Name of Work: C/o UNESCO Building at Chankayapuri, New Delhi. (SH: Interior
furnishingandfurnitureofAuditorium.)
NIT No. Time: 1.
2.
3.
Part-A
4.
5.
6.
7.
8.
9.
10.
Part-B
11.
12.
38/EE/PVMD-2/2015-16(RECALL)
02 Months
13.
14.
15.
16.
17.
18.
19.
20.
21.
Index ........
Instructions for Executive Engineer...................................................................
Check list for contractors for submission of tenders online...............................
(Civil work)
CPWD-6 for e Tendering ......
Information and Instructions for bidders for e-Tendering.............
Press Note......................................................................................................
Item Rate Tender & Contract for Works CPWD-8........
Tender Acceptance
Integrity Agreement........
Proforma of Schedules (A to F)
......
( General conditions Civil Work)
General Conditions....................................................................................
Amendment in General Condition of Contract 2014 Regd Wages, EPFO,ESIC
BOCW
Special Conditions........
Quality Assurance, Quality Audit & Inspection .....
Specification and Sketch of Auditorium chair
Drawing of Auditorium seating layout plan
Particular Specifications .......
Guarantee Bond for Water Proofing work
Form of performance security...........................................................................
Form Of Earnest Money (Bank Guarantee)
Guarantee Bond for Defect Liability, specialized works, etc.....................................
22.
23.
24.
25.
26.
Page No.
01
02
03
04
05
09
10
11
12
13
14
15
16
20
21
27
28
29
32
33
37
38
41
43
46
56
60
63
66
69
71
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
40
42
44
45
55
59
61
62
65
Executive Engineer
PVMD-2, CPWD
Pushpa Bhawan, New Delhi
AE (P)/PVMD-2
EE/PVMD-2
67
68
70
77
2
INSTRUCTIONS FOR EXECUTIVE ENGINEER
Important Instructions for Executive Engineer for e-Tendering
1. All the Executive Engineers in Divisions, AE (P) in Divisions and Divisional Accountant shall
have to obtain digital signature from authorized certifying authorities viz. NIC, MTNL, e-Mudhra,
TCS, Safes crypt, GNFC etc.
2. All the documents such as NIT including Information and Instructions for contractors, all the
conditions of NIT, Schedule of Quantities, Drawings and other documents shall be uploaded at one
time.
3. Uploading of tender document on the ITI website is to be done by the Executive Engineer only.
Under no circumstances document is to be got uploaded through ITI. In case of any difficulty faced
by him he can seek clarification and take help from ITI.
It shall be the responsibility of Executive Engineer alone to upload the tender document.
4. In case of transfer of Executive Engineer, intimation to be sent to ITI immediately through e-mail.
The new incumbent if not in possession of digital signature, has to obtain the same from authorized
agency.
In case the new incumbent already has digital signature then S.No. of his digital signatures need to
be intimated to ITI for updating so as to enable him to open e-tenders.
If necessary, opening of bids could be postponed suitably.
5. Time limit for publicity of tenders shall be as per the provisions of Para17.5 of CPWD Works
Manual 2014 with amendment up to last date of submission of tender.
6. To draw agreement EE shall download the tender document as uploaded with duly filled schedule
of quantities. Contractor`s negotiation letter and other relevant letters written by the contractor such
as extending the validity of tenders etc. and Standard GCC-2014 with amendment up to last date of
submission of tender.
7. Hard copies of documents as submitted physically by the lowest bidder shall be compared with the
documents uploaded at the time of submission of bid. In case of any discrepancy noticed, the
tender shall become invalid.
8. Requisite blanks marked XXX in the NIT should be filled in by the Executive Engineer.
9. The Executive Engineer may retain either Clause-31 or Clause-31(A) regarding supplying water to
the contractor and should delete one of the Sub-Clauses before entering into agreement (Please
refer General Conditions at Page 30-33 Sl. No.-4).
10. The Executive Engineer may delete/ add any Special Condition/Particular Specification, which he
considers necessary as per requirement of site/ or work with prior approval of NIT approving
authority before uploading of tender documents on ITI website.
11. The Executive Engineer should sign each & every document for its authentication as laid down
OM No. DG/MAN/224-B.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
3
CHECK LIST FOR CONTRACTORS FOR SUBMISSION OF TENDERS ONLINE:
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
PART- A
(CIVIL WORK)
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
5
CPWD-6 FOR e-TENDERING
1.
Item rate bids are invited on behalf of President of India from approved list and eligible
contractors of CPWD in furniture appropriate class category only for the work C/o
3.
4.
The work is estimated to Rs. 51,79,461/-. This estimate, however, is given merely
as a rough guide.
Agreement shall be drawn with the successful bidders on prescribed Form No. CPWD 8
which is available as a Govt. of India Publication and also available on website
www.cpwd.gov.in. Bidders shall quote his rates as per various terms and conditions of
the said form which will form part of the agreement.
The time allowed for carrying out the work will be 02 (Two) months from the date of start
as defined in schedule 'F' or from the first date of handing over of the site, whichever is
later, in accordance with the phasing, if any, indicated in the bid documents.
(i) The site for the work is available.
(ii)The architectural and structural drawings shall be made available in phased manner,
as per requirement of the same as per approved program of completion submitted by
the contractor after award of work.
5.
6.
After submission of the bid the contractor can re-submit revised bid any number of
times but before last time and date of submission of bid as notified.
While submitting the revised bid, contractor can revise the rate of one or more item(s) any
number of times (he need not re-enter rate of all the items) but before last time and date of
submission of bid as notified.
When bids are invited in three stage system and if it is desired to submit revised financial
bid then it shall be mandatory to submit revised financial bid. If not submitted then the
bid submitted earlier shall become invalid.
Earnest Money in the form of Treasury Challan or Demand Draft or Pay order or
Bankers Cheque or Deposit at Call Receipt or Fixed Deposit Receipt (drawn in favour
of Executive Engineer, PVMD-2, Pushpa Bhawan, New Delhi - 110062 ) shall be scanned
and uploaded to the e-Tendering website within the period of bid submission. All
intending tenderer/ bidders who have uploaded/ submitted their bids have to submit
their original hard copy of EMDs which is verified from the issuing bank upto 3:00
p.m. on last date of tender otherwise their tenders cannot be opened and to be treated
as invalid tender. (Modified vide OM DG/MAN/303 dt. 28.03.2014). A part of earnest
money is acceptable in the form of bank guarantee also. In such case, minimum 50% of
earnest money or Rs. 20 lac, whichever is less, shall have to be deposited in shape prescribed
above, and balance may be deposited in shape of Bank Guarantee of any scheduled bank
having validity for six months or more from the last date of receipt of bids which is to
be scanned and uploaded by the intending bidders. (Modified vide OM DG/MAN/307
dt. 27.05.2014)
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
6
Interested contractor who wish to participate in the bid has also to make following
payments within the period of bid submission: (Modified vide OM DG/MAN/312 dt.
4.7.2014).
E-tender processing fee - Rs. 2,962/- if registration with tender processing fee is
continued, shall be payable to M/s ITI Limited through their e-gateway by credit /debit
card, internet banking or RGTS/NEFT facility .
The contractors already registered on the e-tendering portal will have option to continue
by paying tender processing fee upto one year from the date of registration or to switch
over to (New) registration without tender processing fee any time. All new registration
from 01.04.2015 will be without tender processing fee.
(Ref: office memo No DG/e-Gov/26 dt. 02.06.2015)
10.
Copy of Enlistment Order and certificate of work experience and other documents as
specified in the press notice shall be scanned and uploaded to the e-Tendering website
within the period of bid submission. However, certified copy of all the scanned and
uploaded documents as specified in press notice.
Online bid documents submitted by intending bidders shall be opened only of those
bidders, who has deposited e-Tender Processing Fee with M/s ITI Limited and Earnest
Money Deposit and other documents scanned and uploaded are found in order.
The bid submitted shall be opened at 03:30 PM on 31/12/2015
The bid submitted shall become invalid and e-tender processing fee shall not be
refunded if:
(i) The bidder is found ineligible.
(ii) The bidder does not upload all the documents (including service tax registration/ VAT
registration/ Sales Tax registration) as stipulated in the bid document including
scanned copy of EMD uploaded.
(iii) If any discrepancy is noticed between the documents as uploaded at the time of
submission of bid and hard copies as submitted physically by the Lowest Bidder in
the office of bid opening authority.
(iv) The tenderer/bidder does not deposit original hard copy of EMD upto 3:00 pm in
Division office, otherwise their tender can not be opened and to be treated as
invalid tender.
11.
12.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
7
(SH: C/o UNESCO Building at Chankayapuri, New Delhi. (SH: Interior
furnishingandfurnitureofAuditorium.)
Intending Bidders are advised to inspect and examine the site and its
surroundings and satisfy themselves before submitting their bids as to the nature of the
ground and sub-soil (so far as is practicable), the form and nature of the site, the means
of access to the site, the accommodation they may require and in general shall
themselves obtain all necessary information as to risks, contingencies and other
circumstances which may influence or affect their bid. A bidders shall be deemed to
have full knowledge of the site whether he inspects it or not and no extra charge
consequent on any misunderstanding or otherwise shall be allowed. The bidders shall be
responsible for arranging and maintaining at his own cost all materials, tools & plants,
water, electricity access, facilities for workers and all other services required for
executing the work unless otherwise specifically provided for in the contract
documents. Submission of a bid by a bidders implies that he has read this notice and all
other contract documents and has made himself aware of the scope and specifications of
the work to be done and of conditions and rates at which stores, tools and plant, etc.
will be issued to him by the Government and local conditions and other factors having a
bearing on the execution of the work.
13.
14.
The competent authority on behalf of the President of India does not bind itself to accept
the lowest or any other bid and reserves to itself the authority to reject any or all the bids
received without the assignment of any reason. All bids in which any of the prescribed
condition is not fulfilled or any condition including that of conditional rebate is put forth
by the bidders shall be summarily rejected.
Canvassing whether directly or indirectly, in connection with bidders is strictly
prohibited and the bids submitted by the contractors who resort to canvassing will be
liable for rejection.
15.
The competent authority on behalf of President of India reserves to himself the right of
accepting the whole or any part of the bid and the bidders shall be bound to perform the
same at the rate quoted.
16.
The contractor shall not be permitted to bid for works in the CPWD Circle (Division in
case of contractors of Horticulture/Nursery category) responsible for award and
execution of contracts, in which his near relative is posted as Divisional Accountant or
as an officer in any capacity between the grades of Superintending Engineer and Junior
Engineer (both inclusive). He shall also intimate the names of persons who are working
with him in any capacity or are subsequently employed by him and who are near
relatives to any gazetted officer in the Central Public Works Department or in the
Ministry of Urban Development. Any breach of this condition by the contractor would
render him liable to be removed from the approved list of contractors of this
Department.
17.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
8
Government of India as aforesaid before submission of the bid or engagement in the
contractor's service.
18.
The bid for the works shall remain open for acceptance for a period of Thirty (30) days
from the date of opening of bids. If any bidders withdraws his bid before the said
period or issue of letter of acceptance, whichever is earlier, or makes any modifications in
the terms and conditions of the bid which are not acceptable to the department, then the
Government shall, without prejudice to any other right or remedy, be at liberty to forfeit
50% of the said earnest money as aforesaid. Further the bidders shall not be allowed to
participate in the rebidding process of the work. (Modified vide OM DG/CON/279 dt.
09.05.2014).
19.
This notice inviting Bid shall form a part of the contract document. The successful
bidders/contractor, on acceptance of his bid by the Accepting Authority shall within 15
days from the stipulated date of start of the work, sign the contract consisting of:(a)
The Notice Inviting Bid, all the documents including additional conditions,
specifications and drawings, if any, forming part of the bid as uploaded at the time of
invitation of bid and the rates quoted online at the time of submission of bid and
acceptance thereof together with any correspondence leading thereto.
(b)
20 The contractor will give detailed execution program of the work which will form part of
his agreement with the department. He will indicate in the program, the time/stage of
the work when the agencies of minor components of works will be deployed by him.
21
Also EE in charge shall be competent authority to give fair and reasonable extension of
time under provision of clause 5 and SE shall be competent authority to reschedule
milestones as stipulated under clause 5.
25 Same milestones shall be applicable for all components of work. The agencies will ensure
that their components of the work are executed in time without giving any chance for
slippage of milestones of the project. The amount to be withheld under Clause 5 of the
contract will be decided by the EE. In the event of not achieving the necessary milestones
as assessed from milestone bar chart, specified percentage of the tendered value of work
will be withheld for failure of each milestone.
26 Arbitration case shall be handled by the EE
27 Security Deposit will be worked out separately for each component corresponding to the
estimated cost of the respective component of works as per provision in schedule A to F.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
28 Superintending Engineer will examine the case of extension of time, after obtaining
comments the Executive Engineer.
29 The bidder shall be responsible for coordinating the activities of all works and essential
progress of works as per mile stone and laid down programs.
30 The bidder shall render all help to the department and associate themselves for
obtaining, necessary clearances/No Objection Certificates (NOCs) for the work done
from the appropriate statutory bodies. The departmental engineers shall sign necessary
application wherever required and fee, if any, to the statutory bodies shall be made by
the department. The contractor shall attend inspection of the statutory body, if any, and
shall comply all the requirement and changes, if any, sought for by such body for
clearance and acceptance of the equipments/services.
31 The bidder shall ensure that the maintenance during the guarantee period are to be
carried out by the appropriate specialized agency who has executed/carried-out and
completed the original work or by the manufacturers authorized service agencies, as the
case may be.
32 The intending bidder has to fill all the details Demand Draft/Pay Order/Bankers
Cheque (Bankers name, amount, number and date) against tender processing fee.
(As applicable as per Memo No DG/e-Gov/26 dt. 02.06.2015
33 List of Documents to be scanned and uploaded within the period of bid submission:
i)
ii)
Executive Engineer
PVMD- 2,CPWD
Pushpa Bhawan, New Delhi.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
10
INFORMATION AND INSTRUCTIONS FOR BIDDERS FOR e-TENDERING FORMING
PART OF BID DOCUMENT AND TO BE POSTED ON WEBSITE
(Applicable for inviting open bids)
The Executive Engineer, PVMD-2, CPWD, Pushpa Bhawan, New Delhi invites on behalf of
President of India online Item rate bids from approved list and eligible contractors of CPWD in
furniture appropriate class category only for the following work:Sl
Description
Remarks
No.
1 NIT no.
38/EE/PVMD-2/2015-16(RECALL)
2 Name of work and location
C/o UNESCO Building at Chankayapuri,
NewDelhi.(SH:Interiorfurnishingand
furnitureofAuditorium.)
