Site Test Reports: SL No Equipments Test Equipments Type of Test (Installation) Type of Test (Commissioning) Remarks

The document summarizes site test reports for various electrical equipment including a switchboard, cables, transformer, and capacitor bank. It lists the types of tests to be conducted during installation and commissioning phases. For the switchboard, tests include breaker operation checks, insulation resistance testing, current and voltage ratio testing of instruments, and relay protection scheme verification. Cable tests involve insulation resistance measurement before and after laying. Transformer tests comprise ratio testing and phase checks. The capacitor bank will have insulation resistance tests conducted as well.

Uploaded by

Katik Xalxo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
145 views2 pages

Site Test Reports: SL No Equipments Test Equipments Type of Test (Installation) Type of Test (Commissioning) Remarks

The document summarizes site test reports for various electrical equipment including a switchboard, cables, transformer, and capacitor bank. It lists the types of tests to be conducted during installation and commissioning phases. For the switchboard, tests include breaker operation checks, insulation resistance testing, current and voltage ratio testing of instruments, and relay protection scheme verification. Cable tests involve insulation resistance measurement before and after laying. Transformer tests comprise ratio testing and phase checks. The capacitor bank will have insulation resistance tests conducted as well.

Uploaded by

Katik Xalxo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Site test Reports

Sl
No
1

Equipments
Switchboard
(HT)

Test
equipments
Bus bar
Breaker

CT

PT

LA
Ammeter
Voltmeter
Relay

Type of test
(Installation)

1. Breaker racking (IN/OUT)


2. Vacuum check
3. Operation
3.1.
Normal closing/ Tripping
3.2.
Emergency Tripping
3.3.
Anti-pumping
3.4.
Local/Remote operation
Visual inspection
Terminal cover

Type of test
(Commissioning)

Remarks

IR
Hipot
IR
Contact Resistance Test
Timer/ Timing test
Coil resistance measurement
Hipot
Scheme (ON/OFF/TRIP/LED/ ANNUINCIATOR)
IR
Polarity test
Secondary winding Resistance
Current ratio test (Relay/ MFM/ Ammeter)
Knee point Voltage test
IR
Polarity test
Secondary winding Resistance
Voltage ratio test (Relay/ MFM/ Ammeter)
Knee point Voltage test

General

IR

Panel/ Fdr wise

Calibration test/ Current ratio test


Selector switch check
Calibration test/ Voltage ratio test
Selector switch check
1. Measured value test
1.1.
Current
1.2.
Voltage
2. Synchronization check
3. O/C, E/F protection
4. Breaker failure protection
5. U/V protection
6. Relay checklist (BI/BO/LED/Trip/ Final

Panel/ Fdr wise

Panel/ Fdr wise

Primary current
injection to be done.

Cables

MFM
HT Cable

1. IR ( Before & after laying)

LT Cable

1. IR ( Before & after laying)

Control cable 1. Core identification.


2. Core continuity.

Transformer

Capacitor
bank

setting)
7. Other any
Ratio test
1. Phase sequence/ Continuity
2. IR ( Before & after Hipot)
3. Hi-pot
2. IR ( Before & after Connection)
3. Phase sequence/ Continuity
3. Core identification.
4. Core continuity.

You might also like