erection in the workshop and its
dismantling after inspection,approval and removing of defects,match marking of all
parts,numbering and proper stacking in the premises of workshop before cartage to
site of work.The work shall be executed in accordance with I.S. 1915-1961 and its
latest revision shall be applicable. The rates shall include cost of all material,its
wastage,cutting,bending if required,welding,making holes,shop riveting ,labor T&P etc.
and also including proper stacking after dismantling of ground erection. All required
equipment should be arranged by the contractor at his own cost, which shall be taken b
by the contractor after satisfactory execution of the job.Also including supply of all
material T&P etc .required for proper completion of work,as per direction of Engineerin-charge.
Sl.
SPAN
NET RATE
No.
COST OF STEEL
+ FABRICATION
(including Wastage)

(including ground erection


& all other works)

Steel Truss(girder)Bridge
Upto 30 m
Rs. 55500.00 Per M.T.
Above 30 m and upto
Rs. 57000.00 Per M.T.
60m
Rs. 58500.00 Per M.T.
Above 60m

Upto 60 m

Suspension Bridge
Rs. 55500.00 Per M.T.

Above 60m

1
2

Rs. 55500.00 Per M.T.

New itemBridge 02:-Erection of Steeltruss(girder)Bridge/Suspension Bridge as


per drawing with required camber including carriage of fabricated parts from the place
of stack near site including launching arrangements such as anchor blocks,tower,steel
wire ropes,winch machine etc. The design of erection sequences shall conform to I.S.
1915-1961 or latest revision. The erection sequence to be submitted by the contractor
to be approved by the Engineer-in-charge.The work shall be executed as per direction
of Engineer-in-charge.The rates shall include cost of all labor and T&P etc. and also
including cartage from site of stacking at Bridge site to the proper place in the bridge
required for proper completion of work,as per direction of Engineer-in-charge.All other
equipment required shall be arranged by the contractor at his own cost,which shall be
taken back by the contractor after satisfactory execution of the job.
J.E. (Tech.)
8th Circle PWD New Tehri

Sl.

SPAN

NET RATE (Rs.)


Steel Truss (girder)Bridge
1 Upto 30 m
Rs.10000.00 Per M.T.
2 Above 30m and upto
Rs. 11500.00 Per M.T.
60m
Above 60m
Rs. 13000.00 Per M.T.
Suspension Bridge
New item Bridge 03:-Supply & fixing of fields rivets of required length as per
drawing conforming to designation I.S. 42 RIS 1148-1973,including riveting with rivet
guns, its wastage and also including all equipment,material,labour,T&P etc. required
for proper completion of work as per direction of Engineer-in-charge.
A.
20 mm Dia.
Rs. 90.00 Per No.
B.
22 mm Dia.
Rs. 105.00 Per No.
Notes:- (Only for New item Bridge 01,Bridge 02,Bridge 03)
1- These rates are at nearest railhead and include Octroi,Royalty and all type of taxes.
2- All material shall conform to relevant I.S. Code/P.W.D. specification.
3- Required test shall be carried out for the material brought to site at
the cost of the contractor.
4- Rates are exclusive of contractors profit.10% contractors profit shall
be allowed.
5- Rates are inclusive of wastage.
6- Index for distance/altitude shall not be allowed on above rates.
7- Rates are inclusive of all type of safety measured and watch and ward
arrangements during construction.

J.E. (Tech.)
8th Circle PWD New Tehri