3
4
5
6
7
3.30 PM ON 31/12/2015
The intending bidder must read the terms and conditions of CPWD-6 carefully. He should only
submit his bid if he considers himself eligible and he is in possession of all the documents required.
Information and Instructions for bidders posted on website shall form part of bid document. The bid
document consisting of plans, specifications, the schedule of quantities of various types of items to be
executed and the set of terms and conditions of the contract to be complied with and other necessary
documents can be seen and downloaded from www.tenderwizard.com/CPWD or www.cpwd.gov.in
or www.eprocure.gov.in free of cost. But the bid can only be submitted after uploading the mandatory
scanned documents.
XXXX To be filled by EE
Those bidder not registered on the website mentioned above, are required to get registered
beforehand. If needed they can be imparted training on online bidding process as per details available
on the website. The intending bidder must have valid class-III digital signature to submit the bid. On
opening date, the bidder can login and see the bid opening process. After opening of bids he will
receive the competitor bid sheets. Bidder can upload documents in the form of JPG format and PDF
format.SC/ST contractors enlisted under class V category are exempted from processing fee payable to
ITI. being composite tender, the bidder must associate with himself any one of the approved associate
agencies for each sub package for tendering for the respective component of the electrical works. This
is item rate tender. Bidder must ensure to quote rate for all individual items accordingly.
In case the bidder fails to quote any rate by mistake, the same shall be treated as zero.
Executive Engineer,
PVMD-2, CPWD,
Pushpa Bhawan, New Delhi
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
11
PRESS NOTE
SHORT NOTICE INVITING e-TENDERS
The Executive Engineer, PVMD-2, CPWD, Pushpa Bhawan, New Delhi- 110062 invites on
behalf of President of India online Item rate tenders from approved list and eligible
contractor of CPWD in furniture appropriate class category only for following work.
NIT No.: 38/EE/PVMD-2/2015-2016(RECALL)
Name of Work
InteriorfurnishingandfurnitureofAuditorium.)
the
website:
Executive Engineer
PVMD-2, CPWD
Pushpa Bhawan, New Delhi
XXXX to be filled by EE
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
12
CPWD 8
GOVERNMENT OF INDIA
CENTRAL PUBLIC WORKS DEPARTMENT
State
Branch
:
:
Delhi.
B & R.
Zone
NDZ-VII.
Circle
Division
:
:
C/o UNESCO Building at Chankayapuri, New Delhi. (SH: Interior furnishing and
furnitureofAuditorium.)
(i) To be submitted online: - 31/12/2015 Up to 3.00 PM
(ii) To be opened online: - 31/12/2015 at 3.30 PM
TENDER
I/We have read and examined the notice inviting tender, schedule, A, B, C, D, E & F, Specifications
applicable, Drawings & Designs, General Rules and Directions, Conditions of contract, clauses of
contract, Special conditions, Schedule of Rate & other documents and Rules referred to in the
conditions of contract and all other contents in the tender document for the work.
I/We hereby tender for the execution of the work specified for the President of India within the time
specified in Schedule F, viz., schedule of quantities and in accordance in all respects with the
specifications, designs, drawings and instructions in writing referred to in Rule-1 of General Rules and
Directions and in Clause 11 of the conditions of contract and with such materials as are provided for,
by, and in respects in accordance with, such conditions so far as applicable.
I/We agree to keep the tender open for forty (45) days from the due date of its opening and not to make
any modifications in its terms and conditions.
A sum of Rs. 1,03,589/- is hereby forwarded in cash/ Receipt Treasury Challan / Deposit at call
Receipt of a Scheduled Bank/fixed deposit receipt of scheduled bank/demand draft of a scheduled
bank/bank guarantee issued by a scheduled bank as Earnest Money. If I/We, fail to furnish the
prescribed performance guarantee within prescribed period, I /We agree that the said President of India
or his successor in office shall without prejudice to any other right or remedy, be at liberty to forfeit the
said earnest money absolutely. Further, if I/We fail to commence work as specified, I/We agree that
President of India or his successors in office shall without prejudice to any other right or remedy
available in law, be at liberty to forfeit the said earnest money and the performance guaranty absolutely
otherwise the said earnest money shall be retained by him towards security deposit to execute all the
works referred to in the tender documents upon the terms and conditions contained or referred to
therein and to carry out such deviations as may be ordered, up to maximum of the percentage
mentioned in Schedule F and those in excess of that limit at the rates to be determined in accordance
with the provision contained in Clause 12.2 and 12.3 of the tender form. Further, I/We agree that in
case of forfeiture of Earnest Money or both Earnest Money & Performance Guarantee as aforesaid,
I/We shall be debarred for participation in the re-tendering process of the work.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
13
I/We undertake and confirm that eligible similar work(s) has/have not been got executed through
another contractor on back to back basis. Further that, if such a violation comes to the notice of
Department, then I/We shall be debarred for tendering in CPWD in future forever. Also, if such
a violation comes to the notice of Department before date of start of work, the Engineer-inCharge shall be free to forfeit the entire amount of Earnest Money Deposit/Performance
Guarantee.
I/We hereby declare that I/we shall treat the tender documents, drawings and other records connected
with the work as secret/confidential documents and shall not communicate information/derived there
from to any person other than a person to whom I/we am/are authorized to communicate the same or
use the information in any manner prejudicial to the safety of the State.
Date:
Signature of Contractor
Postal address:
Witness:
Address:
Occupation :
xxxx To be filled in by EE
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
14
ACCEPTANCE
The above tender (as modified by you as provided in the letters mentioned hereunder) is accepted by
me for and on behalf of the President of India for a sum of Rs........
(Rupees... .)
The letters referred to below shall form part of this contract Agreement:(i)
(ii)
(iii)
Signature
Dated
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
Designation
AE (P)/PVMD-2
EE/PVMD-2
15
To,
Executive Engineer,
PVMD-2, CPWD,
Pushpa Bhawan, New Delhi.
Sub:- C/o UNESCO Building at Chankayapuri, New Delhi. (SH: Interior furnishing
andfurnitureofAuditorium.)
Dear Sir,
I/We acknowledge that CPWD is committed to follow the principles thereof as enumerated in
the Integrity Agreement enclosed with the tender/bid document.
I/We agree that the Notice Inviting Tender (NIT) is an invitation to offer made on the condition
that I/We will sign the enclosed integrity Agreement, which is an integral part of tender documents,
failing which I/We will stand disqualified from the tendering process. I/We acknowledge that THE
MAKING OF THE BID SHALL BE REGARDED AS AN UNCONDITIONAL AND ABSOLUTE
ACCEPTANCE of this condition of the NIT.
I/We confirm acceptance and compliance with the Integrity Agreement in letter and spirit and
further agree that execution of the said Integrity Agreement shall be separate and distinct from the main
contract, which will come into existence when tender/bid is finally accepted by CPWD. I/We
acknowledge and accept the duration of the Integrity Agreement, which shall be in the line with Article
1 of the enclosed Integrity Agreement.
I/We acknowledge that in the event of my/our failure to sign and accept the Integrity
Agreement, while submitting the tender/bid, CPWD shall have unqualified, absolute and unfettered
right to disqualify the tenderer/bidder and reject the tender/bid is accordance with terms and conditions
of the tender/bid.
Yours faithfully
To be signed by the bidder and same signatory competent / authorised to sign the
relevant contract on behalf of CPWD.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
16
INTEGRITY AGREEMENT
This Integrity Agreement is made at ............... on this ........... day of ........... 20......
BETWEEN
President
of
India
represented
...............................................................................,
through
Executive
Engineer,
(Name of Division)
CPWD, ....................................................................................................................., (Hereinafter referred
as the
(Address of Division)
Principal/Owner, which expression shall unless repugnant to the meaning or context hereof include
its successors and permitted assigns)
AND
......................................................................................................................................................................
.........
(Name and Address of the Individual/firm/Company)
through.................................................................................................................. (Hereinafter referred to
as the
(Details of duly authorized signatory)
Bidder/Contractor and which expression shall unless repugnant to the meaning or context hereof
include its successors and permitted assigns)
Preamble
WHEREAS the Principal / Owner has floated the Tender (NIT No. ................................) (hereinafter
referred to as Tender/Bid) and intends to award, under laid down organizational procedure, contract
for
......................................................................................................................................................................
..................................................................
(Name of work)
hereinafter referred to as the Contract.
AND WHEREAS the Principal/Owner values full compliance with all relevant laws of the land, rules,
regulations, economic use of resources and of fairness/transparency in its relation with its Bidder(s) and
Contractor(s).
AND WHEREAS to meet the purpose aforesaid both the parties have agreed to enter into this Integrity
Agreement (hereinafter referred to as Integrity Pact or Pact), the terms and conditions of which
shall also be read as integral part and parcel of the Tender/Bid documents and Contract between the
parties.
NOW, THEREFORE, in consideration of mutual covenants contained in this Pact, the parties hereby
agree as follows and this Pact witnesses as under:
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
17
The Bidder(s)/Contractor(s) of foreign origin shall disclose the names and addresses of
agents/representatives in India, if any. Similarly Bidder(s)/Contractor(s) of Indian Nationality shall
disclose names and addresses of foreign agents/representatives, if any. Either the Indian agent on
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
18
behalf of the foreign principal or the foreign principal directly could bid in a tender but not both.
Further, in cases where an agent participate in a tender on behalf of one manufacturer, he shall not be
allowed to quote on behalf of another manufacturer along with the first manufacturer in a
subsequent/Parallel tender for the same item.
The Bidder(s)/Contractor(s) will, when presenting his bid, disclose (with each tender as per proforma
enclosed) any and all payments he has made, is committed to or intends to make to agents, brokers or
any other intermediaries in connection with the award of the Contract.
The Bidder(s)/Contractor(s) will not instigate third persons to commit offences outlined above or be an
accessory to such offences.
The Bidder(s)/Contractor(s) will not, directly or through any other person or firm indulge in fraudulent
practice means a willful misrepresentation or omission of facts or submission of fake/forged
documents in order to induce public official to act in reliance thereof, with the purpose of
obtaining unjust advantage by or causing damage to justified interest of others and/or to
influence the procurement process to the detriment of the Government interests.
The Bidder(s)/Contractor(s) will not, directly or through any other person or firm use Coercive
Practices (means the act of obtaining something, compelling an action or influencing a decision
through intimidation, threat or the use of force directly or indirectly, where potential or actual injury
may befall upon a person, his/ her reputation or property to influence their participation in the tendering
process).
Article 3: Consequences of Breach
Without prejudice to any rights that may be available to the Principal/Owner under law or the Contract
or its established policies and laid down procedures, the Principal/Owner shall have the following
rights in case of breach of this Integrity Pact by the Bidder(s)/Contractor(s) and the Bidder/ Contractor
accepts and undertakes to respect and uphold the Principal/Owners absolute right:
If the Bidder(s)/Contractor(s), either before award or during execution of Contract has committed a
transgression through a violation of Article 2 above or in any other form, such as to put his reliability
or credibility in question, the Principal/Owner after giving 14 days notice to the contractor shall have
powers to disqualify the Bidder(s)/Contractor(s) from the Tender process or terminate/determine the
Contract, if already executed or exclude the Bidder/Contractor from future contract award processes.
The imposition and duration of the exclusion will be determined by the severity of transgression and
determined by the Principal/Owner. Such exclusion may be forever or for a limited period as
decided by the Principal/Owner.
Forfeiture of EMD/Performance Guarantee/Security Deposit: If the Principal/Owner has
disqualified the Bidder(s) from the Tender process prior to the award of the Contract or
terminated/determined the Contract or has accrued the right to terminate/determine the Contract
according to Article 3(1), the Principal/Owner apart from exercising any legal rights that may have
accrued to the Principal/Owner, may in its considered opinion forfeit the entire amount of Earnest
Money Deposit, Performance Guarantee and Security Deposit of the Bidder/Contractor.
Criminal Liability: If the Principal/Owner obtains knowledge of conduct of a Bidder or Contractor, or
of an employee or a representative or an associate of a Bidder or Contractor which constitutes
corruption within the meaning of Indian Penal code (IPC)/Prevention of Corruption Act, or if the
Principal/Owner has substantive suspicion in this regard, the Principal/Owner will inform the same to
law enforcing agencies for further investigation.
Article 4: Previous Transgression
The Bidder declares that no previous transgressions occurred in the last 5 years with any other
Company in any country confirming to the anticorruption approach or with Central Government or
State Government or any other Central/State Public Sector Enterprises in India that could justify his
exclusion from the Tender process.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
19
If the Bidder makes incorrect statement on this subject, he can be disqualified from the Tender process
or action can be taken for banning of business dealings/ holiday listing of the Bidder/Contractor as
deemed fit by the Principal/ Owner.
If the Bidder/Contractor can prove that he has resorted / recouped the damage caused by him and has
installed a suitable corruption prevention system, the Principal/Owner may, at its own discretion,
revoke the exclusion prematurely.
Article 5: Equal Treatment of all Bidders/Contractors/Subcontractors
The Bidder(s)/Contractor(s) undertake(s) to demand from all subcontractors a commitment in
conformity with this Integrity Pact. The Bidder/Contractor shall be responsible for any violation(s) of
the principles laid down in this agreement/Pact by any of its Subcontractors/sub-vendors.
The Principal/Owner will enter into Pacts on identical terms as this one with all Bidders and
Contractors.
The Principal/Owner will disqualify Bidders, who do not submit, the duly signed Pact between the
Principal/Owner and the bidder, along with the Tender or violate its provisions at any stage of the
Tender process, from the Tender process.
Article 6- Duration of the Pact
This Pact begins when both the parties have legally signed it. It expires for the Contractor/Vendor 12
months after the completion of work under the contract or till the continuation of defect liability period,
whichever is more and for all other bidders, till the Contract has been awarded.
If any claim is made/lodged during the time, the same shall be binding and continue to be valid despite
the lapse of this Pacts as specified above, unless it is discharged/determined by the Competent
Authority, CPWD.
Article 7- Other Provisions
This Pact is subject to Indian Law, place of performance and jurisdiction is the Head quarters of the
Division of the Principal/Owner, who has floated the Tender.
Changes and supplements need to be made in writing. Side agreements have not been made.
If the Contractor is a partnership or a consortium, this Pact must be signed by all the partners or by one
or more partner holding power of attorney signed by all partners and consortium members. In case of a
Company, the Pact must be signed by a representative duly authorized by board resolution.
Should one or several provisions of this Pact turn out to be invalid; the remainder of this Pact remains
valid. In this case, the parties will strive to come to an agreement to their original intensions.
It is agreed term and condition that any dispute or difference arising between the parties with regard to
the terms of this Integrity Agreement / Pact, any action taken by the Owner/Principal in accordance
with this Integrity Agreement/ Pact or interpretation thereof shall not be subject to arbitration.
