0% found this document useful (0 votes)
42 views1 page

Certificate of Practical Completion: Project: Date: Design

This certificate of practical completion certifies that the work on a construction project has been completed according to contract terms. It establishes the date of practical completion and notes that a checklist of corrective work items has been inspected and approved. Representatives from the owner, contractor, consultant, and hotel management have all accepted and agreed to the terms in this certificate.

Uploaded by

Michael Thung
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views1 page

Certificate of Practical Completion: Project: Date: Design

This certificate of practical completion certifies that the work on a construction project has been completed according to contract terms. It establishes the date of practical completion and notes that a checklist of corrective work items has been inspected and approved. Representatives from the owner, contractor, consultant, and hotel management have all accepted and agreed to the terms in this certificate.

Uploaded by

Michael Thung
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

design

Date

CERTIFICATE OF
PRACTICAL COMPLETION
Project
:

The work performed under this contract has been reviewed and found to be practically
completed including all corrective work during the defect liability period.
The date of practically completion is to day, ..
The designated area or scope of work is for entire jobs that mentioned in contract agreement.
Most of items to be completed or corrected prepared by the Supervisor and Hotel Operator as
in attachment and has been inspected and approved by Supervisor and Hotel Operator.
Remarks:
See attached corrective work list (Checklist) that has been signed by Hotel Operator,
Supervisor and Contractor.
Reference document:
. project contract document that have been signed
on , 2002, inclusive all drawings, specification and Consultants instructions.
The Certificate of Practical Completion is agreed and accepted by:
Owner,

Contractor,
.

( )

( .. )

Consultant,
C DESIGN

( .. )

Management Hotel,