0% found this document useful (0 votes)
36 views2 pages

CS9269 Software Project Management Nov

This document contains the question paper for the CS9269 Software Project Management exam given in November/December 2012 by Anna University for their M.E. Computer Science and Engineering program. The paper contains two parts: Part A consists of 10 short answer questions; Part B contains 5 longer answer questions requiring explanations and diagrams related to software project models, CMM models, quality processes, milestones, deliverables, and the design phase for an ATM system.

Uploaded by

Nivitha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views2 pages

CS9269 Software Project Management Nov

This document contains the question paper for the CS9269 Software Project Management exam given in November/December 2012 by Anna University for their M.E. Computer Science and Engineering program. The paper contains two parts: Part A consists of 10 short answer questions; Part B contains 5 longer answer questions requiring explanations and diagrams related to software project models, CMM models, quality processes, milestones, deliverables, and the design phase for an ATM system.

Uploaded by

Nivitha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

CS9269 Software Project management Nov/Dec 2012

CS9269 Software Project management Nov/Dec 2012


Question paper | Anna University M.E Computer Science
and Engineering | Regulation 2009
M.E./M.Tech. DEGREE EXAMINATION, NOVEMBER/DECEMBER 2012
Elective
Computer Science and Engineering
CS 9269/241088/8241088/CS 969-SOFTWARE PROJECT MANAGEMENT
(Common to M.Tech Information Technology)
Regulation 2009

Time: Three hours

Maximum:100 marks
Answer ALL the Questions
PART A-(10 2 = 20 marks)

1. List out all software models


2. Define Umbrella activities in project.
3. In what way software standards differ from other product standards.
4. What are ISO Series of Standards?
5. How to identify Risk?
6. How to measure software?
7. How to monitor project?
8. What is project Initiation?
9. How to gather requirement?
10. What is Deployment?

PART B-(5 16 = 80 marks)


11. (a) For engineering counseling system, which model would you choose? Explain the model with neat
diagram and justify why you have chosen this model? (16)
Or
(b) In what way Spiral model is advantages over the RAD model. Explain with neat diagram. (16)

12. (a) Bring out the importance of CMM model and their relevance to project management. (16)
Or
(b) Distinguished between CMM and People CMM. (16)

13. (a) (i) When to initial Quality process in project? Explain. (8)
(ii) Discuss about software Quality Assurance in project. (8)
Or
(b) What is Configuration Management? Bring out the importance of Configuration management. (16)

14. (a)(i) Distinguish between Milestone and Deliverable. (8)


(ii) How milestones help in Tracking the project. (8)
Or
(b) Bring out the importance of project database.

15. (a) What are the different phases in project development? Explain design phase with its
decomposition for ATM system. (16)
Or
(b) In what way geographical Distribution issues affect project development in real time situation(16)

You might also like