Article 8- LEGAL AND PRIOR RIGHTS
All rights and remedies of the parties hereto shall be in addition to all the other legal rights and
remedies belonging to such parties under the Contract and/or law and the same shall be deemed to be
cumulative and not alternative to such legal rights and remedies aforesaid. For the sake of brevity, both
the Parties agree that this Integrity Pact will have precedence over the Tender/Contact documents with
regard any of the provisions covered under this Integrity Pact.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
20
IN WITNESS WHEREOF the parties have signed and executed this Integrity Pact at the place and date
first above mentioned in the presence of following witnesses:
...............................................................
(For and on behalf of Principal/Owner)
.................................................................
(For and on behalf of Bidder/Contractor)
WITNESSES:
1.
..............................................
(signature, name and address)
2.
...............................................
(signature, name and address)
Place:
Dated
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
21
PROFORMA OF SCHEDULES
SCHEDULE A
Schedule of quantities
Page- 71-77
SCHEDULE B
Schedule of materials to be issued to the contractor.
Sl.
No.
Description of item
Quantity
Place of Issue
---------------------------------NIL---------------------------------SCHEDULE C
Tools and plants to be hired to the contractor
Sl.
Description
Hire charges per day
Place of issue
No.
---------------------------------NIL---------------------------------SCHEDULE D
Extra schedule for specific requirements/
documents for the work, if any.
As
mentioned
documents
in
tender
SCHEDULE E
Reference to General Conditions of contract
Rs. 51,79,461/-
Earnest Money
Performance Guarantee
Security Deposit
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
22
SCHEDULE F
General Rules & Directions:
Officer inviting tender
Executive Engineer,
PVMD-2, CPWD
Pushpa Bhawan, New Delhi.
See below
Definitions:
2 (v) Engineer-in-Charge
Executive Engineer,
PVMD-2, CPWD
Pushpa Bhawan, New Delhi
Or
His successor
2(x)
Percentage on cost of materials and
labour to cover all overheads and profits.
2(xi) Standard schedule of Rates :
Executive Engineer,
PVMD-2, CPWD
Pushpa Bhawan, New Delhi
2(xii) Department :
Clause 1
i)
ii)
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
15 days.
07 days.
AE (P)/PVMD-2
EE/PVMD-2
23
Clause 2
Authority for fixing compensation under
Clause-2
Superintending Engineer
DCC-XII, CPWD,
New Delhi or his successor
Note:- Levy of compensation under
clause-2 as well as fair and reasonable
extension of time will be granted by the
Superintending Engineer, DCC-XII,
CPWD, New Delhi or thereof on receipt
of required information in this regard
from Executive Engineer, PVMD-2,
CPWD, Pushpa, Bhawan, NewDelhi
Not applicable
Clause 5
Number of days from the date of issue of letter :
of acceptance for reckoning date of start
10 days
1
2
30 Days
60 Days
Authority to decide:
(i) Extension of time (Engineer in Charge or
Engineer in Charge of Major Component in case
of Composite Contracts, as the case may be)
(ii)
02 (Two) Months
Executive Engineer,
PVMD-2, CPWD
Pushpa Bhawan, New Delhi
or his successor
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
Superintending Engineer
DCC-XII, CPWD
New Delhi.
or his successor
AE (P)/PVMD-2
EE/PVMD-2
24
Clause 6
...
Clause 6A :
Clause 6A applicable
Clause 7 :
:
Gross work to be done together with net payment /
adjustment of advances for material collected, if
any, since the last such payment for being eligible
to interim payment:
Rs. 20 Lac
Clause 7A:
Whether Clause 7A shall be Applicable
Yes
Clause 10 A :
List of testing equipment to be provided by the :
contractor at site lab
Clause 10 B(ii)
:
Whether clause 10-B(ii) shall be applicable
Clause 10 C
Component of labour expressed as percent of
value of work for civil work
:
Clause 10 CA:
S.N.
....... 25% ..
Base Price
Materials
under clause
as notified
CPWD
of all
covered
10 CA*
by DG,
Cement (OPC)
Cement (PPC)
4240.00 Per MT
Reinforcement Bars
TMT-500
Primary
Manufacturer
Structural Steel
Material covered
under this clause
.....NA..
Clause 10 CC:
To be applicable in contracts with stipulated
Period of completion exceeding the period
Shown in next column...12 months schedule
Of component of Materials, Labours, POL
etc for price escalation. Component of Civil
(except material covered under):
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
Not Applicable
AE (P)/PVMD-2
EE/PVMD-2
25
Clause 10CA
Electrical construction materials expressed as
percent of total value of work
:
Component of Labour expressed as
percent of Total value of work
:
Component of P.O.L expressed as
percent of total value of work
:
Clause 11 :Specifications to be followed Civil
for execution of work
Xm
......... %
......... %
......... %
Original Work
12.2 &
12.3
Deviation limit beyond which
Clauses 12.2 & 12.3 shall apply
for Superstructure work
12.5
30%.
30%
100%
Clause 16:
Civil
Competent Authority for deciding reduced rates:
Superintending Engineer
DCC-XII, CPWD
New Delhi
Or his successor
Up to 5% of the contract value and full
power with CE/NDZ-VII, CPWD,
New Delhi
Clause 18:
List of mandatory machinery tools & plants
to be Deployed by the contractor at site for
civil work :
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
26
SE DCC-XII, CPWD Shall present case before DRC but shall not have any part in decision
making.
(b) For total claims up to Rs. 25 lacs
Chairman
Member
Member
-
EE, PVMD-I, CPWD Shall present case before DRC but shall not have any part in decision making.
Clause 36 (i)
Sl.
No
.
1.
Minimum Qualification
of Technical
Representative
Graduate Engineer
Diploma Engineer
Discipline
Civil
Civil
Designation
(Principal
Technical/
Technical
representativ
e)
Project/Site
Engineer and
Project
Planning/Billi
ng Engineer
OR
Project/Site
Engineer and
Project
Planning/Billin
g Engineer
Mi
ni
mu
m
ex
pe
rie
nc
e
2
years
Rupees Fifteen
thousand only
(Per month)
5
years
Rupees Fifteen
thousand only
(Per month)
Executive Engineers retired from Govt. Services that are holding Diploma will be treated at par with
Graduate Engineers.
Diploma holder with minimum 10 year relevant experience with a reputed construction co. can be
treated at par with Graduate Engineers for the purpose of such deployment subject to the condition that
nos. of such diploma holders should not exceed 50% of requirement of degree engineers. (As per OM
272, dated. 21.8.13)
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
27
Clause 42:
i)
(a)
(ii)
(a)
(b)
(c)
(d)
Civil
Variations permissible on
theoretical quantities.
Cement
For works with estimated cost put to
tender not more than Rs. 5 Lakh
For works with estimated cost put to
tender more than Rs. 5 lakh
Bitumen for all works
Steel reinforcement and structural
steel sections for each diameter,
section and category
GI Barbed wire
:
:
3% plus/minus
2% plus/minus
:
:
2% plus/minus
Description of item
Unit
1.
M.T.
NIL
Rs. 4950/-
2.
M.T.
NIL
Rs. 4664/-
M.T.
M.T.
NIL
NIL
3.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
28
PART- B
(General Conditions civil work)
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
29
GENERAL CONDITIONS
1.
The order of preference in case of any discrepancy as indicated in condition no. 8.1 under
Conditions of Contract given in the General Conditions of contract for Central P.W.D
works 2014 with up to date of submission of tenders shall supersede as follows:
Description in schedule of quantities
General Conditions and Special conditions.
Contract clauses of General conditions of contract for Central P.W.D. works manual
2014 with amendment up to last date of submission of tenders.
(iv) CPWD specifications2009 Vol I &II with up to date correction slips
(v)
Architectural drawings.
(vi) Indian standards specification/BIS.
(vii) Sound Engineering practice.
(i)
(ii)
(iii)
Any references made to any Indian standards specifications in these documents shall imply to
the latest version of that standard, including such revisions/amendments as issued by the
Bureau of Indian standards up to last date of receipt of tenders. The contractor shall keep at his
own cost all such publications of relevant Indian standards applicable to the work at site. In
case of above mentioned scenario silent the decision of Engineer-in-charge shall be final.
2.
The work shall be carried out according to CPWD specifications 2009 Volume I & II,
modified and corrected up to date of submission of bid. For the items which are not covered
under CPWD specifications, the special conditions / B.I.S. specifications shall apply. In this
regard the decision of Engineer-in-charge shall be final.
3.
Unless otherwise specified, the agreement rates for all items of work of the schedule of
quantities are for all heights, depths, leads and lifts involved in the execution of work.
4.
The contractor shall make his own arrangement of water required for the work as per clause 31
of the general conditions of the contract for CPWD works.
5.
The contractor shall make his own arrangements for obtaining electric connection for carrying
out any maintenance activity and make necessary payment directly to the department
concerned. In the absence of electric connection or failure of power supply, the contractor shall
make his own arrangement of generators.
6.
On account of security consideration, there could be some restrictions on the working hours,
movement of vehicles for transportation of materials. The contractor shall be bound to follow
all such restrictions and adjust the programme for execution accordingly.
7.
The work shall be carried out in a manner complying in all respects with the requirements of
relevant bye laws of the local bodies, labour laws, minimum wages act, workmen
compensation act and other statutory laws enacted by Central Government as well as State
Government.
8.
All the malba or rubbish obtained from dismantling or otherwise during the execution of the
work shall be brought down in packed bags or similar means through the staircase and is not to
be thrown to the ground directly from the first floor or second floor etc. This shall be
transported and stacked properly in the specified common disposal point/ dumping ground ear
marked by field staff by cycle rickshaw or any other similar means on the same day and the
site shall be kept clean including the stair case etc. as per the instructions of the Engineer-incharge. Nothing extra shall be paid on this account. A fine of Rs.500/- shall be recovered from
the contractor for each complaint/default of such cases.
9.
After the collection of a full truck load of the said malba (approx 4.5 cum) the same shall be
disposed off by the contractor to the authorized municipal dhalao /dumping ground, for which
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
30
the payment shall be made to contractor per cum basis as per item in the agreement. In case of
non-removal/disposal within seven days after collection of a full truck load malba, a fine of
Rs.1000/- (One Thousand) per day subject to maximum of Rs. 10,000 shall be recovered from
the contractor.
10.
No Residential accommodation shall be provided to any of the staff engaged by the contractor.
The contractor shall also not be allowed to erect any temporary set up for staff in the campus.
11.
No claims of the labours shall be entertained by the Department including that of providing
employment, regularization of services etc.
12.
The engineers who are present at the site from 9:00 AM to 5:00 PM on all working days or as
working hours allowed by Engineer-in-Charge shall carry mobile telephone(s) to enable the
Engineer-in-charge to have easy and quick communication. Nothing extra shall be paid to the
contractor on this account and his quoted rates for various items under this contract will be
inclusive of this obligation.
13.
All materials, T & P, consumable and contingent articles required for the work shall be
arranged by the contractor. Materials used shall be in order of preferences:
13(i)
Replaced materials used shall have same or richer specifications to the original materials and
compatible to the work.
15.
The staff employed by the contractor should be well behaved, Polite & courteous. Any
complaint against staff on behaviour should be taken very seriously and such should be
removed by the contractor immediately from the site.
16.
The contractor shall make all safety arrangement required for the labour engaged by him at his
own cost. All consequences due to negligence or due to lapse of security/safety or otherwise
shall remain with the contractor. The department shall not be responsible for any mishap,
injury, accident or death of the contractors staff. No claim in this regard shall be entertained
/accepted by the department.
17.
Contractor shall be fully responsible for any damages caused to govt. Property or allotees
property by his labour / staff in carrying out the work and shall be rectified by the contractor at
his own cost.
18.
VAT/ WCT/ Income Tax/ Construction Workers Welfare Cess/Other Taxes as applicable shall
be recovered from the contractors bill.
19.
Chases, holes & drilling works etc. shall be done using power operated tools.
20.
Dismantling of cement concrete slabs, floors etc. inside the quarters/building shall be done
with the help of mechanized vibratory hammer, drills etc. The work shall be carried out in
such a way that there should be least disturbance to the nearby/ adjoining allottees /occupants.
The work should be completed within least possible time. The contractor must ensure that
there should be no damaged to the supporting RCC/structural member of the buildings.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
31
21.
For non-compliance or partial compliance of satisfactory execution of items, the Engineer-incharge reserves his rights to levy compensation in accordance with the scale of non-conformity
and the period for which this non-conformity continues. However the total amount of this
compensation for the whole contract shall not exceed 10% of the tendered value of this
contract. This shall be without prejudice to other remedies available to Engineer-in-charge
under this contract to take action against the contractor.
22.
The contractors are advised to get acquainted with the proposed work and its site and also
study the Architectural Drawings, specifications and special conditions carefully before
tendering. No claim of any sort shall be entertained on account of any site conditions and
ignorance of specifications and special conditions.
23.
The work shall be carried out as per CPWD specifications for works-2009 Vol. I & II with up
to date correction slips unless otherwise specified in the nomenclature of individual item or in
the specifications and special conditions, where specifications are silent, the decision of
Engineer-in-Charge shall be final and binding on contractors.
24.
The rates quoted by the contractor shall be taken as net and nothing extra shall be paid on any
account i.e. royalty, cartage, sales tax and stacking at required places etc. Centering, shuttering,
however if required to be done for RCC beams, RCC floor slab and landings only for centering
heights greater than 3.5m shall be measured & paid separately.
25.
Articles manufactured by the reputed firms and approved by Engineer-in-Charge shall only be
used. Only articles classified, as first quality by the manufacturer shall be used unless
otherwise specified. In case articles bearing ISI certification are not available in the market,
quality of samples brought by the contractor shall be judged by standards laid down in the
relevant CPWD specifications. For the items not covered by CPWD specifications relevant
BIS standards shall apply. The sample of materials to be brought to site for use in work shall be
got approved from the Engineer-in-Charge before actual execution of work.
26.
Samples of materials required for testing shall be provided free of cost by the contractor.
Testing charges, if any, shall be borne by the department in case the test results are satisfactory
accept where-ever specifically mentioned otherwise in the NIT. All other expenditure to be
incurred for taking samples, conveyance, packing etc. shall be borne by the contractor.
27.
The contractor shall submit a detailed programme of work within 15 days of the date of issue
of letter of intent. Detailed programme should include all the mile stone, cash flow, material
procurement, manpower deployment. Program must show clearly the critical path to complete
the project in time.
28.
The Engineer-in-Charge can modify the programme and the contractor shall have to work
accordingly. During review of work progress, Engineer in Charge can ask to modify the
programme. Contractor shall resubmit the modified programme in 2 days.
29.
The quantities of each item shall not be exceeded beyond the agreement quantities without
prior permission of Engineer-in-Charge.
30.
All types of mortars to be used in the work shall be mixed in the mechanical mixer and hand
mixing shall not be permitted.
31.
The contractor shall make his own arrangement for getting the permission to ply the trucks
from the traffic police.
No payment shall be made to the contractor for any damage caused by rain, snow fall, floods or
any other natural causes whatsoever during the execution of work. The damage caused to work
32.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
32
33.
34.
35.
shall have to be made good by the contractor at his own cost and no claim on this account shall
be entertained.
Other agencies may also simultaneously be executing the work of electrification, Horticulture
or external services and other building works for the same building along with this work. The
contractor shall offer necessary facilities for the same and no claim in the matter shall be
entertained. The contractor shall especially co-ordinate with the other agency carrying out his
work.
The contractor shall take all precautions to avoid accidents by exhibiting necessary caution
boards. He shall be responsible for all damages and accidents caused due to negligence on his
part. No hindrance shall be caused to traffic during the execution of the work by storing
materials on the road.
The contractor shall be fully responsible for the safe custody of the material issued or brought
by him to site for doing the work
36.
Testing of materials :
In case there is any discrepancy in the frequency of testing as given in the list of mandatory test
and that in the individual sub-head of work as per the CPWD specifications for works-2009
Vol-I & II with up to date correction slips, the higher of the two frequencies shall be followed
and nothing extra shall be payable to the contractor on this account.
37.
Samples of all fittings and fixture to be provided shall be got approved from the Engineer-incharge before use in the work.
38.
The rate for all items of work, shall unless otherwise clearly specified include cost of all
labour, material and other inputs involved in the execution of the items.
The contractor shall make necessary arrangement for water for construction purpose as well as
for electricity and its distribution as per IS Code at his own cost. The department will render
only assistance to the contractor for making application to DJB/ authorised Electric supply
agency, if required. All the fees and charges including consumption charges shall be borne by
the contractor.
The contractor will not have any claim in case of any delay by the Engineer-in-Charge in
removal of trees or shifting, removing of telegraph, telephone or electric lines (overhead or
underground), water and sewer lines and other structure etc., if any which may come in the
way of the work. However, suitable extension of time can be granted to cover such delay.
39.
40.
41.
The contractor shall clean the site thoroughly of scaffolding materials, rubbish, equipments left
out of his work and dress the site around the building to the complete satisfaction of the
Engineer-in-charge before the work is treated as completed.
42.
The labour welfare fund/ cess @ 1% on gross work done shall be deducted.
43.
Maintenance of Register of Tests- All the registers of tests carried out at Construction Site or in
outside laboratories shall be maintained by the contractor which shall be issued to the
contractor by Engineer-in-Charge.
Maintenance of Material at Site (MAS) Register- All the MAS Registers including Cement and
Steel Registers shall be maintained by Contractor which shall be issued to the contractor by
Engineer-in-Charge.
44.
45.
Contractor shall be responsible for safe custody of all the test registers.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
33
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
34
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
35
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
36
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
37
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
38
Special Conditions
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
The contractor must study the specifications and conditions carefully before tendering. If there
are varying or conflicting provisions made in any documents forming part of the contract, the
Engineer in-charge shall be the deciding authority with regard to the intention / interpretation
of the documents and it will be binding on the contractor without any reservation whatsoever
and nothing extra shall be paid. Any error in description, quantity or rate in schedule of work
bills of quantities /item or any omissions there from shall not vitiate the contract or release the
contractor from the
execution of the whole work or any part of the work comprised there in according to drawings
and specifications or from any of his obligations under the contract.
If for any reason, any part of the site is not available temporarily for some time for part of the
work under the contact, the agreed construction schedule shall be suitably modified and
contactor shall diligently divert his men and materials to utilize them profitably and no claim
of damages whatsoever shall be entertained on the account. However the contractor shall be
allowed extension of time for completing the work as deemed fit by the competent authority.
A reference made to any Indian standard codes / specification in these documents, shall imply
reference to the latest versions of that standard including such revision/ amendments as issued
by the Bureau of Indian Standards on the date of opening of the tender. The contractor shall
have to keep all relevant publications of codes at the site at his own cost. However, Engineerin-charge may direct for keeping any other publication/codes at the site of work required in
connection with work.
(a) The contractor shall make his own arrangements for obtaining electric connections, and
shall make necessary payments directly to the department concerned. The Engineer-in-charge
will however, make required references to the authority concerned in this regard. Nothing shall
be reimbursed to the contractor in this regard. The contractor shall make his own arrangement
for backup power at his own cost. No interruption of work due to power failure shall be
accepted. Also no claim of whatsoever due to power failure shall be entertained.
(b) If required, contactor shall obtain from the municipal or concerned authorities permanent
water supply and drainage connection and procure completion certificate for the same from
Municipal / Local authorities. The Engineer-in-charge will however make required references
to the authority concerned in this regard. Nothing shall be reimbursed to the contractor.
The work shall be carried out in such a manner so as not to interfere or affect or disturb other
works being executed by other agencies if any. Other agencies doing works related with this
project will also simultaneously execute the works and the contractor shall provide necessary
facilities for the same. The contractor shall leave such recesses, holes, openings etc. as may be
required for the wetrisers, air conditioning, lift and other related works etc. The contractor shall
carry out the false ceiling work in stages in close coordination with other agencies.
The contractor shall have to make approaches to the site, if so required and keep them in good
conditions for transportation of labour and material as well as inspection of works. Nothing
extra
shall be paid on this account. Any damage done to existing roads shall be made good by the
contractor at his own cost.
The contractor shall have to deploy adequate well experienced technical staff for the work. A
list of staff along with their designation, experience and duties shall be displayed at site of
work. The
contractor or his authorized representative should always be available at the site of work to take
instruction from the departmental officers, and will ensure proper implementation.
The structural, architectural, service and other drawings for the work shall at all times be
properly correlated before executing any work and no claim whatsoever shall be entertained in
this respect.
The contractor shall be responsible for the true and proper setting out of building components
of the work in coordination with the Engineer-in-charge or his authorized representative. The
contractor shall be responsible for the correctness of the positions, levels, dimensions, and
alignments of all the parts of the structure and for arrangement of all necessary instruments,
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
39
2.10
2.11
(i)
(ii)
2.12
2.13
2.14
2.15
2.16
2.17
appliances and labour in connection there with. If at any time, during the progress of the works
any error appears or arises in the position, levels, dimensions or alignment of any part of the
works, the contactor on being required to do so by the Engineer-in-charge shall at his own
expense rectify such error to the entire satisfaction of Engineer-in-charge. The checking of any
setting out of any line or level by the Engineer-in-charge or his authorized representatives shall
not relieve in anyway, the contractor of his responsibility for the correctness there of and the
contractor shall carefully protect and preserve all bench marks, site details, pegs and other
things used in the setting out and construction of works. All duties concerning establishment of
a set of bench marks, permanent / theodolite stations centre line pillars etc including all
materials tool, plants, equipment, labour etc, for performing all the functions necessary and
ancillary there to at the commencement and during the progress of the work till physical
completion of the work in question shall be carried out by the contactor at his own cost.
The contractor at his own expenses shall establish a field laboratory with necessary equipment
to carry out test in order to enable to Engineer-in-charge to conduct field test, whenever
required by him to ensure that the quality of work is consistent with the prescribed
specifications and nothing extra shall be paid on this account.
The contractor shall at his own cost make all arrangements and shall provide all such facilities
as the Engineer-in-charge may require for collecting, preparing/ packing,
forwarding/transporting the required number of samples for tests/analysis as per the frequency
of test stipulated in the contract specifications or as considered necessary by the Engineer-incharge, at such time and such places, as directed by the Engineer-in-charge. Nothing extra
shall be paid for the above operations including the cost of materials to be tested. The testing
charges for tests conducted in the
laboratory shall be borne by the Contractor/
Department in the manner indicated below:By the Contractor, if the results show that the material does not conform to relevant
codes/specifications.
By the Department, if the results show that the material conforms to relevant codes/
specifications. However, cost of all field tests shall be born by the contractor.
The contractor or his authorized representative shall associate in collection,
preparation/packing,
forwarding/ transporting of samples for testing. In case he or his
authorized representative is not present or does not associate himself, the result of such tests
and consequences thereon shall be
binding on the contractor. The contractor or his
authorized representative shall remain in contact
with Engineer-in-charge for associating for all such operations.
The Contractor have to replace the substandard or rejected material with new lot of material
and in the event of the contractors refusal to comply with, the Engineer-in-charge shall be at
liberty to make alternative arrangements for such material through other means at the risk and
cost of the contractor who shall have no claim whatsoever in this regard. The rejected lot shall
also remain at site till the time the contractor brings in new lot of material conforming to
specifications and above procedure shall be followed.
Approved samples of materials/ items shall be kept at site of work till completion of the work.
Each approved sample shall be signed by the contractor and Engineer-in-charge.
The Contractor shall maintain in good conditions all work executed by him till completion of
the work. The contractor shall be responsible for the watch and ward of the building, safety of
all fittings and fixtures including sanitary and water supply fittings and fixtures provided by
him against pilferage and breakage during the period of installation and thereafter till the
building is physically completed and completion certificate recorded by the competent
authority.
Any damage done by the contractor to any existing work shall be made good by him at his own
cost. Existing adjacent buildings, drain pipes, culverts, overhead wires, water supply lines and
similar services encountered during the course of execution shall be protected against damage
by the contactor and nothing extra shall be payable for the same. The contractor shall not store
material or otherwise occupy any part of the site in manner likely to hinder the operation of
such services.
The contractor shall submit to the Engineer-in-charge the following reports.
a) Weekly report of receipt & consumption of material arranged by the contractor.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
40
2.18
2.19
(a)
(b)
2.20
2.21
2.22
2.23
2.24
2.25
2.26
2.27
2.28
2.29
b) Programme of works, material & labour required for the forthcoming fortnight.
c) List of plants & equipment proposed to be deployed.
d) Any other data required relating to work.
Large size details and manufacturers dimensions for material to be incorporated shall take
precedence over small scale drawings.
In the event, the contractor engages specialized agencies other than those given in this
document,
following conditions shall be applicable:The contractor shall submit the list of at least three specialized agencies proposed to be
engaged by him along with the required information to substantiate technical capability and
experience of the agency for prior approval of the competent authority i.e. the tender
accepting authority.
The conditions of approval of specialized agency by the competent authority shall be final
and binding on the contractor and he shall comply all such conditions of approval.
No structural member shall be chased or cut without the written permission of the Engineerincharge. No walls or terraces shall be cut for making any opening after water proofing has
been done without written approval of Engineer-in-charge. When permitted, cutting of water
proofing membrane shall be done very carefully so that the other portion of water
proofing is not damaged.
On completion of work at such place the water proofing membrane shall be made good and
ensured that the opening/cutting is made fully water proof as per contract specifications and
details of water proofing.
The Engineer-in-charge shall recover Delhi VAT on works Contract as applicable on gross of
the work on each Running Account Bill as well as final bill. Income tax plus levied surcharge
on Income Tax and other taxes as applicable shall be recovered from the contractors.
All rates quoted are inclusive of cutting holes and chases in walls and floors and making good
the same with cement mortar/concrete/water proofing of appropriate mix and strength as
directed by Engineer-in-charge. Contractor shall provide holes, sleeves, recesses in the
concrete/ RCC masonry work as the work proceeds.
Running Accounts bills shall be prepared by the contractor on computer using suitable
software as approved by the Engineer-in-charge and will be submitted along with supporting
measurement sheets, material consumption statements and other required documents. The
Engineer-in-charge shall derive a method for preparation, submission and payment of
computerized bill which shall be followed by the contractor. The contractor shall employ
dedicated Engineers to assist the Junior Engineer, Asstt. Engineer of CPWD in checking of
measurements and bills.
The contractor shall take all precautions to avoid accidents by exhibiting caution board day and
night. The contractor shall be responsible for all damages and accident due to negligence on
this part.
No foreign exchange shall be made available by the department for the purchase of
equipments, plants, machinery material of any kind or other items required to be carried out in
execution of work.
If for any reason, it becomes impetrative to use a brand/agency other than the approved brands/
agency mentioned elsewhere in this documents such alternative brands/agencies shall have to
be got approved from tender accepting authority. The decision of the Engineer-in-charge as to
the requirement of an alternative brand/ agency shall be final & binding.
No labour huts shall be allowed at work site
Electricity shall be arranged by the contractor.
All rates shall include cost of scaffolding at all heights and nothing extra shall be payable
on this account.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
41
QUALITY ASSURANCE, QUALITY AUDIT AND INSPECTION:
1- Quality of works shall be the sole responsibility of the contractor through inspection and
testing by the technical staff employed by the contractor. In order to assure proper quality
control over the materials and items of works, testing and inspections shall also be done by:
(i) The Engineer-in-charge and/or his representative or AE(QA)) of SEs office, New Delhi or
C.T.E. (CVC).
(ii) The Third Party Inspecting Agency (TPIA) duly deputed by the department
Wherever TPIA is appearing in this document, it shall also mean Engineer-in-charge and/or his
representative or AE (QA) of SEs office.
2- The quality of the work shall be assured through routine and random testing of materials and
items of work in the field laboratory and outside laboratory.
3- The contractor shall at his own cost establish field Laboratory near to the site of work and
arrange all relevant equipments and manpower for testing of all the field tests specified in the
list of tests appended herewith. This laboratory shall be headed by a graduate Civil Engineer to
be employed by the contractor for this purpose. No extra payment shall be made on this
account. The contractor shall ensure that all his testing equipments are calibrated periodically
at least once in three months, during the tenure of the work.
4- The contractor shall at his own cost collect samples of materials and items of work for the field
tests at desired frequency and carry out the tests in the field laboratory through his technical
staff and maintain proper records thereof.
5- The tests required to be conducted in outside laboratory shall be conducted in the laboratory as
approved by the Engineer-in-charge such as National Test House, Regional Research
Laboratory, Regional Engineering College, laboratory of Engineering Colleges or any other
laboratory.
6- The contractor shall maintain all documents of test reports/results properly and shall hand over
the same to the Engineer-in-Charge after completion of work. Engineer-in-Charge is
authorized to inspect such records from time to time.
7- TPIA shall audit the method of documentation of test result/reports and its suggestions in this
regard shall be binding on the contractor.
8- The samples for tests shall be drawn in the following manner:
(i) Test samples for all the field tests shall be drawn by the contractor after giving due prior
intimation to the Engineer-in-Charge. These tests are specified in list of tests appended
herewith wherein the frequency of the tests are also specified. The test samples of these
field tests may also be additionally drawn by the TPIA at its discretion and get the same
tested in the field laboratory being maintained by the contractor who shall provide all
assistance in collection, packing and transportation of samples to the laboratory.
(ii) For the tests to be conducted in outside laboratory, the samples shall be drawn by TPIA
and the contractor shall provide all necessary help in collection, packing and
transportation of samples to the laboratory.
(iii) Tests limiting to 10% of total no. of field tests shall also be got conducted at outside
laboratory at the discretion of TPIA. Test samples in such cases shall be drawn by TPIA
and the contractor shall provide all necessary help in collection, packing and
transportation of samples to the laboratory. The cost of testing shall be borne by the
Engineer-in-charge in case the test results are satisfactory otherwise the same shall be
borne by the contractor.
9- The contractor shall also assist inspection and collection of samples by TPIA for testing. The
samples of materials/items of work required for testing by TPIA shall be provided free of
charge by the contractor. The cost incurred in collection of samples and its packing &
transportation to the approved lab/field laboratory shall be borne by the contractor. The cost of
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
42
tests conducted in outside approved laboratory, even if the facility of testing is available in
field laboratory, shall be borne by the contractor/department in the manner described below:
a) By the contractor, if the test results show that the material/items of work do not conform
to the relevant Specifications.
b) By the department, if the test results show that the material/items of work conform to the
relevant Specifications.
If testing facilities of field test of any materials are not available at field laboratory, the test
sample shall be sent to approved laboratory. In such eventuality, the cost of testing shall be
borne by the contractor irrespective of whether the test results are satisfactory or not. All costs
related to testing of materials/items of work in the field laboratory and costs incurred in
collection of such samples, its packing and transportation of samples to the laboratory shall be
borne by the contractor in all cases.
10-
In case the contractor or his authorized representative is not present or does not associate
himself in collection of test samples, the test results/reports of such tests and consequences
thereon shall be binding on the contractor.
11-
The contractor shall render all necessary help/facilities for carrying out :
(i) Inspection of works
(ii) Inspection of quarries and collection of test samples there from
(iii) Collection of samples of all materials brought at site
(iv)Testing of all materials at field laboratory/outside laboratory approved by Engineer-inCharge
TPIA will perform testing and inspection at frequency deemed fit by it to ensure that
contractors quality control test results and workmanship are in order. TPIA shall also monitor
contractors process of testing to make sure that what he is doing is adequate and uniform.
12-
13-
The contractor shall submit weekly work program to the Engineer-in-Charge in order to enable
him/ TPIA to supervise inspection of work and testing of materials.
14-
TPIA will :
i)
Review all reports and records for regular field testing and other testing carried out by
the contractor as per specification applicable for execution of work.
ii)
Review manufacturers test report/certificate for all the manufactured materials brought
at site.
iii)
Randomly/routinely check the workmanship and methods adopted for completing
activities of works by contractor and shall suggest remedial measures, which shall be
binding on the contractor.
iv)
Shall prepare QA/QC reports for tests and inspections, the findings of which shall be
binding on the contractor.
15- TPIA will also carry out quality audit of completed item of works to confirm that works are of
acceptable quality and may order rejection/rectification wherever necessary which shall be
binding on the contractor.
16- The reports of inspection and test results given by TPIA shall be binding upon the contractor.
17- The decision of the TPIA shall be final regarding acceptability of the all test results whether
relating to field tests or outside laboratory tests.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
43
SPECIFICATIONS AND SKETCH OF AUDITORIUM CHAIRS
1. SEAT REST ASSEMBLY:
The seat rest assembly is 1.5 thick marine plywood in situ moulded with moulded polyurethane
foam& upholstered with fabric.
SEAT SIZE: 45.0 cm. (W) x 44.5 cm (D) x 12.0 cm(T) @ Front edge and 8.0 cm@ Rear edge.
2. BACKREST ASSEMBLY:
The backrest assembly is made up of a M.S. fabricated frame in situ moulded with
polyurethane foam. The back foam is designed with contoured lumbar support for extra comfort.
BACK SIZE: 46.5 cm. (W) x 62.5 cm (D) x 9.5 cm(T) Avg.
3. POLYURETHANE FOAM:
The polyurethane foam for Seat and Back is moulded with density = 45+/-2kgs/cum. and
Hardness = 20 +/-2 on Hampden machine at 25%compression.
4. ARMREST:
The armrest is made up of Integral Polyurethane Foamand reinforced with M.S. insert.
The armrest is available in two options- with & without Cup holder.
5. SLIDINGMECHANISM:
The sliding mechanism is fabricated from M.S. sheets forming linkages providing a
synchronous motion for the seat & back. The sliding stroke for the seat is 100mm. The
mechanism houses the seat & back.
6. SIDE PANEL / AISLE PANEL:
The chair rests on the ground on two side panels frames made of 2.5mm thk. CR steel.
Each Side Panel is fitted with two upholstered Particle Board of 9mm thk. The side panel
frame is grouted to the floor using foundation expansion bolts through base plate.
7. POWDER COATING:
All steel components are epoxy polyester powder coated.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
44
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
45
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
46
PARTICULAR SPECIFICATIONS
GENERAL (FOR PLAIN AND R.C.C.WORK):-
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
47
R.C.C. WORK:2.1
The RCC work shall be done with Design Mix Concrete. Wherever letter M has been
indicated, the same shall imply for the Design Mix Concrete. The Design Mix Concrete will be
designated based on the principles given in IS: 456, 10262 & SP 23. The Conditions & Specifications
stated herein shall have precedence over all conditions & specifications stated in relevant I.S. Codes /
C.P.W.D. Specifications. The concrete mix shall be designed for the specified target mean compressive
strength in order to ensure that work test result do not fall below the acceptance criteria specified for
the concrete mix. The Contractor shall design mixes for each class of concrete indicating that the
concrete ingredients and proportions will result in concrete mix meeting the requirements specified.
2.1.1
2.1.1.1 The concrete mix design with and without admixture will be carried out by the contractor, at
his own cost, through one of the following laboratories test houses to be approved by Engineerin-charge:(i) IIT, Delhi (ii) National Council for Cement and Building Materials, Ballabhgarh (iii) CRRI,
Delhi, (iv) Delhi Technological University.
2.1.2
2.1.4
The sources of coarse aggregate, fine aggregate, water, admixture & cement to be used in
concrete work shall be identified by the contractor & he will satisfy himself regarding their
conforming to the relevant specifications & their availability before getting the same approved
from the Engineer-In-Charge.
(a)
Coarse Aggregate
(b)
Fine Aggregate
(c)
Water
It shall conform to requirements laid down in IS:4562000 / Para 3.1.1 of CPWD Specifications
(d)
Cement
(e)
Admixture/ Plasticizer
The Contractor shall engage approved laboratories / test house for designing the concrete mix
in accordance with relevant IS Code and to conduct laboratory tests to ensure the target
strength & workability criteria for a given grade of concrete.
The various ingredients for mix design / laboratory tests shall be sent to the lab / test houses
through the Engineer-in-charge and the samples of such aggregates sent shall be preserved at
site by the department.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
48
2.1.5
The contractor shall submit the report on design mix from any of above approved laboratories
for approval of Engineer in Charge within 30 days from the date of issue of letter of acceptance
of the tender. No concreting shall be done until the design mix is approved. In case of White
Portland Cement and the likely use of admixtures in concrete with ordinary Portland/White
Portland Cement, the contractor shall design and test the concrete mix by using trial mixes with
white cement and / or admixtures also, for which nothing extra shall be payable.
i)
ii)
All cost of mix designing and testing, connected therewith, including charges payable
to the laboratory shall be borne by the Contractor including redesigning of the
concrete mix whenever required & as directed by Engineer-In-Charge.
iii)
The mix design for a specified grade of concrete shall be done for a target mean
compressive strength Tck = Fck + 1.65s
Where Fck
s
=
Characteristic compressive strength at 28 days.
=
Standard deviation which depends on degree of quality
control.
iv)
(a)
(b)
(c)
(d)
(e)
(f)
(g)
GRADE OF CONCRETE
STANDARD DEVIATION
M-20
M-25
M-30
M-35
4.0
4.0
5.0
5.0
TRIAL BATCHES
The designed mix proportions shall be checked for target mean compressive strength
by means of trial batches.
Minimum three sets of separate preliminary tests shall be carried out for each trial
batch of concrete mix. Each test shall comprise of six specimens and only one test-set
of six specimens shall be made on any particular day.
The quantities of materials for each trial mix shall be sufficient for at least six
specimens (cubes) and the concrete required for carrying out workability tests.
The workability of trial mix No.1 shall be measured and mix shall be carefully
observed for freedom from segregation, bleeding and its finishing characteristics. The
water content, if required, shall be adjusted corresponding to the required changes in
the workability.
With the modified Water Content, the mix proportions shall be recalculated by keeping
with water cement ratio unchanged. The mix proportion, as modified, shall form the
Trial Mix No.2 and tested for the specified strength and workability.
In addition, trial mix No.3 and 4 shall be designed by keeping water contents same as
that determined for trial mix 2 but varying the water cement ratio by + 10 percent of
the specified value and tested for their design characteristics.
Out of the six specimen of each set, three shall be tested at seven days and remaining
three at 28 days. The preliminary tests at seven days are intended only to indicate the
strength to be attained at 28 days, while the design mix shall be approved only on the
basis of test strength at 28 days.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
49
2.1.10
2.2
The average strength of each test-set is not less than the specified target mean
compressive strength (Tck).
The strength of any specimen cube is not less than 0.85 Tck.
The concrete mix is of required degree of workability and acceptable concrete finish.
All design mix concrete shall be done using semi automatic batching plant conforming
to IS: 4925 of minimum 5 cum per hour capacity. The automatic batching plant shall
be charged by devices when actuated by a single starter switch, will automatically
start the weighing operation of each material (i.e. stone aggregate, sand, cement,
water, admixture etc.) and stop automatically when designated weight of each material
has been reached and also it should have rated capacity ( in terms of concrete in a
single batch). It shall have control panel for operation of the batching plant complete
with computerized printing facility.
ii)
The contractor shall be free to use Ready Mix Concrete (RMC) in place of Batch mix
concrete at his own cost. The contractor shall ensure that transit mixtures shall
transport the concrete to site. All the precautions shall be taken during the
transportation and handling of concrete to achieve the desired strength, durability, etc.
as envisaged in the Mix Design. Contractor has to get the approval from Engineer-InCharge regarding source of RMC by giving the details of such plants indicating name
of owner / company, its location, technical establishment, past experience and text of
Memorandum of Understanding (proposed to be entered between purchaser and
supplier). The Engineer-in-Charge, after satisfying himself about quality / capability
of the company shall give approval in writing (subject to drawing of MOU). The
MOU shall be drawn with RMC plant owner / company and submitted to Engineer-inCharge within a week of such approval. The contractor will not be allowed to
purchase RMC without completion of above formalities for use in the project.
Notwithstanding the approval granted by Engineer-in-Charge in aforesaid manner, the
contractor shall be fully responsible for quality of concrete including input control,
production, transportation and placement etc. The Engineer-in-Charge will reserve the
right to deploy his supervisor at plant site to inspect at any such stage and reject the
material / concrete etc if he is not satisfied about quality of material / product.
iii)
All measuring equipment shall be maintained in a clean and serviceable condition and
their accuracy shall be checked at least once a month.
iv)
Only single sized good quality stone aggregate shall be brought to site of work from
the approved source. The grading of the stone aggregate shall be controlled by
blending the aggregate of different sizes in the required proportions at site of work
v)
The aggregate of different sizes shall be stock-piled separately, preferably a day before
use.
The grading of coarse and fine aggregates shall be checked as frequently as possible
and as directed by the Engineer-In-Charge to ensure that the specified grading and
quality of aggregate is maintained.
It is important to maintain the Water Cement Ratio constant at its specified or
approved value by making adjustment for the moisture contents of both fine and
coarse aggregates.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
50
The moisture contents in the aggregate shall be determined as frequently as possible in
keeping with the weather conditions and as per the provisions of IS: 2386 (Part-III).
2.3
OTHER OPERATIONS: All other operations in concreting work like mixing, slump, laying, placing of concrete,
compaction, curing etc. not mentioned in this particular specifications for Design Mix of
Concrete shall be as per CPWD Specifications.
2.4
SAMPLING:i)
ii)
iii)
iv)
Samples from fresh concrete shall be taken as per IS 1199-1959 and the test cubes
shall be made, cured and tested in accordance with IS: 516-1959.
Each test sample shall comprise of six test cubes (specimen), three of which shall be
tested at 7 days and remaining for tests at 28 days.
FREQUENCY OF SAMPLING: A random sampling procedure shall be adopted to ensure that the sampling is spread
over the entire period of concreting and cover all mixing units. The concrete work
shall be notionally divided into lots as under for the purpose of sampling conditions.
-----
v)
vi)
vii)
viii)
ix)
2.4.1
At least one test sample shall be taken for each lot of concrete work.
Each grade of concrete shall form different lot for testing.
The minimum frequency of sampling of concrete of each grade shall be in accordance
with CPWD specification 2009, Vol I with up to date correction slips:The concrete work shall be assessed on day to day basis & samples shall be taken as
specified.
Work strength test shall be conducted in accordance with IS: 516 on random sampling.
TEST RESULTS OF SAMPLES: The test results of the sample shall be the average of the strength of three specimens. The
individual variation shall not be more than + 15% percent of the average. If variation is more,
the test results shall be treated as invalid. 90% of the total tests shall be done at the laboratory
established at site by the contractor and remaining 10% in any other laboratory as directed by
the Engineer-in-Charge.
2.5
In case the test results of all the samples are above the characteristic compressive
strength, the concrete shall be accepted.
In case the test result of one or more samples fails to meet the requirement (i) above, it
shall be accepted if it meets the requirement as laid down in CPWD Specification.
Concrete of each grade shall be assessed separately.
Concrete is liable to be rejected, if it is porous or honeycombed or its placing has been
interrupted without providing a proper construction joint or the reinforcement has been
displaced beyond the tolerances specified, or construction tolerances have not been
met.
MEASUREMENT
(i)
As per CPWD Specifications.
(ii)
In respect of all projected slabs at all levels including cantilever, canopy, the payment
for the RCC work shall be made under the item RCC slabs. The payment for shuttering
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
51
at the edges shall be made under item of centering and shuttering for RCC slabs.
Nothing extra shall be paid for the side shuttering at the edge of these projected
balconies / projected verandah slabs.
2.6
2.7
Note : In case cement content as per the approved design mix is less than the cement content
specified in the nomenclature of the item, financial adjustment @ Rs. 5170/- per MT (OPC) per
MT of cement will be made.
2.8
2.8.1
2.8.2
Water Cement ratio for Ordinary RCC work shall not be more than 0.5. Contractor shall use
concrete mixture of proper design having arrangement for measuring water for mixing of
concrete.
FORM WORK
The work shall be done in general as per CPWD Specifications.
2.9
2.9.1
2.9.2
2.9.3
Only M.S. centering / shuttering and scaffolding material unless & otherwise specified shall be
used for all R.C.C. work to give an even finish of concrete surface. However, marine-ply
shuttering in exceptional cases as per site requirement may be used on specific request from
contractor to be approved by the Engineer-in-Charge.
Nothing extra shall be paid for the centering and shuttering, circular in shape whenever the
formwork is having a mean radius exceeding 6m in plan.
2.9.4
Nothing extra shall be paid for grid beams and the corresponding slabs having clear span more
than 1.20 metres.
2.9.5
In order to keep the floor finish as per architectural drawings and to provide required thickness
of the flooring as per specifications, the level of top surface of R.C.C. shall be accordingly
adjusted at the time of its centering, shuttering and casting for which nothing extra shall be
paid to the Contractor.
As per general engineering practice, level of floors in toilet / bath, balconies, shall be kept 12
to 20mm or as required, lower than general floors shuttering should be adjusted accordingly.
Nothing extra is payable on this account.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
52
2.9.6
2.10
REINFORCEMENT:-
BRICK WORK:The brickwork shall be carried out with good quality well burnt locally available bricks of class
designation 75 as per CPWD Specifications.
3.2
The rate shall also include for leaving chases / notches for dowels / cramps for all kinds of
cladding to come over brick work.
3.3
Brick work provided around shaft or lift walls or around slab cutouts shall be measured in the
brick for corresponding floor level. Nothing extra shall be paid on this account.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
53
3.4
M.S. bar provided at every third course of half brick masonry shall be in single piece. If
required, welding joint can be used without overlaps. Nothing extra shall be paid for welding
and overlaps.
4.0
4.1
General: - The execution of stones work shall be in general as per CPWD Specifications.
4.2
SAMPLES FOR STONE WORK:Samples of each item of stone work either individually or in combination shall be prepared for
approval of Engineer-in-charge before commencement of work.
5.0
WOOD WORK:-
5.1
The wood work in general shall be carried out as per CPWD Specifications.
5.2
The sample of timber to be used shall be deposited by the contractor with Engineer-in-charge
before commencement of work.
5.3
5.4
The shape and size of beading shall be as per drawings. The joints of beading shall be mitered.
5.5
Timber shall be of specified species, good quality and well seasoned. It shall have uniform
colour, reasonably straight grains and shall be free from knots, cracks, shakes and sapwood. It
shall be close grained. The contractor shall deposit the samples of species of timber to be used
with the Engineer-in-Charge for testing before commencement of the work.
5.6
Wood work shall not be painted, oiled or otherwise treated before it has been approved by the
Engineer-in-charge. All portion of timber including architrave abutting against masonry,
concrete, stone or embedded in ground shall be painted with approved wood preservative or
with boiling coaltar.
5.7
The contractor(s) shall produce cash voucher and certificates from approved Kiln Seasoning
Plants about the timber used on the work having been kiln seasoned and chemically treated by
them, falling which it would not be so accepted as kiln seasoned and/or chemically treated.
5.8
Transparent sheet glass conforming to IS: 2835 1977 shall be used. Thickness being
governed as under unless otherwise specified in the item in wood work/steel work:
Area of Glazing
(a) For glazing area up to 0.50 sqm
(b) For glazing area more than 0.50 sqm
Thickness
4.0 mm
5.5 mm
5.9
5.9(i)
The work shall be executed through specialized agencies to be approved by the Engineer in
Charge.
5.9(ii) The shutters should be fabricated in factories & fabrication should conform to CPWD
Specifications Para 9.6.6 & IS 1003 Part-I.
5.9(iii) The contractor shall propose well in advance to Engineer-in-Charge, the names and address of
the factory where from the contractor intends to get the shutters manufactured along with the
credential of the firm. The contractor shall place the order for manufacturing of shutters only
after obtaining approval of the Engineer in Charge whose decision in this case shall be final &
binding. In case the firm is not found suitable he shall propose another factory. The factory
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
54
may also be inspected by a group of officers before granting approval; shutters shall however
he accepted only if these meet the specified test.
5.9(iv) Contractor will arrange stage wise inspection of the shutters at factory by the Engineer-inCharge or his authorized representative. The contractor will have no claim if the shutters
brought at site in part or full lot are rejected by the Engineer-in-Charge due to bad
workmanship / quality. Such defective shutters will not be measured and paid. The contractor
shall remove the same from the site of work within 7 days after the written instruction in this
regard are issued by the Engineer-in-Charge.
5.9(v) The shutters should be brought at site without primer / painting.
6.0
6.1
6.2
Pressed Steel Frame / T Iron Frames: - The work shall be done as per CPWD Specifications.
The frames shall be fabricated in approved workshops. The angle and flat iron frames for
cupboard shall also be fabricated from the above approved workshops.
6.3
Steel windows / ventilators: The work shall be done strictly as per CPWD Specifications.
Flash butt-welded steel windows / ventilators only shall be provided and shall be procured
from the approved manufacturers. The corners should be welded to form a solid fused welded
joint conforming to the requirement given below.
a)
b)
c)
Weld shall be made all along the place of meeting the member.
Weld should be properly grounded.
Complete cross section of the corner shall form a solid joint with no cavities, free from
cracks, under cutting, overlaps, gross porosity and entrapped slag.
All sub dividing and glazing bars shall be tennoned & riveted into the frames i.e. all centre
mullion section F4B and glazing section T2, T6 shall not be directly welded to the frames. For
this a slot has to be cut in the frames, the F4B / T2 / T6 section inserted into it & head be
hydraulically tennoned & riveted by Tennon Rivetting Machine.
The thickness of projecting type hinges shall not be less than 3.15 mm. For fixing of hinges to
outer frame, slot shall be cut, hinges inserted & welded at the back. For non projected type
hinges if allowed, the wall thickness shall not be less than 3 mm & total width not less than 40
mm. For fixing, the slot shall be cut in the fixed frames, hinge flap inserted & welded from the
back.
The fixing lug shall be as per IS 1038 with adjustable slot & fixed to window frames by screws
& nuts.
The fixing of unit shall be done as per IS 1081.
6.4
M.S. Sheet Door M.S Sheet shall be in one piece i.e. no joint in M.S. Sheet shall be
permitted.
7.0
FLOORING:-
7.1
7.2
Whenever flooring is to be done in patterns of tiles and stones, the contractor shall get samples
of each pattern laid and approved by the Engineer-in-charge before final laying of such
flooring. Nothing extra shall be payable on this account.
7.3
Different stones / tiles used in pattern flooring shall be measured separately as defined in the
nomenclature of the item and nothing extra for laying pattern flooring shall be paid over and
above the quoted rate. No additional wastage, if any, shall be accounted for any extra payment.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
55
7.4
Samples of flooring stones (Kota/ Marble/ Granite etc.) shall be deposited well in advance with
the Engineer-in-Charge for approval. Approved samples should be kept at site with the
Engineer-in-Charge and the same shall not be removed except with the written permission of
Engineer-in-Charge. No payment whatsoever shall be made for these samples.
7.5
The Marble/ Kota/ Granite or any other stone shall be fully supported by the details
establishing the quarry and its location.
7.6
Full width Marble/ Kota/ Granite stone over kitchen platform shall be provided which shall not
be less than 900mm long except to adjust for closing pieces. The marble / stone flooring in
treads and risers of staircase shall not be less than 1500mm long except to adjust the closing
pieces. Nothing extra shall be paid on these accounts.
7.7
7.8
Test shall be conducted to satisfy the quality of material as per CPWD Specifications
7.9
The rate of items of flooring is inclusive of providing sunken flooring in bathrooms, kitchen
etc. and nothing extra on this account is admissible. The proper gradient shall be given to
flooring for toilets, verandah, kitchen, courtyard, etc. as per the directions of Engineer-incharge.
8.0
8.1
The work shall be got executed from the specialized agency as approved by the Engineer in
Charge.
8.2
Total quantity of the water proofing compound required shall be arranged only after obtaining
the prior approval of the make by Engineer-in-charge in writing. Materials shall be kept under
double lock and key and proper account of the water proofing compound used in the work shall
be maintained. It shall be ensured that the consumption of the compound is as per specified
requirements.
8.3
The finished surface after water proofing treatment shall have adequate smooth slope as per the
direction of the Engineer-in-charge.
8.4
Before commencement of treatment on any surface, it shall be ensured that the outlet drain
pipes / spouts have been fixed and the spout openings have been chased and rounded off
properly for easy flow of water.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
56
Guarantee Bond for water proofing works
Ten years Guarantee bond in prescribed proforma shall be submitted by the contractor which
shall also be signed by both the specialized agency and the contractor to meet their liability /
liabilities under the guarantee bond. However, the sole responsibility about efficiency of water
proofing treatment shall rest with the building contractor. (Ten per cent) of the cost of waterproofing work shall be retained as Security Deposit and the amount so deducted would be
released after ten years from the date of completion of the entire work under the
agreement, if the performance of the treatment is found satisfactory. If any defect is
noticed during the guarantee period, the contractor shall rectify it within 15 days of receipt of
intimation of defects in the work. If the defects pointed out are not attended to within the
specified period, the same will be got done from another agency at the risk and cost of
contractor.
9.0.
9.1
9.2
10.0
10.1
SANITARY INSTALLATIONS /WATER SUPPLY / DRAINAGE:The contractor shall submit schematic drawing of water supply and sanitary installation
showing details of layout, including internal water supply and drainage details, showing the
detail of water supply lines including fittings diameter wise and fixtures connecting to soil
waste through traps and connection of W.C. to main shaft pipe for drainage including its
ventilation system for approval of Engineer-in-Charge.
10.2
For the work of water supply and sanitary installations, the contractor shall engage the
approved licensed plumbers and submit the name of proposed plumbing agencies with their
credentials for approval of the Engineer-in-Charge.
10.3
The work in general shall be carried out as per CPWD Specifications.
10.4
The tendered rates shall include the cost of cutting holes in walls, floors, RCC slabs etc.
wherever required and making good the same for which nothing extra shall be paid.
10.5
The Centrifugally spun cast iron pipe IS: 3989-1984 wherever necessary shall be fixed to RCC
columns, beams etc. with rawl plugs of approved quality and nothing extra shall be paid for on
this account.
10.6
The Centrifugally spun cast iron pipe IS: 3989-1984 wherever necessary shall be fixed to RCC
columns, beams etc. with rawl plugs of approved quality and nothing extra shall be paid for on
this account.
10.7
The pig lead to be used in jointing should be as per C.P.W.D. Specifications.
10.8
Nothing extra for providing & fixing CP Brass caps /extension pieces wherever required for
CP Brass fittings shall be paid beyond the rates payable for corresponding CP Brass fittings
10.9.1 The entire responsibility for the quality of work will however rest with the building contractor
only and he shall submit a Guarantee Bond as per prescribed Performa 10% (ten percent) cost
of Sanitary and water supply items in Toilet/Bath/WC and Kitchen area and water supply &
Sanitary works in Shaft / Terrace area would be retained as security deposit and the amount so
deducted would be released after two years from the date of completion of the entire work
under the agreement, if the performance of the items is found satisfactory. If any defect is
noticed during the guarantee period, the contractor should rectify it within seven days and if
not attended to the same will be got done from another agency at the risk and cost of
contractor. However, this security deposit can be released in full if bank guarantee of
equivalent amount is produced and deposited with the department.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
57
11.0
11.1
Extent and Intent: - The work shall be carried out through an approved Special Agency, who
shall furnish all material, labour, accessories, equipment, tool and plants and incidentals
required for providing and installing anodized aluminium doors, windows, claddings, louvers
and other items as called for on the drawings. The drawings and specifications cover the major
requirements only. The supplying of additional fastenings, accessories, fixtures and other items
not mentioned specifically herein, but which are necessary to make a complete installation
shall be a part of this contract.
11.2
General: Aluminium doors, windows etc. shall be of sizes, section details as shown on
the Architectural drawings. The details shown on the drawings indicate generally the sizes of
the component parts and general standards. These may be varied slightly to suit the standard
adopted by the manufacturers. Before proceeding with any manufacturing, the contractor shall
prepare and submit complete manufacturing and installation drawings for approval of the
Engineer-in-Charge and no work shall be performed until the approval of these drawings is
obtained.
11.3
Shop Drawings: The contractor shall submit the shop drawings of doors, windows,
louvers, cladding and other aluminium work, based on the architectural drawings to the
Engineer-in-Charge for his approval. The shop drawing shall show full size sections of doors,
windows etc. thickness of metal (i.e. wall thickness) details of construction, sub frame/rough
ground profile, anchoring details hardware as well as connection of windows, doors and other
metal work to adjacent work. Samples of all joints and methods of fastening and joining shall
be submitted to the Engineer-in-Charge for approval well in advance of commencing the work.
11.4.
Samples: Samples of doors, windows louvers etc. shall be fabricated, assembled and
submitted to Engineer-in-Charge for his approval. They shall be of sizes, types etc. as decided
by Engineer-in-Charge. All samples shall be provided at the cost of the contractor.
11.5.
Sections: Aluminium doors and windows shall be fabricated from extruded sections of
profiles as detailed on drawings. The sections shall be extruded by the manufacturers approved
by the Engineer-in-Charge. The aluminium extruded sections shall conform to BIS designation
IIE/IIV 9 WP alloy, with chemical composition technical properties, as per IS: 733 and IS:
1285. The permissible tolerance of the extruded sections shall be such as not to impair the
proper and smooth function/ operations and appearance of doors and windows.
11.6
Fabrication: - Doors, windows etc. shall be fabricated to sizes at factory and shall be of
section, sizes, combinations and details as shown on the drawings. All doors, windows etc.
shall have mechanical joints. The joints shall be designed to withstand a wind load of 150 Kg.
Per Sqm. The design shall also incur that the maximum deflection of any member shall not
exceed 1/175 of the span of the member. All members shall be accurately machined and fitted
to form hairline joints prior to assembly. The joints accessories such as cleats, brackets etc.
shall be of such material as not to cause any bimetallic action. The design of the joints and
accessories shall be such that the accessories are fully concealed. The fabrication of doors,
windows, etc. shall be done in suitable sections to facilitate easy transportation, handling and
installation. Adequate provision shall be made in the door and window members for anchoring
to support and fixing of hardware and other fixture as approved by the Architect.
11.7
Anodizing: - All aluminium sections shall be anodized as per IS: 7088 and to required
colour as specified in the item as per IS: 1868 grading as specified in item schedule after
cutting the member to requisite sizes before the final assembly. Anodizing confirming to
specified grade with minimum average thickness of 15 microns when measured as per IS: 612.
The anodic coating shall be properly sealed by steams or in boiling water are cold sealing
process as per IS:1868/IS: 6057. Polythene tape protection shall be applied on the anodised
section before they are brought to site. All care shall be taken to ensure surface protection
during transportation, storage at site and installation. The tape protection shall be removed on
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
58
installation. The sample will be tested in the approved laboratory and cost of samples; cost of
testing etc. shall be borne by the contractor.
11.8
Protection of finish: - All aluminium members shall be wrapped with approved self-adhesive
non-staining. PVC tapes.
11.9
11.9.1 Fabricated materials shall be carried in an approved manner to protect the material against any
damage during transportation. The loading and unloading shall be carried out with utmost care.
On receipt of material at site, it shall be carefully examined to detect any damaged pieces.
Arrangements shall be made for expeditious replacement of damaged pieces/ parts. Materials
found to be acceptable on inspections shall be repacked in crates and stored safely.
In the case of composite windows and doors, the different units are to be assembled first. The
assembled composite units should be checked for line, level and plumb before final fixing is
done. Units may be serial numbered and identified as out how to be assembled in their final
locations if situation so warrants.
The contractor shall be responsible for assembling composite, bedding and filling the grove
with polysulphide sealant inside and outside, at transoms and mullions placing the doors,
windows etc. in their respective openings. After the doors/ windows have been fixed in their
correct assigned position, the open hollow sections abutting masonry concrete shall be fitted
with approved polysulphide sealant densely packed and finished neat.
The contractor shall be responsible for doors, windows, etc. being set straight, plumb, level
and for their satisfactory operation after fixing is complete.
11.10
Installation: -
11.10.1 Just prior to installation the doors, windows, etc. shall be uncreated and stacked on edge on
level bearers and supported evenly. The frame shall be fixed into position true to line and level
using adequate number of expansion machine bolts, anchor fasteners, of approved size and
manufacture and in an approved manner. The holes in concrete/masonry members for housing
anchor bolts shall be drilled with an electric drill.
11.10.2 The door/ windows assembled as shown on drawings shall be placed in correct final position
on the opening and marks made on concrete members at jambs, sills and heads against the
holes provided in frames for anchoring. The frame shall then be removed from the opening and
laid aside. Neat holes with Parallel sides of appropriate size shall then be drilled in the concrete
members with an electric drill at the marking to house the expansion blots. The expansion bolts
shall then be inserted in the holes, struck with a light hammer till the nut is forced into the
anchor shell. The frame shall then be placed in final position in the opening and anchored to
the support thought cadmium plated machine screws of required size and anchored to the
support through cadmium plated machine screws of required size threaded to expansion bolts.
The frame shall be set in the opening by using wooden wedges at supports and be plumbed in
position. The wedges shall invariably be placed at the meeting at points of glazing bars and
frame.
PVC/ Neoprene gaskets: - The contractor shall provide and install PVC/ Neoprene gaskets of
approved size and profile at all locations as shown and as called for to render the doors,
windows etc. absolutely air tight and weather tight. The contractor shall produce samples of
the gaskets for approval and shall procure the same after approval only.
Fittings: - Hinges, stays, handles, tower bolts, locks and other fittings shall be of quality and
manufacturer as approved by the Engineer-in-Charge.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
59
Poly-sulphide: -The gaps between frames and supports and also any gaps in the door and
windows sections shall be raked out as directed and filled with poly-sulphide of approved
colour and make to ensure complete water tightness. The poly-sulphide shall be of such colour
and composition that it would not stain the masonry/concrete work, shall receive paint without
bleeding, will not sag or run and shall not set hard or dry out under any conditions of weather.
The sample of poly-sulphide to be used for this purpose shall be got approved from the
architect before its actual use.
11.15
Details of Test: -
11.15.1 The various tests on aluminium sections shall be conducted in accordance with the relevant IS
codes.
11.15.2 The minimum number of tests for anodizing and corrosion resistance shall be as given below:
Sl No.
1.
Details
Doors, windows and ventilators
No. of Tests
One test for every 1000 kg or part thereof.
11.15.3 The samples of major member of each unit of doors/ windows shall be selected at random by
Engineer-in-Charge as such that all the aluminium section shall be got tested.
11.16
Acceptance Criteria: - The aluminium work shall carry two years guarantee after completion
of work against unsound material, workmanship and defective anodizing/ powder coating as
per guarantee bond. Two years guarantee in prescribed Performa attached under sheet VI-15
must be given by the specified firm, which shall be counter signed by the contractor, in token
of his overall responsibility. 10% (ten percent) of the cost of these items would be retained as
security deposit and the amount so deducted would be released after two years from the date of
completion of the entire work under the agreement, if the performance of the items is found
satisfactory. If any defect is noticed during the guarantee period, the contractor should rectify it
within seven days and if not attended to the same will be got done from another agency at the
risk and cost of contractor. However, this security deposit can be released in full if bank
guarantee of equivalent amount is produced and deposited with the department.
11.17
Rates: -
11.17.1 The rates of the item shall include the cost of materials, labour required in all the above
operations.
11.17.2 The rates include the cost of hinges/ pivots and rest of the fittings shall be paid separately.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
60
2.
3.
We, the said bank further undertake to pay to the Government any money so demanded
notwithstanding any dispute or disputes raised by the contractor(s) in any suit or proceeding
pending before any court or Tribunal relating thereto, our liability under this present being
absolute and unequivocal.
The payment so made by us under this bond shall be a valid discharge of our liability for
payment there under and the contractor(s) shall have no claim against us for making such
payment.
4.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
61
6.
This guarantee will not be discharged due to the change in the constitution of the Bank or the
contractor(s).
7.
8.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
62
DATE .............
SIGNATURE OF THE
BANK
WITNESS ..................
SEAL
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
63
....................................................
2.
............................................
1.
...................................................
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
2.
............................................
AE (P)/PVMD-2
EE/PVMD-2
64
GUARANTEE BOND TO BE EXECUTED BY THE CONTRACTOR FOR REMOVAL OF
DEFECTS AFTER COMPLETION IN RESPECT OF STONE WORK/ TILE WORK.
The agreement made this.................... day of ................. (Two Thousand ______ only) ..............
between ....................................S/o ...............................................(hereinafter called the GUARANTOR
of the one part) and the President of India (hereinafter called the Government of the other part)
WHEREAS THIS agreement is supplementary to a contract (Hereinafter called the Contract) dated
...................... and made between the GUARANTOR OF THE ONE PART AND the Government of
the other part whereby the contractor inter alia undertook to render the work in the said contract recited
structurally stable workmanship, finishing and use of sound materials.
AND WHEREAS THE GUARANTOR agreed to give a guarantee to the affect that the said work will
remain structurally stable and guaranteed against faulty workmanship, finishing and materials.
NOW THE GUARANTOR hereby guarantee that work executed by him will remain structurally stable
after the expiry of maintenance period prescribed in the contract for the minimum life of five years to
be reckoned from the date after the expiry of maintenance period prescribed in the contract.
The decision of the Engineer-in-charge with regard to nature and cause of defect shall be final.
During this period of guarantee, the guarantor shall make good all defects to the satisfaction of the
Engineer-in-charge calling upon him to rectify the defects failing which the work shall be got done by
the Department by some other contractor at the Guarantors cost and risk. The decision of the
Engineer-in-charge as to the cost payable by the Guarantor shall be final and binding.
That if the guarantor fails to make good all the defects, commits breach there under, then the guarantor
will indemnify the principal and his successor against all loss, damage, cost expense or otherwise
which may be incurred by him by reason of any default on the part of the GUARANTOR in
performance and observance of this supplementary agreement. As to the amount of loss and/or damage
and or cost incurred by the Government, the decision of the Engineer-in-charge will be final and
binding on both the parties.
IN WITNESS WHEREOF these presents have been executed by the obligator ....................... and
........................................ by ................................. for and on behalf of the President of India on the day,
month and year first above written.
1.
................................................
2.
...........................................
1.
...............................................
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
2.
..........................................
AE (P)/PVMD-2
EE/PVMD-2
65
GUARANTEE BOND TO BE EXECUTED BY THE CONTRACTOR FOR REMOVAL OF
DEFECTS AFTER COMPLETION IN RESPECT OF ALUMINIUM DOORS, WINDOWS
VENTILATOR WORK.
The agreement made this.................... day of ................. (Two Thousand
only).................................
between
..................................................
S/o
...............................................(hereinafter called the GUARANTOR of the one part) and the
PRESIDENT OF INDIA (hereinafter called the Government of the other part)
WHEREAS THIS agreement is supplementary to a contract (Hereinafter called the Contract) dated
.................................. and made between the GUARANTOR OF THE ONE PART AND the
Government of the other part, whereby the contractor inter alia, undertook to render the work in the
said contract recited structurally stable, workmanship, powder coating, anodizing, colouring and
sealing etc.
AND WHEREAS THE GUARANTOR agreed to give a guarantee to the affect that the said work will
remain structurally stable and guaranteed against faulty material and workmanship, defective
anodizing/ powder coating for five years from the date of completion of work.
NOW THE GUARANTOR hereby guarantee that work executed by him will remain structurally stable
and guaranteed against faulty material and workmanship, defective anodizing/ powder coating for five
years to be reckoned from the date after the expiry of maintenance period prescribed in the contract.
The decision of the Engineer-In-Charge with regard to nature and cause of defect shall be final.
During this period of guarantee, the guarantor shall make good all defects and in case of any defect to
satisfaction of Engineer-in-charge at his cost and shall commence the work for such rectification within
seven days from the date of issue of the notice from the Engineer-in-charge calling upon him to rectify
the defects failing which the work shall be got done by the Department by some other contractor at the
guarantors cost and risk. The decision of the Engineer-in-Charge as to the cost payable by the
Guarantor shall be final and binding.
That if the guarantor fails to make good all defects or commits breach there under, then the guarantor
will indemnify the principal and his successor against all loss, damage, cost expense or otherwise
which may be incurred by him by reason of any default on the part of the GUARANTOR in
performance and observance of this supplementary agreement. As to the amount of loss and/or damage
and or cost incurred by the Government, the decision of the Engineer-in-charge will be final and
binding on both the parties.
IN WITNESS WHEREOF these presents have been executed by the obligator
.......................................................and ................................................. by ........................................... for
and on behalf of the PRESIDENT OF INDIA on the day, month and year first above written.
....................................................
2.
............................................
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
66
LIST OF FIELD TESTS
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
67
List of FIELD TESTING EQUIPMENT AND INSTRUMENTS which shall be provided by the
contractor in field laboratories
[A]
[B]
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
68
Sl.
No.
DIVISION/
SUB-DIVISION
Item
Quantities
as per
agreement
Frequency as
per
specification
No. of
tests
required
R.A.
bill
No.
Up todate
quantity
No. of
tests
required
No. of
tests
actually
done
Remarks
10
Signature of Contractor
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
AE (P)/PVMD-2
EE/PVMD-2
69
LIST OF APPROVED MAKE
(Materials for Civil Works)
Specifications/brands names of materials (Refer material, whichever are applicable for the
scope of work) and finishes approved by the Engineer-in-Charge are listed below. However approved
equivalent materials and finishes of any other specialized firms may be used, in case it is established
that the brands specified below are not available in the market and subject to approval of the alternate
brand by the Engineer-in-Charge, (See also conditions of contract.)
Sl. No.
Materials
1. POLY-SULPHIDE/SILICON SEALENT
2.
3.
4.
5.
6.
7.
8.
WHITE CEMENT
REINFORCEMENT STEEL TMT 500-D
WATER PROOIFNG COMPOUND
BITUMEN
LOCKS/LATCH
WIRE MESH
9.
10.
11.
12.
13.
DASH FASTNERS
HYDRAULIC DOOR CLOSER/ FLOOR
SPRING
S.S. STAIRCASE RAILING
14.
15.
16.
17.
FLOAT GLASS
NUTS, BOLTS AND SCREWS, STEEL
EPDM GASKET
CEMENT (OPC)
18.
CERAMIC TILES
19.
VITRIFIED TILES
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
GRASS PAVER
WATER-PROOFING CEMENT PAINT
SYNTHETIC ENAMENL PAINT
PLASTIC EMULSION PAINT
VITREOUS CHINA SANITARYWARE
FIRECLAY SINKS & DRAIN BOARDS
STAINLESS STEEL SINKS
30.
31.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
Approved make
PIDILITE, TUFFSEAL, CHOKSEY CHEMICALS, FOS
ROC
SAIL, TATA, JINDAL, (For 75mm and Onward All Size),
CAPITAL, RANA( For All Sizes under 75mm)
J.K. WHITE, BIRLA WHITE,
SAIL, RINL(Rastriya Ispat Nigam Ltd.), TISCO
ACCOPROOF, IMPERMO, PIDILITE,CICO,FOSROC
INDIAN OIL, HINDUSTAN PETROLEUM
GODREJ, HARRISSON, PLAZA, GOLDEN, YALE
STERLING ENTERPISES, TRIMURTY WELDED MESH,
TIGER
CENTURY PLY, NOVOPAN, KITLAM, ECO BOARD,
PIDILITE, SIKA, THERMOSHIELD, DUNLOP,
VAMORGANIC
HILTI, FISCHER, BOSEH
HARDWYN, GODREJ, YALE
JINDAL STAINLESS STEEL LTD., ICICH INDUTRIES,
ESSAL
MODI FLOAT, SAINT GOBAIN, ASAHI,
KUNDAN, PRIYA, ATUL
HANU/ANAND/LESCUYER
ACC, ULTRATECH,J.P.REWA, VIKRAM, SHREE
CEMENT, BIRLA, JUTE AND CEMENT CORPORATION
OF INDIA,
JOHNSON, KAJARIA, BELL CERAMICS, NITCO
GRANITO, KAJARIA, JOHNSON (MARABONITE),
VARMORA, ASIAN, RAK, NAVEEN, BELL
UNISTONE,DOVETAX, ULTRA,DURACRETE
CICO, PIDILITE, UNITILE
NITCO, BHARAT REGENCY, HINDUSTAN, ULTRA,
DURACRETE, K.K.
UNISTONE, ULTRA, HINDUSTAN
ASIAN, SUPPER SNOWCEM,
BERGER, NEROLAC, ASIAN, SHALIMAR
ASIAN, BERGER, NAROLAC, ICI
PARRYWARE, HINDWARE, CERA, NYCER
PARRY, SUNFIRE
NILKANTH, NIRALI, COBRA, ALEX, JAYNA
JAGUAR(CONTINENTAL), KINGSTON(ELTA),
PARKO(ECO), MARC(ORIENTAL)
NEECO, HEPCO, SKF
AE (P)/PVMD-2
EE/PVMD-2
70
32.
33.
34.
35.
36.
37.
LA(CI) PIPES
G.I. PIPES
G.I. FITTINGS (MALLAEABLE CAST
IRON)
GUNMETAL VALVES
STONEWARE PIPE & GULLY TRAPES
R.C.C. PIPES-(NP-2)
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
BLOCK BOARD
56.
FLUSH DOOR
57.
58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.
69.
70.
71.
PVC DOORS
SFRC/PRECAST C.C. COVERS
PRECAST CC INTERLOCKING TILES
PVC WATER STORAGE TANK
KITCHEN LOFT TANK
PRECAST CC KERB STONE
WHITE CEMENT BASED PUTTY
DUCTILE IRON PIPE (WATER SUPPLY)
FACTORY MADE SECTION WINDOW
PVC CISTERN
M.S. DOOR FITTINGS
ALUMINIUM DOOR FITTINGS
UPVC Pipe & fittings (ISI Mark)
UPVC Pipe (Pressure resist = 6kg/Sq.cm) ISI
Mark
Unplasticised PVC Pipe (IS: 13592 Type-A)
Water Proofing Compound
38.
39.
72.
73.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
RIF, NEECO
TATA, JINDAL(HISSAR)
UNIK, ICS, AMCO, KS, NVR
LEADER, SANT, ZOLOTO
PERFECT, PARRY
LAKSHMI, SOOD & SOOD, JAIN & CO, DIWAN SPUN
PIPES
KIRLOSKAR, IVC, BURN
KIRLOSKAR
B.C., RIF, NEECO
SURREME, PRINCE, FINOLEX, PRAKASH
ZOLOTO, IBP, ARCO
SAINT GOBAIN, ASAHI INDIA
ATUL, MODIGUARD
FENESTA, REHAU, POLYWOOD
SFMC, SAFE, PIONEER INDUSTRIES,CAMSON
SAINT GOBAIN, ASHAI INDIA
SPECTRUM, SANDTEX, REVLONTEX
HINDALCO/JINDAL/NALCO
GODREJ/SHAKTI/NAVAIR
PRAYAG, POLYTUF
RAMA ROLLING SHUTTER, JYOTI ROLLING
SHUTTER, ANAND INDUSTRIES
AJAY FOLOWGUARD, ASHIRWAD FLOWGUARD
J K LAXMI, SRIRAM NIRMAN, TRIMURTI, ISI MARK
ONLY
CENTURY PLY BOARD, NATIONAL PLYWOOD,
KITPLY, JAYNA ISI MARK ONLY
CENTURY PLY BOARD, NATIONAL PLYWOOD,
KITPLY, JAYNA ISI MARK ONLY
FEBRICATED FROM UNSATURATED POLYSTER
RESIN I S. 6746 (Fibreways, Fibre Engineer)
FABRICATED FROM RAJSHREE, FINOLEX PLASTICS
KK MANHOLE, NITCO, DALAL
HINDUSTAN, DALAL, PAVER INDIA, K.K.
SINTEX, POLYCON, SHEETAL ISI MARK
SINTEX
DALAL, PAVER INDIA, K.K.
BIRLA, J.K., WALL PUTTY
ELECTRO STEEL, KESSO, KDUPL, ELECTRO SPUN
ISI MARK PRODUCT ONLY,
STEELBIRD, JINDAL,SEABIRD ISI MARK ONLY
ISI MARK ONLY
ISI MARK ONLY
Prince/Supreme/Prakash/Finolex
Prince/Supreme/Prakash/Finolex
Prince/Supreme/Prakash/Finolex
Tapecrete, CICO, Accoproof, Impremo, Reoplast
AE (P)/PVMD-2
EE/PVMD-2
71
SCHEDULE OF WORK
Name of work:- C/oUNESCOBuildingatChankayapuri,NewDelhi.(SH:Interiorfurnishing
andfurnitureofAuditorium.)
S.
DescriptionofItem
No.
AUDITORIUMCEILING
1 Providing and Fixing 15 mm thick densified tegular edged
eco friendly light weight calcium silicate false ceiling tiles
of approved texture spintone/ cosmos / Hexa or
equivalent of size 595 x 595 mm in true horizontal level,
suspended on inter locking metal grid of hot dipped
galvanised steel sections (galvanising @ 120 grams per
sqm including both side) consisting of main T runner
suitablyspacedatjointstogetrequiredlengthandofsize
24x38 mm made from 0.33 mm thick (minimum) sheet,
spaced 1200 mm centre to centre, and cross T of size
24x28 mm made out of 0.33 mm (Minimum) sheet, 1200
mm long spaced between main T at 600 mm centre to
centretoformagridof1200x600mmandsecondarycross
Toflength600mmandsize24x28mmmadeof0.33mm
thick(Minimum)sheettobeinterlockedatmiddleofthe
1200x 600 mm panel to from grid of size 600x600 mm,
resting on periphery walls partitions on a Perimeter wall
angle precoated steel of size(24x24X3000 mm made of
0.40mmthick(minimum)sheetwiththehelpofrawlplugs
at 450 mm centre to centre with 25 mm long dry wall
screws @ 230 mm interval and laying 15 mm thick
densified edges calicum silicate ceiling tiles of approved
texture (Spintone / Cosmos/hexa) in the grid, including,
cutting/ making opening for services like diffusers, grills,
light fittings, fixtures, smoke detectors etc., wherever
required. Main T runners to be suspended from ceiling
using G.I. slotted cleats of size 25x35x1.6 mm fixed to
ceilingwith12.5mmdiaand50mmlongdashfasteners,4
mmG.I.adjustablerodswithgalvanisedsteellevelclipsof
size85x30x0.8mm,spacedat1200mmcentretocentre
along main T, bottom exposed with 24 mm of all T
sectionsshallbeprepaintedwithpolysterbakedpaint,for
allheights,asperspecifications,drawingsandasdirected
byengineerincharge.
Note:Onlycalciumsilicatefalseceilingareawillbe
measuredfromwalltowall.Nodeductionshallbemade
forexposedframes/opening(cutouts)havingarealess
than0.30sqm.Thecalciumsilicateceilingtileshallhave
NRCvalueof0.50(Minimum),lightreflection>85%,non
combustibleasperB.S.476partIV,100%humidity
resistanceandalsohavingthermalconductivity<0.043
w/m0KC
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
Qty
Unit
Amount
Rate
25
sqm
AE (P)/PVMD-2
EE/PVMD-2
72
2
159
sqm
AUDITORIUMFILLING
BrickworkwithcommonburntclayF.P.S.(nonmodular)
bricksofclassdesignation7.5insuperstructureabove
plinthleveluptofloorVlevel
Cementmortar1:6(1cement:6coarsesand)
cum
HalfbrickmasonrywithcommonburntclayF.P.S.(non
modular)bricksofclassdesignation7.5insuperstructure
aboveplinthleveluptofloorVlevel.
Cementmortar1:4(1cement:4coarsesand)sqm665.80
Providingandfixingplainliningwithnecessaryscrews/nuts
&bolts/nails,includingacoatofapprovedprimeronone
face,andfixedonwooden/steelframework,completeas
perdirectionofEngineerincharge(Frameworkshallbe
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
60
sqm
AE (P)/PVMD-2
EE/PVMD-2
73
paidforseparately).
12mmthickcommercialplyconformingtoIS:1328BWR
type
Providing and fixing decorative high pressure laminated
sheet of plain/wood frain in gloss/matt/suede finish with
high density protective surface layer and reverse side of
adhesive bonding quality conforming to IS:2046 Type S
includingcostofadhesiveofapprovedquality.
1.0mmthick.
MISCELLANEOUS
10
11
Providingandapplyingtwocoatsoffireretardantpainton
cleaned wood / ply surface @ 3.5 sqm per litre per coat
including preparation of base surface as per
recommendations of manufacturer to make the surface
fireretardant.
25mmwoodenplanking,tonguedandgroovedinflooring,
includingfixingwithironscrewscompletewith:
Secondclassteakwood
SKIRTING
Skirting: Providing and fixing 2nd class teak wood plain
lining toughed and grooved, including wooden plugs
complete with necessary screws and priming coat on
unexposedsurface25mmthick.
Providingandfixingwoodenmouldedbeadingtodoorand
window frames with iron screws, plugs and priming coat
onunexposedsurfaceetc.complete.
11.1 50x20
11.2 50x12
12
13
PAINTING
Wall painting with premium acrylic emulsion paint of
interior grade, having VOC (Volatile Organic Compound)
content less than 50 grams/ litre of approved brand and
manufacture,includingapplyingadditionalcoatswherever
requiredtoachieveevenshadeandcolour.Twocoats
Melaminepolishingonwoodwork(oneormorecoat).
WALLTREATMENTSIDE/REARWALL
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
96
sqm
41
sqm
0.42
cum
35
sqm
35
sqm
13
sqm
12
Rmt.
12
Rmt.
160
sqm
55
sqm
AE (P)/PVMD-2
EE/PVMD-2
74
14
15
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
151
sqm
AE (P)/PVMD-2
EE/PVMD-2
75
16
17
CoreVariantsPinewoodE1Fibreboard
FireClass1&P
AcousticsNRCupto0.75
Climate(OCRH)50,70
Lightreflectance75%(beechhaya)
Green(RC%)25
Hygiene(VoC,Cleanroom)Low,Class1
Strength,Loadcapacity(Kg)BallImpact
Supply and installation of Anutone or equivalent Stretch
NRCwallfabricsystembyusingFRGradeNRCfabricofsize
1700mm width, shall be stretched by using wooden base
10mm thick, rigid vinyl Stretch Tracks half wrap/full wrap
15mm (FS15) and Midseam 15mm (FS15), strand board,
synth PF infill with requisite accessories & tools. Wooden
Woodenbase10mmisfirstinstalledonthewallalongthe
marking lines with metal fasteners inserted at 300mm
centers.FS15trackstobeinstalledonwoodenbase,after
applyingStickS7adhesiveonbothsurfacesforatrueand
continuous secure grip, and heavyduty fasteners at
150mm centers on one/both sides of Stretch Tracks.
Strand square edge magnesite bonded pinewood fiber
panels of size 600x1200x10mm having density 400kg/m3,
weight 4kg which is fixed to wall with suitable fasteners.
SynthPF10x10mmthickadheredonstrandpanelbyusing
Stick 7 adhesive. Fabric of width 1700mm is then aligned
totheStretchtracksbyfollowingthefabricthreadlineor
pattern.ThefabricisstretchedandtuckedintotheStretch
tracks and secure into the locking jaws so that it will be
smooth, free of wrinkles with the tucking tools. Note
minimum 50mm additional fabric is required for tucking
hence maximum module wall fabric width would be
1600mm.
CARPETLAYING
Providing and fixing of carpet .Made of 100% Nylon /
Polyamide Yarn used tufted cut pile on 1/10 gauge.
Velocity Injection millitron process with acoustic contract
latex backing. Total thickness 7.4mm surface pile height
4.1mm with total weight of carpet 2100g/m2 with
Antisoiling protection. Performance rating class 33 heavy
commercial use also suitable for castor wheel chairs and
stairswithcertification.Permanentlyantistaticwithcolour
fastness to light 67,with rubbing wet 5 ,rubbing dry 5
and water patterned 5.Safety & Environment CE
Labelling EN 14041 ,EC Certificate EN 14041, Fire
classifications
DK,MK
GODKENDELSED,DIBT
Zulassung,CAN,ULCS102.2,EN135011
EURO
CLASSAU,ASISO 9239.12003,Indoor Hygiene DIM
certificate,GreenlabelplustestapprovedInstallationwith
lowVOCAdhesive.Fullygluedonthefloor.
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
55
sqm
55
sqm
187
sqm
AE (P)/PVMD-2
EE/PVMD-2
76
18
19
20
Providing&fixingof2nos.staggeredlayers12mmmarine
ply of approved make like century,Duro, Green etc. fixed
tosalwoodframework(Paidseperately)at600mmcentre
to centre both ways. The framework to be supported on
150x150x5mm neoprene pads & held in position by
35x35x5mm angle cleats of 150mm length at 1800mm
centres. The framework to be filled with 25mm thermal
bonded polyster wadding micron fiber of 800gm/sqm
mikron fiber. The wadding shall be of Mikasha
International/vibrant/Dupoint. The cleats to be given two
ormorecoatsofredoxideprimer.
CYCLORAMA
CYCLORAMA P/f of the cyclorama for the stage by fixing
35x35x5mmMSangleonthewallwithMSangleholdfasts
securedtothewall&40mmdia14GMSpipeweldedtoit
asperthedrgs.Further40mmdiapopeweldedtoitat600
centresatonangleof45deg.&finallywelding40mmdia.
pipehorizontallytoit.Thepipetobesupportedawaywith
at 200mm centres by MS pipe. Further p/f 12mm dia MS
hooks welded to the both( top & bottom). Supported by
MSangleholdfastsof35x35x5mmonthewallat1200mm
centers. Finally fixing PVC cyce cloth as per approved
sample&fixingbycottondoor10mmthick.(8Mx6M)
CHAIRS
ProvidingandFixinginpositionofAuditoriumchairhaving
seat rest assembly is 1.5 thick marine plywood insitu
mouldedwithmouldedpolyurethanefoam&upholstered
withfireresistenttreatedfabric.SEATSIZE:45.0cm.(W)x
44.5cm(D)x12.0cm(T)@Frontedgeand8.0cm@Rear
edge.ThebackrestassemblymadeupofaM.S.fabricated
frame insitu moulded with polyurethane foam. The back
foam designed with contoured lumbar support for extra
comfort.BACKSIZE:46.5cm.(W)x62.5cm(D)x9.5cm(T)
Avg. The polyurethane foam for Seat and Back moulded
withdensity=45+/2kgs/cum.andHardness=20+/2on
Hampdenmachineat25%compression.Thearmrestmade
upofIntegralPolyurethaneFoamandreinforcedwithM.S.
insert. The armrest in two options with & without Cup
holder. The sliding mechanisms fabricated from M.S.
sheets forming linkages providing a synchronous motion
fortheseat&back.Theslidingstrokefortheseat100mm.
Themechanismhousingtheseat&back.Thechairresting
onthegroundontwosidepanelsframesmadeof2.5mm
thick.CRsteel.EachSidePanelfittedwithtwoupholstered
ParticleBoardof9mmthick.Thesidepanelframegrouted
tothefloorusingfoundationexpansionboltsthroughbase
plate.Allsteelcomponentstobeepoxypolyesterpowder
coated. Recommended makes GODREJ, WIPRO or
equivalent.
BLINDS
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
35
sqm
48
sqm
120
Each
AE (P)/PVMD-2
EE/PVMD-2
77
21
22
Addition: NIL
Correction: NIL
Overwriting: NIL Deletion: NIL
21
Rmt
80
sqm
AE (P)/PVMD-2
EE/PVMD-2